Shift Wise Conformation

HI,
      Can any through light on Shift wise confirmation. IF u have any program or enhancement please do favorable.
Thanks in advance
Regards
NSR

Dear,
Please follow below link:
http://help.sap.com/erp2005_ehp_03/helpdata/en/46/f2a5ce3cd767f9e10000000a1553f7/content.htm
Which help you in shiftwise confirmations including customization.
Regards,
R.Brahmankar

Similar Messages

  • Report on power generation from each plant and shift wise(PP report)

    Hi,
    i got one  Functional spec on pp module. this FS main object is calculate the daily smelter performance.
    Based on this FS  I will make a report on POWER GENERATION FROM EACH PLANT AND  SHIFT WISE.
    so please can  anyone of you  advice to me  , is  there any standard extractors  and standard cubes or ods are there for make this report.
    Regads,
    Suresh.

    Hi,
    here i mentioned tables,fields and logic according to Fspec.
    S.no          Report Field                                      SAP Table-field                                        Logic
       1               Shift                                              AFRU - KAPTPROG                                                                       
        2              Unit                                                MKPF-VERID                                      Pass MATNR and VERID to AFPO and fetch AUFNR for all VERID and pass AUFNR to AFRU and fetch KAPTPROG and GMNGA for that particular BUDAT
      3.            Total Generation                                    -                                         ADD all the unit GMNGA for Individual KAPTPROG
      4.           Total Auxiliary Consumption                   -                                          Pass MATNR and AUFNR to MSEG and fetch the MBLNR and MJAHR. Check MSEG - MBLNR and MSEG u2013 MJAHR = MKPF - MBLNR and MKPF u2013 MJAHR
    and fetch BUDAT for that particular date and pass it those MBLNR and MJAHR to MSEG and check for movement type 201 and fetch MENGE.
    5.            Export to GRIDCO                               -                                            Pass MATNR and AUFNR to MSEG and fetch the MBLNR and MJAHR. Check MSEG - MBLNR and MSEG u2013 MJAHR = MKPF - MBLNR and MKPF u2013 MJAHR
    and fetch BUDAT for that particular date and pass it those MBLNR and MJAHR to MSEG and check for movement type 261 and check for Field SHKZG if H fetch MENGE.
    6.          Import to GRIDCO                               -                                                Pass MATNR and AUFNR to MSEG and fetch the MBLNR and MJAHR. Check MSEG - MBLNR and MSEG u2013 MJAHR = MKPF - MBLNR and MKPF u2013 MJAHR
    and fetch BUDAT for that particular date and pass it those MBLNR and MJAHR to MSEG and check for movement type 101 and check for Field EBELN and fetch the MENGE.
    7.        Smelter Consumption                                -                                            Pass MATNR and AUFNR to MSEG and fetch the MBLNR and MJAHR. Check MSEG - MBLNR and MSEG u2013 MJAHR = MKPF - MBLNR and MKPF u2013 MJAHR
    and fetch BUDAT for that particular date and pass it those MBLNR and MJAHR to MSEG and check for movement type 201 and check for Field WERKS 1400 and display  MENGE.
    8.       Net Export / Import (MW)                                   -                                      Difference between Export to GRIDCO and Import to GRIDCO
    Based on these information ,can please anyone advice to me, is there any standard extractors ,cubes and ods for make this report.
    Thanks,
    Suresh.

  • Report to show shift wise activities for particular product

    Hi, Is there any report exists to show shift wise activities carried on particular product, basically time taken,man/machine utilization,in-process rejection,machine break down etc.? how to generate the same.

    Dear Yadav,
    This report is something called as workcenter's performance report or as plant performance report.
    In standard SAP again CO28 or COOIS or MCP7 or MCPH can be used.
    But still in your case only a customized report can fulfill your requirement.
    check and revert back.
    Regards
    Mangalraj.S

  • Shift wise confirmation and shift wise production report

    Hi Guys
    To get shift wise production confirmation and reports,  I have maintained the following setting ,
    1-     maintained shift sequence and with shift grouping,
    2-     assigned the shift grouping to work centers,
    other theses settings, what other setting to be done for  shift wise confirmations and also production reports,
    thanks in advance,
    mohan.m

    Hi Mohan,
    We had similar requirement for our manufacturing plant.
    We have done Z-Development for
    1) Shiftwise - Linewise Production
    2) Shiftwise - Beltwise Packing
    1) for that we have define new control key
    2) That key assigned to master recipe.
    (Why new control key ?
    New control key is defined specifically to generate this report. Because Auto GR is done only at the end of packing and not at the end of shift. But we want report for each shift. That's why after each shift end proposonatly that much qty is confirmed by new control key. However actual Goods receipt is only happened while completing total manufacutring or packing)
    3) That control kept as base of Z-development.
    4) As far as shift timings are concerned, we have taken actual shift timings of our manufacturing plant.
    Hope this will help to resolve your problem.

  • Shift wise production report

    hi Exprts,
    Process:
    I shift starts at 6.00 am and ends at 14.00 hrs
    II shift starts at 14.00 hrs and ends at 22.00 hrs
    III shift starts at 22.00 hrs and ends at 6.00 am (next day)
    3.We confirm the qty in the t.code CO11N
    The requirement is : How to take the Shift wise production report? , and also a report which shows consumption of components against production order in a shift.
    Regards
    Ramesh

    Dear Ramesh,
    check this link to first post the confirmation shiftwise ,both in CO11N and CO15.
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/c0fa9a04-376a-2c10-c396-86d32ac80614?quicklink=index&overridelayout=true
    Further to this you can get the shift wise production report using COOIS.
    Regards
    S Mangalraj

  • Daily Shift wise Report, Dash board reports

    Dear all
    With refering to the present project in 4.7 version  the customer requirement is below.
    1. Shift wise maintenance report - Here they  are presently maintaining Section, shift, Date, From time, To time , Job descriptions, attenede by remarks.
    In another coloum in same sheet they needs
    From time, To time , Delay descriptions, attenede by remarks.
    Then thirs is communication for next shift- there they are writing the texts which they are saying to next shift guys.
    2. Another what they wants is regularly top managers wants to see the maintenance details ( prev order, down time, consumption cost etc ) in their system dash board(screen) . they are not willing to go sap. How to do this thro .Net or workflow . This is report should be fulfiiled by us.
    3 Shutdown Planning report- here they are maintaining the date wise job hours in graphical form. How we can activate this
    I request you please have some idea about this.

    Dear Nandip/Iftikar,
    Dear thanks 4 ur answers. I have asked the same with our abapers , but they are new and not able to help. i have well tried with notification customer table addition in spro. but its not helping as required.
    The thing is i cant prepare the specs for this report. Example for shift we can create Z table. But Processing job description, Action taken, delay reasons how i can prepare the specs.
    I request you to share your Program or specs please then its better for us. please send at thennarasu_kandasami@ welspun.com
    Edited by: thenna arasu on Jun 2, 2008 2:12 PM

  • DEPRECIATION RUN SHIFT WISE

    1. CLIENT WANTS DEPRECIATION ON SHIFT BASIS
    FOR MACHINE A DEPRECIATION IS 10 %
    IF SUPPOSE MACHINE A RUNS FOR 3 SHIFTS FOR 10 DAYS IN A POSTING PERIOD
                                                               2 SHIFTS FOR NEXT 5 DAYS AND
                                                               1 SHIFT FOR NEXT 15 DAYS
    HOW TO DEFINE DEPRECIATION TO THE PARTICULAR ASSET.  NOTE THAT THE SHIFT AND DAYS ARE NOT UNIFORM BETWEEN PERIODS

    Hi,
    For calculation of depreciation run shift wise , there are two things has to be maintain in asset master.
    1. Shift factor for the asset
    2. Variable proportion (this field u will able to find it in dep areas.)
    Variable proportion is calculated out of the system.
    Variable proportion will be calculated as follows :
    (Difference between two dep rates as per shift wise X100)/ lower dep rate.
    please reward points if useful

  • Shift wise process order confirmation

    Hi Guru's
    My client is asking about shift wise confirmation of process order.
    wht r the step will I follow to maintian the desire requirement.
    Please explain with example upto order confirmation, wht r the field to be check & wht should be the input I give the field.
    If any body sent me the doc related to the problem
    I'll be thankful to him.
    My ID:- [email protected]
    Parminder

    Parminder,
    Basically your shift definition is for capacity planning/scheduling in the desired way
    Create a process order ,Hope you would have also maintained your recipe with timings
    "<b>wheer the impact will be come of this configuration.either Process order creation or order confirmation</b> "
    The proces order will be scheduled(<b>at the time of order creation</b>) as per the timings mentioned in the recipe & the shift definition in the resource
    Then you do phase wise confirmation-Time ticket/Time event
    As per your reply what i understand is that in 3 shifts your process order will get over
    So your shift supervisor will confirm accordingly
    Hope this is useful
    Revert back if you have any further queries
    Reward points if useful
    Regards,
    SVP
    Message was edited by:
            SVP

  • How To calculate Total Number of Employee in shift wise

    Dear Gurus,
    my requirement is calculate the  total no.of employees  present & absent in shift wise.
    My output like this.
    Department                        Shift       Present           Absent
    Information Technology        GSFT       56                   24
    Engine Shop                       ASFT     124                   26
                                             BSFT      155                   45
                                                                                    CSFT       80                     20
    Thanks,
    Rajkumar.A

    Hi,
    You can make a custom report for this.
    If you want to know generally there is a head count report available in OM

  • How to calclulate Total no.of employees in shift wise

    Dear Friends,
    How to calclulate Total no.of employees in shift wise,
    when im giving two input dates,the should be total no.of employees in shift wise.
    please give solution for me,
    Thanks,
    Mathan.

    Dear Mathankumar,
    If you are using LDB then based on date it will pick all employee.
    you mention the Infotype 0007(this will store shift Details) so that it will pick this infotype record.
    After that you can play with the records.
    Like using collect statement based on shift
    Regards,
    Chandrashekhar

  • Shift wise production reports

    Hi Friends
    I am able to do shiftwise production confirmation.
    Shiftwise production confirmation is possible as of SAP ERP 6.0 Enhancement Package 3. But i want shift wise production reports. Is there any standard reports?
    Please suggest
    Tara

    Dear Tara,
    You can get the shift details in the report COOIS.
    Select the profile confirmation in the input screen and execute the report.
    Click on Change layout and select the field for shift definition and you will be able to get the shift details.
    check and revert back.
    Regards
    Mangalraj.S
    Edited by: Mangalraj.S on Sep 30, 2009 10:57 AM

  • Shift wise planning and scheduling

    Dear All,
    Here we have a scenario in which we have to do shift wise planning and scheduling.
    The shift is not fixed.
    It can be 1 shift on particular day and it might be 2 shifts another day. They will plan for this many hours per day for future.
    The scheduling should be done for this many hours which inturn is as many shifts. The working hours per day is not fixed as well. It totally depends on the requirement. So the planning and scheduling should happen based on hour basis and will be different for each day. I need your inputs for mapping this scenario.

    Balaji,
    You have not given any meaningful requirements, therefore it is impossible for me to make suggestions.  What you have said so far implies total randomness.  If all the events are random, there is no planning, only tracking.
    Exactly what do you mean when you say 'planning'?  Material planning in ERP does not consider shift sequences/timings/schedules.  Capacity planning, where work schedules are managed, does consider shift type data, but only takes place only after the orders have been established.
    Scheduling is done based on Work Centers.  A work center can represent one or more machines, one or more people, or a combination of the two.  Work centers can have shifts.  The number of shifts can vary over time.  The shifts can have various working schedules.  The shift working schedules can vary over time.
    I suggest that you describe a single specific scenario you would like to discuss.  Perhaps then the forum can offer some suggestions.
    Best Regards,
    DB49

  • Shift wise WSR in a Negative TM system

    Hi all,
           We have to maintain IT0007, (Planned working time) of an employee for Payroll purposes. But in a negative TM system what is the benefit of maintaining different work schedule rules for different employees based on shift system.
                  Actually my problem is client is not able to give me a monthly shift wise work schedule rule, they say that it is decided manually and there are a number of alterations and modifications in that....so they can't give it in a concrete manner.
    Please clarify my doubt and suggest me how data should be taken and in which form it should be inserted in system.
    Regards,
    Tomesh

    Tomesh
    Option 1
    You may explore if shift substitutions on a day by day basis through time managers workplace can be used for these employees.
    Option 2
    Alternatively, if rostering is performed on another non SAP system, you may need to have these rosters interfaced into SAP for upload into substitutions infotype (IT2003)
    If Option 2 is pursued, you will need to set up "dummy" work schedules for these employees.
    Thanks,
    Gregg

  • Shift wise activity plan

    Hi
    Can any body tell me how to do necking in PS like Primivera scheduling.
    i mean activity is completed in two or more shifts and in this shift some other activity is proferming.
    i want to plan shifts wise activities.
    please can any body guide me 
    thanks

    Can you elaborate the solution. because in factory calander working time is not mentioned.
    for example I have two activities which have 24 hours. one is completed in two days because the working hour is 8 am to 6 pm. And other is completed in one days because its working time is 24hours.
    how to cater this.

  • Shift wise production booking report

    Hi experts,
    Is there any way to get the shift wise production report?
    Through MB51 & with mvt 131 /101 , we get all the production booking for a period but user required this information on shift basis.
    If any body had done some Z development, kindly communicate
    Maruti

    Dear Maruti,
    I you are working in ECC 6.0,you can use enhancement package 3 and do the confirmation in shift basis and also get the shift
    details in the COOIS report.
    Check the article,
    http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/c0fa9a04-376a-2c10-c396-86d32ac80614
    Regards
    Mangalraj.S