Shipment cost - Formla in Scales

hii all ,
i have a condition record with weight scale and i assigned  minimum amount to the scale .
the condition record have only 1 access by SA, AIR_LINE .
i want to the minimum amount to be activated only if the shipment contains dangering goods  (
and NOT by adding another access ) .
is it possible to set it with a scale formula ?
if not, how can it be ?
BR
ASA
Edited by: ASA MOKED on May 20, 2009 11:04 PM

Hi Asa,
If you do not intend to use another access sequence , then you can control through requirement routine in pricing procedure of shipment costs.
Hope it helps.
With regards,
Mrinal

Similar Messages

  • Shipment cost problem

    Hi sap Gurus,
    i defined scales for shipment costs (VS01) :
    1) scale basis L4 (transportation zone of departure point)
    2) scale basis L5 (transportation zone of destination point)
    3) scale basis D (gross weight)
    Then i defined a condition TYPE "ZB02" that has tridimensional scales (1-2-3) and i insert it in pricing procedure SDFC00 after FB00.
    I defined a condition record, but when i do shipment cost the condition record is found by the system (in pricing procedure i see it) but it's red.
    ---> the system calculates only condition TYPE ZB01 that has bidimensional scales (gross weight & distances).
    I think that the problem is that the system don't found the right value of transportation zone of departure & destination.
    But i checked that transportation zone was defined for customer (ship to party) & for shipping point..
    any solution?
    thanks a lot
    Alba

    Dear Alba,
    This is due to not maintaining the condition record for that "ZB02" shipment cost condition type in TK11 transaction.
    After assigning the scales to ZB02 you maintain the condition record for that condition type in TK11 transaction.
    Before going to maintain the conditionrecord you make sure that you maintained access sequence to that condition type.
    As per my advaice you no need to maintain scale basis for transaportation zones.
    You can consider these scale basis
    Gross weight
    Net weight
    Volume
    Distance
    Number of different means of transportation
    Time (travel time or wait time)
    Tariff zone (destination)
    Destination region
    If you want to maintain cost Transportation zone wise you can keep these fields in the condition table based on that you can create condition record.
    For more clearence please go through this SAP help link it will help you about Shipment cost scales and condition record maintenance.
    http://help.sap.com/saphelp_47x200/helpdata/en/28/53584348be11d385ed0000e81ddea0/frameset.htm
    I hope this will help you,
    Regards,
    Murali.
    Edited by: Murali Mohan.Tallapaneni on Oct 24, 2008 11:34 AM

  • How to create new scale basis for shipment costs without modification?

    Hi,
    at the moment I am trying to create a new scale basis for shipment costs.
    It is not a problem to create a new scale basis in table view V_TVFRFQ. The creation of an Append structure in the communication structure KOMK is easy, too.
    The problem is the following:
    When creating a scale for a scale basis with transaction VS01, the system picks some screens out of function group V57S. For my new scale basis there is of course no screen in this standard function group.
    So my question:
    How to create/generate a screen to create scales for my new scale basis without a modification of function group V57S?
    To me it makes no sense that SAP offers a possibility to create customer owned scale bases but then gives the customer no possibility to create an input screen for that scale basis without modification. Therefore I think it should be possible to generate such a screen in some way.
    If you have some idea, let me know.
    Thanks!
    Christian

    Hi Christian,
    We are currently facing exactly the same problem you described in your message in January 2009.  I see that you have marked this as "answered", and was wondering if you would mind explaining how you overcame this issue?
    Any assistance would be hugely appreciated.
    Many thanks,
    Kaushik

  • Shipment cost -  pricing scales

    helo to all ,
    i have a requirement to add a scale to an existing conation record .
    1. is it possible and what are the effects by changing the condition type from wight/volume to
        scale ( multi-dimm ) ?
    2. the condition record calculates the qty in the delivery * Z009 ( condition - that was insert in TK12)
        i need to add scale to this condition in order to maintain a minimum value :
    example :
    delivery qty = 6 KG
    Z009 = 4 $
    MIN amount in scale = 30 $
    qty*Z009 = 24   < 30   ---> then the condition value is 30 $ .
    HOW can i define this scale ? ( its not volume or wight )
    can i do it in another way that not involves scales ??
    BR
    ASA
    Edited by: ASA MOKED on May 18, 2009 5:42 PM
    Edited by: ASA MOKED on May 18, 2009 5:43 PM

    Hi,
    Please go through the link below for more details on shipment cost - pricing scales.
    http://help.sap.com/saphelp_45b/helpdata/en/35/b0e8f087a62488e10000009b38f9b7/frameset.htm

  • Shipment cost - Change definition of condition types

    Change definition of condition types in work pricing procedure
    hey all ,
    we implemented the shipment cost module and now we have to make some changes
    in working condition types because the requirements of the customer changed .
    is it recomended and what are the effects of changing the definition of condition types
    and by that changing working pricing procedures .
    for example if i change condition type from D - wight, V - Volume F - Formula to   T scale
    ( and makeing the properchanges in the scale )  or add some more condition the existing pricing
    procedures ?
    BR
    ASA
    Edited by: ASA MOKED on May 22, 2009 3:33 PM

    hey and thanks for the reply ,
    did you make changes in the definition of existing condition types ?
    for example change condition calc.type from d-weight to t-scale ?
    BR
    ASA .

  • Shipment Cost: Group Condition Type calculated on a special weight...

    Here is the scenario: A shipment (truck) combines multiple deliveries, grouped on a stage when same destination (happens often).
    A condition per LB is to be calculated on the cumulated weight per destination (per stage) BUT not simply on the gross weight, but on the heavier of 2 special weights: the business here uses a special formula according to the packaging, and it gives 2 weights (stored in Z fields of LIKP), an actual weight and a cubic weight.
    The purpose is to identify for each delivery the heavier weight and to use cumulated the weight across the deliveries to the same destination to calculate the per CWT cost.
    This is my first issue: the condition type is defined at Delivery calculation base, Calculation Type Multi-dimensional, and as a group condition). How do I define to use the cumulated of each delivery heavier weight ? In the Scale for condition type view, I used the scale basis D Gross Weight (which is not right..), there is also a field for a Scale Base Value formula, I wondered if that is what I should use..
    My 2d issue: once the cost is calculated, I have to re-distribute it on the deliveries as per the proportion of their heavier weight compared to the total weight used for the calculation…Should that be an alternate Condition Base Value formula in the pricing procedure (where xkwert would be….the heavier weight….would that be then a new Z field to be filled in by the user exit determing the heavier value) ??
    Thanks a lot, it is a tough one, I know...who is the best ever shipment cost pricing consultant ? !

    Hi Guys
    Unfortunately I do not think that you will get an answer now. Either your question is not simple or we do not know.
    So in the interest of keeping the Forum tidy and easier to surf through could you please close your thread and either try one of the other forums or try another post. I do not think that most people will bother to look this far back anymore.
    Sorry I cannot help as I would if I could.
    Regards
    Frenchy.

  • FM to create & update Shipment Cost Condition Records (TK11/12)

    Hi All,
       I am looking for a FM which can update Price and Validity dates in existing Shipment Cost condition records and also able to create a new shipment cost condition record.
    I have tried using BAPI_PRICES_CONDITIONS. It returns a success message but no change in shipment cost condtion record
    I have tried giving OPERATION = 009 to create new record and OPERATION = 004 to update existing one. But of no use.
    Can i use any of the RV_CONDITION_* function modules
    RV_CONDITION_MAINTENANCE
    RV_CONDITION_COPY
    If yes then what are the mandatory parameters I have to pass in.
    Or else creating a BDC program for TK11/12 is the option.
    Appreciate a quick and positive response.
    Regards,
    Leona.

    Hi,
       I have used the BAPI 'BAPI_PRICES_CONDITIONS' . In my requirement there was no need to update the scale.
    Hope the below links will help you in solving your issue.
    BAPI for VK11,VK12,MEK1,MEK2
    http://www.sapnet.ru/viewtopic.php?p=765&sid=88b6f60f85501678fc93cd16e187ad61
    Regards,
    Leona

  • Shipment cost pricing report - Scaled

    Hi,
    We created multi dimentional scales for shipment costing. May i know if there are SAP standard reports (like V/LD for pricing) that we can use to view the data along with scales?
    Thanks
    Venkat

    Dear SAP USER
    Check T_LD And T_LA

  • Shipment cost is zero

    Hi friends,
    I have confogured Transportation module for my cliet and while i am trying to calculate Shiment cost, the Pop  up  screen saying Net value is 0.
    Where did i made mistake? Please help me in this with your suggestions.

    Hi,
    Please clarify the scenario in detail so that i can help u to resolve the issue, say for example u want to calcuate the shipment cost based on weight or distance both scenario will have different implication  in master data.
    Prerequisites:
    1. Material master data ( Unit of measure & sales unit)
    2. Transportation condition records ( t-code TK11)
    3. Vendor Master records (in control tab specify the service agent procedure group)
    4. check the condition types whether correct calculation type was maintained r not & must match with unit of measure in        material master.
    5. Dont maintain the scales for condition types mentioned in Transportation pricing procedure.
    6. check the transportation pricing procedure.
    Initially check all this requisites & get back to me if still same error pops up ( please provide me the detail information for resolving the issue)
    i have resolved the same  issue.
    Regards,
    Rayudu

  • Shipment cost - fixed prices

    Hello SAP experts,
    I have created a new condition type to calculate shipment costs for which:
    - calculation type = quantity
    - scale basis = quantity
    I know there is a way to enter the prices per quantity unit (e.g. PC), like this:
    - if quantity = 1 PC , price is A per PC
    - if quantity = 2 PC, price is B per PC ==> total price for 2 PC will be 2*B
    - if quantity = 3 PC, price is C per PC ==> total price for 3 PC will be 3*B
    I would like to be able to enter fixed prices, depending on the calculated quantity:
    - if quantity = 1, price is X
    - if quantity = 2, price is Y
    - if quantity = 3, price is Z
    Does anyone know if and how you can enter the prices this way?
    Thanks a lot for any recommendations or help!
    Kind Regards,
    Alexander

    Used Multi-dimensional condition with scale.

  • Shipment cost & shipping type

    Hi all,
    i have some question about routes & stages.
    1) in one routes with two stages: these stages can be different for shipping type? (for instance: 1) by ship 2) by road
    2) when i calculate shipment cost: (a condition record with scales in function of tariff zone of departure and tariff zone of destination)----->
    why the costs are only calculated by the system for 2nd stage e not for 1st stage.????
    if i configure 1st stage (by road as the 2nd stage) the system calculates cost for 1some  st and 2nd stage... (and it's right)!!!
    Any solutions??
    best regards
    Alba

    Hi,
    Dear Imran,
    You have posted this question twice and there is no such condition
    You have to maintain scale and if need to develop routine and that I already suggested to you.
    Kindly do not post 1 question many time
    Kapil

  • Wrongly Price Picking in Shipment Cost

    Hi Guru’s,
    I am maintaining the condition records for freight cost in Tk11, choose the condition type I have configured for freight and maintain those records for freight basis the truck type and the transporter rate is scale wise. Example- 100km – 3/- & 200km-4/-
    I am creating the shipment in VT01N & selected the two delivers & Route, Route Km is 100. I have created the shipment cost in VI01, system picking the KM is 100 but price picking 4/- instead of 3/-.
    Can anybody give the advice? Why it is pickup wrong price? Is any setting or configuration required?
    Useful answers duly rewarded
    Regards,
    Devendra

    Hi,
    Thanks for reply,
    I have maintained the Scale type in “To scale" but same problem is there.  My client is requirement the fright calculation – KM x Rate x MT(Qty) & rate is scale basis.  I have maintained the condition type as below
    Scale
    Scale basis – R – (Distance)
    Check value -   (None)
    Scale type    -  (To-scale)
    After maintained the condition, I am creating the shipment cost & go to condition. I have checked the header conditions details; system doubles the KM in Scale base val. 200 km instead of 100 km.
    Pl. give the advice
    Regards,
    Devendra
    Pl. help
    Edited by: Devendra on Mar 11, 2008 11:36 AM
    Edited by: Devendra on Mar 17, 2008 6:44 AM

  • Shipment Cost Condition Type

    Dear Gurus,
    Is there any standard system condition type in the shipment cost who calculate the cost in the below behavior.
    If product weight is in b/w 1 to 10 tons cost is $10,000.
    and if weight is more than 10 tons lets say 11tons system calculate the value per ton. (10,000/10 ton = $ 1,000/ton * 11 tons = $11,000).
    Please advise.
    Looking forward for the response.
    Regards,
    Imran khan

    Hi,
    Dear Imran,
    You have posted this question twice and there is no such condition
    You have to maintain scale and if need to develop routine and that I already suggested to you.
    Kindly do not post 1 question many time
    Kapil

  • Calculate shipment cost on day basis

    hi,
    how can i calculate the shipmentment cost on day basis.For this which condition type should be used in my shipment pricing procedure.

    hello, friend.
    to be honest, i have not tried that but i think it is possible.  you can go to IMG > Log Ex > Transportation > Shipment Cost > Pricing > Pricing control.  look into a condition type, go to 'Scales' and you will find 'scale basis' (value 'O' - time period scale in days) and 'unit of measure' (days).
    i guess you also need ABAP enhancement to calculate the number of days between planning and shipment completion to calculate costs in days.
    regards.

  • Control of Incoterms in creation of Shipment Costs

    Dear All,
    We calculate shipment costs (Through Transportation module in SD-Freight payment-Outwards) on calculation base A (Delivery) or B
    (Delivery item) and do not want to calculate deliveries that have certain
    Incoterms (for example, TOP-To Pay, where Customer makes payment to Transporter).
    By default, the system always creates a subitem in the shipment cost
    document for the corresponding calculation base for every delivery item or for every delivery involved.
    We want to have Control over certain Incoterms where we don't pay to the customers. We want to restrict the users not to calculate Shipment Costs in TOP-To pay cases. Kindly help if any Userexits available for this scenario to handle.   
    Regards
    Subrat

    Hi,
    I think we have a similar requirement. For FCA transports is the transport cost zero. We have created a seperate condition in the cost procedure as a condition class A ( discount or surcharge ) in T_06. This has an access sequence assigned which uses a 9xx condition table (T_03) with fields Service agent f.stage ( TDLNR ) and
    Incoterms     ( INCO1 ). This enables us to maintain condition records in TK12. So FCA is maintained with 100 % deduction and thus no costs.

Maybe you are looking for

  • Statistical Posting seen in Vendor balance report

    Hi, I have posted a bank guarantee through statistical posting (F-55). As per my knowledge, statistical posting does not update GL. Statistical Entry Passed: Vendor A/c... Dr (Special GL - G)    TO BG cleaing But when i take a report for Vendor repor

  • How do i unlock my ipad when it's disabled and says connect to itunes

    how do i unlock my ipad when it's diasabled and says connect to itunes?

  • Taglibs in oc4j

    Hello, I'm trying to build a small webapplication in JSP that is showing a table in a browser. I'm using a tag from the Business Components Data Tags library. So in the JSP-page I have: <%@ taglib uri="/webapp/DataTags.tld" prefix="jbo" %> <jbo:Appli

  • N8 Belle Refresh annoyance

    Please can you help me ! My phone is a UK Vodafone labelled Nokia N8 which is running on firmware 111.030.0609 Belle) I love this phone (mainly for its amazing camera) and have recently had it unlocked from Vodafone but have never had the upgrade opt

  • Iphone USB - too much power?

    I'm recently getting the error message of one or more of my usb ports being disabled because something is drawing too much USB power. I've gotten this message with my iphone plugged in, and when nothing was plugged in. My computer was in for service