Shipment cost in Billing.

Hi all,
after i have done the shipment cost document, i create my invoice (ZFK). Here in Pricing Procedure, there is the  condition FK00 that gives the shipment cost. But it's marked as statistical condition, and so it's out of the total of the invoice.
If i want that it's not statistical condition, to insert it in the Invoice's total, (i want that customer pay for it), what can i have to do?
Please let me know...
Best Regards
Alba

Hi
Condition type should  be placed in the standard pricing procedure which is maintained in shipment pricing procedure.also maintain in copy controls VTFL maintain the price source field to 'F'.
Regards
Sujith

Similar Messages

  • Pass the shipment costs to billing document

    Hi All,
    I want to transfer the shipment costs to billing document.
    But i don't want to transfer to customer. I want to post it as accruals.
    What are the settings need to do in SD and transportation module for copying the shipment costs to billing documenbt.
    Do we require to maintain any special config.
    Please help me to solve it out.
    Thanks
    Lakki

    Hi
    Maintain the Pricing procedure for the shipment cost document,in which place a Frieght condition type suppose fb00 which also has to be placed in your billing document pricing procedure for the last step with stastical check so that from shipment ,frieght will be copied but the value will not be inclued in the netvalue for ur customer.for frieght condition type maintaian req-51 with base cal -51in ur shipment pri.proc.   Apart from this maintain in copy control from delivery-billing price source as 'F'.
    Hope this will help u.
    Sujith.

  • Shipment cost in customer billing doc

    Hi all
    I want to include shipment cost in billing document I want to know the detail process.
    After rising shipment cost doc vi01 this will get reflected in
    Shipment doc vt01n
    I need to charge the cost to customer .i want to include cost in customer billing document VF01
    I want to know from shipment document how will the condition types will be copied into billing document
    1.Should I have to maintain any copy control between these two docs?
    If yes what confi settings need to be done
    Pls let me know  the steps in detail
    regards
    srijen

    Hi mukund thanks for reply
    in copy control i need to maintain "D" or "F"
    i want to know from shipment cost document Vi01 how the conditions are copied to delivery document
    for example- i maintained ZF01,ZF02 in shipment cost doc and i need these two conditions to be displayed in customer billing Vf01
    1) from shipment cost doc how i have to get them in billing doc
    what confi settings are needed
    regards
    sujan

  • Billing the Shipment Costs to the Customer

    Hi,
    In my scenario, I had created shipment document & shipment cost document, now what ever be the cost in that I want to charge to customer in addition of material price.
    I had created condition type say KF00 in shipment & made it statistical. same condition is in my pricing procedure in SD.
    In front of procing procedure I had made tick mark i.e. Transaction speciefic price procedure
    In copy controll LF to F2, at item level I selected price source as shipment cost.
    But still cost is not flowing in the billing document.
    Please suggest what to do
    Thanks,
    kapil

    Hi,
    Refer this [http://help.sap.com/saphelp_erp60_sp/helpdata/en/d5/2285347860ea35e10000009b38f83b/frameset.htm]
    and [Re: sap sd Transportation;
    please check the copy control for Billing in the SAP Hep link
    Regards,

  • Shipment cost condition not copied in the billing document

    hi
    I have created shipment for the delivery and compelted the shipment cost as well , however when i create the billing document the shipment cost conditions are not copied in to the billing document.
    i have already set up pricing source as F in copy control from Delivery to billing document ,
    what are the other settings to be done to copy the shipment cost condition types to billing document  ?
    Regards
    Dinesh

    You migth include it on copy control frome delivery to invoice.
    Regards,
    RP

  • Shipment cost in Sales in billing document.

    hi gurus,
    I  have a scenario where Shipment Cost is to be calculated & then the same should carried to the billing doucment.
    do anybody have the step by step guide for Shipment Cost calculation  in Billing Document. Please mail me at [email protected]
    Thanks in advance
    Regards
    Mahendra

    Shipment cost can be calculate with Fright condition
    Step create condition type by opining standard freight condition KF00 and Step2 customized according to your requirement
    Step3 Maintain in pricing procedure
    Step4 maintain condition record
    Regards Ajit

  • I can Billing shipment costs to the customer, But......

    hi
    I can Billing shipment costs to the customer, But i can't get an additional entry in the customer billing document.how to do? and could anyone help me?

    In the Pricing procedure, add a condition type for Freights ( preferably Manual condition). In the calculation make it add to the Net Price.

  • Billing for shipment cost

    hi all,
    can anyone tell me how will add the calculated shipmet cost in to my billing,so that i adds to hte net value in the billing.
    please do guide me if any configuration is required.
    thanks.

    HI
    I did the settings in copy control for delivery to billing :
    Pricing Source : F
    after this
    When I creating billing document (delivery related) using VF01 - I am getting the error:
    0000500095 000010 Shipment 0000100020: Shipment Cost Determination is incomplete
    Diagnosis: Copying Control for billing requires that shipment costs are copied from the shipments belonging to this delivery shipment costs have not yet been fully calculated for a shipment belonging to this delivery.
    System Response: Billing is not completed
    Procedure: Check the shipments belonging to the delivery
    calculatye the shipments for all shipments
    set the shipments as not relevant for shipment cost calculation, if necessary.
    Can u please suggest how to solve this issue.
    I checked the Shipment Document STATUS:
    it says
    Freight Cost Shipment Header Status:
    Shipment costs Cal.: Completely Processed.
    Shipments costs set: Completely processed
    Complete Freight Cost doc. Status:
    OvSts freight cost doc.status: partially processed
    Tot Shp.Cost settlement status : Completely processed.
    even i checked the vendor (forwarding agent) a/c. :the amount got posted to his account.
    please advice me.
    thanks in advance.
    babu rao

  • Any UserExit while Posting Shipment cost?

    Dear All,
    SD transportation/shipment cost integration with MM-Account Payable.
    Process:
    1. VA01 - create sales order
    2. VL01n - create Delivery
    3. VL02n - PGI
    4. VT01n - create Shipment
    5. VI01 - create shipment cost doc.
    Here  PO will get generated automatically. For that PO, a service entry sheet is created for every L.R no given by Transport vendor. Then MIRO is posted for the service entry sheet.Payment is done against that.
    But my client's requirement is that normally transporter will have contract with the company.  Transporters supply to various Customer place and raises the bill for every L.R no.
    In case of Transporteru2019s freight bills settlement, vendor invoice posting should be L.R no wise which is captured in Shipment
    L.R no wise tracking is required for Transporteru2019s payment.
    I understand that there is no SAP STD integration of LR number of shipment doc with vendor Incoming Invoice posting. But Vendor invoice can be posted for multiple POs.
    When shipment document is created, the system will generate PO automatically in the background. L.R number is to be captured and should be passed on to PO doc through USER EXIT.
    Hence I request you to  kindly reply USER EXIT available for Shipment doc. so that the customization (development) can be done in transporteru2019s (vendor) payment L.R No. wise.
    Please reply your view in this regard.
    Regards,
    Anbu

    Hi,
    Exit Name           Description VI01
    V54B0001            Shipment costing: Configure pricing
    V54B0003            Shipment Costs Calculation: Determine Rate Type and Currency
    V54B0004            Shipment Cost Calculation: Determine Status
    V54C0001            Shipment costing: Description(s) shipement cost item(s)
    V54C0002            Shipment costing: Create shipment cost sub-items
    V54C0003            Shipment Costs Processing: Determine Invoicing Party
    V54C0004            Shipment Costs Processing: Determine Loc. for Tax Invoice
    V54D0001            Shipment Costing: Determining the Tax Countries
    V54KSFRC            Determining the factors for apportionment of shipment costs
    V54P0001            Extended Function Codes for Shipment Cost Information
    V54U0001            Shipment cost processing: Check whether changes made
    V54U0002            Check shipment costs for completion
    V54U0003            Specification of shipment cost number
    V54U0004            Formatting for update of new objects (shipment costs)
    V54U0005            Updating new objects in shipment cost processing
    V54U0006            Shipment Purchase Order - Header Data Supply
    V54U0007            Shipment Purchase Order - Item Data Supply

  • LE-TRA Shipment costs as inbound delivery costs, goods receipt

    Hello gurus:
    We are facing the following scenario, regarding inbound transportation.
    We plan our shipment document and shipment  costs, and they feature several items. Each of those items represent a shipping service, which in certain cases be taken on different countries by the same service agent.
    That is, we have a service X on country A, with tax indicator 1, and service Y on country B, with tax indicator 2.
    Both services would need to be transferred as delivery costs to the purchase order.
    According to note 427944, shipment cost value is cumulated by service agent., so that it looks impossible to get the values broken up to the purchase order, which would be the first step to subsequently get the right tax indicators for each item of the shipment.
    Even using different condition types on the shipment cost document, system cumulates by service agent and transfers to the first condition found on the purchase order schema.
    Has any of you faced similar issue? Any workaround possible?.
    Thanks in advance for your valuable help.
    David Ramos.
    PORCELANOSA MM.
    This is the section of note 427944 that indicates the treatment of the shipment costs in the purchase order,
    Transfer the shipment costs into the condition types of the purchase order:
    The shipment cost value (without tax amounts) is cumulated for all relevant shipment cost documents
    for each service agent and transferred to a corresponding condition type of the purchase order item.
    Before cumulation, the amounts are first converted into the purchase order currency.
    1. A transfer of the values for each condition type (similar to the transfer from a shipment
    cost document to the SD billing document) is not supported.
    2. If different service agents exist in the shipment cost documents, a corresponding number of
    condition lines (with value 0) must be specified in the purchase order item. These can always
    belong to the same condition type (in schema 'Manual') or also to different condition types (not
    'Manual'):
    a) Manual condition lines: If the condition type in the schema of the purchase order is
    marked as 'manual', the condition type must be created (with value 0) in the purchase order
    item before the goods receipt. If delivery costs are expected from different service agents,
    several non-valuated entries must be generated for this condition type. If more condition
    lines exist than required, these are then no longer taken into account. If condition lines
    are missing, the last service agents are not settled.
    - Advantage: You only have to define one condition type for the delivery costs.
    - Disadvantage: Each purchase order must be processed manually before the goods receipt.
    b) Automatic condition lines: If the condition lines are to be generated automatically for
    the delivery costs (the condition type is not flagged as 'Manual' in the schema), the schema
    must have enough condition types to settle several service agents. If more condition lines
    exist than required, these are then no longer taken into account. If condition lines are
    missing, the last service agents are not settled.
    - Advantage: The goods receipt can be carried out without manual preparation beforehand in
    the purchase order.
    - Disadvantage: You must define identical condition types with different names.
    Message was edited by: PORCELANOSA MM

    Hi,
    If you refereed the OSS Note 427944 correctly it explains how the shipment cost can be transferred to delivery cost based on some pre-requisite.
    Like the value for PO should be >0
    Like the service agent is involved during shipment liability, then there should be cumulative transfer for each value which will update based on shipment cost if PO value is "0".
    The shipment cost will be delivered to all delivery items based on weight.
    If you want to enhance this then you need to use the enhancement V54KSFRC to update the values as per your requirement.
    Rgds,

  • Product Gap To Accommodate the Shipment Cost in R/3 Procurement process- MM

    Hi,
    We are in to IT distribution business; in our nature of business we donu2019t know shipment cost at Purchase Order, we can have various options
    As per Our business requirement we want to take the MAP cost as basis of our Sales Price considering very low profit margin, so  for every shipment( partial GR) the freight cost  are not on proportionate basis, it will vary widely depending on the facts like
    A.     Mode of transport(Air / Ship /Road )
    B.     Size of Truck load/ Ship Container
    C.     Number of Partial Shipment
    D.     Shipment for Multiple Purchase order.
    Further we want the freight cost  to be automated based on above variations.
    Problem:
    We need to incorporate both the partial delivery cost (Elucidated below) at Goods receipt point for each and every shipment (Partial Delivery).
    We want automated price component should flow to Good receipt on partial delivery basis considering both components mentioned below.
    For understanding kindly refer to the below mentioned example.
    Case 1:
    We placed one Purchase Order Qty 1000 to Vendor HP on Inco term Ex Works Taiwan,
    This Quantity of Material will be shipped partially to Our Plant at Dubai; We will out sourced Freight forwarder for picking the material from HP factory to Dubai Sea Port
    We have different components as below
    Fixed      $  115.00      Per Bill of Lading / Shipment
    Variable 1 and/or      $  235.00      Per 30 CBM / 20" FT Container
    Variable 2 and/or      $  200.00      Per 60 CBM / 40" FT Container
    Variable 3      $  200.00      Per 70 CBM / 40" FT HC Container
    Again the Shipment will be transferred from Sea Port to Our Plant through road, this may be a
    Variable     From 1 to 8 CBM --> $ 19     3 Tonn
         More than 8 CBM --> 19 CBM --> $38     7 Tonn
         More than 19 CBM --> 43 CBM --> $52     40" Trailer
    Any concept or solution will be acknowledged..
    Thanks & Regards
    Sudhansu
    Edited by: sudhansu satapathy on Jan 27, 2011 9:50 AM
    Edited by: sudhansu satapathy on Jan 27, 2011 2:02 PM

    Hi,
    Quick answer will be
    As you do not know delivery cost at the time of PO creation , you can post delivery cost in MIRO with a option to a particular G/L account & need to active in following path:
    SPRO > Materials Management > Logistics Invoice Verification > Incoming Invoice > Activate Direct Posting to G/L Accounts and Material Accounts > Here Activate "Dir.posting to G/L acct = active" and save. 
    OR
    Try for rebate / subsequent settlement.
    Regards,
    Biju K

  • Shipment costs in COPA

    Hello,
    We are trying to assign shipment costs to copa, we execute VI01
    transaction and we do account assignment. It appears account assignment
    fully completed but when we display the profitability segment there are
    some of the value fields that are empty.
    The fields that are empty are "Material", "Distribution
    channel" and "Division", and all of them are filled when the SD bill document is
    registered. I don´t understand why the system does not take them to the
    profitability segment because they are fixed value fields.
    We have checked that when we register vendor billing documents it works
    correctly and all the fields have their corresponding value.
    Thank you very much
    Beatriz

    Hi I was just looking at your post and  have a similar  situation .
    Currently our shipment cost documet Vi01 is posting to a cost center .
    Is there any way it goes to COPA directly  with all the billinig information
    What are the config needs to be done
    iis it just in OKB9 we need to put the GL account to Profitability segment
    the GL account we use is 53000000  and from OKb9 based on plant it picks a Cost center  and From cost center we settle it to COPA
    Is thre a better way

  • SAP transparent table stores condition value of Shipment cost

    HI
    I need to know which SAP transparent table stores condition value of Shipment cost document (specific for Freight condition which derived from Bulkiness group).
    Background:
    Minimum load calculation logic
    In the pricing procedure for shipment cost we have two conditions: One is ZMIN (similar with SP00)  which is having condition class u201CHu201D, Calculation type u201CGu201D which determine Bulkiness group according to access sequence. Bulkiness group is where we define different group with different minimum load. e.g. ZCEM16 u2013 25.TON (22.68) Second condition is ZAFR (Similar with FB00), ZAFR calculates the base value from ZMIN (Compare actual weight with Min weight value of Bulkiness group), if the net weight is 23 ton, it will calculate at 25 ton because of the bulkiness group.
    Now I need to know in which table system stores dynamic value of ZMIN?  Just like we have PR00 in KONV which we can find from KNUMV of billing / sales order.  If I use the same logic then I donu2019t find ZMIN Condition type and value in KONV table for the specific shipment cost document.  Please advice how to and from which Table I can find Bulkiness group value of Shipment cost document.
    Thanks

    Hi,
    Get the shipment cost number from shimpment document (document flow or shipment document header).
    Goto VFKP table,enter shipment cost number and choose detials. get the document condition number from  KNUMV field.
    Now goto KONV and enter document condition number and choose details. you can see condition type and value.
    Thanks & Regards,
    Chandrasekhar

  • Third Party and Shipment Cost managed by Trader.

    Hi gurus,
    I have set up  the scenario third party with Delivery note and it works fine.
    That means i can execute all the process till the billing. Customer, trader and supplier are set.
    The problem here is that in this scenario, the trader wants to be responsible for the shipment costs. Before implementing the scenario i thought it would be possible to, from the purchase order generate an outbound delivery and create a shipment document for applying costs to it. The problem is  for position TAS it is not possible to do none of that.
    I can't find a solution for this... has anyone faced a problem like this? Or is capable of seeing a possible solution?
    best regards.
    Diogo

    Hi Tuffy,
    In Third party dropship scenario, customer give an order from your e-trade site or online sales site. after receiving the order, your contracted company with you will deliver the order, not you. you are adding your profit to the list pricing. Process is going below:
    customer >> shopping from you >> payment to you >> getting the amount of profit after sales >>> sending of order and delivery information about customer to contracted company >> contracted company will deliver th order to the customer.
    But in other type of third part sales, we sould create purchase order additionally.
    I hope these will clarfy your confussion.
    Regards,

  • Shipment cost for third party

    Hi,
    for the third party business (where the vendor delivers the material to customer directly), we want to bring the freight at customer invoice level and post to COPA.  we don't follow shipment document creation for this. we create a PO and an inbound delivery with respect to PO and GR with respect to inbound. we enter the freight cost as a condition in the PO. during invoice verification this is posted in FI. finally we create a customer billing after this.
    But if we want to bring the same freight to customer invoice, how can this be possible?
    Even if we follow shipment creation and shipment cost creation for inbound delivery, how can we bring the freight cost in a customer billing document which is with respect to sales order?
    Regards
    Karthik

    hi
    please give steps properly which ur following
    also you can include  freight by creating freight condition and maintaining VK11
    for more prompt reply post this to SD-Billing forum
    regards
    kunal

Maybe you are looking for

  • Inserting flash in Dreamweaver.

    now I have seen tutorials over and over and I have done this website 3 times now. I do the div's first at then I do make an editable region and save the template. Then I do the pages. Then I go to the left middle div to insert the flash (in the templ

  • Ordinal 19 in MAPI32.dll

    I have tried reinstalling and also repairing the Reader X on my sister's machine running Windows XP Home SP3.  When trying to open any PDF file, we get an error message, "The ordinal 19 could not be located in the dynamik link library MAPI32.dll."  H

  • Images on Firefox come out pixelated

    Hi, For some reason, Firefox on my MacBook Air displays pixelated images. When I access the same site on Google Chrome, the images come out with good resolution. I tried looking for the settings to correct this but cannot seem to find it. I do enjoy

  • SSL with third party certificate

    Hi All, I followed the configuration mentioned in the white paper Oracle Forms Services 10g: Configuring Transport Layer Security with SSL An Oracle White Paper July 2005 (frm10gss.pdf). That is working fine. I have a third party certificate (file fo

  • My settings on my iPod touch is not loading

    I was deleting things on my iPod for more space and now it will not load Help?