With CNS0 I can create deliveries from projects. Everything goes fine, I can create the outbound delivery, pick and pack and do the post goods issue. But when I want to create a shipment for this outbound delivery I do get the following message: "number of deliveries found: 0". All seems like ok, I created lots of deliveries and shipments and I did exactly the same for the deliveries from project but somehow SAP cannot find any deliveries, what am I doing wrong?
Thanks
regards,
EK

Check when adding deliveries to Shipment Change the default status of goods movement from 'A' to 'C' I am sure  this may be the mistake .
Reward Points if helpful.
-Sudheer.

Similar Messages

  • Account Determination Error when doing GI for Delivery from Projects

    Hi,
    When we try and Goods Issue a delivery from Projects, we get the following error:
    Account determination for entry 0 GBB 0001 ___ 7900 not possible
    We are not sure why the Account grouping code comes through with no value. Please could someone assist with this issue.
    Regards,
    De Wet

    Hi,
    Check in T code OBYC,whether the account determination is maintained against the valuation class for BPX.
    Regards

  • Control for delivery from projects

    Hi
    Is there any way we can control the delivery of components from projects CNS0 using User statuses.
    The components in project stock should not be delivered until the User status permits it.
    Kindly advise.

    Hi,
    Please create a user status with business transaction "Goods Issue Delivery" as forbidden , and assign the status to the WBS element.
    It should work. I have not tried it out though.
    Muraleedharan.R

  • PS: WBS is not flowing for a Material, while creating delivery from Project

    Hi,
    While creating delivery from Project thro CNS0, WBS is not flowing for a Material in delivery, in turn WBS is not flowing in Billing document for same material, in turn not allowing to Post the Billing document to Accounting.
    Error while releasing Billing to the Accounting: Accounting Entry is not generated. Error Message:Assign Condition type
    YMRG in COPA.
    Pls let me know, what can be the reason ?
    Thanks.
    Amit.

    Hi Kuldeep,
    Check this note,
    Note 159387 - Message BP603: incorrect line item is displayed
    Its valid only till 4.6. Might give you some idea but.
    Regards,
    Gokul

  • Delivery from Projects

    PS Gurus,
    One question regarding delivery from projects.
    I add Header component T-20000 in activity and explode the BOM in project.
    As a result of this, all the components pertaining to T-20000 comes up in project.This BOM explosion changes the item category of T-20000 to T.
    The question is how do I produce this T-20000 through Production order? I cannot run MRP for this material as it is not relevant to MRP in MRP settings (set to ND). I will change it to PD. But why the its item category changes to T?
    After its production, how do I deliver from PS since its just a text item.
    Please reply urgently.
    regards
    Sunny

    Sunny,
    I´m afraid this is a standard behavior. Once you explode the BOM in CN22, the header material will remain in the project just as Text item.
    As a workarround, you can consider adding material T-20000 again as an individual material (not exploding the BOM) or including material T-20000 in its own BOM as if it were a component.
    Another option is to try CN33, Bill of Material transfer. As far as I know, the header material will not be added as text item if you transfer the BOM.
    Hope this helps
    Regards

  • Delivery from Project with reference to sales order

    Dear All,
    I am facing problem in delivery. In my case scenario is-
    1. There are 10 materials with 20 quantities.
    2. I create a sales order only for two material with 5 quantities and enter wbs element number.
    Now when i use CNS0, enter sales order number and wbs elelment number system shows all 10 materials that I dont want means I want the materials that are included in sales order. Please help me how to control this.

    Please read SAP Help for a better under standing...
    I mentioned below a line from SAP help for your info.
    ...... it selects material components, the system takes components into account that have been assigned to either a network or ...... ...
    Please follow the below path to access the help..
    SAP Help Portal >>> Logistics >>>> Project System >>> Material >>>> Delivery from Projects......

  • Depo Excise Invoice but Delivery from Project

    Dear Experts,
    my requirement is i am creating Excise Invoice W.R.T delivery from Project in J1IJ.
    And we are creating order related commercial Invoice to the Customer which order is assigned to WBS Element
    here how we will bring excise values into the commercial Invoice.
    regards
    etr

    Ajith thanks for ur reply,
    please understood my requirement
    Normal Depo Sales is like VA01-VL01N-J1IJ----VF01 here whatever excise values captured in J1IJ those values come to the commercial Invoice.
    As per My requirement we are creating Project and while creating sales order we have to assign WBS element.
    now Project -Delivery--Excise Invoice J1IJ
    Sales order -
    Inovice VFO1   
    my question is how excise and commercial Invoice values come together.
    regards
    etr

  • Delivery from Project - reg

    Hello,
    in my project i want to deliver material frm my project.
    Now iam using thg CNS0,
    i want to know the difference between CNS0 and VL01N.
    which way is better to deliver material frm project and difference b/w those.
    pls help me in this regard,
    Regards,
    Prakash.
    Reward points for useful answer.

    Hi Prakash,
    CNS0 is transaction for project delivery and VL01N is for ales order based dlivery. Which one to adopt is dependent on the rest of the configuration and business requirement.
    Project delivery type is "LP' and default delivery item category type is "DLP'.
    Primary difference between project delivery and other deliveries is that project delivery does not create any requirement (TOR) , whereas in the case of sales order based deliveries, deliveries create requirements. i.e, requirements which were till then emanating from sales orders, emanate from delivey once a delivery is created.
    Another major difference is that with VL01N, you can do delivery related billing, whereas  deliveries created using CNS0 cannot be referenced for billing.
    Hence, if there is no billing process involved, CNS0 would be the ideal choice. If mile stone billing is involved, again CNS0 would be the obvious choice. If delivery related billing is involved, possibly you may have to go in for VL01N.
    Some explanations provided in SAP Note:677169 are quoted below:
    Quote begins:
    Delivery from project (CNS0)
    a) How can I change delivery type 'LP' ?
                           Answer:
    Delivery type 'LP' (0VLK) is hard coded and can not be changed.
    b) Why is availability check not executed in CNS0 ?
                           Answer:
    Please check whether availability check is switched off by delivery item category (0VLK; indicator 'AvailCkOff').
    c) Why does availability check in CNS0 return different quantitites than availability check in network ?
                           Answer:
    Availability check is controlled by checking rule and checking group. In CNS0 checking rule is hard coded to 'B ' for plant stock and 'BE' for individual stock. In network checking rule is defined by order control (plant/order type/business func.) and might therefore differ from the hard coded checking rule used by CNS0.
    Please be aware that also in SD ATP checking rule for delivery is hard coded with same values.
    Please check ATP result with transaction CO09.
    d) How can I filter out components in CNS0 ?
                           Answer:
    Please refer to notes 546029 and 891134.
    Quote ends.
    Hope you find the explanation useful.
    Muraleedharan.R

  • Delivery from Project for the Assembly: sales order item

    Hi,
    When I create a sales order lets say for material "A".
    And I want to deliver this component from sales order. With Production order.
    I have attached the material "A" in Project to an activity with a positive quantity, in MD04 I am unable to see the planned order for that.
    Project is released and it has created a order reservation but i am unable to convert it into the Planned order how it can be achieved.
    Material is not relevent for the MRP.
    Please suggest some solution.

    Hi,
    Please run project MRP (MD51), selecting option 3 (planned orders) against create P.req. field under MRP control parameters tab.
    Planned orders will be created automatically & u can see in MD04 also.
    Thanks
    Kishore

  • High Sea Sales mapping in delivery from projects

    Hi,
    I have got a typical scenario where in delivery is supposed to be thru PS.
    Quotation consists of only the predefined Costing heads (non-deliverable & in line items) against which unit cost estimate is made using BPOs. After receipt of order the quotation is copied to create Sales Order  and WBS elements are assigned at line item.
    Deliverable materials are assigned at each WBS level in the designated Project and wrt the Sales Order, deliveries are created and billed. Pricing of the delivered materials is carried out in the billing doc.
    There is a scenario in which imported materials originally planned to be sold from stock and whose delivery was to be created from projects is now converted to HSS.
    Request to advise how to map this business process.
    Regards,
    Rajesh Mohapatra

    Hi Rakesh,
    1. When we do delivery thru CNS0 it Dr- FG Consumption /ac and Cr-FG Stock a/c. Suppose if i have to take this Dr-COGS-Fg and Cr-Fg Stock a/c. will you please suggest the necessary customization steps and user transactions.
    2. In our scenario we have done delivery through CNS0. When we do billing, we are getting an error that Profitability segment is not derived for GL (revenue). I have checked the relevant derivation rules which looks correct. Do u have any idea how to maintain derivation rule to derive WBS element?
    3. In other scenario, intstead of opting PS. We have followed: 1. Cretaed SO (with WBS). 2. MD04- Cretaed Planned Order 3. Converted Planned order to Process Order 4.Goods Issue and confirmation of process order  5.VL01N-Delivery (601 E).
    While doing delivery we r getting an error that create GL (FG-COGS) as Cost element. This is GL is mapped to GBB-VAX.we have for GBB-VAY with cost elemnt. Do we have to create this GL also as cost element? why system is not picking from GBB-VAY? any idea
    Regards,
    Babu

  • Delivery from project appearing in billing due list

    Hi,
    We have a scenario in which delivery is done through project (Tcode CNS0) and the billing is done through sales order (order related billing)
    The delivery type LP used for the delivery is not assigned to billing type since we are not supposed to do billing with respect to delivery document.
    But these delivery documents are appearing in billing due list (VF04) and remain there in the due list
    We want delivery documents (from project) NOT to appear in the billing due list.
    Please help.

    Hi Shambhu,
    Lets assume ZLP is not relevant for billing and if delivery is done then how can excise invoice ibe generated.
    Issue is delivery doc type LP is assigned to billing type which is meant for excise invoice and not assigned to billing type of final invoice.
    Now in India, why LP is assigned to excise invoice billing type, because for every delivery excise invoice is created.
    But for the same delivery type LP in europe, excise is not created and hence these documents remain there in billing due list.
    The issue can only be resolved if europe starts using another delivery type like ZLP which is not assigned to any billing type, but again that seems to be very difficult to implement at this moment of time.
    Thanks Shambhu.

  • Delivery from project stock

    hello!
    i have following requirement
    - sales order -> creates a requirement to unrestricted stock
    - delivery -> creates a requirement to unrestricted stock
    during delivery processing the materials are booked manually to project stock.
    - at goods issue i want to book automatically from project stock
    as i do not want to create requirements for project stocks, i cannot use a matching requirement class.
    can someone think of a solution?
    thanks!
    matthias

    Hi Fortain ,
    I did bit of analysis to track it down and i noticed that when you run availability, system check for Checking Rule "B".  I think if we want to enable WBS element field, it should be "BQ". I am trying to figure out. But no clue.
    Let us keep trying.
    Regards
    Vinu

  • Return Delivery from Project

    Hi  All,
    How to generate return delivery from CNS0?
    The scenario goes like this.
    1. Materials are attached to the network activities( both plant stock and Project stock materials exist)
    2. Delivery request is created from CNS0
    3. Goods are picked and PGI is done.
    Now, there is a goods return process which has to happen because of some reasons.
    Can i trigger this from CNS0 if YES then how?
    Waiting for your expert advice
    Regards
    Prasad

    Hi,
    you cannot perform the returns processing with CNS0. You have to use the "standard" sales returns processing.
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/70/a7853478616434e10000009b38f83b/frameset.htm
    Kind regards
    Jan

  • Delivery from projects Assembly

    Hello All,
    When i am trying to do delivery from CNS0,for a project and WBS the system is not showing DeliveryQty,Open Qty is 0.
    The system shows error.
    Acitivty is confirmed,Delivery info isassinged to WBS
    Ramanan

    Hi Ramanan,
    Please check whether material is getting issued to the network (281 movement) when you confirm the activity. In that case stock would be zero. Obviously, then you cannot make the delivery. Use MMBE and check the stock position, most likely yhis is the case.
    Get the material into project stock and check out. It should work.
    Muraleedharan.R

  • CNS0: Delivery from project -- jump to VL01N screen

    Hi guys,
    we are creating deliveries from projects. We now have the request to jump to the normal maintenance screen of deliveries (VL01N) before the delivery is saved, so that other fields can also be maintained.
    Does anyone knows if a user exit within CNS0 is supporting that? Something like a "before_save" user exit so that we could jump to VL01N screen?
    Any other ideas are welcome as well....
    Thanks for your replies
    Cheers
    Jan

    Hi,
    Try following
    V50R0001 - Collective processing for delivery creation
    V50R0002 - Collective processing for delivery creation
    V50S0001 - User Exits for Delivery Processing
    Regards

Maybe you are looking for

  • To Update rows in Table in OA Framework

    Hi All, I have one requirement to update the table. For the first time when User opens the form, nothing is stored in database for the user id. He opens the form and enter 5 rows and click on save button.So 5 rows get inserted in database. Each recor

  • Can can I enlarge my PS Touch files beyond the maximum allowed within the app?

    HI all, I want to use the PS Touch files that I am creating for potentially large format (anything beyond a thumbnail) work. Regardless of the extension being used, I get the same low quality image results/very small sized files which do not translat

  • Shifting schedules on Calendar?

    Hi, I'm a student and I use iCal as a reference to most of my lectures, tutorials, assignment deadlines, etc. One thing that really bugs me, though, is that I haven't found a way to schift my schedule when on a break between semesters. Has anyone exp

  • Thinking about upgrading.

    Hi. I've been using After Effects CS3 for a while now, as I just haven't had the funds to upgrade to CS4. I recently got my finances in order and am thinking about upgrading to CS5. Can someone briefly explain the differences between CS3 and CS5, and

  • Lennovo A1 " Turn on USB storage problem"

    Hi Lenovo community.. I just want to ask if you could help me resolve this issue. When I connect my A1 tablet on any pc for file transfer. the "Turn on USB Storage " just keep on spinning. When I tilt the screen the "Turn on USB storage" spears and s