Shipping Point and Excise Condition

Hi,
This is my old issue for which I need solution.
When we change shiping point in sales order Excise condition become statistical for one plant.
But now with similar pricing with same sales organisation above setting are not working for other plant mean there is no change in condition when we are changing shipping point for that plant.
So please help me to solve this issue
Lalit

There is no direct link between Shipping Point and Excise Condition but CIN related settings are mainly dependent on Plant settings.
So check whether any user exit is applied.
G. Lakshmipathi

Similar Messages

  • Shipping point and storage location determination

    for one of my delivery type i had defined shipping point determination as per following.
    define shipping conditions
    define loading group
    assign shipping points: with combination of shipping conditionsloading groupplantprop shippping pointmanual shiping point.
    i also checked the cmr and mmr both are correct.still system is not proposing shipping point and storage locatgion in my obd

    Hi Charan
    Shipping conditions is taken from sold to party
    Pls check whether you are using a different SP and SH
    Check in these t codes
    In OVL2 are you seeing the shipping pt determination for your combination?
    In OVL3 are you seeing the storage location determination for your combination?
    If yes then shipping pt will be definately picked up in sales order
    Storage location will be definately picked up in the delivery if you have assigned the rule MALA in OVLK
    Have you assigned your delivering plant to your shipping pt in enterprise structure assignment?
    This also check
    Refresh the whole order and try again
    If need be log out of SAP and relog and see provided you have youR OVL2 and OVL3 correct?
    Note If shipping conditions are assigned to your order type in VOV8 then that will have priority over the shipping conditions of SP
    So for that combination you should maintain shipping pt in OVL2
    Regards
    Raja

  • How to get automatic plant and shipping point and storage location

    hi,
    sap gurus,
    how to get automatic plant and shipping point and storage location automatically into the sales order
    i have done all the config settings for that
    but its not appearing automatically.
    regards,
    balaji.t

    Hi
    Balaji...
    U can get the plant in sales order,  by doing the default the same in customer master or in  material master. In customer master -- sales are data--shipping tab delivering plant there u can assign and get the same in order for that customer. it is better to do in customer master rather than in material master.
    Shipping point is getting determine in sales order and u can not make it default like plant. Shipping point is determine in the basis of Shipping condition of customer ( ship to party)+ loading group of material + Deliverying plant there u have to assing the shipping point and it will flow in the sales order. Tcode OVL2
    For S loc u have to enter manually in the sales order u can not get it automatically.
    Hope this will help you.
    Thx.

  • Shipping point and shiptoparty

    hi,
    can u pls tell the differnce between the shipping point and shiptoparty and sold to party and unloading poing and loading point ......................
    tell me in ur won words
    regards
    Guur

    Hi,
    Shipping point : The physical location (for example, a warehouse or collection of loading ramps) from which you ship the item.
    Use
    You can predefine shipping/receiving points in the system, based on different combinations of
    plants
    shipping conditions
    loading groups
    During delivery processing, the shipping/receiving point is the most important criterion that you use to select deliveries.
    A delivery can be shipped from one shipping point only or received at one receiving point only.
    If you want to provide more detailed information about a shipping point you can specify a loading point (for example, one of a number of different loading ramps).
    Example
    If, for example, you want to ship refrigerated goods to a certain customer by rail, the system proposes a shipping point with a suitable location and equipment for loading refrigerated goods onto rail cars.
    Procedure
    The system can propose a shipping/receiving point. If valid alternatives are predefined in your system, you can change the shipping/receiving point manually.
    You can define a user-specific default value for the shipping point in the user parameter VST.
    Ship-to-party:
    i buy a gift for my friend online.
    i'll be the sol-to party for the website.
    My friend will be the ship-to party.
    Sold-To party : The partnewr to whom i sell some goods.
    Ship-to-party: The partner to whom i ship the goods.
    <b>Reward points</b>
    Regards

  • "shipping point" and "loading group" in SAP SD/MM

    Hi experts,
    Could somebody explain me the difference betwen "shipping point" and "loading group" in SAP SD/MM.
    best regards,
    Hermann

    A delivery is always initiated from a shipping point. The shipping point can be proposed automatically during order processing depending on the plant, loading group and shipping condition.
    Its plays a vary important role as without a shipping point you really cant create a delivery document
    Loading groups are defined in Material master Record , which specifically means which group will load the material for the transportaion, is it done by Crane, or on pellets, etc ...
    Hope this helps
    Cheers

  • SHIPPING POINT AND STORAGE LOCATION DETERMINATION IN DELIVERY

    i made configuration setting for shipping point and storage location determination during delivery process. still system is not proposing this data during delivery.
      due to this reason lot of time is consuming during delivery creation.
    plz suggest the complete configuration flow for this determination.

    Dear Ram,
    Can you please specify the configuration that you have made? And which storage location determination rule are you using for your Delivery Type?
    Regards,
    Amitabha

  • Very urgent : shipping point and delivery creation date

    Hi :
    I have a custom table with fields :
    belnr, posnr, btyp, aufnr, ebeln, ebelp, livbeln, liposnr,matnr,wadat,kunnr,werks,bmeinh,getri,inaktiv,wabukz,erdat,aedat,loekz.
    Custom Transaction with fields :
    vbeln (field name belnr) , aufnr, delivery vbeln ( field name livbeln ),werks, mat .avail.dat ( mbdat ), transport.plan date(tddat),
    matnr, and sales order item (posnr).
    I have to select sales order , item from custom table based on plant (werks) shipping point , and delivery creation date.
    how can i relate shipping point and delivery creation date to my query.
    For delivery creation date, it should be selected based on current date+-2 and should choose MBDAT OR TDDAT which ever is earlier based on current date.
    I would appreciate if anyone can give me som idea and full points r rewarded.
    Thx.
    Rag

    Hi,
    Try this:
    select a1belnr a1posnr vbep~etenr into corresponding fields of table itab from a1 inner join vbap
    on a1belnr = vbapvbeln
    inner join vbep
    <b>on vbapvbeln = vbepvbeln and vbapposnr = vbepposnr</b>
    where a1~werks = p_werks
    AND vbap~vstel = p_vstel
    AND vbep~edatu = p_edatu
    AND (vbep~mbdat <= p_edatu OR
    vbep~tddat <= p_edatu ).
    regards,
    Anji

  • 2LIS_12_VCITM populates the same Shipping Point and Receiving Plant

    Hi Gurus,
    We are using 2LIS_12_VCITM extractor which answers all delivery-related requirements. However when I checked the data in RSA3, Shipping Point and Receiving Plant are the same. So I checked some sample deliveries in table LIKP and it shows the correct shipping point and receiving plant (which are different to each other). I checked VL03N and table LIKP is giving the correct shipping points and receiving plants. Receiving Plant or LIKP-WERKS and Shipping Point or LIKP-VSTEL. My question is how this happened? Consequently, when I initialized in BW, shipping point and receiving plants are the same which should not be.
    Thanks for all the help.

    The data for the 2LIS_12_VCITM is not just sourced by LIKP (Delivery Header), but by LIPS (Delivery Item) too.
    Plant, in this extractor, is sourced by LIPS-WERKS instead of LIKP-WERKS. The receiving plant is LIPS-UMWRK. If you require this data, you will have to enhance the structure and create the User Exit code in tcode CMOD to extract that particular data.

  • Shipping point and delivery creation date

    Hi :
    im selecting sales orders , items and schedule line
    from a custom table based on plant, shipping point and delivery creation date. 
    Is there any relation between Schedule lines and delivery creation date.
    For delivery creation date d_date = SY-DATUM,  and should select Mat Avail dt MBDAT or Trans. planning dt TDDAT which ever comes earlier.
    vbep-edatu = itab-d_date.
    select a1belnr a1posnr vbep~etenr into corresponding fields of table itab from a1 inner join vbap
    on a1belnr = vbapvbeln
    inner join vbep on a1posnr = vbepposnr
    where a1~werks = p_werks
    AND vbap~vstel = p_vstel
    AND vbep~edatu = p_edatu
    AND (vbep~mbdat <= p_edatu OR
    vbep~tddat <= p_edatu ).
    can anyone help me with this select statement.
    Thanks.
    Raghu

    Hi,
    Try this:
    select a1belnr a1posnr vbep~etenr into corresponding fields of table itab from a1 inner join vbap
    on a1belnr = vbapvbeln
    inner join vbep
    <b>on vbapvbeln = vbepvbeln and vbapposnr = vbepposnr</b>
    where a1~werks = p_werks
    AND vbap~vstel = p_vstel
    AND vbep~edatu = p_edatu
    AND (vbep~mbdat <= p_edatu OR
    vbep~tddat <= p_edatu ).
    regards,
    Anji

  • Shipping point and plant

    Hi experts,
    In VL01N, the system pops up the message below when entering storage location, picked qty & batch. Pls help to solve. Thx.
    "Shipping from shipping point 2000 and plant 1001 is not possible.   Message no. VL027".
    Acutally, shipping point 2000 has been assigned to plant 1001 in OVXC. In shipping point determination, shipping condition 20 - loading group 1000 - plant 1001 - proposed shipping point 2000 has been maintained. Shipping condition & shipping point between the sales order & delivery match.

    Hi Cathy
    Please make sure that your plant 1001 and shipping point 2000 is assigned  properly
    Then your OVL2 shipping point determination settings
    As you are getting this error while entering the storage location
    That means your OVL3 is not maintained properly
    OVL3 is storage location determination settings
    It is determined thro
    1.Shipping point
    2.Delivering plant
    3.Storage conditions from MMR (optional)
    In t code OVL3 maintain for Shipping point 2001 and Delivering plant 1000 and storage conditions of material maintained in MMR (plant data/storage location data 1 ) or you can keep  this as blank also
    For this combination maintain your storage location the key which you are manually entering in VL01N
    Regards
    Raja

  • How are shipping point and delivery note connected ?

    I wanted to understand how is shipping point connected to process of creating delivery notes....can we configure sap using SPRO such that the delivery note creation happens automatically for certain shipping point once the order is created and saved ....and for certain shipping point the delivery note is not automatically created ( assuming we are using the same order type) but the determination of automatic DN creation is done by the value of the shipping points ??

    Actually what is shipping point?
    Shipping point is an independent org.unit which is linked to the plant and represent the point of departure or receipt of materials.
    Normally lot of shipping points are assigned to the plant.
    Relation:
                   Actually a delivery is created from a single shipping point only.. That is the reason when u complete the sales order, at the time of creating the delivery note, u are forced to enter the shipping point, without that the system willn't proceed further.
    Determination:
    It is determined with the formula of shipping conditions + loading grp + deliv. plant
    Answering to ur 2nd query,
    when u are creating the delivery from the sales order screen (by going to menu bar and click delivery), the system automatically assumes the shipping pt is from the sales order.
    But if u enter the different shipping point in delivery note creation, the system will thro an error that delivery split due to diff. shipping points.
    Hope i clarify ur queries, ur further queries are welcomable.
    Reward points if useful...
    regards
    Kaleeswaran

  • Invoice Splitting - for some shipping points and not others

    Dear Gurus, I have a requirement where for some shipping points I need to be able to split an invoice on sales order (i.e. a separate invoice for each customer order) and for other shipping points I require a single invoice for multiple customer sales orders.  Using the copy control rules for LF to F2, I have set the Refence Number to B but this does not achieve what I want.  Would it be possible to achieve this via a copy requirements routine and by setting the values in VBRK-ZUKI?  Do I just copy the standard 003 routine and apply my changes here?  If yes, where do I insert the code - the top or bottom?  Regards

    In VOFM, first of all "Copying requirements" are used when we want to stop creating a target document from a source document or to prevent certain items from copying to target document under certain conditions. Copying requirements can't be used to do invoice split.
    Data transfer routines are the ones that allow invoice split (in addition to allowing copying fields from source to target). Although "copying requirements" is a loosely used terminology, it is important we make distinction between copying requirements and data transfer routines as both are different and perform different functions.
    SAP uses field VBRK-ZUKRI (a 40 character field) to store the combination of field values that are used as basis of invoice split. Invoice split happens if any of the fields stored in VBRK-ZUKRI differ across orders/deliveries (or their items) from which invoices are created.
    We assign VBRK-ZUKRI during item copy control in data transfer routines. The fields are simply concatenated and assigned to VBRK-ZUKRI.
    in VOFM, "Data transfer" routine 003 for Billing documents for example splits the invoice for each reference document, as shown by code below
    Include FV60C003
    *       For each reference document an invoice is created
    FORM DATEN_KOPIEREN_003.
      DATA: BEGIN OF ZUK,
              MODUL(3) VALUE '003',
              VTWEG LIKE VBAK-VTWEG,
              SPART LIKE VBAK-SPART,
              VGBEL LIKE VBRP-VGBEL,
            END OF ZUK.
      ZUK-VTWEG = VBAK-VTWEG.
      ZUK-SPART = VBAK-SPART.
      IF KURGV-PERFK = SPACE.
        ZUK-VGBEL = VBRP-VGBEL.
      ENDIF.
      VBRK-ZUKRI = ZUK.
    ENDFORM.
    In the above coding we are concatenating VBAK-VTWEG (Distr channel), VBAK-SPART (Division), VBRP-VGBEL (Reference Order from billing item) as the criteria for invoice split. So if any of these field differ then it will cause a split. So basically we are creating one invoice for all items that reference a single order
    So what you need to do for your requirement, is to copy the logic of data transfer routine 003 in VOFM to your own custom 9XX routine and make the assignment to ZUK / VBRK-ZUKRI only when shipping point (LIKP-VSTEL) is not equal to certain values that you don't want split to happen. It is better to maintain those shipping points in a custom table and make the check on the table rather than hard coding, so that in future it is easy to add more shipping points or remove existing ones if needed.
    Also remember to assign the new data transfer routine number 9XX to all relevant item categories in VTFL for your target billing type and reference delivery type

  • Shipping point and Plant in CRM 4.0

    Hi experts,
    Where do i find Plant and Shipping point in CRM Sales transaction? of CRM 4.0 version.
    Thanks in advance.
    Regards,
    DV.

    Hi DV,
    For sales order exchange scenarios please check the following notes:
    541113 - Data exchange scenarios for orders (CRM-R/3)
    511074 - Change of CRM documents in R/3 Backend System, part 1
    520045 - Change of CRM documents in the R/3 Backend System, part 2
    705200 - Data exchange - Scenario X, Y and Z (old version)
    889051 - Scenario A: Overview and settings (new version of 705200)
    620139 - Scenario A: Interdependent changes in sales documents - R/3
    Kind regards,
    KZ

  • Shipping point and plant assignment

    Hi,
    When i am maintaining enterprize structure in sd in assignment of organizational unit if i want to assign shipping point to the plant ,its not detecting plant untill i set up sales line(plant+sales organization/distribution channel) .what is the relation between sales line set up with shipping point to plant assingment? please clarify...
    Regards
    Supriya

    Shipping point can ONLY be assigned to a delivering plant.
    2. Plants can be "made" in to delivering plant by assigning Sales Org. , D channel to Plant.
    Therefore after 2 you have the possibility to assign shipping point to the plant (which has been made a delivering plant)
    PS - org unit plant is used in MM, PP and SD etc. but delivering plant is an important org unit for SD.
    From a business process perspective - PP: Plant is a manufacturing unit, MM: Plant is a storage of material unit. But to deliver goods to customers, a delivering plant has to be created. Shipping point is the starting point (& the org unit that controls) of outbound deliveries. Thus shipping point is assigned to Delivering plant.
    This is also logical from a business process perspective!
    Edited by: Typewriter on Aug 19, 2011 3:08 PM

  • How to Avoid the Tax and Shipping point and plant redetermination

    Dear experts
    my business requirement is to change the Ship- to address while creating the sales order . Due to this my taxes and shipping/plant data get re determined . The order type i am using triggers to planned order and availability check .
    When i change the address of ship to the proposed date gets changed and effects the delivery planning ,
    Please suggest a way  if i chnage the address of SH during sales order creation or change ( VA02) . my shipping data should not determined  and the availability check wont carry out
    Regards
    Vinay Kr  Joshi

    HI,
    if you change the ship-to-adress, in my oppinion it is right, that there is a new planning.
    if you wont have this planning, you should set the dates fixed in the availability check.  sign date and quantity fixed.
    Hans

Maybe you are looking for

  • Cannot get a menu screen on appletv box

    I Have an apple3 tv box. Hooked it up last night and it worked fine. Today when I turn the box on the only screen that comes up is a picture of the back of the apple box and a USB cable. I cannot get to a menu screen. I have rebooted everything sever

  • Appraisal Workflow - Item not completed

    Hi, After performing Approved or Reject in MSS for Appraisal Workflow, the task are not completed or removed from the UWL of the user. If we do the same from R/3 the workitem gets completed. I checked the workflow task and it always ask for 'Confirm

  • Loading to 0FIAR_C05 InfoCube

    The business delivered content for InfoCube 0FIAR_C05 only supports full updates from the extractor 0FI_AR_5 using a full update InfoPackage.  If we include this InfoPackage in our process chain, I think that data values will double in InfoCube unles

  • Login Attempts

    Dear All, How can i get the details of failed and successfull login attempts in Oracle 9i? Which system tables should I query Regards, Simon

  • TS4268 I still can't activate imessage???

    I'm using IOS7.1 iphone 5.Can you help me how to solve this trouble.! I can't activate my imessage. I try everything but it doesn't work!