Shipping point configuration for selected materials

We have configured one working day as our rounding-up period for shipping point in the system.  This forces the material to be available one day before shipping for preparation and traffic time.  
The abpve has worked well for us since we have been make to order company till now.  Today we are moving towards keeping stocks for seasonal and fast moving items.  Problem:  In our current configuration, we can not ship on the same day even when we have stock.  The shipping point will add the rounding-up period for all materials on a SO.
We would like to allow for same day shipping for in-stock items, as long as ATP confirms the qty.  At the sametime, continue to add the extra day for shipping point for anything that is not in stock.
What can we consider to allow for such flexibility.  I would appreciate any pointers or help to point a rookie in the right direction.. 
Thank you in advance,

hi,
u can achieve teh stocking scenario by creating a new shiiping point with 0 lead times (i assume u will continue with the MTO scenario too). for teh other requirement check the settings in ovz9- especially the tab 'recepits in the past'.
saurabh

Similar Messages

  • Creat Shipping point configuration for plant

    Hi
    I want create shipping point for plant XYZ.
    I need to create shipping point, so that I can maintain country and Transportation zone for the same.
    Request you please tell me where i can configure in IMG?
    What is the step by step process for setting shippong point for anty plant ?
    Vicky

    Hi Vicky,
    Shipping Point Configuration:
    1) SPRO->Enterprise Structure->Definition->Logistics Execution->Define, copy, delete, check shipping point...  for Defining the Shipping Point
    2)SPRO->Enterprise Structure->Assignment->Logistics Execution->Assign shipping point to plant... for linking Shipping Point with Plant.
    3)SPRO->Logistics Execution ->Shipping->Basic Shipping Functions->Shipping Point and Goods Receiving Point Determination->
                 ->Define Shipping Conditions
                 ->Define Loading Groups
                 -> Assign Shipping Points ........ here you enter the combination of Shipping Condition, Loading Group, Plant for  determing the Shipping Point which can be one default and many manual.
    Regards,
    Karthik

  • How to take planning run for selected materials?

    We have some 50 materials for which only i want to take planning run.I try to use MRP area but it it creating problem at the time of delivery of materials.Please suggeset solution.

    Hey,
    you can resolve this issue by creating a separate MRP controller for these materials and configure the user exit key for this MRP controller at MD01. (just press F4 at user exit key and select the maintain values option) such that materials for only these MRP controller are planned.
    This however, has a drawback, ONLY materials whose MRP controller is selected would be planned:
    Eg;
    if Parent material A has two child materials in it Y and Z.
    if you assign A the MRP controller 001 <~~ and
    Y and Z have some other MRP controller, the dependent requirements generated from A would not be planned on Y & Z,
    So, if you want the planning to take place at all BOM levels for these materials you can place the same MRP controller for all materials which you want to plan separately.
    Hope this solves your issue.

  • Shipping Point Determination for Sub contracting Process

    Dear Experts,
    While processing the GR for a Sub Contract Purchase Order, we are getting an Error  'VL 100 - Shipping Point XXX doesn't exists'
    However, I am not understanding where from this Shipping point is picked.
    Checked the Shipping point determination based on Loading Grp, Shipping conditions & Plant. But that is a different shipping point, and it is being picked while processing the outbound delivery for sending components thru 541 Movement.
    It is clear that the Shipping point XXXX is not existing, but not sure, as where from that Shipping point is being determined while doing GR
    Request for your inputs please
    Thank you,
    Best Regards,
    Ramakrishna Mangena

    Hi Ramakrishna ,
    What u earlier said is perfectly right : Shipping point determination based on Loading Grp, Shipping conditions & Plant
    Check the following :
    Are u posting GR through VL31N .
    If yes, just check the receiving pt entered in Header Data - Shipment Tab.
    Regards
    Ramesh Ch

  • Delivery schedules print or output for selected materials only

    Hi
    We have schedule agreement LP document type which has 350 materials
    Every time we transmit message to vendor we do not want to transmit all materials delivery schedules to vendor
    we want to transmit only selected materials delivery schedules
    how this can be achieved
    We using copy of standard delivery schedule message type LPET
    Please help
    Thanks in advance

    LPET includes all open deliveries in output and doesn't exclude even if they transmuted already

  • Access Point configuration for flat network

    We have recently aquired a remote location which has a pre-existing flat network (172.16.X.X/16). Before we are able to convert them over to our new IP scheme, they have a need to have wireless connectivity on site. We have 4 1142's which I need to configure for them. I have experience configuring WLC's and autonomous AP's for networks with multiple vlans but have never configured AP's for a flat, single subnet network. I need to configure them for either guest access (internet only) or corporate access to network resources with radius authentication. Do I configure a native vlan as I would for a typical multi vlan network? Do I configure the switch port as an access port as opposed to a trunk beacause of the lack of layer 3? I basically need a sample configuration for this situation.

    since you are on flat network, you just need to configure the SSID, no need for subinterfaces.  With the AP only servicing the one VLAN you can leave the port as an access port as well.
    as they are on the only subnet, I wouldn't do a 'guest' SSID.  I would go with just the corporate SSID with WPA2/AES/802.1x.  So the config is exactly the same for the RADIUS server and the SSID, but greatly simplified since you don't have to sub-interface anything.
    Steve

  • ALE/Change Pointer Configuration for ZSEGMENTS

    Hello all,
    I have been searching for a few days now trying to obtain my requirement with extending of an idoc.  I am working with the following:
    Message Type: HRMD_A
    BASIC Type: HRMD_A06
    Extension: ZHRMDA06
    I extended the idoc because I wanted to include 2 extra infotypes which are not on that idoc.  Infotypes 77 and 709.
    Here is what I have completed so far.
    WE30...Created ZSEGMENTS to include below.
    WE31...Extended the HRMD_A idoc to include the ZSEGMENTS defined below.
    WE82...Updated the output types and assignments to idoc.
    BD61...Activate Change Pointers
    BD50...Activated change pointer for HRMD_A.
    I change the address field in infotype 0006. 
    Run the BD21...idoc is generated with the changes to address, everything looks good.
    Do the same thing for the ethnic origin on infotype 77, no idoc is generated. 
    I turned on logging onto table PA0077.
    I am evaluating the change logs via SCU3, and I am seeing my changes on the field.
    What I have tried...
    I have tried creating a object in t-code SCDO (ZTEST)
    I have associated  ZTEST with table/field PA0077-RACKY.
    Tried running BD21...No iDoc generated.
    I have been researching for a few days and it feels that this should be able to be done through configuration and not custom coding.  Am I wrong to think that?
    Has anyone ever did anything like this before which they can point to documentation or even the appropriate search criteria on the SCN forums.
    Thanks in advance for your help!
    Jason

    Hi Jason,
    I believe you have to enter the fields that trigger the changing pointer in tcode BD52. In my case these are the fields for BOM:
    Regards,
    Custodio

  • How to assign shipping point for STO

    Hi experts
    for STO, PO=>Delivery
    When creating PO, enter material master then press enter, client want to proposal shipping point automatically
    for example, when create PO, enter material master, if the material master MRP2 view storage location is 1130, then proposal shipping point 7000 after press enter
    Is SAP stardard function can do this?

    Hi,
    If your configuration is proper in IMG, then shipping tab will reflect in P.O
    And for your speciefict requirement activate shipping point determination on the basis of storage location
    IMG >> Materials Mang. >> Purchasing >> Purchase order >> Set up stock transport order >> set up stock transport between storage location >> set up storage location dependend shipping point determination
    Here u can carry 2 activities
    In this define rule as Strorage location speciefic shiping point detemination for delivery type
    and next step assign shipping point according to storage location
    kapil

  • How to trun off batch determination for certain shipping points ?

    During Delivery Notes creation we would like to turn off the batch determination on basis of certail shipping points. can some please guide what is the best way to do it. We do not want it turned off for all the shipping points but for a special ones.
    The idea is when we create Delivey for certain shipping point we do not need to fill in the batch code and yets save, pick confim, goods issue during delivery creation process....
    we have sepcial shipping points for consignment process and for them we need to skip the batch determination......
    Thanks in advance
    Rajey

    I don;t think you  can control based on shipping point because batch creation is controlled at movement type level

  • No transfer order created via VL10A for certain shipping point

    No transfer order created automatically via VL10A for a certain shipping point.
    For Shipping Point E004 the TO is automatically created in VL10A, but for Shipping Point E070 it's not automatically created.
    Could you kindly let me know why TO is not automatically created by Tcd VL10A?

    Automatic TO creation depends the warehouse number or movement type. Can you check the warehouse number for both shipping points?
    Regards,

  • Use of "Rounding work days" in shipping point?

    Hi, Could someone please explain to me how the "rounding work days" in shipping point is used for ATP purpose (within R/3 itself)?
    Let's assume that the Delivery date is coming up as 18th Nov, 2011 08:00:00 hrs in schedule line, and the rounding work days is maintained as 0.2 days. Assume that the route has 1 day for transport, and this route time is relevant as per shipping point configuration.
    What would be the value of GI date/time that I should expect for the schedule line?
    Do I simply convert 0.2 days to hrs in 00:00:00 format, and subtract this time for delivery date to arrive at GI date, or could any other master data come into picture for GI date calculation?
    I am currently seeing GI on 17th Nov, 2011 00:00:00 hrs, and not able to understand this value of GI time.
    PS: Calendar for route is a custom calendar with working time from 00:00 to 24:00 hrs on all weekdays (monday to friday), and no working hrs are maintained at the shipping point.

    Hi,
    If the current date is 03.11.2011.
    you have maintained rounding work days 2 days. days specifyied in route is 1day.
    then if you raise an order for current date.system will propose schedule lines after 3 days it means 07.11.2011.
    Thank you,

  • Pick Pack time in shipping point.

    Hi Gurus,
    I would like to have a clear understanding on the Pick Pack time / Loading time in Shipping point Configuration.
    1. I have configured shipping point with factory calendar assigned to it.
    2. I have given the pick pack time in the shipping point config.
    Now the question is, i'm able to give fraction values also here , say 2.5 days for pick pack time,.
    what does this mean? how do i infer.
    Please provide clarity.
    I do not want details on how the dates are determined in Sale order w.r.t to this details, instead more clarity on how days will be taken if fractional values are given in days and not in hours.
    Regards,
    Basha.

    System will consider decimal based on factory calender and work times fields
    If work times are defined, lead times can be set in hours/minutes and applied to the work times.
    The following priorities are used for scheduling:
    Factory calendar and work times maintained
    The lead times are used in hours / minutes work time. Here, both the work days defined in the calendar as well as the work times on the individual weekdays (Monday through Sunday) are taken into consideration.
    Additionally maintained lead times in calendar days are possibly not taken into consideration if the lead times are not maintained in hours/minutes. The work time would then be zero from the schedulung view.
    Factory calendar maintained
    The work times in calendar days are used and the workdays defined in the calendar are included. From the scheduling view, each day has 24 hours (in contrast to the lead time in hours/minutes where the work times are taken into consideration).
    Additionally maintained lead times in hours/minutes are possibly not taken into consideration if the lead times in calendar days are not maintained. The work time would then be zero from the scheduling view.
    No factory calendar maintained
    As above, the system calculates only using calendar days, and work-free days, such as weekends or public holidays, are not taken into consideration
    Thanks
    Chidambaram

  • Shipping point determination steps

    shipping point determination steps

    Hi
    The following are used for the shipping point determination:
    1. Shipping conditions - Proposed from CMR. The entry in VOV8 for the sales document type if there overwrites the entry in the shipping conditions mainatined in the CMR.
    2. Loading group - Proposed from the material master record.
    3. Plant - proposed from CMIR - if not found then CMR - if not found then MMR.
    But you should first define and assign the shipping point in the "enterprise structure" otherwise you will not be able to do the shipping point determination.
    IMG - logistics execution - shipping - basic shipping functions - shipping point & goods receiving point determination - assign shipping points.
    Shipping point definition:
    IMG - enterprise structure - definition - logistics execution - define, copy, delete, check shipping point. You have to define the shipping point here for the particular plant.
    Shipping point assignment:
    IMG - enterprise structure - assignment - logistics execution - assign shipping point to plant. Here select your plant and assign the shipping point to the same.
    Reward Points if helpful.
    Regards

  • How to find the shipping point creation Date and time

    Hi All,
      Could you please help to solve this issue.
       Some of the users created shipping point, Now I have to find out in which date and time the shipping points were created, is there any table to find. please help me.
    Regards,
    Muralikrishna

    hi Murali,
    first define and assign shipping point in enterprise sructure in define shipping point EC07 and assign in OVXC
    goto OVL2 and assign the shipping points
    The following are used for the shipping point determination:
    1. Shipping conditions - Proposed from CMR. The entry in VOV8 for the sales document type if there overwrites the entry in the shipping conditions mainatined in the CMR.
    2. Loading group - Proposed from the material master record.
    3. Plant - proposed from CMIR - if not found then CMR - if not found then MMR.
    But you should first define and assign the shipping point in the "enterprise structure" otherwise you will not be able to do the shipping point determination.
    IMG - logistics execution - shipping - basic shipping functions - shipping point & goods receiving point determination - assign shipping points.
    Shipping point definition:
    IMG - enterprise structure - definition - logistics execution - define, copy, delete, check shipping point. You have to define the shipping point here for the particular plant.
    Shipping point assignment:
    IMG - enterprise structure - assignment - logistics execution - assign shipping point to plant. Here select your plant and assign the shipping point to the same.
    hope this helps,
    cheers,
    Hema.

  • Shipping point in S/O........

    I am actually not getting the drill down option of shipping point in sales oder and its showing as a incompletion log even though i have defined it and assigned it the plant and also determined the shipping point in the OVL2 but still i am facing the problem.
    Please reply........

    Hi Vinayak
    Shipping point is determined for the combination of:
    a) Shipping Condition (which is assigned in the customer master or Salesdocument type)
    b) Loading group (which is assigned in the material master)
    c) Delivering Plant (which has already been determined)
    Since you have confirmed that you have assigned in OVL2, please check once again whether the plant and shipping point are assigned to correct Shipping Condition and Loading Group.
    Most probably either the shipping condition or the loading group is wrongly assigned to the respective plant and shipping point.  For example, in customer master, you would have defined the shipping condition as “<b>01</b>” (standard) whereas, it is supposed to be “<b>03</b>” (standard exports).
    Thanks
    G. Lakshmipathi