Shipping point determination in stock transfer order,

Hi, experts,
                        I have one problem regarding stock transfer note, In my business scenario, product wise SR no use for excise invoice, So, i had maintain no range as per shipping point wise, But , when i have create stock transfer order, at a time system take default shipping point , as per shipping point determination, But i want to different shipping point in this stock transfer order, but i can not change shipping point in stock transfer order, Can u give me any solution of this problem,
T.code - Use - ME27
Order type - UB
Regards:
Happy

First create a STO with a Plant as per your Requirement by maintaining the same Plant in the Material.Also maintain the same Plant in determining the Shipping Point Determination.
Otherwise to change the Shipping Point Manually is not a good habit by the Users.
Best Regards,
Ankur

Similar Messages

  • HOW SHIPPINS POINT IS BEEN DETERMINED IN STOCK TRANSFER ORDER IN A COMPANY

    HOW SHIPPINS POINT IS BEEN DETERMINED IN STOCK TRANSFER ORDER IN A COMPANY

    Shipping Point determination will be based on 2 configurations
    (1) based on the combination of Shipping Condition (Customer Master), Loading Group (Material Master) and Plant.
    (2) based on the combination of Shipping Condition (Customer Master), Loading Group (Material Master), Plant and Storage Location.
    However you need to check the configuration of delivery type whether the rule assign is (a) Plant-specific Shipping Point determination or (b) Storage Location-specific Shipping Point determination at the following path: SPRO=>IMG=>Logistic Execution=>Shipping=>Basic Shipping Functions=>Shipping Point and Goods Receiving Point Determination=>Set Up Storage-Location-Dependent Shipping Point Determination=>Define Rule for Determination of Shipping Point.
    Hope this will help.
    Edited by: ekltai on Mar 3, 2011 2:32 AM

  • Sales Area Determination in Stock Transfer Order - user exit

    Dear SD gurus,
    We have different distribution channels for inter company and intra company stock transfers; since only one sales area can be set in the configuration (setup STO -> shipping data for plants), we want to use a user exit to determine the sales area dynamically.
    We have created an enhancement of function exit V02V0001 (Sales area determination for stock transport order); but the program flow doesn't seem to stop in this exit despite setting break-points.
    Can someone suggest why this exit is not fired during runtime or if this can be used at all for our purpose.
    Regards,
    KC

    Is user exit required, as the sales area will be different. Incase of Intra company stock transfer the process will be as under:
    Create Purchase Order (ME21N)
    Create Delivery in background (VL04, VL10a, VL10C, etc)
    Change Delivery for picking / packing & PGI (VL02n)
    Create Billing Document (VF01)
    Assumption: Stock Transfer configuration is in place. Assistance can be taken from SAP Best Practices in help.sap.com
    Incase of Inter-company, the process will be as under:
    Create Sales Order (VA01)
    Create Delivery (VL01N, etc)
    Change Delivery (VL02N)
    Create Billing Document (VF01)
    Assumption: Configuration is in place. Assistance can be taken from SAP Best Practices in help.sap.com
    Regards,
    Rajesh Banka

  • Shipping point in PO stock transport order

    When I create PO (stock transport) I need to change shipping point every time? Can you pls tell me where I can find it and set it in SPRO?
    regards
    Piotr

    Piotr,
    You can default the shipping point in your STO based on the combination of shipping conditon (maintained in customer master), loading group (maintained in material master) and the plant in SPRO->Logistics Execution->Shipping->Basic Shipping Functions->Shipping Point and Goods Receiving Point Determination->Assign Shipping Points.
    If you don't use any of the entries (for instance if you don't use the loading group), then just leave the entry blank in config.
    Hope this helps.
    H Narayan

  • KE24 no shipping point for STO(Stock Transport Order)

    Dear All:
    When I run KE24(account based), I found some of the data without "shipping point" value. Most of these records are from STO orders.
    May I ask if there is any solution for this issue?
    Thanks and Best Regards,
    Harrison

    Hi, This situation in ONLYfor STO orders.
    For other orders, it is normal.
    Therefore, I do NOT think this is because COPA fields are NOT maintained.
    Thanks for your reply
    Harrison

  • Customer determination in Stock Transfer Order

    We have a situation whereby we have created a unique storage location to handle direct delivery of goods to an internal customer. When we create the STO for transfer of product from a production plant to the distribution plant (in which the new location exists) it picks up the customer associated with the receiving plant (as expected). Is anyone aware of a method of assigning the customer from the storage location when this STO is created?

    Hi,
    you can define storage location-specific customers only for STOs within a plant between SLocs. Otherwise the customer associated with the receiving plant is used. You can try the BAdI ME_PROCESS_PO_CUST. I'm not sure whether it'll work but I think it's worth trying.
    Regards,
    Attila
    PS:
    Interface IF_PURCHASE_ORDER_ITEM_MM
    method SET_SHIPPING_DATA
    Edited by: Attila Giber on Apr 29, 2010 12:49 PM

  • Shipping point determination is not happening for CRM sales order in ECC

    Hi,
    When we create direct sales order in ECC, shipping point determination is happening automatically that means all the relevant settings are properly maintained in ECC for automatic determination of shipping point.
    But when we create sales order in CRM and replicate it to ECC, shipping point field is empty even though we use same master data.Hence we are unable to create delivery document.
    All the master data (Org structure,Customers,Materials and plants) downloaded from ECC to CRM.
    Your help would be highly appreciated.
    Thank you.
    Regards,
    Nagi

    Hello Nagi,
    Shipping point is determined by the following three factors:
      1.shipping condition 2.loading group 3.plant
    So please check your customization by the following steps:
      1.Use T-code OVX6 to check if you have assigned the plant to your CRM order's sales organization.
      2.Shipping condition is usually taken from CRM order directly. Please check whether you have CRM order shipping condition set to the same one as creating ECC order VA01
      3.Use T-code SPRO then press F5, go to Logistics Execution  Shipping Basic Shipping Functions  Shipping Point and Goods Receiving Point Determination  Assign Shipping Points to check the shipping point is assigned correctly.
    I hope this could be helpful.
    Best regards,
    Maggie

  • Stock Transfer Order, is there any field called "commit to ship"

    Dear Experts,
    While doing Stock Transfer Order, is there any field called "commit to ship"  which means that the qty is confirmed to transfer from Plant A to B.
    Regards

    I am not sure exact field are you reffering in PO there is commited qty in delivery schedule tab this will shows commited qty in po once qty confirmed

  • Transaction to see the Open stock transfer order for the plant

    HI ,
    i need to develop one report in that client to make the report for the all open stock transfer order & the cost of the open stock transfer order for the plant .
    I need how to cretae the stock transfer order for the material , whci material master is required for this process.
    please give me step by step details for this .
    regards
    satish
    Edited by: satish kapartiwar on Jul 16, 2009 9:33 AM

    Hi Satish,
    You can see open stock transfer quantity in MB5T and stock value in MB5L. If you want to make stock transfer, there is two types intra company transfer(with in same company code) and inter company transfer (different company codes).
    Steps for Intra company stock transfer:
    This is only within the comp.code(w/o SD)
    (w/o SD) 351101 MvT. and (with SD) 641101
    1. Mat.(1434)should be maintained in both the plants.(@1000&1100).
    2. Should have enough stock in supplying plant(1000).
    3. Make its supplying plant as a vendor in vendor master record in receiving plant(1100).
    4. Make it receiving plant as a customer in customization.
    Create customer (xd01) & and define the shipping data for plants in both the plants.
    Path: spro u2013 img u2013 material mgmt u2013 purchasing u2013 po u2013 set up STO u2013 define shipping data
    (1 by1 )
    In Receiving plant (1100)
    Customer num. 123345 (for ex.)
    Sales org. yyy
    Dist. Channel yy
    Sales div. y
    In Supplying plant (1000)
    Customer num. -
    (don't fill)
    Sales org. yyy
    Dist. Channel yy
    Sales div. y
    5. Assign doc. Type is "NL" for intra company STO. If STO is inter company, Assign doc. Type is "NLCC".
    Position doc type is "UB"
    Enter supplying plant(1000) & doc type (NL)&checking rule (ex:01)
    6.Assign doc. Type is "UB" to u'r plants.(PO)
    Go for new entries
    Enter supplying plant(1000) & Receiving plant (1100)&doc type (UB).
    7. Create a PO, choose the doc type is 'UB' & item cat.'U', Enter supplying plant as a vendor in PO of the receiving plant(1100).
    8. Provide this num (PO) to SD people, they will do the delivery by using transactional code is VL10B.
    9. Sales people they will provide "out bound delivery num".
    10. Do the GR. In GR the second tab 05 outbound delivery instead of PO mov.type 101.
    11. See the stock overview in the receiving & supplying plants.
    Steps for Inter company Transfer:
    1) Create one Customer Master in XD01 with respect to Supplying Plant Sales Area and assign this Customer no with Receiving Plant in OLME->PO-> set up STO->Define shipping data for plant and for the supplying Plant assign the above sales area.( Make sure, In Customer Master, sales Area Tab: you are maintaining shipping condition)
    2) For Receiving Plant Pur. Org and Co.Code Combination create Vendor master in XK01 and in this vendor master assign the Supplying plant in Pur.Org.Data screen->Extras--> Add.Pur.data
    3) OLME->PO-> Set up STO------>For your supplying plant assign document type NB, Delivery type NLCC and Checking Rule RP
    4)then For your supplying Plant and receiving Plant assign Document type NB
    5)Make sure you are maintaining Sales View for the material at supplying Plant and in Sales /Gen plant Data view maintain Availability check, Loading group and Transportation group.
    6) In SPRo-->Logistics execution> Shipping->Basic shipping functions->Shipping point Determination>assign shipping points-> For your Loading group, Shipping Condition and Supplying plant combination, Assign shipping point
    these are the configuration settings you have to do in background.
    Then Create STO from Receiving Plant in ME21N with document type NB.
    Based on that STO, Create Delivery in VL10B from supplying Plant
    Do PGI in VL02N from Supplying plant
    Do GR in MIGO at Receiving Plant keeping Outbound delivery as a ref. document.
    Now your STO bet. two plants belongs to diff. Co.Codes will be completed.
    Regards,
    Prasath

  • Could not create Purchase Order Stock Transfer Order

    Hi Expert!
    Need your help.
    User could not make Could not create Purchase Order Stock Transfer Order for new plant 1075 & 1076 at P05 with error message Not posible to determine shipping data for material. Our new vendor are 510022060 for new plant 1075 and 510022061 for new plant 1076.
    The problem was caused by the missing STO setup for these two plant 1075 and 1076, as no customer code being referred.
    Now i got the customer number for these two plants but how to set it up in configuration? Please guide me step by step.

    Hi Crystal,
    The following customising need to be carried out for Inter Company Stock Transfer.
    Path : sproMaterials ManagementPurchasing-Purchase OrderSet up Stock Transport Order
    Define Shipping Data for Plants :
    For the Supplying plant (1) the Sales Org data to be maintained.
    For the Receiving plant (2) the Customer No to be maintained.
    Create Checking Rule - U can use existing one Eg : B
    Define Checking Rule : Use Standard one Eg :01 linked to B.
    Assign Delivery Type and Checking Rule -- For the Supplying Plant (1) and document type NB use the delviery type NLCC and Checking Rule B.
    Assign Document Type, One-Step Procedure, Underdelivery Tolerance :
    For the supplying Plant (1) and Receving Plant (1) ; assign the document type : NB.
    Points to be noted :
    The Material should exists in both the plants ( 1 & 2 ) with the sales view maintained . Note that the Loading grp / Transporting Grp is mantaory in Sales Views.
    The Vendor is to be assigned to the supplying Plant (1 ) in Purchasing View of Vendor Master.
    For that click on Extras - Add Purchasing data in Purchasing view of Vendor Master (XK02 )
    Do maintain the customer in Control data of Vendor Master.
    Do maintain the Vendor in Control data of Customer Master.
    Also note that shipping conditions are maintained in the Customer Master . The same can be found in Sales Area - Shipping Tab.
    Shipping Point determination :
    SPROLogistics ExecutionShippingBasic Shipping FunctionsShipping Point and Goods Receiving Point Determination--Assign Shipping Points ( For a particular Shipping condition/ Loading Grp /Plant - the shipping point is assigned ).
    Regards
    Ramesh Ch

  • Shipping point determination - ME2O

    I'm using ME2O for creating a delivery. I select a line and i press the Create delivery button. A popup appears but the filed Shipping point is empty. What configuration should i make to have a value in that field?
    The shipp. points are assigned to the plants and the determination using the shipping conditions- loading grp-plant are already configured.
    Thanks.

    hi,
    this is to inform you that,
    ME2O - DELIVERY WITH REFERENCE TO SUBCONTRACTING.
    Please check in IMG:
    1. MM - Purchasing -> Purchase Order -> Setup Stock Transfer Order -> Define shipping data for plants
    2. Select the plant and double click in Enter the following field the sales area for the same.
    5.MM>Purchasing>set up Subcontractor order>assigning plants to the delivery document LB.
    6.Have you created a Customer master record in the same sales area as Material and then assigned it to the Vendor Control data in CMR.
    hope this clears this issue.
    balajia

  • Stock Transfer Order Between plants

    Hello Everybody,
    Can someone tell me the steps and configuration involved in STO between 2 plants?
    Please help me .
    Thanks,
    Sneha.
    Please dont post basic and repeated questions.  Do search in the forum
    Edited by: Lakshmipathi on Feb 26, 2009 2:23 PM

    Hi Read this fully and configure accordinngly
    Configure Inter company Stock Transport Order
    Material should exist in both the plants (Delivering & Ordering),
    Internal customer should be assigned to the ordering plant ( MM -> Purchasing -> Purchase Order -> Setup stock transport order -> assign the internal customer to the ordering plant and assign the Sales area of the internal customer.
    Assign its Sales area to the delivering plant
    Assign the document type and Delivery type NB and NLCC
    Assign the Supplying plant --> Receiving Plant --> NB
    Take the delivering plant and assign the sales area.
    Vendor master has to be created and assign the supply source (Delivering Plant).
    Create a purchase order ME21N ---> Save
    Delivery VL10 G ---> Calculation rule (appropriate) --> Assign the purchase order number here and execute.
    Select the Delivery creation line and do the back ground process.
    Start the log display and see the delivery document number by the documents button
    Goto VL02N --> do picking and PGI --> Then do the MIGO with respect to the delivery document.
    Billing (Intercompany pricing conditions should be set).
    AND
    1. Customer No. for the Goods Receiving Plant - OMGN
    2. Availability Check- Checking Rule (if necessary) - OMGN
    3. Assign a Delivery Type for the Delivering Plant - OMGN (for Stock Transport Orders, NLCC)
    4. PO type (which i believe you have done) - OMGN
    5. Assign Vendor No. to the Supplying Plant (done) - VK02
    6. Assign Customer No. to the Purchasing Plant for the Inter-Company Invoice (but you need to assign this to the Sales Organization pre-assigned to the Purchasing Plant),
    IMG-SD-Billing-Inter Company Billing-Define Internal Customer No. by Sales Org
    ***and by the way for the Invoice to work between Cross-Company Plants, you need also to have a Sales Org for the Supplying Plant and a Pricing Determination Procedure
    INTERCOMPANY PRICING:
    PI01 Inter company: fixed amount per material unit
    PI02 Inter company: percentage of the net invoice amount
    These condition types specify that the price charged by the delivering plant to the sales organization is shown as a statistical value in the sales order and an effective charge in the internal invoice.
    The condition records you create and maintain for inter company billing are the same kind of records that you create for pricing in general.
    IV01 Inter-company Price ERLOS Revenue
    IV02 Inter-company % ERLOS Revenue
    STO:
    STO CONFIG:
    The following steps have to be followed in order to configure stock transport order between two plants.
    1. Create a vendor for the Company code of the receiving plant using account group 0007 via T-Code XK01.
    2. In the purchasing data view assign the supplying plant and the schema group
    3. Create customer with the sales area of the vendor.
    4. The shipping conditions, the delivering plant and the transportation zone determine the route in the STO.
    5. In the pricing procedure determination relevant to the STO assign document pricing procedure and customer pricing procedure to get the pricing in the invoice.
    6. Maintain condition records for pricing condition.
    7. Maintain carrier as a partner in the customer master.
    8. In OMGN select the supplying plant and assign the company code and sales area. Similarly select the receiving plant and assign the company code and sales area (The company code to which the plant is assigned to).
    9. Assign the delivery type and checking rule to the document type.
    10. And finally, assign the purchasing document type to the supplying plant and the receiving plant.
    11. Create the STO using T-Code ME 21N and save.
    12. Check for release strategy if any and release using T-Code ME 28.
    13. Create delivery in background using VL10G.
    14. If delivery is created, it is an indication of correct configuration and master data creation.
    Stock transfer between two plants in different company codes is known as inter company stock transfer.
    Material shoud be maintained in both supplying and receiving plant MM01
    Sotck should maintain only in supplying plant MB1C
    Create receving plant as a customer in suplying plants company code and sales area XD01
    Assign this customer number in receving plant detials OMGN
    Assign supplying sales area in supplying plant details OMGN
    Assign delivery tupe NB for in combination of supplying/ receving plants.
    Create STO ME21N
    As it is normal there in the item details wer should get shipping date i.e customer number
    Go for Delivery VL10B
    Shipping point *****
    Select PO go for execute
    then select the delivery then go for delvy ............create delvy,,,, delvy nubmer generated.
    Goods Issue VL02
    Delvy doc **********
    Click on picking
    enter the picking qty
    Click on PGI
    in the mean time check in the PO history you will get the details
    Goods receipt MIGO
    Stock overview the stock will be updated....
    P.O Order types and Delivery Types
    STO: - Stock Transfer Order
    Stock Transfer between Two Plants with One Company code.
    The Purchase Order Type is Used in this case is "UB",
    And the Delivery Type Used here is "NL"
    STPO:- Stock Transfer Purchase Order
    Stock Transfer Purchase Orders Between Two Plants with Two Different Company Codes.
    The Purchase Order Type is Used in this case is "NB",
    And the Delivery Type Used here is "NLCC".
    INTRA COMPANY STO.
    1. There should be two plants in the given company code for intra STO to
    happen.
    2. Assign Purchasing org of the ordering to the supplying plant.
    3. Create a customer in the supplying sales area.
    4. Assign the customer to the ordering sales area.
    5. IMG > MM > Purchasing > PO > Setup STO > Define shipping data for plants
    here go to supplying plant and mention its own sales area.
    6. In the ordering plant assign the customer created in the supplying sales area
    and also the supplying sales area.
    7. Maintain checking rule as 01.
    8. Assign the delivery type NL supplying plant checking rule and PO Doc type
    UB.
    9. Assign document type UB supplying plant and ordering plant then decide up
    on either 1 step or 2 steps.
    10. Create PO with doc type UB.
    11. Go to VL10B give the PO No. and enter, select the line item and click back
    ground. (Where Del. Will be created in the back ground)
    12. Go to VL02N for picking and PGI.
    13. If 1 step no need of doing MIGO else for 2 steps do MIGO.

  • Stock transfer order error

    Dear sir,
    while doing me21n(stock transfer order i m getiing one warning message "Ship. point 3100 not allowed for ship. cond. 01, loading group 0001, plant 3100"
    can u plz guide how to solve the issue i think i have mainted shipping data but still i m getting the same error.
    thanks
    Debesh Tripathy

    Dear,
            I have checked for error message it is also telling that there is some issue in shipping point determination.
            I will request u to do the same exerise once again, GOTO LOGISTIC EXCUTIONBASIC SHIPPING FUNCTION-- SHIPPING
           POINT AND GOODS RECEIVING POINT DETERMINATION--ASSIGN SHIPPING POINT in following manner
            SC       LGrp      Plnt          PrShp      MShp
            01        001        3100       3100        3100
           and also check 
           GOTO LOGISTIC EXCUTIONBASIC SHIPPING FUNCTION--
           SHIPPING POINT AND GOODS RECEIVING POINT DETERMINATION--STORAGE LOCATION DEPENDENT SHIPPING POINT
           DETERMINATION--DEFINE RULE FOR DETERMINATION OF SHIPPING POINT ( DOUBLE CLICK) and for ITEM CATEGORY NL
           put PLANT SPECIFIC SHIPPING POINT DETERMINATION and retry the whole process.
           If still problem exist then check ur MASTER RECORD for CUSTOMER and MATERIAL.
           For CUSTOMER ( which u have assigned for PLANT )use XD02 and select SALES AREA TAB and goto  SHIPPING TAB
           under which u will find SHIPPING CONDITION FIELD,do check it is 01 or something  else.
           and for Material use MMO2 and goto SALES:GENERAL/PLANT TAB there u will find LOADING GROUP, do check whether it
           is 001 or something else.if still not work then revert back.
    Regards
    AJIT K SINGH
    HAPPY TO HELP U
    Edited by: AJIT K SINGH on Dec 2, 2009 9:38 AM

  • Routing in Stock Transfer Order

    Hi,
    We are having SAP 4.7 & we have activated Transportation Routing process.
    Routing is copied in Sales order & Delivery. But the same is not copied in the stock transfer Order. We are doing following steps.
    We are using Stock Transfer order to transfer the material from One storage location to another storage location. Supplying Plant & Receiving Plant are same in Stock transfer Order. We are entering Receiving STorage location & Shipping point in the STO.
    Is this b'coz of Supplying plant & receing plant are same in the STO ? Or i need to active something els for this.
    Kindly revert back.
    Thanks in advance.
    Samir Bhatt

    Hi,
    this is one of the problems caused by an organisation structure that is not quite matching the "real world".
    In SAP each Plant should have a unique address and the storage locations are thought of as areas within that address.
    If you have two sites that have different addresses, they should <u>ideally</u> be separate plants. You can then use all of the available functionality within SAP that you would expect.
    If you want to set up a route that goes from one address to another than this is possible, but in your case you are actually saying that you want a route for s delivery from and too the same address, not really a real world scenario.
    So if you really want to do this then each site should be a plant. I expect that it is too late to change your design but it is important for others reading this to understand the problems that are caused when Storage locations are used instead of Plants for physically separate addresses.
    Sorry if this is not much help to you but it should help you to understand why you are having a problem.
    Steve B

  • Stock transfer order

    Hi Gurus,
    While doing Stock Transfer order - assigning deliverying plant
    to sales organisation : I could not assign and message is giving :
    "The sales org is part of company code Z222, Plant Z223 is part of company code Z223. Organization data for inter company billing missing in plant Z223."
    For you kind information :
    I have maintained regular enterprise structure ie everything is Z222 means comp code, plant, shipping point etc. for my memory.
    Stock transfer order step
    Step 1 I maintained another enter prise structure ie. everything is Z223 company code, plant etc.
    Step 2 Intercompany billing customer, I assignd customer no. in relevant sales org ie, Z222
    Step 3 I am assigning deliverying plant ie Z223 to sales organisation ie Z222 but I could not assign, the message has come.
    Kindly anyone help me out.
    Thanks
    rakesh

    Hello.
    Go to SPRO --> Materials Management ---> Purchasing ---> Purchase Order ---> Set Up Stock Transport Order --> Define Shipping Data for Plants. Select the ordering plant (Z223) and assign the intercompany customer, and the sales area of the deliveing plant.
    Once you maintain this try to assign the Delivering plant (Z222) to Ordering sales organisation (Z223) and Distribution channel.
    Prase

Maybe you are looking for

  • How do I open a word document that has been downloaded onto Firefox downloads?

    I edited a document on Word that was in word rtf. The document had been in my dropbox folder. When I saved the document it was downloaded to my Firefox downloads (but not to dropbox.) . I want move the file to my dropbox.

  • About JavaScript and LiveCycle Designer generally

    Conditional statements have to get structure strictly, i. e. else has to followed after if. Never without, otherwise you will get confused solution!

  • Pages are ordered wrong. How do I fix this?

    I am using Adobe Reader at my community college and one of my philosophy .pdf's that my teacher has assigned us to read has 5 pages that are numbered wrong. The order of the pages specified by the .pdf, pg.10-pg.14, are as follows: 62, 65, 63, 64, 66

  • Flash 10 installed but not being detected by numerous sites

    Hi! I have installed and re-installed Flash 10 numerous times over the past day trying to get it to work. I have followed the "Trouble Installing Flash for Windows" solutions including Subinacl and everything else that is suggested there. I have also

  • ID already in use

    When I try to sign into FaceTime i get the message "Unable to verify "[email protected]" because it is already in use by another Apple ID".  What does this mean & how do I rectify it?