Shipping Point Issue

Hello Experts,
I'm having a bit of challenge with Shipping point withing my sales order. From my understanding  SHIPPING POINT depends on the PLANT,SHIPPING CONDITIONS & LOADING GROUP
SHIPPING CONDITIONS is selected for my customer under shipping tab. I've used PLANT (3000 New York) and SHIPPING CONDITION (30 Standard)
LOADING GROUP is chosen under Material master General plant data tab which is (0001 Crane)
Then I went to Transaction code OVL2 to maintian the combination of PLANT+SHIPPING CONDITIONS as (3000, 0001)
Even after performing all the above steps system doesn't automatically propose me Shipping point and under sales order item details shipping tabe when i click on SHIPPING POINT message shows 'No possible entries exist for this field.
Can anybody see what's missing in my steps?
Many thanks in advance.'

More precisely you can check the following
1.Shipping conditions entered in the Customer Master Data of Sold to party/ sales area data/ Shipping tab.
2.Loading group entered in Material Master data / Sales : General/Plant view.
3. Delivering Plant which would be picked in the following sequence-
  (a) Customer Master Info records. Check at [VD53]
  (b) Customer master data of Ship to party - Sales Area data/ shipping tab.
  (c) Material master data - Sales : Sales org1 view
  (d) Else you can enter or change manually in the system, which has priority above all.
In the sales order you can find the Shipping Conditions  in the Header data - Shipping tab page - you can enter manually or overwrite it.
In the sales order you can find the Delivering plant at Item data - shipping tab page. same as above you can enter it manually or overwrite it.
Loading Group is not displayed in a Sales order & can be looked in Material master data only.
See that the above fields you have in your Sales order & MMD are assigned with the shipping point at [OVL2] screen.
If it does then certainly the Shipping Point would be picked up.
Ram

Similar Messages

  • How to trun off batch determination for certain shipping points ?

    During Delivery Notes creation we would like to turn off the batch determination on basis of certail shipping points. can some please guide what is the best way to do it. We do not want it turned off for all the shipping points but for a special ones.
    The idea is when we create Delivey for certain shipping point we do not need to fill in the batch code and yets save, pick confim, goods issue during delivery creation process....
    we have sepcial shipping points for consignment process and for them we need to skip the batch determination......
    Thanks in advance
    Rajey

    I don;t think you  can control based on shipping point because batch creation is controlled at movement type level

  • KE24 no shipping point for STO(Stock Transport Order)

    Dear All:
    When I run KE24(account based), I found some of the data without "shipping point" value. Most of these records are from STO orders.
    May I ask if there is any solution for this issue?
    Thanks and Best Regards,
    Harrison

    Hi, This situation in ONLYfor STO orders.
    For other orders, it is normal.
    Therefore, I do NOT think this is because COPA fields are NOT maintained.
    Thanks for your reply
    Harrison

  • EDI: partner profile for shipping point or plant

    I want to issue idocs for delivery notes based on shipping point or plant, not shipto party as is usual.
    How can I go about this?
    It looks like I need to create a new partner type. Or can I use logical systems?
    If logical system is used, then how do I make the connection document->LS?
    The external system uses the RCVPRN to determine which warehouse to handle the delivery for.
    I am changing the RCVPRN in a user exit now, but this still requires creating/ changing all partner profiles for shipto parties.
    Any ideas? previous experiences?
    Thanks,
    phillip

    Hi Phillip,
    it looks like I need to create a new partner type. Or can I use logical systems?
    > Yes, you can use LS
    If logical system is used, then how do I make the connection document->LS?
    > You can use FM: MASTER_IDOC_DISTRIBUTE to send the outbound IDOC...
    Regards,
    Hendy

  • Want shipping Point address(not Number) in the invoice layout

    Dear Experts
    Please tell me tables and fields  how get the shipping point address in invoice layout, if i give likp-vstel, it picks the shipping point number only,
    issue resolution is very urgent
    Thanks and regards
    Janardhan

    Hi janardhan,
    i am also working on the same type of requirement. here i am giving the details. i think it will helpful to u..
    Sold to: VBRK_KUNAG
    Ship To: VBPA-KUNNR where VBPA-PARVW=”SH”
    Invoice No: VBRK-VBELN
    Name OF Finished Product
    Material Code: VBRP-MATNR
    Cases : VBRP-VRKME where MVKE-VRKME=”CSE”
    Pallets : VBRP-VRKME where MVKE-VRKME=”PAL”
    Price per case in Unit of measure: KONV-KBETR
    Price in Unit of measure: RV61A-AWEIN
    Net weight : VBRP-NTGEW
    frieght without VAT: VBRP-NETWR + VBKD-INCO1
    Vat 20%: 20% of KONV-KBETR where KONV-KSCHL=”ZVAT”
    total with VAT: VBRP-NETWR (VBRP-NETWR + VBKD-INCO1) + VBRP-MWSBK where KONV-KSCHL=”ZVAT”
    Only VAT : KONV-KBETR where KONV-KSCHL=”ZVAT”
    Ammount in words ( if value is 10rs, that should be come in ten repees only): VBRP-BRTWR
    1. My Client requires the company code address ( Name , city, pincode, phone number, etc) and his bank details in the layout
    VBRK-BUKRS – Com. Code
    ADRC-NAME1—Name
    ADRC-STREET—Street
    ADRC-CITY1 --- City
    ADRC-COUNTRY – Country
    ADRC-REGION—Region
    ADRC-POST_CODE1- Postal code
    ADRC-TEL_NUMBER – Telephone number
    2.He requires the customer Address like name , street, house number, pincode, phone number, and fax number)
    KNA1-NAME1 -
    Name
    KNA1-STRAS --- Street and house number
    KNA1-ORT01 --- City
    KNA1-REGIO --- State
    KNA1-PSTLZ -
    Pin code
    KNA1-LAND1 --- Country Key
    KNA1-TELF1 -- Telephone number
    KNA1-TELFX --- Fax number
    3. Total without VAT: VBRP-NETWR
    4. Freight without VAT : VBRP-NETWR + VBKD-INCO1
    5. Shipping Point Address has to come to layout
    ADDR1_DATA-NAME1 --- Shipping point name
    ADDR1_DATA-STREET --- Street
    ADDR1_DATA—HOUSUE_NUM1—house number
    ADDR1_DATA-CITY1 --- City
    ADDR1_DATA-REGION --- State
    ADDR1_DATA—POST_CODE1—postal code
    ADDR1_DATA—COUNTRY-- Country
    6. Plant Address address has to come to layout
    VBRP-WERKS -- Plant
    VBRP-WKREG—Region
    VBRP-WKCTY -- City
    VBRP-WKCOU -- Country
    these r the fields needs to be taken based on the requirement..
    Reward if helpfull.
    Regards,
    Praveen kumar.D

  • Sales office to shipping point in VA01

    Hello,
    We've tried to create a new Sales Organization with a new Sales Office in SAP system, but got following problem in VA01:
    In VA01 first screen you can choose them ok. But in sales order items Shipping Point/Receiving Point is automatically sales organization and NOT the sales office. You can't change the shipping point manually either, VA01 says "Shipping point is not defined for this transaction".
    We've tried SPRO configuration but haven't found anything that helps, any ideas?
    Thanks in advance,
    Tom

    Dear Tom,
         I dont think the new sales organization is the cause of your issue to determine shipping point in VA01 line items.
    Because Neighter Sales organization nor sales office doesnt have any direct assignemnt with shipping Point.
    Shipping Point determination is based on :
    Shipping Conditions ( which will be copied either from  Sales doc type or Customer master of the sold to party)
    Loading Group ( will be taken from MMR-Sales/Plant general tab)
    Delivering Plant ( taken from: Customer Material Info record or Customer Master record / Material Master record) .
    Coming to your issue: as per your post,
    Whether you want the system should determine Shipping Point based on either sales org or sales office? Ist so-Please confirm. But in std its not provided.

  • Lead Time - Customizatiou0131n steps: Shipping point, route, and loading group

    It says about delivery scheduling that "The lead time considers the shipping point, route, and loading group". Can anybody explain me briefly the customization menu steps about this sentence?
    Thanks in advance.

    Please go through this document it will help you
    1) Maintain transportation planning point through Menu as follows:
    IMG Maintain Logistic Execution  Definition Enterprise Structure  transportation planning point.
    Create your own like BP01 enter the general data¡¯s required
    2) Defining modes of transport:
    IMG RoutesBasic Transportation Functions  Transportation Logistic Execution Define modes of transportDefine routes
    Use the standard like:
    Shipping type: 01
    Description: Road
    3) Define shipping types :
    Basic Transportation Transportation Logistic ExecutionIMG Define shipping types Route Functions
    Or through T-code: SM30
    PT: 01
    Description: Truck
    Mdtr: 01
    STPG: 0001
    4) Define transportation connecting point :
    LogisticIMG DefineRoutes  Basic Transportation Functions  Transportation Execution Define transportation connection pointsroutes
    Copy the std point and make it FB01 as departure zone and FB02 as destination zone
    5) Define routes and stages.
     Logistic Execution IMG Define Define routes Routes  Basic Transportation Functions Transportation routes and stages
    Use the standard route and copy it as FB0001 and enter the departure zone and destination as what we created.
    6) Defining Transportation Zone:
    Basic Transportation Logistic Execution IMG Define transportation Router determination  Route Transportation Functions zones
    Use the standard transportation zone depending on the route so as for the example use 0000000003 - Southern Region
    7) Maintain country or transportation zone for shipping points
     Logistic Execution IMG  Route determination  Route  Basic Transportation Functions Transportation Maintain country and transportation zone for shipping point
    Shipping point be ASH1 and route as 0000000003 which is assigned to country India
    8) Maintain route determination:
    Logistic ExecutionIMG Route determination Route  Basic Transportation Functions  Transportation  Maintain route determination
    Country of departure: India
    Departure Zone: 0000000003
    Country of destination: India
    Destination Zone: 0000000003
    And enter the data’s needed like shipping condition 01, etc.
    Maintain Transportation relevance for shipping point, sales document type and delivery types.
    9) Now create shipping types
    IMG Define shipment Shipments  Transportation Logistic Execution types
    Copy the standard 0001 and make it to AFIL
    10) Define and assign traffic zones through T-Code: T_76 (or) thru menu as follows
    IMG Define Basic functions  Shipments cost  Transportation Logistic Execution and assign tariff zones
    Copy the standard and make it to FABTARIFF and assign our transportation planning point as ATP1, ATP2 assign tariff zone to every particular transportation planning point
    11) Define and assign pricing procedures
    Shipments Transportation  Logistic Execution IMG define and assign pricing Price control  Pricing cost procedures
    Copy the standard shipping cost pricing procedure SDFC00 to FBSC01
    12) Assign purchasing data:
     Logistic Execution IMG Assign purchasing data Settlement  Shipments cost Transportation
    13) Assign transportation planning point to shipping condition, purchase organization, purchasing group and to plants.
    14) Define Automatic G/L account determination:
     Transportation  Logistics Execution IMG Automatic G/L Account Determination Settlement Shipment Costs
    Or through T-code: OMWB
    Use G/L account 614000 as used in standard
    15) Automatic determination of CO assignments:
    IMG Automatic Settlement  Shipment Costs  Transportation Logistics Execution Determination of CO Assignments
    Or T-code: OKB9
    16) Maintain shipping point address.
     Logistics Execution  Definition Enterprise Structure Define, copy, delete, check shipping point
    17) Creating G/L account centrally.
    Financial AccountingAccounting  Master Records  General Ledger 
    Individual Processing Centrally
    Or through T-Code: FS00
    18) Enter the G/L account 614000 to the company code AFIL
    19) Create transportation condition records:
     Shipment cost  Transportation  Master data Logistic Execution createPrices
    Or thru T-code: TK11
    Enter condition type FB00 that is freight condition type, which is used as standard in the shipping cost pricing procedure.
    Enter the price and save it
    Process:
    1. The system determines the pricing procedure for the shipment cost item-using transportation planning point, service agent and shipment cost item category
    2. Calculation Basis
    3. Condition Record
    4. Access sequence.
    For the sales order, create a delivery using VL01N and pick the goods. Now create a shipment using VT01N and assign the delivery to the shipment document. Make sure to enter the carrier and other details before performing the transportation planning and execution. Save the shipment document and PGI for the delivery would be done automatically.
    A shipment represents a physical goods movement between two or more locations.
    For the system to create a shipment, shipping-relevant deliveries must exist.
    You use Transportation Planning to group pending deliveries into shipments and then to perform the shipments.
    The outbound delivery documents contain routes that the system calculates in route determination, and a transportation planning date for the delivery.
    Dynamic transportation planning is responsible for grouping together outbound deliveries into shipments that have at least the same route, visit plan type and the same transportation planning date.
    The following restrictions can be taken into account for a shipment in Dynamic Transportation Planning:
    • Weight
    • Volume
    • Variable capacity
    • Number of stops
    • Maximum duration
    • Loading units
    Create Shipment Document
    Use
    After the status of the delivery is open for transportation planning, it is possible to create a shipment document to schedule the transportation.
    Transportation Create Single document Logistics Logistic Execution  TransportationPlanning
    T.code: VT01n
    Enter your transportation planning point and shipment type. Press enter.
    Creating the shipment cost document
    Use
    After the deliveries are scheduled by shipment and the shipment is executed, now it is time to maintain and close the shipment document in order to record all relative information and ready for the shipment cost settlement.
    Single document Logistics Logistic Execution  Transportation Shipment cost Create
    T.code: VI01.
    After creation of shipment cost doc. You settle the Shipment cost.
    Go to VI02, enter shipment cost no.and press enter.
    Then go to Overview -- Fright cost items, Select the line item and double click it.
    Go as main menu: Item --> Acc. assignment, you enter G/L acc. and cost center to which the transportation cost will be posted.
    On the Standard change, details – Freight cost items screen, then check the check box “Transfer”, which means you will transfer the relative transportation cost to FI/CO, in this case, the system should determined which Purchase Order will used to settle the cost, so after you check the “Transfer” check box.
    Press save button on the current screen.
    Shipment cost settlement and documents:
    Use
    After the shipment cost settled in shipment cost document, it has the following affects:
    It creates a service entry sheet that refers to the purchase order determined.
    It posts acceptance of services performed.
    It creates an accounting document for the accruals.
    Further subsequent documents are created in FI.
    Create Delivery:
    T.code: Vl01n
    Create TO:
    T.code: LT03
    Create Shipment Document
    Use
    After the status of the delivery is open for transportation planning, it is possible to create a shipment document to schedule the transportation.
     Transportation Planning  Create Single document Logistics Logistic Execution Transportation
    T.code: VT01n
    Enter your transportation planning point and shipment type. Press enter.
    Creating the shipment cost document
    Use
    After the deliveries are scheduled by shipment and the shipment is executed, now it is time to maintain and close the shipment document in order to record all relative information and ready for the shipment cost settlement.
    Single document Logistics Logistic Execution  Transportation Shipment cost Create
    T.code: VI01.
    After creation of shipment cost doc. You settle the Shipment cost.
    Go to VI02, enter shipment cost no.and press enter.
    Then go to Overview -- Fright cost items, Select the line item and double click it.
    Go as main menu: Item --> Acc. assignment, you enter G/L acc. and cost center to which the transportation cost will be posted.
    On the Standard change, details – Freight cost items screen, then check the check box “Transfer”, which means you will transfer the relative transportation cost to FI/CO, in this case, the system should determined which Purchase Order will used to settle the cost, so after you check the “Transfer” check box.
    Press save button on the current screen.
    Shipment cost settlement and documents:
    Use
    After the shipment cost settled in shipment cost document, it has the following affects:
    It creates a service entry sheet that refers to the purchase order determined.
    It posts acceptance of services performed.
    It creates an accounting document for the accruals.
    Further subsequent documents are created in FI.
    Generally process is-
    1) VL01N
    2) VT01
    3) VL02N - PGI
    4) VI01
    5) ML81N – Service Entry Sheet
    6) MIRO – Invoice Verification
    Shipping docs (VT01) are created before PGI...
    You cannot carry out transportation planning or creation of shipment after the goods issue has been executed. Once goods issue is done it means that the material has left your premises so there is no need for a transportation planning after it.
    In case you need carry out the shipment documents at the end of the day you could just create the delivery documents during the day and at end of the day create the shipment documents and the goods issue
    This link is also usseful:
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LETRA/SDTRA.pdf
    Hope this helps you.
    Regards
    nitin

  • Receiving Day / Shipping Point

    Hi Experts!
    When delivering e.g. to Spain from a German shipping point there is a calendar assigned on customer site that has no holiday at all combined with a fixed receiving day "Friday". The German calendar is assigned to the shipping point.
    Because of the route (transit days = 2 days) plus 1 day pick/pack we have always on Tuesdays the material availabiltity day when the delivery starts automatically.
    I realize that in week 21 (holiday on Thursday) the system calculates the Monday as material availability date and I wonder why. Obviously the holiday was considered even the material has already left Germany. In consequence the delivery is too early.
    My understanding is that the settings of the shipping point should calculate only the material availability date and the goods issue date but not more. The Spanish customer is not interested in any holiday in Germany.
    I can't change the setting for the shipping point because our German deliveries have to be kept in this way.
    Any idea?
    Kind regards,
    Hartmut Kroeger

    Hi, thanks for your answer, but this is not what I meant.
    The customer has the goods receiving day intentionally, this is to concentrate all deliveries to him on Tuesday (all material availability dates are Tuesdays).
    Therefore on Customer site everything is OK.
    What I don't understand is that the material availability day was calculated here on Monday.
    Even picking and packing on Tuesday would be OK, then it's sent out anyway. And the following holiday on Thursday should not have any impact on the pack-work in Germany (the '"send work" has alredy finnished then in Germany).
    Therefore my understanding was that any calendar on customer site calculates the goods receiving day (here the Spanish customer) and the calender for the shipping point calculates the Material availability date resp. the Goods Issue date but not the complete transit time.
    In other words: My setting in the Spanish customer has no meaning, anyway all dates are calculated based on the calendar in the shipping point, no matter what calendar is on customer site.
    My problem does not depend especially on a calendar setting on customer site.
    Even without a fix goods receiving day, e.g. for a requested date on Fridays we have the same problem.
    In that week where a holiday is, the system calculates one day earlier even the original dates (without holiday) could be used without any danger. In fact we are delivering too early to that customer.
    Regards,
    Hartmut Kroeger
    Edited by: Hartmut Kroeger on Jun 5, 2009 7:45 AM
    Hi all...
    In the meantime I got the solution!
    As already explained, on customer site everything is OK, same with the shipping point. Problems I had just with the transportation times, I wanted to ignore any holidays there. This is possible by assigning in the routes directly a calendar, of course without any holidays.
    So now all levels are OK for me (customer, routes, shipping point).
    Regards,
    Hartmut Kroeger

  • Any enhancement to increase pick time, do not want new shipping point

    Have 1 customer that requires a longer picking time, prefer not to create a new shipping point for a one off case.
    Would perfer to write an enhancement so the material availability date is 5 days before goods issue date (5 days pick time) instead of our normal 1 day.  A new ship point would work great with 5 days pick time but big change for users.
    Thanks,

    Hi Glenn,
            SAP System considers the picking time maintained on the shipping point(OVXD) while giving the Material availability date. Picking date is same as material availability date by defualt. Then it will take picking time as 1day( If you have maintained picking time as 1 day on shipping point) and  gives the loading date. you ask your abaper to hard code  the material availability date (overwrite the praposed date by 4 days for particular customer) in "userexit_move_fields_vbep".Kindly please let me know If you need any more help.
    Regards,
    Ram Pedarla

  • Multiple Shipping Point in One Plant

    Hello.
    How to decide if we create another shipping point or not.
    We have two warehouses, located far from each other.
    The design is to have just one plant, and create two storage locations.
    Should I make two shipping points for each warehouse and assign to just one plant?
    Share you ideas...
    Thank you,

    Dear Deriada Gemma 
    Shipping point requirement is based on physical locations from which shipment is done, in case you are using Logistic execution then based on shipping point shippings will be done.
    If you have two wh and want to create seperate deliveries for both wh use two seperate shipping points
    you can automatically determine based on plant, loading group and shipping condtion.
    from help you will find few other reason for which seperate shipping point decision can be made
    list list, printing ...etc
    Define, copy, delete, check shipping point                                                                               
    In this step, you define the shipping points in your company or edit              
        shipping points that already exist. In order to adapt the functional              
        scope of a shipping point to the organization in your company, you                
        should process the following check list:                                                                               
    o   The shipping point is the top level in the organization for                   
            shipping.                                                                               
    o   A shipping point can be allocated to several plants.                                                                               
    o   A shipping point can be divided into several loading points.                                                                               
    o   A delivery is always initiated from exactly one shipping point.               
            Thus, all items of a delivery belong to one shipping point. Groups            
            of deliveries also belong to exactly one shipping point.                                                                               
    o   You can influence delivery scheduling via allocation to departure             
            zones.                                                                               
    o   The shipping point can be proposed automatically during order                 
            processing depending on the plant, loading group and shipping                 
            condition.                                                                               
    o   A shipping point has an address.                                                                               
    o   The shipping point is used as a selection criterion for lists of              
            deliveries and the work list deliveries.                                                                               
    o   The shipping point is used as a selection criterion for processing            
            deliveries like printing, picking or goods issue.                                                                               
    o   You can determine the printer destination for messages differently            
            for every shipping point on account of shipping documents.                                                                               
    Regards
    Jitesh

  • Plant Switzerland -- Shipping point Germany

    Hello SAP masters!
    We have our plant in Switzerland and some shipping points to this plant in Germany.
    Is this with SAP possible?
    Or we need for the shipping points in Germany a separte plant also in Germany?
    Thanks for your held?
    Best wishes
    Petra Schober

    Technically there is no problem to make this happen, even the shipping point has its own adress which is different from the plant adress. But technically these are just numbers that get assigned to each other.
    From a logistics point of view, I see already an inconsistency.
    If the plant is in Switzerland, how can you ship then from Germany?
    You have to get the materials to Germany first to be physically able to ship from there. Of course you can set up a storage location to your Swiss plant that is located in Germany.
    Germany is in EU, Switzerland not, so you might get bigger issues with necessary legal reporting to tax authorities as well as statistical offices (Intrastat report) with this setup.
    Best you meet with Finance guys to talk about requirement and setup.

  • Shipping point at Item Level of a Sales Order

    Dear Gurus,
    Can anyone explain to me step by step how can I copy:
    1- The shipping point
    2- The route
    At Item level of a Sales Order in VA01
    Many thanks
    Regards
    Chris

    Dear Gurus,
    Can anyone explain to me step by step how can I copy:
    1- The shipping point
    2- The route
    At Item level of a Sales Order in VA01
    Many thanks
    Regards
    Chris
    Hi Chris,
    Answer to your Question,
    Please understand that Shipping Point and Route will be automatically determined based on the configuration settings we make. However we can even override the values manually in sales order screen (Va01 / Va02). See below the config settings to be made for  Shipping point and Route:
    1. Shipping Point.
    Based on the combination of below three parameters, Shipping Point will automatically populate while creating a Sale order. (VA01)
              Shipping Condition
              Loading Group
              Delivering Plant
    SPRO- Logistics Exceution - Shipping - Basic Shipping Functions - Shipping Point and Goods Receiving Point Determination - Assign Shipping Points
    2. Route
    Based on the following Four factors from configuration:
    Departure Zone of Shipping Point
    Destination Zone of Customer (Shipto)
    Shipping Condition from Customer master.
    Transportation Group from Material Master.
    Hope this Solves your Issue.
    Regards,
    VBASHA

  • Shipping point error in sales order creation

    Dear Friends,
    I'm new into customizing in SD. I just crested a new plant, distribution channel, shipping point and have assigned the shipping point to the plant. while trying to create sales order i get this warning message "DOCUMENT /00010 HAS NO CHECKING GROUP (MATERIAL MASTER - PLANT DATA) MESSAGE N0 : W083.
    Also, if i edit for incomplete log it is indicating the following as being missing- SHIPPING/RECEIVING POINT, NO LOADING DATE, NO MATERIAL AVAILABLE DATE, TRANSPORT PLANNING DATE, NO GOODS ISSUE DATE.
    What else do i need to maintain in the customizing  to make it work well
    Thanks in advance

    Dear,
            It is showing because u have not maintained PLANT in MATERIAL MASTER DATA but no need to do so u can directly put into S.O. Iin each line item.
            It is just a warning nmessage just press enter and pass it.
            If still u want to do so then use TCODE ( MMO2) and select SALES ORG1 and under GENERAL DATA u will find PLANT FIELD
            where u can maintain PLANT for matarial but once u maintain data here MATERIAL is restricted to that PLANT so will not allow u to sell it from other PLANT thats why itb is always advisable to keep it blank if you are suppose to sell same MATERIAL from two or more PLANT.
    Regards
    AJIT K SINGH
    HAPPY TO HELP U

  • GTM - wrong shipping point determination

    Hi ,
    Currently we are implementing SAP - GTM (Global Trade Managment functionality ) for our client and I am reletively new to this functionality. While creating one transaction cyles in the SAP system I am facing following problem :
    Issue .While creating delivery document against sales contract/sales order through TEW (Traing Execution Workbench),system opens the VL01N screen and instead copying shipping point & delivery date from sales order as it is,it proposes some default shipping point 0001 and wrong delivery date.Due to this system gives error and does not execute the VL01n transaction till the correct shipping point and delivery date is enetered.I checked default value in the user->own data also ,but no value is stored against the parameter id's of these two fields.
    Looking forward for valuabel inputs on the above issue.
    regards,
    Sachin

    Hi,
    OSS note 1872977 changes the TEW, so that the shipping point is taken from the sales order, like normal SD.
    /Torben

  • Shipping Point and Excise Condition

    Hi,
    This is my old issue for which I need solution.
    When we change shiping point in sales order Excise condition become statistical for one plant.
    But now with similar pricing with same sales organisation above setting are not working for other plant mean there is no change in condition when we are changing shipping point for that plant.
    So please help me to solve this issue
    Lalit

    There is no direct link between Shipping Point and Excise Condition but CIN related settings are mainly dependent on Plant settings.
    So check whether any user exit is applied.
    G. Lakshmipathi