Hello,
We have recently implemented Shipment freight cost for Inbound Shipments. Shipment cost is calulated based on weight.
The issue we are facing is:
If In an Inbd/delivery there are two HU and each having 100 cartons(total shipment 200 cartons) and weight is 1000Kg per HU, so assmue total cost of the entire shipment (two HUs) is 2000 USD.
Shipment cost document is created and enter the cost as 2000 USD for entire shipment.
Now While PGR for first HU (inbound delivery) we found that qty is 110 car inplace of 100 cartons,
System calculate the Freight cost as 1100 USD and while PGR of the 2nd HU(inbound delivery) we found the correct qty 100 cartons and system calculate the freight cost as 1000 USD.
The problem is actual shipment cost is 2000 USD whereas system is calculating 2100 USD.....
Has anybody this issue earlier, please share your experience....
Regards,
JPS

Hi Michela,
This is possible by adding one more condition type with blank condition category and negative value in plus/minus field.
please refer the following wiki which gives step by step configuration.
Appreciate if it is useful
http://wiki.sdn.sap.com/wiki/display/ERPLO/PostingplanneddeliverycosttoNon-inventoryaccount
Edited by: Raja Ramasamy on Apr 14, 2010 7:20 PM

Similar Messages

  • Reducing the Freight cost on material value for undelivered material

    Hi Experts,
    Summary :  The material supplier vendor needs to be paid for full quantity of material. The freight transport is allowed an under tolearance of 0.5% on the material to be supplied. If the delivered material quantity breaches the 0.5% under tolerance then amount at 1.5 times the cost of material for the shortage is to be deducted from the transporter. A dummy GR will have to be prepared for the undelivered quantity for which we do not want the freight cost to be loaded. The details scenario is mentioned below :-
    We have to make a Purchase Order with material code say ABC for procured of some material. Suppose we make a Purchase Order for 100 nos. at a Unit Price of Say Rs. 10/- for Material Code ABC on say Vendor M/s XYZ. A freight condition is maintained in the Conditions Tab and suppose the Freight is Rs. 10 per unit of the material.
    While preparing the Goods Receipt through MIGO, in the Freight Tab we select say freight vendor say M/s PQR against the freight condition and post the goods receipt.
    While doing Invoice Processing in MIRO, when we enter the combination of Purchase Order and Planned Delivery Cost the system will populate the vendor codes of both the supplier of material and the transporter. On selecting the transporter the freight amount will populate against which the invoice of the tranporter can be processed.
    In the Vendor Master of M/s XYZ GR-Based Invoice Verification is activated.
    The vendor is allowed an under tolerance of 0.5% (i.e. the vendor should deliver at least 99.50 nos. of the Purchase Order). If the vendor delivers 99.50 or more then there will be no deduction in the freight charges.
    But suppose the vendor delivers only 99.4 nos. of the quantity. Then we will prepare the GRIR for 99.4 nos.only. But while processing the MIRO we need to deduct 1.5 times the value of the material from the freight amount for the shortshipped quantity, i.e.
    0.1     no (99.5 u2013 99.4) X Rs. 10/- * 1.5 = Rs. 1.5 are to be deducted from the final payment from the freight amount of the transporter.
    The material supplier will have to be paid in full 100 nos. of quantity and will raise an invoice for 100 nos. A dummy GRIR for the 0.6 nos. of undelivered material will have to be prepared for processing the invoice for the 100 nos. of the material supplier and a dummy issue for 0.6 nos. of undelivered material will be prepared to remove them from the system.
    Hence the freight cost for this 0.6 nos. of undelivered material will also go into the cost of the material and increase the MAP by that amount. Also the goods issue Cost will also have the effect of the freight cost.
    We do not want to load the freight cost for the undelivered material in the value of the material.
    Can any one please suggest a solution for the same.
    Thanks in advance.
    AJ.

    Hi
    A PO Will be raised for full quantity of material say 100 nos.
    The material supplier vendor needs to be paid for full quantity of material.
    A freight vendor is maintained at the time of GR for material against the freight condition maintained in the Po.
    The freight vendor facilitates the delivery of the material from the vendor to the purchaser for which he is given an under tolerance limit of 0.5%. Any delivery below this tolerance limit, freight amount to the effect of 1.5 times the per unit rate of material x short fall below 0.5% tolerance will be deducted from the freight amount.
    A dummy grir will have to be prepared for the short delivered quantity for processing the invoice for the full quantity of the purchase order, as the vendor is going to raise the invoice for full purchase order quantity. The client does not want to load the freight cost of the undelivered quantity on the material value as it will wrongly show the MAP of the material. This shortshipped material will be issued to remove it from the system and the stock will remain for the delivered quantity only. The vendor is subject to gr based invoice verification.
    Please suggest a solution.
    Thanks in advance.
    AJ
    The freight transport is allowed an under tolearance of 0.5% on the material to be supplied. If the delivered material quantity breaches the 0.5% under tolerance then amount at 1.5 times the cost of material for the shortage is to be deducted from the transporter. A dummy GR will have to be prepared for the undelivered quantity for which we do not want the freight cost to be loaded.

  • Reducing freight cost for undelivered material

    Hi Experts,
    Summary :  The material supplier vendor needs to be paid for full quantity of material. The freight transport is allowed an under tolearance of 0.5% on the material to be supplied. If the delivered material quantity breaches the 0.5% under tolerance then amount at 1.5 times the cost of material for the shortage is to be deducted from the transporter. A dummy GR will have to be prepared for the undelivered quantity for which we do not want the freight cost to be loaded. The details scenario is mentioned below :-
    We have to make a Purchase Order with material code say ABC for procured of some material. Suppose we make a Purchase Order for 100 nos. at a Unit Price of Say Rs. 10/- for Material Code ABC on say Vendor M/s XYZ. A freight condition is maintained in the Conditions Tab and suppose the Freight is Rs. 10 per unit of the material.
    While preparing the Goods Receipt through MIGO, in the Freight Tab we select say freight vendor say M/s PQR against the freight condition and post the goods receipt.
    While doing Invoice Processing in MIRO, when we enter the combination of Purchase Order and Planned Delivery Cost the system will populate the vendor codes of both the supplier of material and the transporter. On selecting the transporter the freight amount will populate against which the invoice of the tranporter can be processed.
    In the Vendor Master of M/s XYZ GR-Based Invoice Verification is activated.
    The vendor is allowed an under tolerance of 0.5% (i.e. the vendor should deliver at least 99.50 nos. of the Purchase Order). If the vendor delivers 99.50 or more then there will be no deduction in the freight charges.
    But suppose the vendor delivers only 99.4 nos. of the quantity. Then we will prepare the GRIR for 99.4 nos.only. But while processing the MIRO we need to deduct 1.5 times the value of the material from the freight amount for the shortshipped quantity, i.e.
    0.1     no (99.5 u2013 99.4) X Rs. 10/- * 1.5 = Rs. 1.5 are to be deducted from the final payment from the freight amount of the transporter.
    The material supplier will have to be paid in full 100 nos. of quantity and will raise an invoice for 100 nos. A dummy GRIR for the 0.6 nos. of undelivered material will have to be prepared for processing the invoice for the 100 nos. of the material supplier and a dummy issue for 0.6 nos. of undelivered material will be prepared to remove them from the system.
    Hence the freight cost for this 0.6 nos. of undelivered material will also go into the cost of the material and increase the MAP by that amount. Also the goods issue Cost will also have the effect of the freight cost.
    We do not want to load the freight cost for the undelivered material in the value of the material.
    Can any one please suggest a solution for the same.
    Thanks in advance.
    AJ.

    answered

  • Freight cost to be included in the Raw material cost while creating VL31N

    Hi all,
    We are purchasing raw material from other country. we are paying freight for the imported material.
    My requirement is, when doing inbound delivery freight cost has to be included in the raw material cost.
    Now its not getting included in the raw material cost.
    What are all the necessary steps to be done to include the freight cost into the raw material?
    Thanks in advance,
    Babu

    Hi,
    You can create dummy material inmaterial master record.
    You can enter the material manually while creating inbound delivery, which will come as unplanned delivery cost.
    Br,
    Tushar Patankar

  • Post freight cost in diff. G/L of the material cost Accnt Cat. E

    Hi MM experts,
    I created a PO in reference to Sales Order (account assignment E-Trading materials)
    In condition I added a custom condizion for freight (SPRO Cond.category B, flag on accruals).
    When I received material the freight cost was added in total stock valuation.
    Account    Account short text             Amount Trs
    174020     STOCK M  VENT DIR                 576,03     BSX
    319500     FACT/REC                                 476,03-    WRX
    171090     Cte pass.stock march               476,03     EIN
    171090     Cte pass.stock march               576,03-    EKG
    422000     TRANSPORT                             100,00-    Z03
    319500     FACT/REC                          100,00     ZMA
    I want to see only stock value without freight cost in G/L account. I want freight cost in other G/L different of the material cost.
    I expect that the result is as follows:
    174020     STOCK M VENT DIR                  476,03     BSX
    319500     FACT/REC                                 476,03-    WRX
    422000     TRANSPORT                             100,00-    Z03
    319500     FACT/REC                                 100,00     ZMA
    Is there any other way to avoid this problem?
    Thank you very much.
    Regards,
    Michela

    Hi Michela,
    This is possible by adding one more condition type with blank condition category and negative value in plus/minus field.
    please refer the following wiki which gives step by step configuration.
    Appreciate if it is useful
    http://wiki.sdn.sap.com/wiki/display/ERPLO/PostingplanneddeliverycosttoNon-inventoryaccount
    Edited by: Raja Ramasamy on Apr 14, 2010 7:20 PM

  • Stock Transfer Order - Post freight cost in diff. G/L of the material cost

    Hi Friends,
    I created PO (stock transfer Plant to plant). In condition I added
    standard price and Freight cost. When I received material in
    receiving plant the freight cost was added in total stock valuation of
    receiving plant.
    In Plant to Plant transfer I want to see only stock value without
    freight cost in receiving plant. We want freight cost in other G/L different of the material cost.
    Best Regards,
    Edgardo Delgado

    Hi
    Futher to Imdarpan statement, normally we will have different pricing procedure for STO's for the reason you are mentioning with this procedure for freight you can define acct key & accrual if reqed seperately & while posting respective documents it will not go to material cost it will get accounted in different G/L account.
    If you are not maintaining accural tick in condition it will get added to material cost, just maintain this in freight condition.
    Regards

  • Free goods but want to freight cost updation upon GR

    Hi,
    Scenario:
    I have a PO with 20 line items and header freight cost.
    There are few more items in PO which are ticked as free goods.
    There is a stock of those materials with certain MAP.
    Freight condition has been configured as vendor GR so that it gets loaded on materials upon GR.
    Requirement is that
    Upon GR of this PO,MAPshould get updated with the freight cost for those materials also which have been marked as free goods.
    How this can be achieved ?
    Regards,
    manOO

    Hi Rang,
    Thanks for the feedback.However service PO is out of scope as client do not want to go for servicees.
    I could not understand your suggestion
    <u>you give PO to frieght vendor for freight value & in remarks you mention reciving as FREE GOODS from vendor xxxxx & do GR load cost to material & pay to freight vendor. (this is not advisible, but one solution for your problem).</u>
    I have to receive one material via purchase order as a free item but I need to pay vendor for the freight charges that will be incurred to ship this item along with all the other items in the same PO.
    Can you please explain me further as what you mean to say in your post.
    I should be able to load these freight cost on all the materials in PO including the material with 'free' indiactor.
    In short upon GR MAP should affect with freight cost as there will not be value addition of the material since received as free.
    Please suggest.
    Thanks in advance
    Regards,
    manOO

  • Open field for cost center on the material master

    We have a unique requirement in a facility we intend to implement plant maintenance in to track a cost center to a material by including the cost center on the material master somewhere.  Cost center is not a field on any of the material tabs we use for maintenance materials, but the requirement is just that it is tracked in a field, even if it's just an open field like a "user defined field" or another field not used often.  We realize there are disadvantages such as the field not being checked against active cost centers, but we are looking at options short of adding cost center as a field manually to a tab (which I believe would require ABAP assistance).  I don't think there are any other fields/tabs we are currently not utilizing but I could be wrong... The best option we can think of is adding it in a material characteristic so it shows on the classifications tab, but I thought I would see if anyone has any other ideas.
    Thanks

    Not sure what is the need of cost center on material master when you want to implement Plant maintenance module. Do you have any specific requirement for this?
    Ideally cost center will be derived from either functional location/ equipment (equivalent of material master) on to PM work order or notification.
    Can you elaborate the requirement?
    After all if you wish to go with cost center, then I suggest it should be at plant level as PM requires plant level distribution. You can add up a custom field and give the reference of cost center data element with help of developer.

  • Freight Cost while Goods Receipt in STO

    Dear Experts,
    In SAP standard STO process, freight cost calculated while Material issued against STO ( 351/641 movement).
    Is there any way possible to calculate the freight at the time of goods receipt instead of at the time of Goods Issue..
    Thanks in Advance.

    Why do you want it at the time of GR?
    Anyways, you can not see or change the freight amount in MIGO. And I don't think there is any other way to post the freight amount other than 351/641 goods issue.

  • Post freight cost to a different a GL account during 411-K for consignment PO Process

    We are planning to implement PO consignment for one of the client.
    The scenario is, client pays the freight cost to the supplier in advance upon receipt of consignment stock .When consignment stock is moved to own stock (411k), during the movement of the stock we need to create two accounting entries one for the material cost and the other for freight cost such that the freight can be adjusted with advance paid freight cost. Freight cost can be settled manually with another PO but the requirement is moving average price of the material should include the  cost of material  and freight cost .
    For an example if the material cost is $100(PB00) and freight cost is $10(FAR1 - 10%), during 411k it  should create  two entries one for material cost($100) and the other for freight cost($10) which can be adjusted manually.
    We tried by adding freight condition (FRA1) in consignment info record along with PB00 –Gross price and in this case during 411k it is summing both the prices($110) and posting to one GL account and the same settles during MRKO  but what we are looking for is how we can split this into $100 and $10 .
    I know standard SAP does not support this this during 411k.
    I want to know if there is any User exit, pricing procedure, routines, etc...  Or any other way that can be used to achieve this requirement. Appreciate more detailed answer

    Hi,
       As you know, currently the delivery cost are not supported in consignment and pipeline settlement. The system design is explained in the note: 208555 - MB11 Delivery costs for pipeline and consignment.
       If you want delivery cost in consignment, you have to go for development. There should be additional entry for delivery costs in RKWA table. I am not sure about the feasibility, but still would like to share the below points:
       For creating additional entry in the accounting document while doing MB1B / MB11, you may check the BADI AC_DOCUMENT.
       You may refer the note: 165647 - Documentation: Enhancement RMVKON00 (MM-IV) which explains some enhancements related to consignment settlement.
    Regards,
    AKPT

  • MIRO - Credit memo considering freight costs

    Dear friends ,
    We need to process a Goods Return  to the vendor, but the goods has additional costs like Freight.
    So we are doing the reversal process as follow:
    MIRO - Credit memo
    => but when we process the credit memo the System brought together the freight costs.
          we need to return but not remove the freight costs from the material cost.
    MIGO movement 122.
    => here everything is ok.
    Question:
    How treat that situation where we need to keep the freight costs in the material account ?
    Best regards,
    Alessandro

    hi
    in that case, in miro header, there is a tab "details" here u have a option to enter unplanned dlvy cost.. u can enter ur unplanned dkvy cost.
    ref the link
    http://help.sap.com/saphelp_erp2004/helpdata/en/cb/370d3ae4533072e10000000a11402f/frameset.htm
    Edited by: Jayakumar Raju A.S on Aug 17, 2009 3:00 PM

  • Inbound Logistics:  What are the best options to capture freight costs?

    We attempted to implement a freight payables solution which was built on Inbound Deliveries> Inbound Shipments> Inbound Shipment Cost Documents.  The PO line items were flagged with a conf.control key which made the above inbound documents relevant.
    Very long story short, we had to remove this functionality because of two major issues:
    1.     The Inbound Deliveries were created with incorrect quantities some of the time.  When the Inbound Deliveries were created with incorrect quantity those errors caused major problems (e.g., over accrual of freight cost to the tune of several millions of dollars!!!).
    2.     Also, when the Inbound Deliveries were created with incorrect quantity MRP went berserk (e.g., when the IB delivery has the wrong quantity that shows up in MD04 and the planners are left scratching their heads wondering why the supplier is shipping so much or so little).
    I wonu2019t get into the details of how the Inbound Deliveries were being created but suffice to say they were manually entered by the supplier without the benefit of an EDI transaction- it was more of a manual entry- hence the data accuracy problem.
    The point of this post is to gain feedback from other customers who have implemented an inbound freight payables solution with success & understand what processes were used to make your project successful.
    For example, if I had a u201Cwish listu201D Iu2019d request the following:
    1.     The IB delivery document type Iu2019d like to use should be non-MRP relevant.  This will eliminate the confusion that occurred when planners run MD04 and see all of the shipment notifications.  Also, if the MIGO_GR transaction is used to receive the POu2019s, they will see the quantities on the PO, not on the IB delivery.  This would be good for us from a business continuity stand point.  However, if the IB delivery is not MRP relevant, than your GR does not accrue the freight cost defined on the SCD which short circuits the entire point of having these documents.
    u2022     Q:  Have you had any success implementing an IB freight solution with minimum impact to planning / inventory / operations?
    2.     As mentioned above, the data accuracy of the IB delivery was problematic.  Because of this issue we have changed our thinking so that we would require a EDI ASN to be sent from our supplier to our SAP system.  Using EDI we feel that greater accuracy would be obtained since the quantities defined would map to what is being picked or at least aligned with what we would expect to be invoiced for.  The problem is we donu2019t know how EDI capable our suppliers are.
    u2022     Q:  Has anyone had success implementing this with your suppliers on a large scale?
    3.     Are there other inbound freight payment solutions that Iu2019m not thinking about u2013 custom or other that you have implemented & can share some of the specifics about?  Iu2019d enjoy hearing about them.  Since we are re-thinking what we implemented Iu2019m open to any suggestions. 
    Thanks so much for your time!
    Rich Wortmann

    Chandra,
    Thank you for your reply.  I'm aware of the freight condition approach you suggest & the ability to define the carrier in the freight condition.
    We explored this functionality in the past.  The problem/limitations we've experienced were as follows:
    1. Essentially you have to know your freight cost & the carrier by PO line item at the time the PO is created.  Both of these variables we typically cannot predict in our environment.
    2. We have a lot of situations where the PO is considered a u201Cblanketu201D where it will remain open for a month up to a year.  Knowing the entire freight cost for these PO's once they are created is impossible to predict so to support the freight conditions we would have to change our business process which would be a big effort for our organization.
    3. Our suppliers ship product based on multiple PO's / PO lines, again it is impossible to predict what the per unit freight cost would be at the time a PO is generated.
    These factors are what led us to the IB delivery solution which handles each one of these scenarios quite well provided you have good data when the IB delivery is created.
    Regarding your second post:  Thanks!  This information is helpful.
    Sincerely,
    Rich Wortmann

  • Service PO with Freight Cost

    Hi Experts,
    Please let me know the possible solution for the below scenario:
    We have created a Service PO (no service master data), service cost per qty is 5000 and freight cost is Rs. 500 (entered in the condition type).
    Ex. Sending a Roll for clean and coating to the service vendor.
    Once we received the serviced material we accept it in ML81M. Here the problem is only Service cost will come when service entry sheet accepted, could let me know how to arrive the freight cost also at service acceptance or any other method to do the same.
    YJ

    Hi,
    this is not possible,you have to create separate line item for same,
    check foolwoing SAP Note:
    Hi,
    Delivery cost not suppostr in service entree sheet
    SAP Note 381030 - Delivery costs in service
    Symptom
    When you reset the acceptance of services performed and when you reverse invoices for service orders, the delivery costs are not posted back 1:1.
    Other terms
    ML81N, reversal, freight, freight costs, delivery costs, service.
    Solution
    Delivery costs are generally not supported in external services management and in case of blanket purchase orders, item category D or B. Instead of representing delivery costs via conditions, in case of service documents, freight costs and other, SAP recommends to add in additional service lines.
    Regards
    Kailas ugale

  • How to allocate the freight cost when providing free shipping

    We do not charge our customers freight cost.  We would like to allocate our freight cost to the product cost of each item sold.  Can we allocate our freight cost in the delivery note, then copy the delivery note to the customer invoice and remove the freight?  Will this process allocate the freight cost to each item cost on the delivery note, and at the same time not charge the customer for freight?  If this process will not work, is there another way to allocate the freight cost to each item on an customer invoice, without charging the customer for freight?
    Regards,
    Wayne

    Hi,
    It is not possible to post the freight charge to item cost while booking delivery.
    Freight value will be posted to the Revenue account defined in the Freight set up.
    Material need to be re-valuated by selecting the Freight revenue account, so that freight value will be debited to stock and credited to Freight Revenue account.
    After doing this you can book delivery and Invoice.
    Regards
    Ravindran Srinivasan

  • Full Freight Cost payment to Vendor irrespective of GRN Quantity.

    Hi MM Gurus,
    I have a requirement where our client have to pay to Vendor for Frieght Value in the first bill (Vendor send many bills based on the GRN quantities) only irrespective of the GRN Quantity.
    E.g I have a PO of 100 Qty and the Frieght condition value as 100 INR. Now, We have done partial GRN of 10 Qty only so the INR 10 is inventorized on the material for freight cost during GRN. But we have to pay 100 INR (full amount of Freight Condition) to vendor during MIRO for partial bill of 10 quantities of which we have done GRN.
    I have tried doing in MIRO by entering full value 100 INR and 100 Quantity in MIRO for freight Condition but due to tolerance defined in system the invoice goes for block for payment. Actually, the concerned user do not have authorization for the release of blocked invoices (MRBR) and we cannot change the tolerance also because it comes under Audit.
    I was thinking whether we do have something in Condition type settings where we can pay full frient cost to vendor in the first bill only irrespective of the Partial GRN?
    Please suggest me on this.
    Regards,
    Neeraj

    Hi,
    Create a freight vendor separately and assign that condition for th freight vendor in conditions of PO and for that freight vendor do not check the G/Rbased.
    In this case after creation of PO you need to do MIRO woth planned delivery cost selection in that screen and then you get a pop up where in you can select your freight venodr and make invoice verifiation for that freignt vendor and later you can go with GR for as much ever quantity as you are in need.In this way it wont effect the freight price with respect to your inward quantity.
    Thanks.

Maybe you are looking for

  • Error while saving any workflow in database

    hi i had created a simple workflow and i was trying to save in database, but i faced following problem while saving... plz help for this 1700: Could not connect with username/password 'system/myadmin@orcl' ('ORA-12154: TNS:could not resolve the conne

  • Ipod for Windows 2006-06-28 software installer fails

    When I install the iPod utility for Windows, version 2006-06-28 (the current download), the install shield goes to 100% --- but then it reverts and deletes all the files it installs at the very end. eventvwr tells me the last application event was: "

  • Problem in RFC for CCAP_REV_LEVEL_MAINTAIN

    Hi, I am a BizTalk developer and my requirement is to update the Rev Lev of a material in SAP. My basic findings told me to use the BAPI: CCAP_REV_LEVEL_MAINTAIN. But when I'm trying make an RFC on CCAP_REV_LEVEL_MAINTAIN I'm getting the following er

  • DirContext. Best practice.

    Hello, I have a question. What is the best way to organize DirContext usage? I have a web application. It has security module. Security module uses admin Microsoft Active Directory account and SSL connection. Security module performs several tasks: 1

  • Very slow when copy files to Window Server by SMB

    I have a Windows Server 2003 as a file server, at first mac client connect it whith no problem by SMB , but now, just copy a 5kb jpg file to the windows server will cost more than 5min, then we set up Apple Share on windows with errors, but Apple Sha