.sim files, integrated planning presentation, vanished?
Dear friends,
a few weeks ago I had .sim files with rather nice explanantions of the new integrated planning with bi 7.0.
i cannot find them anymore. can anybody hep me with this isue? I also need the player for these .sim-files.
One was called "Demo - Creating Simple Planning Applications using the BEx Analyzer.sim"
Best regards
Dirk
I found the presentation for BI 7.0 tools here:
https://websmp104.sap-ag.de/bi
-- BI in SAP NetWeaver 2004s
BI CAPABILITIES
Direct link:
https://websmp104.sap-ag.de/~form/sapnet?_FRAME=OBJECT&_HIER_KEY=501100035870000008552&_HIER_KEY=601100035870000200812&_HIER_KEY=701100035871000424712&#HOME
Thank you all very much for your help!
Dirk
Message was edited by: Dirk Knauer
Similar Messages
-
View temporary data in Web layout during file upload in Integrated Planning
Hi Experts,
When using File Upload funcationality, in Integrated Planning,
I have a requirment, How user can view the data in the web layout?
After data display user can make changes in the data and on click of Save the updated data is saved in cube.
If any one has come across this requirment can you please help me out how things can be carried out?
If "how to implement" document is present can you please provide me the link.
Thanks and Regards,
AbhiHi Abhi,
I assume, you are using WAD for this..
Please do the following: (Please note the the cube has to be in Plan mode while executing WAD)
1. Create a input enable query (through query designer) on th eaggregate level (the one you are using for IP). You might need to create filers for the aggregate level. these filters can also be used in the query.
2. In the WAD, pull this query.
3. Create a button in WAD and check for the planning functionalities readily available that you can use in WAD. One of the planning functionality is SAVE Data. This will save any data which is entered by the user.
4. In the same button integrate a Refresh Data command after the SAVE data. This will automatically refresh the query and pull the updated/changed data from the cube.
This should work. Please write back in case of any clarification.
Regards, Rishi -
Problem in Load File into BI-Integrated Planning
<b>Hi Marc,
When I am running the URL for file upload in BI Integrated Planning, I am getting the below message ( we have created the variable on navigational attribute):</b>
Note
The following error text was processed in the system BWD : /BI0/OICOSTCENTER__0SALES_DIST is not a valid attribute type.
The error occurred on the application server ma1ua231_BWD_00 and in the work process 0 .
The termination type was: RABAX_STATE
The ABAP call stack was:
Method: IF_WD_CONTEXT_NODE_INFO~ADD_ATTRIBUTE of program CL_WDR_CONTEXT_NODE_INFO======CP
Method: WDDOMODIFYVIEW of program /1BCWDY/780RZKQ35587UCX2RCTU==CP
Method: IF_WDR_VIEW_DELEGATE~WD_DO_MODIFY_VIEW of program /1BCWDY/780RZKQ35587UCX2RCTU==CP
Method: DO_MODIFY_VIEW of program CL_WDR_DELEGATING_VIEW========CP
Method: MODIFY_VIEW of program CL_WDR_VIEW===================CP
Method: DO_MODIFY_VIEW of program CL_WDR_CLIENT_COMPONENT=======CP
Method: DO_MODIFY_VIEW of program CL_WDR_WINDOW_PHASE_MODEL=====CP
Method: PROCESS_REQUEST of program CL_WDR_WINDOW_PHASE_MODEL=====CP
Method: PROCESS_REQUEST of program CL_WDR_WINDOW=================CP
Method: EXECUTE of program CL_WDR_MAIN_TASK==============CP
<b>In System we are getting Short dump as:</b>
An exception occurred which is explained in detail below.
The exception, which is assigned to class 'CX_WD_CONTEXT', was not caught and therefore caused a runtime error.
The reason for the exception is:
/BI0/OICOSTCENTER__0SALES_DIST is not a valid attribute type.
I went through your blog. Just curious to know when can we expect Version 2 of the how-to solution will support a direct upload from Excel without the need to launch a browser.
Thanks
Kamlesh MishraHi Marc,
Thanks for your support and great help for the problems we are facing in IP. Now we are able to get the browser screen for selecting the file, but we are facing new issue, When we are uploading file, the system is giving dump saying "THE ASSERT CONDITION was violated" in the below source code:
LOOP AT n_t_charsel INTO l_s_charsel WHERE sign = 'I' AND opt = 'EQ'.
ASSIGN COMPONENT l_s_charsel-iobjnm OF STRUCTURE <l_s_data> TO <f>.
ASSERT sy-subrc = 0.
IF <f> IS INITIAL.
<f> = l_s_charsel-low.
ENDIF.
ENDLOOP.
(We are unable to open the Blog, it is showing us "No Authorization" message)
Thanks,
Kams -
BI-Integrated Planning: File Upload
Hi, I have implemented the "BI-Integrated Planning: File Upload" paper and it seems to work fine.
Whatever "Version" is in the delimitied file gets loaded just fine. (New Version gets created in master data) So if version 999 is in the file the new version 999 get created with no master data issues. But, when I try to load a file with a material that doesn't exist in Master Data, I get errors about the material not existing. We need to have the upload allow new materials..
I am wondering if it Is the InfoObject Conversion Routine that causes the error, but if that was the case we wouldn't be able to load new materials in our regular loads.
Why does the file upload app allow you to create a new version, but not a new material?
Any ideas?I found out that a new characteristic value can be created for characteristics with no Master Data Table.
I.E. 0VERSION can have a new value
I.E. 0MATERIAL cannot have a new value
Answer was found in following thread:
IP input query: mandatory fields and new master data input -
*** Question How to load a file into BI-Integrated Planning and use WAD 7.0
Hi, I created an manual DTP upload to my planning infocube and it works fine. The transformation rules convert 0CALMONTH into the relevant Calendar and Fiscal characteristics. So all of my Time Characteristics are fine, both Calendar and Fiscal.
However, When using the "How to load a file into BI-Integrated Planning and use WAD 7.0" solution, only the Calendar Characteristics are populated and not the Fiscal. The upload application somehow knows to populate the 0CALMONTH2, 0CALQUART1, 0CALQUARTER, and 0CALYEAR.
How can I get the upload to populate my Fiscal Period Characteristics?
Would it be best to modify the "Upload Application, or can I write a planning function to update the fiscal characteristics, or some other way?
Thanks!My planning data is being uploaded via the SDN Planning File Upload Solution. What I did was end up modifiying the upload class ZCL_RSPLF_FILE_UPLOAD Method EXECUTE.
I added the following code if anyone is interested.
*{ INSERT BWDK902323 1
THIS SECTION OF CODE POPULATES THE FISCAL PERIOD CHARACTERISTICS
USING THE FISCAL YEAR VARIANT 'NK' AND THE CALENDAR MONTH/YEAR
FIELD-SYMBOLS <0FISCVARNT> TYPE /BI0/OIFISCVARNT. " Fiscal Year Variant
FIELD-SYMBOLS <0FISCYEAR> TYPE /BI0/OIFISCYEAR. " Fiscal Year
FIELD-SYMBOLS <0FISCPER> TYPE /BI0/OIFISCPER. " Fiscal Year/Period
FIELD-SYMBOLS <0FISCPER3> TYPE /BI0/OIFISCPER3. " Posting Period
FIELD-SYMBOLS <0CALMONTH> TYPE /BI0/OICALMONTH. " Calendar Month/Year
ASSIGN COMPONENT '0CALMONTH' OF STRUCTURE <L_S_DATA> TO <0CALMONTH>.
ASSIGN COMPONENT '0FISCPER' OF STRUCTURE <L_S_DATA> TO <0FISCPER>.
ASSIGN COMPONENT '0FISCVARNT' OF STRUCTURE <L_S_DATA> TO <0FISCVARNT>.
ASSIGN COMPONENT '0FISCPER3' OF STRUCTURE <L_S_DATA> TO <0FISCPER3>.
ASSIGN COMPONENT '0FISCYEAR' OF STRUCTURE <L_S_DATA> TO <0FISCYEAR>.
<0FISCVARNT> = 'NK'.
CALL FUNCTION 'FISCPER_FROM_CALMONTH_CALC'
EXPORTING
IV_CALMONTH = <0CALMONTH>
IV_PERIV = <0FISCVARNT>
IMPORTING
EV_FISCPER3 = <0FISCPER3>
EV_FISCPER = <0FISCPER>
EV_FISCYEAR = <0FISCYEAR>.
*} INSERT -
Power Sim - Does it work with Integrated Planning (IP)
PowerSim currently promotes itself as being able to perform superior simulations on SEM-BPS. With BI7.0, we have the option of using Integrated Planning (IP) or BW-BPS. Following are my questions:
1. Does PowerSim work with IP?
2. Does PowerSim work with BW-BPS in addition to SEM-BPS? Assuming yes, what are the differences / challenges (if any) using BW-BPS in a BI7.0 as opposed to going against SEM-BPS?
3. Does BI7 have any "out of the box" advanced simulation capabilities that are "close" to what PowerSim provides.
4. Given SAP's recent strategic investments of Outlook Soft / Pilot / Acorn, the assumption is that these will integrate into the BI platform over the next year +. Does anybody know if any of these tools provide similar simulation capabilities to PowerSim and/or what SAP's timing is to integrate / ramp-up?
ThanksHi Richard,
1) Unlike in previous versions of SEM-BPS. there's no special support for PowerSim in BI-IP. Please check with PowerSim vendor what kind of standard SAP interfaces they support (to read from/write data to BI).
2) Yes, when it comes to PowerSime BW-BPS is no different to SEM-BPS. You cna use BW-BPS just like SEM-BPS (some limitations are the financial planning functions). For more information please see the BI FAQ at http://service.sap.com/bifaq.
3) No.
4) No. PowerSim provides specialized capabilities which are not included in that form in the products listed by you. Please check with PowerSim what capabilities they provide in connection with SAP NetWeaver BI 7.0
Regards,
Marc
SAP NetWeaver RIG -
Date entry error in BI Integrated planning 2004s
Hello,
I am trying to fill a date field in BI Integrated Planning via mannual planning. The ratio was created as Dec type. When I introduce for example the value 01.01.2006 or 01/01/2006 and save the data, the new value is not saved in the infocube, so I suppose there is some kind of format issue. The same value in the former layout in BPS Web Interface was introduced as 01.01.2006.
Morever, if I introduce the value as 20060101 or 01012006, BEx is close immediatly with a fatal error message.
Other ratios in the layout like %of growth are save properly in the infocube.
I have installed SapGui NW 2004s SR1 Presentation - 6.40 Compilation 5 and SAP Netweaver 2004s BI AddOn Patch Level 801 (Bw700SP08P_801-10001615.exe).
Thank you for your help.
Regards.
Message was edited by: Ignacio Arroyo
Message was edited by: Ignacio ArroyoThank you Leon,
In fact, I had already checked that the value was represented in BEx as 01.01.2005, after introducing the value from former Web Interface layout. However if I change the value to 01.02.2005 and save data, the value return to 01.01.2005. I don't think it is a definition issue, since other ratios in the same layout are defined with the same restrictions and are saved OK.
Moreover If I introduced 01012005 BEx is closed with "Business Explorer critical program error occurred. The program has to close. Please refer to the trace for further information" and of course that is not a good point for our final users ......
The following lines appear in the BEx trace log file:
+RSR_XLS_RFCtrc: 7.1875
RSR_XLS_RFCtrc: 1.09375
BExApplication.GetTemplate: DecimalSep = .
RSR_XLS_RFCtrc: 14.0625
BExApplication.GetTemplate: Instantiating Serializer: 0
BExApplication.GetTemplate: DecimalSep = .
RSR_XLS_RFCtrc: 1.09375
BExApplication.GetTemplate: Instantiating Serializer: 0
BExGrid.CreateFromDeSer: Deserializing
BExGrid.CreateFromDeSer: DecimalSep = .
RenderingGridCells: 907
RenderedCells: 907
BExExcelApplication.BeforeRender: Trying to set Display Alerts to false
BExExcelApplication.SetNameAddress: ComException thrown El servidor lanzó una excepción. (Exception from HRESULT: 0x80010105 (RPC_E_SERVERFAULT))
RenderValues: 0.15625
RenderFormats: 0.46875
RenderIndent: 0.15616
RenderBuildInputRectangles1: 0
RenderBuildInputRectangles2: 0
RenderBorders: 0.156288
Rendering Shape: 1
Rendering Shape: 2
Rendering Shape: 3
Rendering Shape: 4
Rendering Shape: 5
Rendering Shape: 6
Rendering Shape: 7
Rendering Shape: 8
Rendering Shape: 9
Rendering Shape: 10
RenderHierarchyShapes: 0
BExExcelApplication.SetNameAddress: ComException thrown El servidor lanzó una excepción. (Exception from HRESULT: 0x80010105 (RPC_E_SERVERFAULT))
RenderData: 10.78125Count:
BExExcelApplication.SetNameAddress: ComException thrown El servidor lanzó una excepción. (Exception from HRESULT: 0x80010105 (RPC_E_SERVERFAULT))
BExItemGrid.ProtectSheet: Protect Sheet
BExExcelApplication - OpenQueryThreaded -
Windows visible is set to true
RSR_XLS_RFCtrc: 0.15625
BExConnect.Dispose: Disposing BExConnect+
Thank you for your help
Message was edited by: Ignacio Arroyo
+<i></i>+
Message was edited by: Ignacio Arroyo -
BI 7.0 Integrated Planning
Hi BI experts,
If anybode haveing documents on BI 7.0 integrated planning. Please send.It would be grreat help for me.
Please send to this id: [email protected]
Thanks in advnace.
Best regards
shekar gundaHi Shekar,
The integrated planning is a part of BW-BPS and Some of the standard SEM functions might not be available.It is the same functionality like in BPS but with the new front-end based on Excel with Mi9crosoft Excel Functionality. you can still use BPS but you can opt for BI Integrated planning.
and have a look at the following file on
https://service.sap.com/bi
Media Library ==> Standard Presentations ==> Standard Presentation: BI Integrated Planning.It gives a good overview
and also check the SDN FORUM LINK.
New Considerations on Integrated Planning
Posted on: Jul 24, 2006 6:02 PM, by user: Harjan ter Haar
Frequently Asked Questions in SAP NW 7.0 - Enterprise Data Warehousing, Reporting, Query & Analysis and Business Planning [original link is broken]
https://www.sdn.sap.com/irj/sdn/docs?rid=/webcontent/uuid/93eaff2d-0a01-0010-d7b4-84ac0438dacc [original link is broken]
You could get some SAP Documents here.
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/5ee3725b-0401-0010-e381-ac323362ce91
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/5c46376d-0601-0010-83bf-c4f5f140e3d6
These two pdf files has all almost all info about BI2004s.
Go through this Link for BI 7.0 Documents.
https://websmp101.sap-ag.de/bi
and Click on BI StandardPresentations link.
Here You can download BI 7 Documents.
Assign points if the links are helpful
Regards
CSM Reddy -
Hi,
Pl tell me how to achieve Integrated planning in BI 7 as we have detailed how to doc for BW 3.5' s BPS.... Pl give me how to document for Integrated planning.
Thanks & Regards,
VijayaHi,
Check the below pdf file:
https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/00915d56-1e31-2a10-6785-e8b5c4114de3
What You Should Know About Planning With SAP NetWeaver BI
SAP NetWeaver BI Integrated Planning for Finance
http://www.sap-press.de/katalog/buecher/htmlleseproben/gp/htmlprobID-113
http://help.sap.com/saphelp_nw70/helpdata/en/43/0c033316cd2bc4e10000000a114cbd/frameset.htm
https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/00915d56-1e31-2a10-6785-e8b5c4114de3
https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/90cef248-29e0-2910-11bb-df8dece7e22c
Hope this helps.
Thanks,
JituK -
Integrated Planning Service cannot be reached
Hi Experts,
I am having an issue in opening the planning modeller. Once i click on start modeller on transaction RSPLAN, i get the following error.
Service cannot be reached
What has happened?
URL http://imtsapm01.massap.corp.pri:8000/sap/public/myssocntl call was terminated because the corresponding service is not available.
Note
The termination occurred in system PP1 with error code 403 and for the reason Forbidden.
The selected virtual host was 0 .
What can I do?
Please select a valid URL.
If you do not yet have a user ID, contact your system administrator.
ErrorCode:ICF-NF-http-c:000-u:SAPSYS-l:E-i:imtsapm01_PP1_00-v:0-s:403-r:Forbidden
HTTP 403 - Forbidden
Your SAP Internet Communication Framework Team
BI reporting works fine without any issue. Not sure why this doesnt work. is there some special service which needs to be activated for integrated planning? I am running BI-7 and BI and portals are hosted on the same machine. I have done all the connection tests and there is no error on the system.
Would appreciate you're help.
thanks and regards
dilankeHi,
Please check the following things:
1. Check whether the necessary services are active. You can check this using SICF transaction. If its inactive, please activate.
2. Check if the BI server is properly connected to the Intergrated Planning portal.
3. Check if you have added the URL in internet explorer connections settings. Open internert explorer -> Internet options-> Connections-> LAN settings -> Advanced -> Exceptions. Check if you url is added here.
4. Check the drivers settings. Go to run -> drivers-> etc (folder name) ->host (file name). Open this host file as notepad and check if the BI server id and url is added here.
If all the above steps are correct, the IP portal should work correctly.
Thanks.
Regards. -
CCA and PCA retraction in Integrated Planning
Hi all,
Please I need some orientation about CCA an PCA retraction when you are using Integrated planning.
I read blogs about CCA retraction (made by Praveen Mayalur) and was very helpfull, but it only refers a planning scenario using BW-BPS, and I don't have the same structure to send the data in the integrated planning.
I had looked in SDN and SAP portal, and I can't find anything about it.
I hope you can help me.
Thanks in advance, best regards
Inge EichhornsHi
1) Retraction are driven by BPS, IP is not equipped with Retraction.
2) Cost Center & Internal Order Retraction should be configured through in BPS--> Planning Area; Planning Level, Planning Function; Parameter Group.
3) You need to configure Source Structure, based on business requirement you need to ensure that the retraction happens either in CO Currency or Transaction Currency.
4) Try to use the SAP Standard Function Modules for Cost Center and Internal Order Retraction. Refrain from copying & modifying the same.
go through the Cost Center Retraction relevant documents and they are very helpful.
5) Function Modules for Profit Center Retraction are not available in ECC due to the New GL Concept.
6) If possible advise the Business to use "File Upload" for Profit Center Data.
Regards
Srinivas -
COPA Vs BPS (BI Integrated Planning)
Hi.
I would like to know if BPS or BI-Integrated planning replace the COPA module in SAP.
Cheers
AnandAnand,
The COPA data that is extracted will be stored in the data warehouse layer of BI 7 and which can be accessed by a report in query designer in which the planing will happen.
The dtaa flows is like this:
1Enter and record all the business transactions in R/3 - various modules and components and transfer them to COPA.
2. Build COPA data source in R/3
3. Extact the COPA data to COPA DSO or Cube in Bi 7
4. Make a planning cube in BI 7.
5. Create aggregation levels, filters based on planning cube and actual cube.
6. Create planning functions to do perform planning calculations and apply business logic.
7. Create input ready query in query designer.
8. Launch the query and planning.
Also, since BPS is also present in BI 7 along with IP, you can do the planing in BPS component also, but any future functionalities will be delivered towards IP.
Ravi Thothadri -
Problems with BI Integrated Planning
Hello, everybody,
We installed BI 7.0 and want to use BI Integrated Planning, but then i connect to Modeler Wizard i get error <b>No JCO Connection</b>. Our BASIS Team can't find an issue.
Maybe there is some kind of configuration in BI side, not just in BASIS?
Could you give us some advice?
Thanks in advance.
Best Regards,
Arunas StonysJoanne,
Are you still having issues with BI-IP? I have been troubleshooting with the basis folks in getting BI-IP up on a new system over the last few day to a week and have now gone through the process myself whereas before I had been given a system already set up. I have enclosed some troubleshooting feedback with my counterpart in getting the system up.
What type of issue are you having?
Can the basis folks start the planning modeler or planning wizard in RSPLAN even if you can't?
1. The note mentioned above 919850 and the help documentation in SPRO under
SAP NETWEAVER->Business Intelligence->BI Integrated Planning
are very helpful. They have to set the following Jco Destinations in Web Dynpro Content Administrator:
BI_MODELDATA
BI_METADATA
WD_ALV_MODELDATA_DEST
WD_ALV_METADATA_DEST
And the problem was the connection to the message server. It was not possible to connect without having a Logon group assigned. This had to be done in WI4 ABAP as well as in the SLD for this system. After that assignment connection was no problem.
2. make sure you have the portal ips in your host file.
3. have they have created an account for you in client 001 of the NW04S?
4. Have they created a portal id for you and assign the portal role com.sap.ip.bi.business_planning_showcase to you?
5. have they configured the setting for starting the planning modeler (also under SPRO)..
Hope this helps. If you have more specific questions, feel free to e-mail me directly.
Mary -
hi,
where do I find XI sim files? Can I get scenarios as well for sim files?Hi
You can check in service.sap.com for this-
Link is -
https://websmp109.sap-ag.de/netweaver ->SAP Netweaver In detail->Process Integration->SAP Exchange Infrastructure->Media Library
There are mnay tutor files/documentation etc..
Elearning~
https://www.sdn.sap.com/irj/sdn/developerareas/xi?rid=/webcontent/uuid/a680445e-0501-0010-1c94-a8c4a60619f8
Topic based Demos
https://www.sdn.sap.com/irj/sdn/docs?rid=/webcontent/uuid/110ff05d-0501-0010-a19d-958247c9f798#xi
Regard's
Chetan Ahuja -
Questions about Integrated Planning and BPS
Hi all,
I'm testing the functions of BW7.0. And at the point of comparing the new BI Integrated Planning from the BPS, I'm stuck with 3 problems. Can anybody give me some solution?
<b>i.</b> When using the input-ready layout of the BW-BPS 3.5, I was able to create a new record and load it up to the cube. Is it possible to make the same operation like this using the BI Integrated Planning of BW7.0?
<b>ii.</b> When using the BW-BPS 3.5, showing the character hierarchy on the Manual planning layout can be chosen. And I'd like to show the BPS Characteristic Hierarchies in BI Integrated Planning of BW7.0 like it is in the BW-BPS 3.5. Is it possible to show the hierarchy in similar type somehow? If not,can't I show the sum of it anyhow? And if possible,can you also show the sum of the each hierarchy and change the data?
<b>iii.</b> When showing the Characteristic combination data, can you choose how to show them from the transaction data or from all the combination like it was possible in the BW-BPS 3.5?
Kind regards,
Hiroshi IwanagaDear Beat,
Thanks for your help.
The information you gave me made a lot of help.
Can I ask you more about the first question?
About getting new lines in the table web item,as you have told me, I have set the parameter NEW_LINES_COUNT as 20 in the table web item. But when I execute it,no lines shows up. Is this a program error or am I setting the parameter in a wrong place?
And this getting new lines feature, is it also possible when using a workbook?
Thanks in advance,
Hiroshi Iwanaga
Maybe you are looking for
-
How to do autoprovisioning to a custom connector based on jobcodes?
Hi, I have developed a custom connector which has 50 job codes. Based on the job codes we need to do autoprovisioning. How this is possible? do we need to create rule for each job? Thanks in advance
-
External Hard Drive Data Recovery
Hello Apple Support Communities! I have a Western Digital 320GB external hard drive and it currently has 0 bytes available. This has prevented me from even viewing the hard drive on my finder window. I can only see it in disk utility. I have tried re
-
The dialog box, indicating remaining disk space on your hard drive located at the bottom of the finder window is gone in OS 10.8. How does one keep an eye on how much space remains on the hard drive or any external device for that matter?
-
Setup of PXE boot for SCCM 2012
I have setup SCCM Server on a test network with IP 192.168.9.10. I have also setup a DC which is running AD, DNS and DHCP and its IP is 192.168.9.2 On what server do I install WDS and how do I configure WDS/DHCP to point SCCM 2012 to enable PXE boot
-
IdeaPad Overview of HMM (Hardware Maintenance Manual)
Trying to download the Lenovo Flex 15 Hardware Maintenance Manual. I have called Lenovo 3 times, but the website still hasn't been updated. I went to the support site, put in my model info and click on manuals. Hardware Maintenance Manual and get