Simulation version to Operative project

Hi experts,
I am unable to create an operative project structure from a simulation version using project builder.
My req:
I have sim version:  T-90001/ SIM001
I wish to create operative project T-90001
I can use CJV4 for transfer of project. But is it possible in CJ20N?
Warm regards
ramSiva

Hi Ravi
Thanks for your response
Please look at the link http://help.sap.com/saphelp_erp60/helpdata/en/0b/ba853488601e33e10000009b38f83b/frameset.htm
There is an illustration which depicts that,
- Project P1234/version 0001 --> Project 1234 --> Project P1234/Version 0002 --> Project P1234
As per this illustration, the project number remains same.
As you said, the transaction CJ20N is not allowing me to transfer the simulation version to operative project.
But, i am experiencing a dump error while trying to transfer simulation to operative in CVJ4.
At the conclusion, i mean to say that irrespective of transaction code, this may be allowed.
Please comment.
warm regards
ramSiva

Similar Messages

  • Error while transfer simulation version to operative.

    Hi Experts
    I tried to transfer a simulation to operative in CJV4.
    But i experienced the below message:
    Backward scheduling (enter finish date)
    Message no. CO028
    I could not find the reason, since all the the networks have start and finish dates, still i am unable to tranfer sim to operative.
    Please advise the action.
    Warm regards
    ramSiva

    ramSiva,
    As fas as I know, it is not necessary at all to maintain forecast dates before transfering from sim to operative.
    As per your reply I understand that no forecast dates were maintained in the operative project before transfering to sim and that no forecast dates are maintained in the sim before transfering back to operative. Is this so, isn´t it?
    I cannot think of a reason why this may be happening.
    Maybe ask OSS ???
    Sorry for no better answer
    Regards
    Martina

  • Simulation version Error - Message no. C2323

    Dear Experts,
    I'm trying to create simulation version from operative project.
    I'm getting the following error even though I have maintained settlement rule.
    Settlement rule contains errors and has not been saved
    Message no. C2323
    Diagnosis
    You use a strategy and/or default rule to automatically determine settlement rules for orders/networks.
    The system has determined a settlement rule for NWA #46 according to the defined strategy and/or default rule. However, when checking this settlement rule, an error appeared.
    This error may occur, for example, when you want to create a settlement rule for the superior WBS element, because due to a user status on the WBS element, this is not allowed.
    System Response
    The settlement rule is not saved due to the error.
    Procedure
    Maintain the settlement rule manually for NWA #46, and check the strategy and/or default rule used.
    Please help.
    Regards,
    VINOD.V

    below is the settlement strategy parameter for network
    Manual maintenance of settlement rule
    1   Automatic generation of settlement rule
    2   Generate settlement to WBS element
    3   Copy settlement rule of the WBS element
    4   Copy settlement rule of the project definition
    5   No settlement rule
    then assign strategy to PSP/PS1
    assign network settlement profile to network type as zps1,2,3,4&5
    so just configure the strategy according to suitability then run simulation.
    Regards,
    Sanjeev

  • How to compare the simulation version

    Dear Experts,
    For Operative Projects we can create Simulation Versions (CJV1 / CJV4) & Project Version (CN72).
    We can compare different Project Versions with Operative Project (S_ALR_87013539 / 38).
    Similarly can we compare Simulation version with Operative Project?
    OR can we see plan cost report for simulation version?
    Please guide.
    Rajesh

    Hi,
    Simulation versions are not meant for comparison purpose. You can use Project versions for that, which are snapshots of project at that point of time.
    Simulation versions can be used to analyse 'what-if' conditions and for quotation ie pre-order analysis. Before receipt of sales order, you can create simulation project and do cost planning for quotation purpose. After receipt of sales order, this project can be made operative. In case of loss of project, you can delete simulation.
    Another case can be during execution you want to check "what happens if" kind of conditions. you can transfer operative project to simulation version, simulate reqd condition. If results are desirable, you can copy the simulation version onto current project or alternatively delete simulation.
    Regards

  • Slaes pricing using simulation version

    Hi experts,
    Is it possible to create sales pricing using simulaton version project ?

    Hi Ravi
    Thanks for your response
    Please look at the link http://help.sap.com/saphelp_erp60/helpdata/en/0b/ba853488601e33e10000009b38f83b/frameset.htm
    There is an illustration which depicts that,
    - Project P1234/version 0001 --> Project 1234 --> Project P1234/Version 0002 --> Project P1234
    As per this illustration, the project number remains same.
    As you said, the transaction CJ20N is not allowing me to transfer the simulation version to operative project.
    But, i am experiencing a dump error while trying to transfer simulation to operative in CVJ4.
    At the conclusion, i mean to say that irrespective of transaction code, this may be allowed.
    Please comment.
    warm regards
    ramSiva

  • Comparison between Opreative Project & Simulated version

    Dear Colleague,
    I have one query regarding simulation version, may I know how I will compare operatioe project with any simulation version by using SAP standard reports like CN41N. I already maintained version check box ticked in DB profile. As I know that we can easily compare Project version with operative project but do not know how to compare operative project with simulated version. Please just advice...
    Regards,
    Ashok Sangal

    Hi Ashok,
    Simulation versions are compared with operative versions in the same manner in which project versions are compared with operative project. The simulation versions for the project appears in the "Project version" selection. Select the required Simulation version to include it in the results.
    regards
    Sejo

  • Sales pricing from Project Simulation Version

    hi.
    Has anybody created sales pricing for the project using transaction DP 82? It does not create the sales pricing for the simulation version, even though I have provided the version key.
    The status of the simulation version of the project is CRTD. I am using the network cost planning in the simulation version of the project. Am I missing something here? I am hoping to get an answer from this community. Thanks for your help in advance.
    Regards
    Mey

    Hi
    The following are the prerequisites for the sucessful fuctioning of sales pricing for simulation versions of the project.
    1. A dynamic item processor profile (DIP profile) must have been maintained in the customer inquiry.and must be Customized for Project System.
    2.The same DIP profile must have been entered on the Sales B tab page of the item detail view in the SD order.
    3. A customer inquiry with at least one item that has to be maintained and assigned to a billing element must exist. The system determines the SD data for sales pricing from this inquiry item.
    4.You have planned costs (in concordance with cost elements) for your project version.
    If these prerequisites are met, i think it will work
    Reward if helpful
    Regards
    Murali

  • Planed costs on Simulation Version

    Where can I see the planed costs on Simulation?
    I have an escenario where the project is created as Simulation, and after this one is evaluated on duration and costs, the user transfer the simulation to an operative project, but I need to see the planed costs.

    Hi ,
    Go to trnsaction CNS41 Structure Overview report
    Press The Push button DB Profile
    Tick on Version data in Origin
    here u can select the simulation versions for which u want to see the Project info with differentiated colors
    by selection of Project planned cost field
    Rgds

  • PS - Simulation version made Inactive after transfer to Operative

    Hi,
    It is by process that once a simulation version is transferred to an operative project, all the active simulation of that project existing in the system till that time are flagged inactive. We need to manually set them to active again.
    I would like to know if there is a way set this default feature off or make it selective to flag only the simulation in question as inactive, and leave the others as active?

    This looks like a system error not an application error. Talk to your BASIS consultant / system administrator.
    Regards,
    Anuradha

  • Problem in tranfering simulation project to operative project-CJV4

    hi all,
    I am able to transfer operative project to simulation project but after making changes in the simulation project, I am not able to transfer the simulation project back to the operative project.
    on clicking the transfer icon ,it gives a message:the project is being updated
    but later an error is generated in the sap mail box :
    Transaction..   CJV4
      Update key...   485204B734B8379DE1000000AC190086
       Error Info...   00 671: ABAP/4 processor: SAPSQL_ARRAY_INSERT_DUPREC
    and the operative project is not affected.
    plz help..points will be rewarded.
    regards,
    johnson

    thanks for the quick response,
    no, i m not getting any dump.
    when i transfer the project,it successfully goes into the log tranfer screen  while the status msg is the project is being updated...when i press back button....the previously mentioned error occur.
    regards,
    johnson

  • Quotations from Project Simulation Version

    Hi experts,
    We are creating project quotations using DP81. We create multiple quotations for the same inquiry using Project Simulation Version.
    We would like to know from which version the quotation document has been created, is it possible?
    Or can you suggest any workaround?
    Thanks

    Hi,
    Both options, as in DP81 we are able to select simulations versions.
    But onces the quotations has been created we can't know the source. we know the project as is informed in the account assignment but not the simulation version we have used.
    Has anybody faced this issue before?

  • Reg:Operative and simulation version comparison in cn41

    Hi,
    I am doing comparison of date between Operative project and Simulation project(cn41) .But all the object are displaying row wise in single column
    Project Object                                      Ear Start                        Ear Finish
    Activity1(operative)                                  11.03.2011                        16.03.2011
    Activity1(Simulation)                                 20.03.2011                       15.03.2011
    But I want it to display like this(Both operative and simulation separately)
    Project Object       Ear Start(Op)          Ear Finish(Op)  Ear Start(Si)         Ear Finish(Si)
    Activity1(operative)   
    Activity1(Simulation)                                                   
    How it can be possible.Can Any body give some idea and way to resolve this issue.
    With Regards
    Rohit Prakash
    Edited by: rohitSAPCOMMUNITY on Mar 15, 2011 6:16 AM

    hi sophie,
    create separate network for each wbs in project.  see if this can solve your issue.
    vengaiah chowdary

  • Project Simulation Version

    Hi,
    Is there any Function Module or BAPI to extract all details of PRoject Definitions and WBS element and Network Activities for Project simulation Version/Version key.
    Thanks
    Ramesh

    Hi,
    Both options, as in DP81 we are able to select simulations versions.
    But onces the quotations has been created we can't know the source. we know the project as is informed in the account assignment but not the simulation version we have used.
    Has anybody faced this issue before?

  • CJV4, WBS simulation version cost in COSS and COSP by cost element

    Hi PS expert.  (-:
    IN PS When we freeze a simulation version with CJV4,  (operative data to version), sap will create new object number in table VSCAUFV_CN for each network and VSPRPS_CN for each Wbs element related to the simulation Version.
    In our environment, SAP will add record in COSS and COSP for the new object number for Network but NOT FOR THE WBS.
    Is it standard to NOT record the cost in COSS and COSP for the simulation cost of the WBS (against the new object number?)
    That mean we will able to see the simulation cost by cost element for network, but NOT FOR WBS element.
    For the WBS, we only record the cost in RPSCO by cost category.
    Is there a way to active (with an exit ..classu2026bapi) the recording of the cost of the WBS by simulation version in COSS and COSP
    Thanks you very much for your help
    Sophie

    hi sophie,
    create separate network for each wbs in project.  see if this can solve your issue.
    vengaiah chowdary

  • Simulation version

    Hi,
    On simulation i have two questions
    1. What is the significance of simulation profile. Is it required to be assigned for the project (Through project profile) before carrying out the simulation?
    2.I am trying to create simulation version in CJV4 for the project. I have created the simulation profile and assigned it to my project profile. But when i try to create the simulation version i am getting the following error
    "When you want to run a report that uses the PSJ logical database, module pools are generated for runtime optimization and memory optimization. This module pool cannot be generated since therew is an error in the logical database. This error can only occur, if the SAPDBPSJ program was changed during the runtime of your prrogram".
    Can any body help me in this?
    Rajesh

    Hi,
    Simulation profile is not mandatory. The profile controls what texts get copied from operative project to simulation. If you dont give this profile, all texts get copied into simulation.
    I would be able to help if you tell me the error message number. I hope it is not dump. In that case goto ST22 and let me know the details.
    Regards

Maybe you are looking for

  • How can i enlarge subtitels in Apple tv

    The subtitels in a film that i bought or rented from the iTunes store are too small. Does anyone know how to get bigger subtitels ?

  • How do I get a photo from an email and send it by text?

    I received a photo by email and would like to attach it to a text message. Is this possible?

  • Tables or Views to get the data

    Hi, I am new to OLM and need some help in identifying the tables for gathering information and sending email notifications. From which table can I get the email ids of all the customers who registered in a class. As there can be multiple classes so h

  • Migration of account balances

    Hi, I need to migrate account balances (client) in a same system. New accounts will be created, and i need to transfer/migrate the balances of a determine type of client, into a new general account that will congregate the balances of all the clients

  • IPhone 4S bought "unlocked." Worked with Straight Talk, not in France.

    So I've had my iPhone 4S for a while and never had problems. Brought it to Straight Talk over a year ago after buying it unlocked on Amazon. Now I'm studying abroad for 6 months and I decided to buy a new SIM card and just use it here. So I bought a