Singale line in Production order

Dear Experts..
While doing MB1A (Material issue to production order) we are getting 2 lines that is required quntity and set up.
We usually issue full quntity to production but while doint the entry the user need to seperate it and enter.
This will couse a issue most of the time the user calculate worngly or enter it wrongly..
Pls help me how I can get 1 single line that includes required qty and set up..

Oh.. Experts..
Set up  qty means fixed qty,  that is consumed before starting the mass production.
Example if I  want to produce 10 stickers my raw material would be 1 meter of label.
We will define in the BOM 1 meter for 10 stickers and another line fixed qty 0.5 meter while doing the production 0.5 meter will get waste and using another 1 meter we produce 10 stickers. while issuing  the material am getting 2 lines though its common raw material but  1 belongs to 1 meter qty another one fixed qty that is 0.5 meter.
how I can combined..

Similar Messages

  • Production order with pipe line material

    Production ordre created and got confirmed  and found pipe line materials got stuck in COGI and on analysis found in that specific ordrer ordre pipe line material are not activated with special stock key indicator i.e. 4.
    Due to this it got stuck in cogi and for the same material created an order and found there is a allocation and  activated with special stock key indicator i.e. 4.
    Help me to resolve the existing Goods issue from COGI and cause of not activated with special stock key indicator i.e. 4. in production order.

    Dear ,
    did the pipe line material is showing in  production reservation  as one of the BOM compoenent?
    If it is the case , then cancel the confirmation in CO13 and try to connfirm the operation with Clear Reservation Option .
    Refer the below thread which may help you to figure out the issue :
    Re : How to consider Power and Steam in power plants and paper mills
    Re : Power and steam
    Regards
    JH

  • Production order from sales order with multiple line item(for one material)

    Dear Gurus,
    I am working in MTO scenarios. If there is several line item in a sales order for one material, multiple production order( same as no. of sales order line item) is getting created against each of the line item.My requirement is,since the material code is same in each line item and sales order is one, one production order should be generated for all line item. please tell me how to do it.
    (Here for one material, multiple line item is required for some specific reason)
    Regards
    Rajib Pathak

    Hi,
    This is not possible.
    In Std SAP will create one production order for one sales order. The stock is also allocated to thet particular sales order only. Because each and every sales order may vary in any one of the parameters. Considering this, SAP has designed like this.
    Regards,
    V. Suresh

  • Schedule line delivery date of sales ordere in production order-MTO

    We have a Make to order scenario where item in sales order can have mutliple scheule lines on different delviery dates.
    Ex : sales order 100020  and item no 0010
    has schedules with schedule line dates as
    10.04.2010----1pcs
    20.04.2010---1pcs
    03.05.2010----1pcs
    When the planned orders are converted to production orders, the 1 del date (EDATU) in the all the three production orders is the same ie the earliest delivery date (10.04.2010), even though the delviery dates are different for three as shown above.
    Is there a way we can show the indivdual delivery dates on all the three production orders.
    production order 1----- 1 del date as 10.04.2010
    production order 2 -
    1 del date as 20.04.2010
    production order 3 ---1 del date as 03.05.2010
    Thanks in advance.
    When a planned order is converted toproduction order

    We have a Make to order scenario where item in sales order can have mutliple scheule lines on different delivery dates.
    Ex : sales order 100020  and item no 0010
    has schedules with schedule line dates as
    10.04.2010----1pcs
    20.04.2010---1pcs
    03.05.2010----1pcs
    When the planned orders are converted to production orders, the 1 del date (EDATU) in the all the three production orders is the same ie the earliest delivery date (10.04.2010), even though the delviery dates are different for three as shown above.
    Is there a way we can show the indivdual delivery dates on all the three production orders.
    production order 1----- 1 del date as 10.04.2010
    production order 2 -
    1 del date as 20.04.2010
    production order 3 ---1 del date as 03.05.2010
    Thanks in advance.

  • Schedule lines for an external operation in a production order

    Hi All,
    I have an external operation defined in a production order and a scheduling agreement is assigned to it in the Routing operation details.  Now, i want to generate schedule lines when a production order created but the system always generating a purchase requisition.  Do we need something to be configured in the background?  Please help!
    The idea is to have the goods receipt done against the same agreement always.
    Regards,
    Sravan

    Hi Sravan,
    As per my view point, this is standard SAP behaviour. System will generate PR only in case of external operation.
    If you go to OPL8 (Order type dependent parameters) for your respective order type & plant combination you have option of maintaining setting related to PR only and there is no option of using scheduling agreement or generating schedule lines.
    I don't see any possibility to use scheduling agreement using to have schedule lines for external operation.
    Regards,
    Tejas

  • Sales Order Schedule line not populating in the Production order

    Queation: Is there a way to tell the system to look at the sales order, line item AND schedule line. It is displayed in MD04 but it doesn't carry over to the Production Order. We are a MTO and this information is relevant in a number of ways. 
    Please Help.

    Vickie,
    If you are using MTO scenario then when you run the MRP for the material, it will create a planned order for that sales order based on the dates calculated from the sales order schedule line (Shipping tab)...
    So now when you convert the planned order to production order, all the sales order details will get copied.
    try and revert back.
    Swapnil

  • How can I add a new line item for production order?

    HI all,
    How can I add a new line item for production order through BAPI/FM? Thanks in advance.

    Hi Mil,
      Unfortunetly SAP is not in front of me.
    But if possible go to BAPI transaction , check for any production order's bapi for CHANGE purpose. Where you will be able to add your new line.
    Reward if useful!

  • How to Find Out The Production Order Number For The Sales Order Line Items

    Hi All,
    I want to know the number of production orders for each sales order line item. I know the sales order number .Can anyone tell me how the tables can be linked to get all the production order numbers for each sales order line item.

    I think it depends on your configuration. But check fields KDAUF and KDPOS in table AUFK.  or in table AFPO.
    Regards,
    Rich HEilman

  • Updating lines in a production order

    Hi Experts,
    A customer of mine wants to have the ability to change items in production orders.
    So if a particular item is out of stock it can be replaced by another item in multiple production orders.
    I now made a add-on which can do this. Despite there is one condition that makes it impossible to update any line on the production order: This happens when the the first line of the production order has been issued for production. If this occurs it is not possible to update any other line on the production order.
    This is very rare, cause I can still update all lines (that have not been issued) in SAP so why can't I do it via DI API?
    I hope someone is familiar with this problem and can give me an advise how to solve this.
    Kind regards,
    Hendri Wessels

    Hi,
    The customer is using SAP 2007A PL49, but I also tested this issue in SAP 8.8 PL10 and it still occurs.
    Kind regards,
    Hendri Wessels

  • Production order line item data

    Hello All,
    I am working on production orders co03 rite now.
    I want to access the line item data for a particular order,
    AUFK and AFPO  are not giving the details i need,
    please advise,
    thanks,
    Gaurav

    Dear Gaurav,
    U shud try the Table AUFM to get the details u r looking for.
    U will get your required output.
    Reward points if u feel it was helpful
    Regards
    Srinivasan

  • PLD Production Order need to add BOM lines

    I have a need to add the comments from the BOM lines table (ITT1) to the production order.
    As soon as I add the field (copied the definition from the BOM report) the lines go wild.  I go from 5 lines to 35 lines with the production components printing multiple times.
    Any body have a way to link the BOM lines to the production order lines so I get the right lines printing?

    I would suggest you create a user field at the Production Order Rows and use the following formatted search to copy the comments from the BOM definitions.
    This user field can be easily added to the PLD and will help avoid duplicating rows which you are currently facing.
    SELECT T0.Comment FROM  [dbo\].[ITT1\] T0  WHERE T0.Code = $\[$37.4.0]   AND  T0.Father = $\[$6.0.0]
    Suda

  • Production Order quantity should be same as Sale order line item qnty

    Dear experts
    we have one user requirement as such
    Production Order  line item quantity should be same as Sale order line item qnty.
    suppose for SO Line item he is ordered 100mts,Production of this paricular Line item should also be 100mts it should not be more than this,How to satisfy his requirement.
    Regards
    Sandeep patil

    Hi,
    If the Manual intervention is eliminated for processing of the data then the SO Line Item Qty will be equal to Production order Qty.
    Background Jobs for MRP Run, Planned Order to production order cretaion will help you to manage this, along with effective Authorization Management.
    Regards,
    Siva

  • Reservation problem in production order for PIPE line materials

    while releasing the specific production order reservation number generated but in generated reservation pipe line materials are not existig hence while doing confimation as backflush indicator activated hence this got stucked in COGI.
    On observation found this specific order generated with  refernce to other oreder which is not confirmed yet.
    & for the same materials orders been created for long time they got confirmed successfully with goods movement.
    what could be reason for this order ,please suggest to over come this.

    please cancel this question

  • Replicate the Sales order Line Item Text to Production Order

    I want to replicate the Sales Order Line Item Text to Production Order? Please tell me if this is Functional job or a Developers Job?
    I believe this can be achieved by customization and doesnot need any programming and I am trying hard to gather relevant posts for this, but didnt find any.
    Please help me with some information if some body encountered this earlier.
    Regards,
    Jessica Sam.

    Hey Jay, thanks for your reply.
    Please confirm me if this is a developers job or a functional job?
    Do i need to do some programming to achive this?
    I checked with couple of my collegues and friends and 90% people say it can be achieved throug functional configuration.
    can thorugh some light on this as i had been researching on this seriously and still have mixed opinions .
    Thanks,
    Jessica

  • Production Order header Qty change without changing the line qty

    Dear Experts,
      This is one of the requirement from my client. He has to change header planned qty without changing line planned qty in the production order. They are doing this to avoid the wip variance account posting. Can we achieve this through SDK? If so how?
    Regards,
    Gokul K.

    Hi Gokul,
    You can over write the planned quantity by the base quantity in each line.
    Here is my sample fro you:
    If (Not pVal.Before_Action) And (pVal.EventType = SAPbouiCOM.BoEventTypes.et_VALIDATE) And (pVal.ItemChanged) And (pVal.FormTypeEx = "65211") And (pVal.ItemUID = "12") Then
      With CType(SBO_Application.Forms.Item(FormUID).Items.Item("37").Specific, SAPbouiCOM.Matrix)
      For ii As Integer = 1 To .RowCount - 1
      .Columns.Item("14").Cells.Item(ii).Specific.value = .Columns.Item("2").Cells.Item(ii).Specific.value
      Next
      End With
    End If
    regards,
    Csaba

Maybe you are looking for

  • Page item validation does not get removed

    Hi All,      I had a page item validation defined on the page and later removed by deleting the validation in the 'page processing' in Application Builder. However, the validation still seems to execute at runtime. Can anyone tell me if it needs to b

  • I have lost my address field in Safari -how can I get it back

    I have no address field in Safari any more. Only my home page comes up and I cant write over it to get another web page. Also google search bar disappeared.

  • Parameters to be set for Oracle repository

    Hi , My Oracle DBA are in process of setting up a Oracle 10g DB as repository for business objects . I am not finding any docs which tells best practices for configuring oracle database like character set , nls parameters etc . is there a set of docu

  • IS NOKIA 5530 Xpress music still available on mark...

    HI , I planned to buy a nokia 5530 Xpressmusic mobile phone on october 2010. When i went to the retail store. They said this mobile is out of market. Plz help me guys. Lemme know if this mobile is still in market.

  • Kontakt 3 as a Multi-midi instrument? How? Multi-outputs?

    I am having trouble getting Kontakt to work properly as a mutlii-output instrument with multi-midi inputs. There are instructions in the manual and online but I seem to have some problems. I create an Instrument track of Kontakt 3. I select 16 stereo