Single BOM across multiple plants in sub-contracting

We have a single purchasing organisation managing sub-contracting for around 17 plants. This organisaiton purchases sub-contracted items for all the plants.
The problem we are facing is having to maintain the same BOM for all the 17 plants.
The central purchasing org is going to create the PO with multiple lines - requesting delivery from the vendor to the different plants.
How can we avoid having to create the same BOM in every plant?
Regards,
Praveen.

hi 
u can  avoid  by choosing  the  recurrcive  allowed  for  BOM  can  avoid it
kishore  reddy

Similar Messages

  • MTO Discrete Manufacturing with multiple plants and sub-contracting

    Dear PP Gurus,
                           I am facing a problem, pl. help me out.
    My Scenario is as follows:
    I am having 4 plants with Make-To-Order Discrete Manufacturing scenarieo .
    Suppose to manufacture a particular Product , there are 10 operations.The first 4 operations are carried out in Plant A, 5th and 6th carried out in Plant B, Operations 7 is Sub-contracted to a Vendor. After the job-work from Vendor, the job returns back to Plant A and the remaining operations are carried out in Plant A.
    The whole scenario has to be mapped into SAP. Please guide me from the very beginning( Masterdata maintenance). Also, what shud be the MRP( Single-item multilevel or anything else)
    Your help is highly required by me.
    Thanks in advance,
    Soumyendu

    Hi Sadhukhan,
    For external processing in different company code, u need to specify PP02 in the routing for external vendor. In PP02 control key indicator must be set in external opn. Before that create purchase info record. Enter subcontract info record in routing. After running MRP , convert the PR to PO. Send the material by MB1B by 541 mvt. Receive the material by MIGO by 101 mvt.
    Reward if useful.
    Keerthi

  • APO gATP vs R/3 ATP - To check sales order ATP across multiple plants

    Hi There,
    I am trying to evaluate gATP functionality for SD sales orders.
    The primary requirement is to have sales order ATP checking take place across multiple plants.
    E.G.
    Sales order line is entered for qty 100
    60 is available in plant A, 40 is available in plant B
    System checks both plants and creates 2 lines - one for delivery from plant A and one for delivery from plant B
    (we are currently heading down the road of writing ABAP to do this 'multi-plant' check in R/3 but the more complex the requirements get the more interested I am in understanding more about APO/gATP)
    I would like to understand the benefit of implementing APO / gATP as opposed to using standard R/3 ATP and perhaps writing custom ABAP code to search for inventory across multiple plants.
    I would appreciate any insight regarding what is required to setp gATP to perform such checking and any other feedback regarding this issue - especially if you have had to implement something similar at your company.
    I have looked here but not much clear help:
    http://help.sap.com/saphelp_scm50/helpdata/en/26/c2d63b18bc7e7fe10000000a114084/frameset.htm
    Thanks,
    Niall

    Hi Niall
    you are probably looking at RBATP (Rule based ATP). Look at transaction /sapapo/rba04 in APO where you develop your own location and product substitution rules. Going down an ABAP road in R/3 may work short-term but not long-term as the requirements may get more complex.
    Regards
    Srinivas

  • Availability check across multiple plants

    Can anyone tell me how to do availability check across multiple plants belonging to same Company Code on First Expiry First Out basis. The Sales Order should Pick up plant which has product(batch) which is near to expiry .

    Dear Kalpkothari  ,
    Your requirement can be fulfilled using the following user exit.
    USEREXIT_SOURCE_DETERMINATION
    OR
    USER EXITS AVAILABLE FOR AVAILABILITY CHECK
    User exits in program FV45VFZZ
    o   USEREXIT_ADD_FIELD_TO_HEADER
    o   USEREXIT_ADD_FIELD_TO_LINE
    User exits in program FV45VFZY
    o   USEREXIT_DELIVERY_GROUPS
    o   USEREXIT_MVERF_INIT
    o   USEREXIT_QUOTA_KEY_VALUE
    User exits in program RV03VFZZ
    o   USEREXIT_AVAILABILITY_IN
    o   USEREXIT_AVAILABILITY_OUT
    o   USEREXIT_DARA_REFRESH
    o   USEREXIT_PLANT_SELECTION
    Thanks & Regards,
    Hegal Charles

  • Restricting single PO with multiple plant

    Experts,
    Pl help me in restricting user from creating single PO with multiple plant. Is there any config available??? 
    I dnt want to go for any ABAP development.
    Thanks in Advance,
    Parag Mahajan

    Dear Parag,
    Querry :  Restricting a single P.O. with multiple plants:
    If you want to restrict a single Purchase order with multiple plants the reason may be that;
    Suppose your ordering material A for which you have three vendors in you SAP. But you are requiring this material in all your plants say example three plants.
    You can create Purchase order for same with vendor but due the huge requirement your vendor get overloaded.And your other capable vendors are not used at all.
    You can try out with quota arrangement for all vendors with which the quantity will be allocated to all the vendors depending on the quota rating.
    Also you can define lot sizing procedure for a your vendor in customizing and can avoid creating Purcahse order with multiple plants.
    Thanks ,
    Tushar Patankar

  • MRP across multiple plants

    Hello everyone,
    I have a scenario where I have multiple plants. During Production of some finished products, I have to procure some material from anothere plant. For this I have used Special procurement key in MRP 2 to throw requirement to corresponding plant.
    As Per MRP run, I Hope to use NEUPL run once a week for the corresponding plant. Do I Have to run MRP seperately for each plant so that MRP requirement for semi finished products are also raised in corresponding plant. Will in that case help to group together multiple plants under scope of planning or an MRP area.
    My second question is that if we run MRP with processing Key: NETCH what can be the corresponding impact. I was hoping to run it daily so as to capture changes in requirements, if any.
    Please do give your suggestions.
    Sincerely,
    Aji Kurian Mani

    Brian,
    I am looking for a way to run MRP across multiple plants as if it was one plant.
    Well, that phrase can mean different things to different people.  In general, though, SAP ERP does not support this requirement.
    I guess you overlooked the rules of engagement for this forum, which state that you should first search the forums for answers before posting a question.  There are lots of workarounds, using Special Procurement and/or MRP Areas.  Just search the ERP PP and ERP MM forums.  This topic has been discussed extensively.  
    There are also several third party products available that can probably meet your requirements as well. Be advised that the purchase price of these products are substantial, and the implementations are not trivial.  Many shops are unwilling to invest the money and effort into advanced planning systems, and end up just working with ERP planning, using workarounds, enhancements, and  business process changes.
    SAP is also marketing one of these advanced planning products as a 'solution extension', that they are calling Supply Chain Response Management (SCRM).  This software was developed by the third party software company ICON, and SAP now has established a relationship with ICON. You can see info on the software at
    http://www.sap.com/solutions/solutionextensions/supply-chain-response-management/index.epx
    and also on the ICON website at
    http://www.icon-scm.com/en/products/sap-supply-chain-response-management-by-icon-scm/
    Best Regards,
    DB49

  • Problem in BOM explosion for a operation Sub Contract.

    Hi All,
    Please advise how to explode a BOM or Assign component in a Purchase order with Item category (L) for a Operation SubContract External Processing  oriented material for which no material code is created from a Series Operation production order .
    Actually in my scenario, no raw material component will send to the Sub -Contract Vendor. Only Assembled operation material lets say operation 20 from a routing ( which is not having material code ) from an In - house production from a shopfloor has to be sent to the vendor to create a operation 30 material , which is also not having a material code." How to explode a BOM or component allocation for the Non- codified Item in a PO".
    regards,
    YK

    Hi
    Change the control key of the operation to PP02. System will prompt u to PR data screen where u have to tick on Subcontracting checkbox. Enter other mandatory field like material grp, cost element, purchasing grp etc. On saving system will create PR with line items. System will trigger the components reqmt based on the assignment to operation. Example if for operation 20, materials M1 & M2 are assigned, then in the PR u will find M1, M2 in the component screen which u have to send to the vendor.
    Hope it is clear to u.

  • Single-signon for multiple sites or sub sites

    Does anyone know of some good articles/publications or suggestions for
    implementing a single signon for multiple very secure internet sites in
    weblogic type environments.
    For example, bank1 has a internet site and bank 2 has an internet site.
    Bank 2 has some cool features they want to offer bank1's customers. They
    agree but, bank1 wants to present bank2 as a tab or part of bank1 site.
    IN order to do this there are lots of fun things, but the things Im
    interested in are how to authenticate between them and handle timeouts.
    timeouts seem particularly tricky in that if I dont hit a page on bank2
    for a while, it could time out its session for the guy on bank1. Also if
    im in the bank2 section of the site, then bank1 could time me out as
    well.
    any ideas let me know.
    thanks
    Joel

    I've been informed ;-) that a pure Java solution is also available from
    Entegrity. So here are a couple of URLs for you to research
    anagrammatically:
    http://www.netegrity.com
    http://www.entegrity.com
    Cameron Purdy
    Tangosol, Inc.
    http://www.tangosol.com
    Tangosol: How Weblogic applications are customized
    "Cameron Purdy" <[email protected]> wrote in message
    news:[email protected]...
    Netegrity?
    Cameron Purdy
    Tangosol, Inc.
    http://www.tangosol.com
    Tangosol: How Weblogic applications are customized
    "Tim Funk" <[email protected]> wrote in message
    news:[email protected]...
    This is long winded and I tried to have this make sense, if it doesn't
    just mark this as read ...
    I am running into the same issue. Out of need, different applications
    need to be hosted on different boxes/JVM's/web applications. I am
    experimenting with a customer single sign on process which is
    independent of Java but lends itself nicely to it. Here is my thoughts:
    1) All applications need to run under the same domain. For example:
    foo.redrose.net, www.redrose.net, bar.redrose.net, app1.redrose.net
    all reside under redose.net.
    2) You have a database table (secure) that contains the following:
    user id, password, session id, last access time.
    3) This database table contains all of the valid sessions across the
    domain (in this exmaple .redrose.net)
    4) There is a daemon running which runs every ?? seconds that deletes
    any records older than ?? seconds/(or minutes/hours) in the
    database.
    5) There exist a cookie which is set to the domain level that contains
    the session id.
    6) The session id provides a way to obtain the id and password for the
    user to authenticate to the container. For example in WL5.1SP8 there
    exists: weblogic.servlet.security.ServletAuthentication.weak(...) to
    authenticate to your container. By using this you will get the
    capability of setting up your roles and ACLS etc in you web.xml and
    weblogic.xml to handle authorization.
    7) All requests to any applications participating in this philosophy
    must do the following for EVERY request (or appropriate):
    Even if you are logged authenticated to the container and authorized,
    you may have timed out or logged out of another application. So the
    database table must be checked to see if the session id exists. At the
    same time, you must also update the last access time to prevent timeout.
    8) If the user tries to access a different application which he has not
    authenticated to yet - the user will be forwarded to a servlet whichwill:
    a) Look for the cookie at the domain level
    b) If the cookie is found - get the UID and PWD from database
    b2) Present login form if cookie is invalid/not exists
    c) Authenticate to container
    d) Forward back to original page and let the container handle
    authorization since you have already authenticated.
    I use have encapsulated the database activity into 3 stored functions:
    1) isValidSession(session_id) - Returns null or the user id and pwd
    concatentated which will need split apart if needed
    2) makeSession(user_id, password) - Returns a new unique session id and
    creates the appropriate record
    3) cleanUpSessions() - Arguements not yet determined. This will delete
    any records older than a certain time. I would like to have the proc
    know what to delete without being given a parameter but time to the
    second level can be tricky for some DBMS's.
    There is a concern of storing the user id and password in the database
    but this can be eliminated with a good design to restrict access to the
    database table and using encrypted connections.
    Hope this helps. Hopefully - a similar philosphy will be adopted by an
    application container so I may not have to worry about this and I can go
    back programming business functionality.
    -Tim
    Joel Nylund wrote:
    Does anyone know of some good articles/publications or suggestions for
    implementing a single signon for multiple very secure internet sites
    in
    weblogic type environments.
    For example, bank1 has a internet site and bank 2 has an internetsite.
    Bank 2 has some cool features they want to offer bank1's customers.They
    agree but, bank1 wants to present bank2 as a tab or part of bank1site.
    IN order to do this there are lots of fun things, but the things Im
    interested in are how to authenticate between them and handletimeouts.
    >>>
    timeouts seem particularly tricky in that if I dont hit a page onbank2
    for a while, it could time out its session for the guy on bank1. Alsoif
    im in the bank2 section of the site, then bank1 could time me out as
    well.
    any ideas let me know.
    thanks
    Joel

  • Spreading a single form across multiple pages

    I'd like to implement a single record form that spreads it's items across multiple pages for the purpose of grouping related information on each page such as "Contact Details"," Education Profile" etc. There are way too many columns for a single page.
    In Oracle forms you can create a form across multiple canvases or on different tabs of a tabbed canvas. Each item has a property to position it on which canvas.
    Is this possible in ApEx? I can see that transaction processing could be complex.
    How do I avoid, for example, inserting the record a second time if I commit from a different page?
    Any comments appreciated.
    Paul P

    Another way to do this without javascript and ajax that works pretty well is to setup a list that represents the logical "sections" and display it as a sidebar list.
    Create a hidden item on the page called PX_ACTIVE_SECTION and set the visibility of each region on the page based on the value of this item. For example: :PX_ACTIVE_SECTION = 'Contact Details'. You can also have multiple regions associated with a single tab. Set the default value to whatever section you wish to display first.
    Next, set each list item to be "current" when :PX_ACTIVE_SECTION is equal to that item ('Contact Details', 'Education Profile', etc.). Also set the URL destination of each item to: javascript:doSubmit('section name');
    Finally, add a branch back to the current page that sets PX_ACTIVE_SECTION to &REQUEST.. This traps the doSubmit call so you can set the hidden item. (Add a condition, if needed, to prevent this branch from executing due to other buttons and requests).
    The result is that the user can switch freely between sections and save after all data is entered. The page does refresh (since it doesn't use AJAX), but if your regions aren't too big, it should be reasonable.

  • Synchronizing Material Master revision level across multiple plants

    Hello,
    If an organization uses material master revision level to maintain the details of material's validity across different plants then we see a material master with different revisions in that organization. Now I  would like to understand the impact of this practice in big organizations , is it advisable to have a material master with different revisions in different plants? , if not then which is the best way to synchronize these material masters ( with different revision level ), which are already in use?
    Bets Regards,
    Avinash
    Message was edited by: Ulf Petzel

    Hello Ulf,
    Thanks for your reply, the actual issue is..
    There are two companies; both are using the same material.
    We are building a central system and synchronizing the materials from all companies.
    While synchronization, we found that revision level are different across companies.
    1.      Should we avoid using revision level in our organization?
    2.      If I can find the validity of a material with change no + material + plant, then what is the purpose
             of the revision level?
    3.     What will be the impact, if we remove the entire revision level across all companies?
    4.     In real world, across different organizations, how revision level is synchronized across companies or at least in the central system.
    Please let me know your valuable inputs.
    Thanks
    Sridhar  

  • How to create group bom for multiple plants with different company codes

    Dear all,
    In my current scenario we have 5 Company codes with a plant with each company. The same kind of materials exist in all the 5 plants, so what i want is when i create any BOM, that BOM has to extend in all the company codes, as with GROUP BOM i can able to extend the same in only one company code.
    So how to do this?
    Thanks in Advance
    Bhushan

    For that first extend all the materials to all the plants... In one plant create a BOM for the material..
    In all other polants in CS01,   click COpy from .. There you mention the matreial and the plant in which the BOm is alerady available..
    karthick

  • Single song across multiple menus

    iDVD '08
    I have a DVD that has about 10 "Chapter" pages/sub-menus. Is there a way I can assign a single song to keep playing through all of those pages, or do I have to assign a separate song to each page/sub-menu?
    _mike

    If you think about it, having the same song continue from one menu to the other is not feasible because the viewer can keep a menu on screen for as long as desired, going to the next menu in mid-song, or waiting til the end on that menu, entirely an individual choice. So, unless one waits for the portion of the song to finish and then quickly goes to the next menu, the continuity is lost.
    You could do this, but it would be way more effort than it is worth.

  • Rescheduling across multiple plants

    Hi,
    When the rescheduling runs, is it possible via the standard system to look for inventory in mulitple plants and change the plant (where the inventory is available) on the sales order item accordingly?
    Any thoughts would be highly appreciated.
    Thanks,
    Prayarna

    Not in standard SAP.
    You need to write a progrma to do that (I would limit to unconfirmed items only).
    But it's not an easy task as material may have different availability control settings in different plants and you in fact may select not the best option...
    I believe tools like i2 can do that.  Try to check if APO can help here as well.
    By writing your own program you may just spend time trying to re-invent the weel (re-create tool like APO or i2) and it's not an easy task

  • Sub-contract without BOM

    Hi
    How to create sub-contract without BOM..We want to create a subcontract for a customer return finished product .Even this Product have bom.We don’t want to send any components with the FP.We want to send some service materials with this FM.How to do this in SAP?
    Thanks
    Nick

    hi Nick,
    have not tried in one company code, any way you can try this with creating another plant as subcontracting vendor & process in the same way how you process for sub contracting.
    1) Create plant as sub-contracting vendor
    2) create po with item category L
    3) send components
    4) receive materials.
    but since it is within a company code check for legality involved with FI, you can customize special transaction key for this may be with movement types since it is within a company code, that is the reason i asked you is it within a co.code
    Regards
    Ranjit

  • Can Windows Server Backup spread a single backup job across multiple disks if they are not set up as a virtual disk?

    This may be a dumb question, but I can't seem to find any definitive information after having done many, many searches.  Short question is - can Windows Server Backup spread a single backup job across multiple disks if they are not in a storage
    pool or some other RAID/JBOD structure?
    Background:
    I'm running Server 2012 Essentials with all Windows Updates installed.  I have been backing up approx 2.8TB of data (Bare Metal Recovery, C:, S: (shared folders), and system reserved) for the past year+ onto a storage pool made up of two-2TB external
    USB drives.  Backup is slow (takes approx 1.5 days to complete), but generally works.  Not surprisingly I was constantly getting capacity low messages so I decided to increase my backup storage pool by adding a 3TB drive and another spare 750GB drive
    for a total of 7.75TB.  Instead of having four separate external USB enclosures, I bot a 4-bay enclosure - Startech.com model #S3540BU33E to simplify this (or so I thought!).
    The first problem I had was adding the two new drives to the existing storage pool. I think that is because the Startech uses a JMicron USB controller that reports identical uniqueid's for all drives so only one shows up in the GUI interface for creating storage
    pools. After doing research on this, I set up a new storage pool and virtual disk using all four drives via Powershell and thought I was good. However, when the backup ran, it failed after filling the first drive, saying there was no remaining capacity. In
    reality there were three remaining empty drives and there storage pool reported almost 5TB of avail capacity. I assumed this was due to the identical uniqueid issue so I decided to try a different tactic.
    Instead of using a storage pool that combines all four disks into one virtual disk, I just added each of them to Windows Server Backup as individual drives thinking it would manage them collectively. I.e., when a drive filled up during a particular backup,
    it would just start using the next drive and so on. Apparently this was a foolish assumption because the backup failed again as soon as the first disk filled up.
    So now I don't know if this is still an issue with the identical uniqueid's or if Server Backup actually can't spread a single backup across multiple individual drives that aren't in a pool or other virtual disk implementation. Hence, my original question.
    My guess is that it does *not* spread them across individual disks, but I just wanted to get confirmation.
    Thanks

    Mandy,
    Thank you for following up on my question.
    Unfortunately the article you referenced doesn't address what I am trying to accomplish.
    The article focuses on saving the same backup job to multiple disks and rotating the disks between on and offsite for enhanced protection.  However, it still requires that an individual backup job fits on a single disk.
    What I am trying to determine is if a single backup job can span across more than one physical disk (during the backup process) without those physical disks being in some type of virtual disk implementation (e.g., storage pool, RAID, etc.).
    Thanks,
    Gerry

Maybe you are looking for

  • A blank white rectangle appears infront of loading pages, forced to click it closed. How to remove these blanks from happening?

    I click a link and while page is loading, a single wide blank rectangle with an x in the upper right corner pops up. I am forced to close it by clicking the X. I cannot click on the desired 'loaded page' that sits behind the blank box at all. This ha

  • Saving a PDF showing grammer and spelling flagged

    Is there a way when exporting to pdf of it showing the highlighted grammer and spelling issues to view in the final PDF document? Or can this be done in Acrobat itself instead - client needs to see the spelling/grammer issues in a PDF?

  • Unable to export Webforms

    Hi All, I am trying to export Webforms from Planning App. Hyperion Planning is installed on Linux. The command that I am trying to execute is: FormDefUtil export -all servername username password app_name I am trying this from the same directory wher

  • ABAP Coding:The included type has no structure

    Hi All, When i tried to write following code, i 'm getting error like "*The included type has no structure *" TYPES:       BEGIN OF it_datapak1.             INCLUDE STRUCTURE RESULT_PACKAGE.     TYPES:          alpha(18) TYPE c,       END OF it_datap

  • Descrete Vs Repetative

    Hi, Can anybody tell me please why in repetative manufacturing production orders are not involved.. but planned orders itself acts as production order. Pavan