Single cycle plan with counter in plant maintenance

Dear Experts,
I am creating single cycle plant with performance based with couter reading.
1 I have crated a measuring point with counter in running hrs
2 Created a single cycle plan and given the couter no. there
3 Since i hv given 4000 hrs in plan, as soon as i update the document there should be a notification but it is not happening
Can any one clarify the issue
Thanks&Regards
N.Chandrasekhar

Dear thyagarajan,
1 I hv created meas point with counter with specified equip
2 made document for that of 10 hrs
3 Created a  single cycle plan giving reference same equip Cycly given 250 hrs, Entered the counter no there, call horizon 100, schedule 365 days.... while saving given no to save.....while scheduling IP10,
taken the counter ducument which i 1st saved 10 hrs... thn called 1st call and released and saved.
4. here with out entering that 250 hrs in ducument i am getting the notification............?
5. I have to get the notification after entering 250 only..
Why is happening like that
Hope you have under the issue
Regards
N.Chandraasekhar

Similar Messages

  • Single cycle plan

    Hi experts,
    Plz tell me What is meant by single cycle plan ?how it works?
    Thanks in advance.

    Hi
    If you want to create plan for a single criteria single cycle plan should be used
    For ex:
    If you want to the maintenance for every 6 months
    then create plan in IP41
    Select maintenance order or Notification
    enter
    Maintenance plan cycle tab  Enter 6 in Cycle/ unit    &   Mon   in adjacent
    Maintain offset as 0
    fill the order needed and save
    go to IP10 schedule it
    If you want to creare plan for every 6000 hours
    Then create a separate measuring point and document
    Enter the measuring point no in counter
    M.Alagesan

  • Maintenance Plan with Counter

    Dear All,
    I have the following requirement, would be of great help if you can help me get the solution:
    Their is a pump which is to be maintained. The orders need to be generated on the basis of two parameters:
    1. Number of hours the pump has ran. This can be recorded against measuring point.
    2. Number of calendar days elapsed.
    The maintenance order should be created which ever condition is met first. For example: Every 200 hrs the pump runs, a maintenance order should be created also if the time elapsed is 2 months the order should be created. Now whatever of the above two comes first the order should be created against that only.
    Can anyone please tell how to achieve this.
    I have thought of two options though they dont look good:
    Option 1: Create two maintenance plan. Delete/TECO the extra order generated.
    Option 2: Create one maintenance plan with multiple counters, one for running hours and the other for calendar days. Keep OR relation. But here we need to update calendar days counter every day which is not feasible.
    Thanks
    Geravine

    Hi...
    First of all you have to create the Measuring Counter for your Pump using the T.code IK01 and then post the initial measurement  document against the measuring counter using T.code IK11.
    After above create the Cycle set for Multiple counter using T.Code IP11Z, and define the Cycle for your Multiple Counter Plan.
    In your condition, define the cycle length as "2" and UOM as "MON" and second cycle length as "200" and UOM as "HRS" and also provide the short text for Cycle short text as per you convenience. This is one time activity.
    Then create the Multiple counter Plan using the T.Code IP43 and cycle set created in earlier step. Provide the Technical Object i.e. Pump (Most probably Equipment) all other details are copied from it. Enter the created Measuring Counter for your Technical Object in the Maintenance Plan Cycle Tab against the 200 Hrs Row in Counter Columns. In the Second Tab i.e. Maintenance Plan scheduling parameter Choose "OR" Link . Enter the value Scheduling Period which help you to show the future plan in advance.
    And as per requirement you can also check the box  available for Completion Requirement, Check the box if you required that New Maintenance Order  will not be generate until the previous order is get closed.
    Hope this will resolve your query

  • If I have a Photography plan, can I also select an Single App plan with the same account?

    So can I have at the same time two plans?
    I don't need for every apps, only Photoshop and Illustrator.

    Hi Barpaff,
    Yes, you can add illustrator with the same account. So, you will be having two applications.  1) Creative Cloud Photography Plan and 2) Creative Cloud Illustrator single app.
    You can add as many as single application in the same account but application should be different.
    Let us know if you need more information on this.
    Thanks,
    Eshant Jindal

  • Single Cycle Plans and Counters

    I'm getting this error "Field RMIPM-POINT does not exist in screen SAPLIWP3 0201'" in my BDC program when I try to edit the plan.
    In IP01, IP02 and IP03 (SAP 4.6C), there is a counter field. Is there a way to activate/deactivate this field? Does this counter field always exist regardless if you enter a measuring point or not? I've seen cases (with my client) wherein this field does not show on the screen but I can't seem to replicate it in our system. I know how to resolve the problem but I don't know how or why the counter field is not displaying. I also checked OSS but found nothing.
    Your help is highly appreciated. Thanks in advance.

    Hello,
    I would check the parameters that your functional made on those txs, if you can´t find a field it´s sometimes because the customization isnt allowing to show them.
    Hope this helps,
    Gabriel

  • Replacing a active counter in a maintenance plan

    Hopefully someone can help....
    I have a strategy plan that schedules off a counter. Now this same counter is used in various other plans so I don't want to replace it. I just want to pull it from the current plan, and replace it with a new counter I created. Any ideas?
    Thanks
    Josh

    Dear thyagarajan,
    1 I hv created meas point with counter with specified equip
    2 made document for that of 10 hrs
    3 Created a  single cycle plan giving reference same equip Cycly given 250 hrs, Entered the counter no there, call horizon 100, schedule 365 days.... while saving given no to save.....while scheduling IP10,
    taken the counter ducument which i 1st saved 10 hrs... thn called 1st call and released and saved.
    4. here with out entering that 250 hrs in ducument i am getting the notification............?
    5. I have to get the notification after entering 250 only..
    Why is happening like that
    Hope you have under the issue
    Regards
    N.Chandraasekhar

  • Planning in Plant Maintenance using MCB.

    Hi Experts,
    My client is into Mining Industry. This is a Greenfield SAP Implementation.
    Client is not clear with the Planning requirements in the Plant Maintenance module.
    Therefore, I have suggested that all the Standard Businenss Content Extractors and relevant Queries will be delivered as part of Maintenance Planning.
    I tried but could not find any Plant Maintenance Planning (MCB) related DataSources and Queries in the BI 7.0 Business Content page @ http://help.sap.com/saphelp_nw70/helpdata/EN/f6/7a0c3c40787431e10000000a114084/frameset.htm.
    Could you please help me with this?
    Thanks in advance,
    Chandu

    Hello Chandra,
    We are in the Health Care sector and I have a similar requirement as of yours. We are not really sure what all we would require from PM, so we are thinking to go ahead with all the Business Content Reports and I have been asked to install all the Cubes, DSO's, Extracots, Reports Etc, Etc....
    I just also have the above link in my hand and it doesn't give us a whole lot clear picture..? So how did u carry out with your requirement? What all you ended up installing? Please do share it, will be a great help for me.
    Thanks in advance, Venu.

  • Can I do plant maintenance cost planning in functional location wise?

    Dear Experts,
    My customer plans to prepare annual plant maintenance cost planning in "functional location" wise.
    Can this be done?
    If yes, what are the steps?
    regards,
    Abraham

    Abraham,
    You could do it indirectly in ECC using a cost centre for each FLoc. You can then plan the costs in the cost centre
    PeteA

  • SAp Plant MAintenance certification test questions

    Hi all,
    I am due to take Plant MAintenance certification  this march.It would be greatful if I can get some sample question before I appear for this exam.

    The examination questions are based on the functionality and features of the SAP PM.  The possible topics covers are:
    1. Organizational Units and Master Data in Plant Maintenance
    Organizational Units
          - Maintenance Plant and Planning Plant
          - Work Centers
          - Storage Locations  Functional Locations
          - Structure Indicator
          - Reference Location and Functional Location
          - Creation Options
          - Data Transfer  Equipment
          - Installation/Dismantling at Functional Locations
          - Equipment Hierarchy
          - Change Documentation
          - Equipment Category  Material and Serial Numbers
          - Serial Number Profile
          - Goods Movement and Warehouse Stock
          - Valuation Batches  Bills of Material (BOM)
          - Assemblies
          - BOM Categories
          - Item Categories
          - Change Documentation  Additional Functions
          - Configuration
          - Classification
          - Measuring Points and Counters
          - Partners and Addresses
          - Document Link
          - Status Management
          - Permits and Warranties
          - Data Transfer
    2. Maintenance Processing
    Breakdown Maintenance
    Preventive Maintenance Processing
          - Notification Types
          - Objects and Object Information
          - Catalogs and Catalog Profiles
          - List Viewer for Notifications and Orders
          - Order Type
          - Object List
          - Operation List
          - Relationships
          - Material List
          - Availability Check
          - Order Release and Printing
          - Material Withdrawal
          - Completion Confirmation in Time
          - Technical Completion Confirmation
          - Technical Completion
          - Action Log and Document Flow  Processing External Services
          - External Services as Individual Purchase Order
          - External Services with External Work Centers
          - External Services with Service Entry Sheets  Processing Refurbishment Tasks
          - Valuation Type and Valuation Category in the Material Master
          - Refurbishment Without Serial Numbers
          - Refurbishment with Serial Numbers
          - Inventory Management and Controlling  Processing Maintenance Projects
          - Planning and Executing Maintenance Projects
          - Completion, Settlement, and Monitoring of Maintenance Projects  CATS - Cross-Application Time Sheets
          - Data Entry Profile
          - Data Entry Sheet
          - Data Transfer  Capacity Planning
          - Scheduling
          - Work Center and Available Capacity
          - Capacity Leveling
          - Employee Assignment
    3. Controlling Functions in Plant Maintenance
    Plant Maintenance in the Organizational Structures of Accounting
          - Budget Planning and Monitoring
          - Cost Estimation
          - Planned/Actual Cost Determination
          - Order Settlement
          - Logistics Information System (LIS)
          - Plant Maintenance Information System (PMIS)
          - Enhancement Options
    4. Preventive Maintenance
    Task List Management
          - Task List Types
          - Profile and User Fields
          - Component Assignment
          - Task List and Order  Single Cycle Plan
          - Structure
          - Scheduling Indicator
          - Deadline Monitoring  Strategy Plan
          - Maintenance Strategy
          - Task List and Maintenance Strategy  Performance-Based Maintenance Planning
          - Counters and Measurement Documents
          - Maintenance Plan Scheduling  Maintenance Planning with Several Counters
          - Cycle Sets
          - Link Type 
    (Referece: SAP-IMG.COM)

  • IBIP Plant Maintenance

    Hi Experts,
       I am trying to use IBIP for migrating PM Module data.I need to migrate maintenance plan. i am using IBIP and structures as follows:
       IP01-IBIPMPLA
       IP04-IBIPMPOS.
    i entered the test data in both the structures and it is showing the following error when i execute:
    Formatting error in the field RMIPM-WPTXT; see next message
    Fill in all required entry fields     
    but i enterd the WPTXT field in IBIPMPLA.
    so can any one please help do this.
    it is very urgent
    Madhu

    Hi Madhu,
    check if you have to fill the informations ZYKL1 and ZEIEH (required for single cycle plan) or WSTRA (required for strategy plan) or WSET (required for multiple counter plan). These fields are mandatory fields when creating maintenance plans.
    By the way, their is a standard tool available to migrate plant maintenance data, including maintenance plans. The migration is done by standard SAP ibip functionality. Refer to www.im-solution.eu/downloads for detailed information.
    brgds
    IMCSM

  • Strategic Maintenance in Plant Maintenance

    Hi All,
    I want to change Single cycle pln to Strategy maintenance plan.
    Could you please tell what all are the benefits of Strategic maintenance(Time Based).
    Will it save some time for Planners?
    Thanks in advance.
    Regards,
    Sanjay Tiwari

    No
    It is only one tasklist with 1 to 30 operations.
    If you go for 3 single cycle plans you will have to break this into 3 different Tasklists.
    Oprn 1 to 10
    Oprn 1 to 20
    Oprn 1 to 30
    But in a strategy plan you will have only one Tasklist with Oprn 1 to 30 and manage all cases.
    This is achieved by mentioning the Strategy you are creating thru IP11, in the Tasklist Header page,
    AND
    Marking the frequesncy of each operation in the  'MntPkgs' pushbutton in the operations page of the Tasklist.
    (This 'MntPkgs' push button in the oprations page will be available only after you mention the Strategy in the T/L Header page)
    After this you have to create a Plan through IP42.
    It is not difficult to understand.
    You should try this first in Sandbox or Test servers to understand fully.
    Regards..

  • Single cycle schdule fixing

    Dear Experts
    How to fix the schedule or PM orders.If these are planed for particular date then it shouls always fall with same schdule even not completed as per schdule.
    I created a plan for 1 month cycle.It falls on 1 of every month,but if i completed this on 7th then in next month it starts on 7th instead of 1st please guide how to to.I am using single cycle plan.
    Thanks
    Raj

    Hi,
    There are two shift factors in the Maintenance Planning component. These are shift factors for the following cases:
    Premature completion
    Delayed completion
    You can define the shift factor specifically for your maintenance plan by specifying the shift percentage to be taken into account when calculating the next due date.
    The shift factor only applies once the maintenance plan has already been scheduled, and when the difference between the planned date and actual date lies outside the tolerance range.
    The planned date for your maintenance order was 01.09.09, but it was confirmed 15 days too late, namely on 16.09.09. The next planned date may now be on a different date since this is dependent on the shift factors entered. Three possible shift factors are shown in the table below:
    Planned Date
    01.09.2009
    Confirmed on the  
    01.09.2009 
    NextPlanned Date   
    01.09.2009        
    16.09.2009          
    08.09.2009  
    ShiftFactor
    0%
    100%
    50%
    Regards,
    Rakesh
    Edited by: RAKESH ASHOK MANE on May 5, 2009 2:09 PM
    Edited by: RAKESH ASHOK MANE on May 5, 2009 2:13 PM
    Edited by: RAKESH ASHOK MANE on May 5, 2009 2:21 PM

  • Maint plan with different diemensions(Strategy & Performance )

    Dear PM experts
    let me know how to get the preventive  maint order get  generated with both performance based and strategy based , Which ever is earlier  , against  that order must get generated. how to use Cycle set concept
    regards

    Hi
    I just like to add some points here. You may need to decide based on business scenario what business have.
    Single cycle plan u2013 if user will carry out same operation at regular interval then you can suggest them to use Single cycle plan. Example every one month or every 100 hrs
    Strategy plan u2013 if user will carry out difference operation at different interval then you can suggest them to use Strategy plan. You have to define time based or performance based strategy in IP11 Transaction. Example inspection work after one month & replacement work after 6 month ( Time based) or inspection work after 100 hrs & replacement work after 500 hrs.( performance based)
    Multiple counter plan - if the user will carry out same operation after 3 month or after 300 hrs whichever come earlier then you can suggest them to use Multiple counter plan. You have to define cycle set for IP11Z transaction.
    Let me know if you need anymore information
    Jeny

  • Goods issue for plant maintenance order

    Goods issue with ref to plant maintenance order( Componenets of the order) is not possible in transaction code MIGO. Error message " MIGO is not possible for the refurbishment order".
    Goods issue for the same order can be posted with transaction MB!A.

    hi santhosh
    kindly check the order type .i think you are using MB1A for refurbishment process.but it is not possible.only maintenance order can be posted via MB1A
    follow the procedure for goods issue in refurbishment order.
    Choose Logistics ® Plant maintenance ® Maintenance processing ® Completion confirmation ® Goods movement ® Goods movement.
    The entry screen for a goods issue appears.
    Choose the pushbutton For order.
    Enter the relevant order number in the dialog box and choose Continue.
    An entry screen appears.
    Choose Copy.
    The Maintain Serial Numbers dialog box appears.
    Choose Reference document.
    Enter the order number in the Refurbishment order group box and choose Execute.
    A list appears with the planned serial numbers for the refurbishment order.
    Check the selections of serial numbers, for whose material you want to post a goods issue, and choose Copy.
    The serial numbers are copied into the Maintain Serial Numbers dialog box.
    Choose Exit window.
    The goods issue is posted.
    regards
    thyagarajan

  • New $45 Single Line Plan

    Hello
    Perhaps this is just me but the new $45 single line plan seems like a good deal, relatively speaking, when you compare it to the other major providers and realize the consistency of the Verizon Wireless network.  However, this plan is for new customers only and is a single line plan with 250 MB of data.  However, when you look at it in a different light it is also a slap in the face to existing customers on the share everything plan.  I will use my account as an example.
    We are a very light data use family and our four iPhone Family exists on 1GB of data (no data overages).  So we pay $160 for all phones + $50 for the 1GB of data.  After my employer discount our final pre-tax/surcharge bill is $201.50.  That being said if each phone was on this $45 single line plane we would have a pre-tax/surcharge cost of $180 ($21.50 less than current share everything price), and we'd still have basically the same total amount of data, though each phone would be limited to 250MB of data rather than share a pool of 1GB, but since none of our phone have exceed 250MB we'd be likely not run into overage issues.
    Sounds great so I should switch all of our phones over to this $45 single line plan, right? Well the plan is for new customers only, so not an option.  But the bigger point is this.  Verizon just in effect dropped the price of 1GB of data to $20. So, for a similar low use data family such as mine, they will pay $180 for the same unlimited calling, unlimited texts, and 1GB of total data, but my family who has been with Verizon for several years have to pay $201.50 for is basically the same plan except that we can share our 1GB data allowance among our four phones.  At that rate a family with 8 smartphones that use up to 250MB each would still be saving money by placing each phone on the single line plan.  I thought family/share plans were supposed to save groups money because it ties more individuals to Verizon.
    I know that most are not like my family and make use of more data than us.  So for example, a family of two, currently on share everything 2GB allowance will have a pre-tax/surcharge cost of $140, but if each line was on the new $60 single line plan that comes with 1GB of data they would have a bill of $120 and they'd pay $20 less than the share everything plan they are on now. However, again this new $60 single line plan is for new customers only, according to the sales person I spoke to the other day.
    I am not complaining about the service I receive when using my phone its great and I get service almost everywhere I go, even when camping.  I am not complaining about the customer service I receive, because I always have a good experience when I call to speak to a customer service agent.  I am not complaining about the subsidized phones I have had over the years, I don't mind the contract that ensures Verizon will recoup the cost of my phone (the phone Verizon paid apple for up front on my behalf). What I am complaining about is the fact that in response to other recent price changes by the other carriers, Verizon made some slight price changes but made these lower prices only available to new customers.  In essence Verizon is basically saying, Hey existing customers you have to pay more for your data and services but new customers get to pay less so that we can lure them away from T-mobile, sprint and AT&T.  So anyway just my 2 cents (or in this case several dollars) worth as it relates to Verizon's new single line plans relative to the share everything  plans. Please feel free to comment and add your thoughts.  If a Verizon rep wants to give me the additional $30 off on my family's 1GB data allowance I will take it and be very happy.
    Bryan

    I disagree. You can't make judgements about people that you don't know and I have every right to DEMAND excellent Customer Service. . I have been assisted by some very helpful Verizon Customer Service representatives over the 12 years that I have given them my business. However, I have had some very bad ones too especially in their stores. I learned years ago that I could get the best CS by phone and later by using their chat system wen it
    came online. Yesterday's experience was horrible in every way though.
    I did not fully elaborate yesterday so let me do so now. Before I called Verizon CS, I used their chat system as I always do. The person I chatted
    with actually tried to get me to take a $60 per month plan with a ONE YEAR COMMITMENT.  I could not believe what I was hearing (reading actually). I
    mean really, I could have taken their prepaid plan with NO COMMITMENT and that would have made more sense. I repeatedly asked for the $45 per month plant but was told it would not suit my needs. Then, I was forced to call Verizon where I was told by another CS person that then plan I wanted did
    not exist.  I still can't get over a CUSTOMER RETENTION SPECIALIST not knowing the services that its company offers. That is inexcusable.
    Actually, her manager should be fired for not making sure his/her employees are knowledgeable. Anyway, she tried to shove different plans down my
    throat until she finally realized that I knew what I was talking about. Perhaps that is the plan along, you call to get a lower rate and they tell
    you it doesn't exist. Then, they offer you all these other plans that might save you a little but give you so much more. Hmm, I may be onto something
    there, sounds like Bait and Switch to me. How about you?
    This latest adventure has left a bad taste in my mouth. Sure, I have a $45 (before taxes and fees) per month plan now BUT I could have had that long
    ago if I switched to another carrier. True, my service might not be as good as with Verizon but my Verizon service isn't that great in my house anyway.
    Many of the other carriers don't charge taxes and fees either so their $45 per month plan truly is $45 per month. I will wait anxiously too see what
    my final monthly cost will be. Funny, my Customer Retention expert could not tell me what the monthly rate was with taxes and fees included. How can
    you not know that?
    As a developer who also codes for iOS and Android, I have several different ones laying around for testing. This weekend, I am going to activate one on
    T-Moblie and one on Straight Talk and see how the service compares to Verizon. If neither is comparable, I will look at AT&T. I have their
    U-Verse service and love the CS I get from them. I may even get a discount for bundling. Either way I am ending my long relationship with Verizon as
    soon as I find a replacement.
    I apologize for turning this thread into a rant but at the very least I feel purged by getting it out there.

Maybe you are looking for