I'm getting this error "Field RMIPM-POINT does not exist in screen SAPLIWP3 0201'" in my BDC program when I try to edit the plan.
In IP01, IP02 and IP03 (SAP 4.6C), there is a counter field. Is there a way to activate/deactivate this field? Does this counter field always exist regardless if you enter a measuring point or not? I've seen cases (with my client) wherein this field does not show on the screen but I can't seem to replicate it in our system. I know how to resolve the problem but I don't know how or why the counter field is not displaying. I also checked OSS but found nothing.
Your help is highly appreciated. Thanks in advance.
Hello,
I would check the parameters that your functional made on those txs, if you can´t find a field it´s sometimes because the customization isnt allowing to show them.
Hope this helps,
Gabriel
Similar Messages
-
Single cycle plan with counter in plant maintenance
Dear Experts,
I am creating single cycle plant with performance based with couter reading.
1 I have crated a measuring point with counter in running hrs
2 Created a single cycle plan and given the couter no. there
3 Since i hv given 4000 hrs in plan, as soon as i update the document there should be a notification but it is not happening
Can any one clarify the issue
Thanks&Regards
N.ChandrasekharDear thyagarajan,
1 I hv created meas point with counter with specified equip
2 made document for that of 10 hrs
3 Created a single cycle plan giving reference same equip Cycly given 250 hrs, Entered the counter no there, call horizon 100, schedule 365 days.... while saving given no to save.....while scheduling IP10,
taken the counter ducument which i 1st saved 10 hrs... thn called 1st call and released and saved.
4. here with out entering that 250 hrs in ducument i am getting the notification............?
5. I have to get the notification after entering 250 only..
Why is happening like that
Hope you have under the issue
Regards
N.Chandraasekhar -
Single cycle set , multiple cycle sets and counters
Hi every one,
i wanan know the use of single cycle set, multiple cycle set and counters. What kind of functionalilites can be covered by these fields specially in performance based planning and schedulling. Kindly give me some documentation on all three or some good example which can explain the scnerio clearly. Any help would be of great imprortance for me.
Regards
Abhishek SinhaHi,
This may help you
http://help.sap.com/saphelp_46C/helpdata/EN/b0/df293581dc1f79e10000009b38f889/frameset.htm
Regds
Vinit -
Hi experts,
Plz tell me What is meant by single cycle plan ?how it works?
Thanks in advance.Hi
If you want to create plan for a single criteria single cycle plan should be used
For ex:
If you want to the maintenance for every 6 months
then create plan in IP41
Select maintenance order or Notification
enter
Maintenance plan cycle tab Enter 6 in Cycle/ unit & Mon in adjacent
Maintain offset as 0
fill the order needed and save
go to IP10 schedule it
If you want to creare plan for every 6000 hours
Then create a separate measuring point and document
Enter the measuring point no in counter
M.Alagesan -
2g data allowance in single line plan is only for 4g LTE or for all data using?
I got a single line plan and an iPhone 5s a couple days ago. I am confused the data allowance is for 4g LTE only or for all data using? Thank you!
Hello edsun1997
I would love to answer this for you. You have 2 GB's to use on our network this will start over at the beginning of your cycle. If you use Wifi and turn off our network, Wifi would not go against that 2 GB bucket.
JoeL_VZW
Follow us on Twitter @VZWSupport -
Dear Experts
How to fix the schedule or PM orders.If these are planed for particular date then it shouls always fall with same schdule even not completed as per schdule.
I created a plan for 1 month cycle.It falls on 1 of every month,but if i completed this on 7th then in next month it starts on 7th instead of 1st please guide how to to.I am using single cycle plan.
Thanks
RajHi,
There are two shift factors in the Maintenance Planning component. These are shift factors for the following cases:
Premature completion
Delayed completion
You can define the shift factor specifically for your maintenance plan by specifying the shift percentage to be taken into account when calculating the next due date.
The shift factor only applies once the maintenance plan has already been scheduled, and when the difference between the planned date and actual date lies outside the tolerance range.
The planned date for your maintenance order was 01.09.09, but it was confirmed 15 days too late, namely on 16.09.09. The next planned date may now be on a different date since this is dependent on the shift factors entered. Three possible shift factors are shown in the table below:
Planned Date
01.09.2009
Confirmed on the
01.09.2009
NextPlanned Date
01.09.2009
16.09.2009
08.09.2009
ShiftFactor
0%
100%
50%
Regards,
Rakesh
Edited by: RAKESH ASHOK MANE on May 5, 2009 2:09 PM
Edited by: RAKESH ASHOK MANE on May 5, 2009 2:13 PM
Edited by: RAKESH ASHOK MANE on May 5, 2009 2:21 PM -
Is lightroom included in Single App plan?
I want to buy Photoshop CC in Single App plan and also requires Lightroom.
My question:Is the Lightroom already included (free) in Single App plan (just like Photography plan) ?
Thanks.My question:Is the Lightroom already included (free) in Single App plan (just like Photography plan) ?
No.
With the Single App plan all you get is Photoshop.
You need the Creative Cloud Photography Plan
Creative Cloud Photography plan | Adobe Creative Cloud -
Can I change my app in the single app plan?
I bought the CC single-app plan and I want to change my chosen app from Indesign to Photoshop. Is this possible?
Hi Abbonathan16,
Welcome to Adobe Forums
You can cancel the Single Application for In design and purchase the Photoshop application.
Let us know if that helps!
Thanks
Garima -
Table for maintenance plan and maintenance cycle and Unit
Hello,
I need to know the table where the values are stored for maintenance plan, maintenance cycle and Unit.
I know that we can get the maintenance cycle and unit from MMPT table.
Question 1
If the maintenance plan has only a single cycle then the data is stored in above table MMPT, but if a maintenance plan has mutiple cycles like 1 maintenance plan has maintenance cycle as 364 Days and 1092 days then the data is not stored in MMPt table.
Question 2
Requirement is I need to develop a report where in I need maintenance order, maintenance plan and the relevant maintenance cycle and unit. Supose an maintenance order is created for the above maintenance plan which has 2 maintenance cycle how can I identify for which maintenance cycle the order is created.
Regards,
NarendraHi,
Please review PM tables
PM/SM/SD Tables
MPOS Maintenance Items
AFAB Network - Relationships
PLKO Task list
PLAS
AFFH Operations
PRT assignment data for the work order
AFFL Work order sequence
AFFT Order process instructions
AFFV Order process instruction values
AFFW Goods movements with errors from confirmations
AFIH Maintenance order header
AFKO Order header data PP orders
AFPO Order item
AFRC Table of planned changes to conf.: Automatic goods receipt
AFRD Default values for collective confirmation
AFRH Header information for confirmation pool
AFRU Order completion confirmations
AFRV Pool of confirmations
AFVC Operation within an order
AFVU DB structure of the user fields of the operation
AFVV DB structure of the quantities/dates/values in the operation
MPOS Maintenance ITEM
AFWI Subsequently posted goods movements for confirmations
AUFK Order master data
AUFM Goods movement for order
MPLA Maintenance Plans
BGMK Master warranty header
BGMP Master warranty item
BGMS Text item master warranty
BGMT Master warranty text
BGMZ Warranty counter information
CRHD Work Center Header
CRTX Text for the Work Center or Production Resource/Tool
EQKT Equipment short texts
EQST Equipment link to BOM
EQUI Equipment master data
EQUZ Equipment time segment
HIKO Order master data history
IFLO Functional Location (View)
IFLOT Functional location (TABLE)
IFLOTX Functional location: Short texts
IHGNS Plant maintenance permit segment
IHPA Plant Maintenance: Partners
IHSG Object-related permits in Plant Maintenance
ILOA PM object location and account assignment
IMPTT Measuring point (table)
IMRG Measurement document
KAKO Capacity Header Segment
KONP Conditions (Item)
KONV Conditions (Procedure Data)
OBJK Plant Maintenance Object List
QMEL Quality notification
QMFE Quality notification - items
QMIH Quality message - maintenance data excerpt
QMMA Quality notification - activities
QMSM Notification - Tasks
QMUR Quality notification - causes
STPOA Name is does not have an A at the end; BOM items
T001 Company Codes
T001L Storage Locations
T001W Plants
T077D Customer account groups
T003O Order Types
T352R Maintenance revisions
T353I_T Maintenance activity type description
T356 Priorities
T357G Permits
T357G_T Table 357G texts
T370A Activity category for PM lists
TINCT Customers: Incoterms: Texts
TVKO Organizational Unit: Sales Organizations
TVKOS Organizational Unit: Divisions per Sales Organization
TVKOV Org. Unit: Distribution Channels per Sales Organization
TVTA Organizational Unit: Sales Area(s)
VIAUFKST Order selection view
MMPT Cycle detail
Regards
Carlos -
Single line plan, how to switch and question about what rep told me.
I just got a contract (9/3) and have the "more everything plan" - I called Verizon Cust. Care (9/4) to inquire about the single line plan, I was told by Matthew that the single line plan price is in addition to the 40.00 line surcharge, so it would be $100.00 per month. Is this information accurate, or is it only $60.00 per month (as the website states for the ) plus taxes and fees?
The single line plan is only $60/month. There is no $40 line surcharge. You must be on the Singe Line Plan, though, not the More Everything Plan.
-
MS Project 2010 Server
How to move a single MS Project plan and it's SharePoint project site from a PWA server to another PWA server (one at a time)
I have 2 Project PWA servers, i know how to copy all the databases (Publishing, Draft, Reporting, archive, content) from one SQL server and copy it to the other PWA server so both server can be identical.
I need to only move a single project from a PWA server to another,
Moving the Project plan, actual time data, SharePoint site with all it's content
Is there a 3rd party tool that can be added on to the server to help me move single project plans? to different PWA servers?
-IsaackVisit my friends at FluentPro and try FluentBooks
http://www.fluentpro.com/productsfluentbooks2013.html
they have a 2010 version also.
Hope that helps,
Thanks, Eric S. Pcubed -
Hi, my current plans and products include Creative Cloud Photography plan (one-year) and Creative Cloud single-app membership for Photoshop (one-year), I only use photoshop occasionally and for very basic things, are these two plans required for basic photoshop use or am I able to go with one or the other ?
PS is part of the photography plan, so your single app plan is redundant.
Mylenium -
I am a single App user and I would like to upgrade to the $29.00 offer for complete plan
Hi captcunningham,
Please cancel you current plan by following the help document below:
Cancel your membership or subscription | Creative Cloud
Then, you can go ahead and join the plan you wish on Adobe website:
Creative Cloud pricing and membership plans | Adobe Creative Cloud
Regards,
Sheena -
I noticed in the FAQ's for the single line plans that they are eligible for the EDGE discount. I just recently was able to get my Veteran status verified for my Military discount. FYI, DO NOT try to do the verification process online, it takes forever and three days! It only took thirty minutes in line at the retail location versus online, where I've been waiting for five days and it STILL is not verified!!! Anyways, while at the retail location I asked about their smartphone plans and I was quoted $75.00 for the single line plan at 2GB, but was also told that it was already discounted and thus was not eligible for my Military discount. If that is true then those plans should not be eligible for the EDGE discount either, but they are. So what is the correct answer?
Okay, so this is what I get out of all this.... The Military discount provides a 15% discount to monthly plans of $34.99 and above. A 25% discount on accessories is also available. So I could get a Single Line Plan with 2GB of data for $75.00 a month OR I could get a More Everything Plan for one line ($40.00 Line Access Fee - 15% Military Discount = $34.00) with 2GB of shareable data ($50.00 - 15% Military Discount = $42.50) for $76.50? In other words, a person without a Military (or for that matter any other) discount can get the SAME service cheaper (especially with the EDGE Single Line rate being only $65.00) than I could, after having served this great country of ours. Let's not forget that the Single Line plans are NOT eligible for the Military Discount, but they ARE eligible for the EDGE discount... Well ain't that just swell. What a (removed) to those of us that served! Thanks for much of nothing Verizon!!
If I am wrong, please forgive me, but then again that is why I am posting this, for clarification. I can not understand for the life of me why Verizon would not allow the Military Discount for the Single Line Plans, since they DO allow for the EDGE discount. Come on...
Edited as required by the Verizon Wireless Terms of Service
Message was edited by: Admin Moderator -
Photography and Single App plans?
Hello all.
My subscription is almost up and I want to subscribe, but not sure which plan to subscribe to.
I only use Photoshop on the desktop.
Aside from cost, what is the difference between Photography and Single App plans?PS is part of the photography plan, so your single app plan is redundant.
Mylenium
Maybe you are looking for
-
How can I tell what is "Auto Launching"
User's (me) tech background: Fairly technical user here, but getting pretty rusty. In a past life (late '90s) I was a network administrator as well as server admins for NT 4, Novell (up to 4.11), AIX, and HP-UX servers. Used to be really good at a co
-
How can I trim multiple images to the same duration all at once?
I imported 80 images and added them to a timeline. By default, they all last for 5 seconds. I want them to last for 4 seconds instead. Can I make changes that apply to all images at once?
-
Problem in SSL programation client in Weblogic 5.1 using JSSE
How to solve this Exception. When I sent more than 8000 bytes of data in the request weblogic 5.1 in solaris server gives me this error. But the same server and same configuration in Window NT with same SSLClient program does not give any expection e
-
Problem with registering device in Sybase Control Center with SUP 2.2 SP04
Hi, I have Sybase Unwired Platform SP04, and I am trying to register my Android device in Sybase Control Center. I registered application connection with HWC as a template. I also installed 2 Sybase apps from Google Play Store on my Android device -
-
In my client i have requirement as I want to display number ranges for VBELN and XBLNR . But VBELN purpsoe we used RV60AFZZ program and FORM USEREXIT_NUMBER_RANGE USING US_RANGE_INTERN. This is calling in Function module RV_INVOICE_DOCUMENT_ADD insi