Single ink line =single uniform traced line in Live Trace? Nope.

I'm using AI CS5 and I'm trying unsuccessfully to get a Technical Drawing result with ONE single traced uniform-thickness line from a single scanned drawn line in a Photoshop file. I am trying to NOT get a calligraphic line that runs thin-blob-thicker-blob-thin again, then becomes two parallel hairlines, then goes back to thick-thin. It may look hand-drawn and artsy; that's fine, but it isn't what I'm hoping for. I want a single standardized 1pt path with no double (supposedly outlined) sections. That's all I can get using the furshlugginer "Technical drawing" setting. Is that normal? If so, boy, have I got a feature request for Adobe! I realize that there will be occasional corners and feet that will become traced blobs that I will need to lop off, and I can handle that, but how do I draw a single line, scan it, then, in Live trace, achieve a single uniform line, like most of the actual, real, technical drawings I have seen? Or do I have a problematic copy of CS5?

Thanks, Steve. After my frustrtion and outrage subsided I checked out a dimly-related forum topic and found it very helpful: "uniform lines in a vector image". Your point was well made, plus two more: Set the Max line width wide enough so that no blob or corner exceeds it, e.g., 30pt is around a quarter of an inch; if I set the line width max at 30 pts I'm likely to wind up with a clean, uniform 30pt line without blobs, from which I can simply assign a thinner weight, such as 1 pt. The other tip is to blur the original raster line slightly, so as to suggest a centerline, blurred at its edges; Live Trace will zero in on the phony "centerline". Is there a "use centerline" setting in Live trace? I seem to remember that there was one in Autotrace and in Streamline, but I'm unable to find one in Live Trace. Frankly, the value of the "options" presented in the Live Trace pallet isn't particularly obvious. I looked through the Illustrator Classroom in a Book, and was told to "experiment with all the options", but not how to get any particular result. In the end, the settings can be used to get the results I was looking for, but I had to do some serious digging, without much help from the documentation. I would think that getting one traced vector line from one raster line would be a natural place to start. Guess not.

Similar Messages

  • Since changing over to Mountain Lion I discover that I am no longer able to adjust spaces between lines. If I choose spacing of 1.3 after two lines single-spaced, the entire previous lines end up with 1.3 spacing. What am I missing?

    Since changing over to Mountain Lion I discover that I am no longer able to adjust spaces between lines. If I choose spacing of 1.3 after two lines single-spaced, the entire previous lines end up with 1.3 spacing. What am I missing?

    Do those previous lines have a Return/Linefeed after them, or are they just wrapped to a new line?
    What App is it you're using?

  • Sales order : Creation of VBAP main lines from VBEP schedule lines

    Hello , I am working on SAP sales order interfacing with legacy system. This is the scenario where legacy system orders will come to SAP system for availability check. I mean , the legacy system sales order are replicalted in SAP system. and the availability check runs for it in APO. 
    Based on the SAP system stock availability , the sub item or sub items ( schedule lines) will be created in the sales order. Here is one example of partial quantity availability.Below example shows that sap system has received a order of quantity 100.
    SAP stock available is only 20 for 29th may. Another quantity 80 will be available on 30th May.
    So system will create two sub items or two schedule lines.
    But when I save the sales order the sub-items lines should be converted into main item lines as shown in the below example in after save.
    I tried this developement by using MV45AFZZ. User exit - SAVE_DOCUMENT_PREPARE. But I am not getting right results.
    I short , I would like to have single schedule line for one item line. And if there are multiple schedlue lines then for each schedule line one item line should be created automatically by the system
    Before Save
    Item
    Schedule line
    Req Date
    Req Qty
    Rounding Qty
    Confirmation Qty
    40
    1
    29th May
    100
    100
    20
    2
    30th May
    80
    After Save
    Item
    Schedule line
    Req Date
    Req Qty
    Rounding Qty
    Confirmation Qty
    40
    1
    29th May
    20
    20
    20
    41
    1
    29th May
    80
    80
    2
    30th May
    80

    Hi Ravindra,
    I think this is not possible . If the stock is not available this will display in same passion.
    Regards,
    Madhu.

  • How can I live trace a hand sketch line work and cut from background to apply to new coloured backgr

    I placed a hand drawn scanned photo of artwork to illustrator cs4 in an attempt to trace the lines and remove from paper and add the line drawing to a brochure artwork. this to give illusion of an old artist's manuscript with drawings. first attempt with the psd file in trying to apply trace as a "hand drawn " method crashed illustrator. I tried again and used ink drawing which came out blotchy. Tried simple trace and got a warning that the file was too large. I'm thinking that the drawing itself is very soft and the paper around it is grainy and dim. I had tried to brighten   and lighten in the scan mode.I did get it as far as a trace at one point and used outline stroke but then couln't fill in the lines or cut it out. I have taken it to photoshop and drew a pen selection around the soft lines and used a transparent background on it, hoping to stroke it in illustrator and drag it off over to the brochure template .But didn't try it yet. I also just made the resolution 250 and the size document to 6 x 9 in approx. But now am fearful of another experiemental attempt. Am I on the right track or is there another method to bringing in a line drawing that is not defined well and getting it to trace and remove from it's background to apply onto the illustrator document being worked on. I have done placing and tracing before but not a line work. Any suggestions that won't crash my program would be welcome. As an artist I will want to do this again and again so want to know the proper method or what I am missing. I've been using illustrator for 7 months now.

    Maybe Li[ve trace] is not t]he way[ to go
    I have some suggestion one leave it as is and use a blending mode of multiply to give it a color background like this
    leave it as is make it a grayscale tiff import int Illustrator and color it it in Illustrator like this
    Or trace over it with the brush tool aand then give it a color ground.
    Or do the original over and do a cleaner job with no tone or a minimum of tone. Then Live trace.

  • Creating a 'dotted line' from a 'solid line'?

    In Pages one can draw a line, and then choose to have it solid, or dotted, or a series-of-strokes (with a click). Is there anything comparable in Motion? I'd love to be able to turn my solid line into a 'dotted line' or 'series-of-strokes' with a single click.

    http://www.motionsmarts.com/tutorials/drawinglines/drawinglines1.html
    bogiesan

  • Show 2 line graphs together in Line bar combo graph

    Hi,
    I am currently working on to show data for 2 years (which will be selected through prompt), month on month basis in Line-Bar Combo Graph.
    I could achieve to show 2 years of data month on month basis in Bar Diagram, but the same is not happening for Line diagram.
    In Line Diagram, values for 2 years are joined and shown as a single line, where as I want to see 2 separate lines for the years selected.
    Kindly have a look at the link below:
    !http://i42.tinypic.com/cuek8.jpg!
    Any suggestions?
    Regards,
    Jitendra

    Hi,
    I am putting up the snapshot of what I have done,
    !http://i42.tinypic.com/2j8jkx.jpg!
    As you can see in the image, I have
    1. Utilization Rate &
    2. Attendance Booking
    as my fact.
    I can arrange the Attendance booking (Bar Diagram), as Month-on-Month basis for any 2 years.
    My aim is to plot Utilization Rate, in the Line Diagram. Currently it's been shown as One Single Line, I want to see 2 different line for the 2 years selected.
    Kindly help.
    Regards,
    Jitendra

  • Removing gridpaper lines on scans with live trace?

    Hi everyone
    In my continuing struggle to get the 'perfect' scanned images vectorized I would like to solicit the advice of the forum again
    i wish to remove/ignore in live trace the grid lines that are printed on certain notepad paper, but whilst retaining the inked/drawn images I have added myself.
    Is there a plugin, recommended exterior app, or Illustrator process that can quickly do this?
    Often these grid lines intersect the scanned image, which is the problem.
    I use CS4..
    Thank you!

    I would use white-out (the white paint used to correct typing errors back in the typewriter days).
    However, make sure you apply it to the grid lines on the graph paper and not the image on your monitor. Some white-out paints are oil-based and will wreak havoc on the protective surface coating found on most LCD monitors.
    OK... seriously... I would clean up the scan in Photoshop before bringing it into Illustrator. (Select | Color Range will make quick work of it... unless you were boneheaded enough to sketch in the same color as the grid lines.)

  • How to pass Schedule lines of an item Line to 'BAPI_QUOTATION_CREATEFROMDAT

    Hi Friends,
    I am trying to create Sales Quotation using the  'BAPI_QUOTATION_CREATEFROMDATA2'  from Webdynpro Application.
    I am able to create the quotation with Line items, but I am not able to pass the multiple schedul line for an Item line.
    it takes,but it checks the item availabilty and propses the delivery propsal dates.
    but my requirement is It should take only the schedule line items which I am passing to BAPI,because I do the availability check in my application and pass those schdule line items to BAPI.
    If I pass only one schedule line item then should create only with one schdule line item,If I pass Muliple then it should create schedul lines for item line.
    Please help me in solving the issue.
    Regards,
    Xavier.P

    Hi max,
    loop at lt_nd_quote_items into ls_nd_quote_items.
        lv_item = lv_item + 10.
    *Check weather Availablity check is done or not.
        read table lt_nd_schedule_lines into ls_nd_schedule_lines
                           with key matnr = ls_nd_quote_items-matnr.
        if sy-subrc = 0.
          loop at lt_nd_schedule_lines into ls_nd_schedule_lines
                            where matnr = ls_nd_quote_items-matnr
                            and   kwmeng = ls_nd_quote_items-kwmeng.
            lv_sch_line = lv_sch_line + '0001'.
            wa_order_schedule-itm_number         = lv_item.
            wa_order_schedule_inx-itm_number     = lv_item.
            wa_order_schedule-sched_line         = lv_sch_line.
            wa_order_schedule_inx-sched_line     = lv_sch_line.
            wa_order_schedule-req_date           = ls_nd_schedule_lines-delv_date.
            wa_order_schedule_inx-req_date       = c_abap_true.
            wa_order_schedule-req_qty            = ls_nd_schedule_lines-kwmeng.
            wa_order_schedule_inx-req_qty        = c_abap_true.
            wa_order_schedule-SCHED_TYPE         = 'BP'.
            wa_order_schedule_inx-SCHED_TYPE     = 'X'.
            wa_order_schedule-MS_DATE = ls_nd_schedule_lines-delv_date.
            wa_order_schedule_inx-MS_DATE = 'X'.
            wa_order_schedule_inx-updateflag     = 'I'.
            append:wa_order_schedule to  it_order_schedule,
                   wa_order_schedule_inx to it_order_schedule_inx.
            clear:ls_nd_schedule_lines.
          endloop.
        else.
    *If no Availablity check is done,pass the item details to schedule lines.
          lv_sch_line = lv_sch_line + sy-tabix.
          wa_order_schedule-itm_number         = lv_item.
          wa_order_schedule_inx-itm_number     = lv_item.
          wa_order_schedule-sched_line         = lv_sch_line.
          wa_order_schedule_inx-sched_line     = lv_sch_line.
          wa_order_schedule-req_date           = ls_nd_quote_items-delivery_on.
          wa_order_schedule_inx-req_date       = c_abap_true.
          wa_order_schedule-req_qty            = ls_nd_quote_items-kwmeng.
          wa_order_schedule_inx-req_qty        = c_abap_true.
          wa_order_schedule_inx-updateflag     = 'I'.
          append:wa_order_schedule to  it_order_schedule,
                 wa_order_schedule_inx to it_order_schedule_inx.
        endif.
        clear:ls_nd_quote_items,lv_sch_line.
      endloop.
    Max,  the internal table lt_nd_schedule_lines  is containg my schedule lines,if there are no lines in that table i am just passing the default line item details so that the BAPI take care of schdule line for that Line item.
    Could you please help me in figuring the issue?
    Regards,
    Xavier.P

  • Copy Trading Partner to Asset line items from Vendor line items in F-90

    Dear Friends,
    I want to copy trading partner field from Vendor line item to other line items like Asset and Tax in T.code - F-90
    Client want to use Transaction type - 100
    Is it feasible?
    Thanks in advance

    try:
    1) substitution - tcode OBBH
    or
    2) open FI - menu FIBF tcode BF44
        - event 1120 or 1130
    A.

  • FBCJ LINE ITEM AND FI LINE ITEMS ARE DIFFERENT

    Dear Expert
    FBCJ LINE ITEM AND FI LINE ITEMS ARE DIFFERENT

    Hi,
    It seems from the screen shot you are seeing different documents as in the first screen shot it clearly shows you have booked the multiple expenses under one see the below screen shot we have circled it
    whereas FB03 screen shows different.
    You can do one thing click on circle item and check the expenses involved in it and accordingly go to FBL3N and display documents for that G/L for the date 05.04.2014.
    Hope your issue has been resolved else revert.
    Regards,
    Tejas.

  • How to split a line item to 2 line item.

    Hi all !
    I have a request, help me please !
    In system I have a invoice with 1 line item value 1000 USD.
    Customer payment 600$. a incoming payment with value 600$ will post to system.
    I want incoming payment and invoice will auto clear 600$ but system can't auto clearing because value is not Identical.
    I want line item of invoice will split to 2 line item. Line item 1 value 600$ and line item 2 value 400$.
    Line item 1 of invoice will auto clear with incoming payment and system will exist a invoice with 1 line item value 400$.
    How to split a line item to 2 line item ? Have FM for split a line item to 2 line item in SAP ?
    If you have other solution for this request, help me please !
    Thanks !

    Hi,
    Have a look at Split line item - Sales Order
    Regards

  • Unable to find line break between two lines in attachment file.

    Dear all I will be very great full if someone help me out,
    I am trying to send mail through SMTP server with an attachment of oracle report, but I am unable to find line break between two lines, when I down load the attachment from mail and open attach.txt file by double click on it. Next line starts right after previous line ends, it should starts with new line.
    In order to send an attachment file, I am reading source file line by line and put MIME protocol’s attachment instance, contain of source file is being properly written into target file if I open that attachment on cmd prompt.
    Following code may help you to understand the case.
    Thanks in advance.
    My code is as follows:-
    create or replace procedure bec_file_test
    v_subject varchar2, -- Subject of the email
    v_body varchar2, -- Body of the email
    v_from VARCHAR2 default 'XYZ.com', -- sender mail id
    v_to varchar2 default 'XYZ.com', -- Field To of the email
    v_cc varchar2 default 'XYZ.com' -- cc address
    ) is
    -- variable to hold the smtp server connection
    v_smtp_connection utl_smtp.connection;
    -- variable to hold the smtp host name
    v_smtp_host varchar2(100) default 'mail.bec-group.com';
    -- variable to hold the smtp port
    v_smtp_port number default 25;
    -- composite of {CR}{LF} caridge return and line feed.
    CRLF varchar2(2):=CHR(13)||CHR(10);
    cursor pr_rec is
    select requisition_no,line_no,release_no,a.contract,
    a.project_id,substr(a.activity_seq,1,11)ACT_SEQ,
    substr(a.part_no,1,12)PART_NO,
    substr(a.description,1,32)DESCRIPTION,
    substr(a.Bal_qty,1,8) BAL_QTY,
    substr(a.unit_meas,1,5)UOM,
    a.wanted_receipt_date WAN_REC_DT,
    a.latest_order_date LAT_ORD_DT
    from bec_pr_line_rep a
    where a.Bal_qty>0 and a.header_state not in 'Closed'
    and upper(a.state1) like 'RELEASED' and a.contract not in ('U1ENG','ULENG','U1FND','U2FND')
    and a.buyer_code='70306'
    order by a.part_no;
    begin
    declare
    fHandle UTL_FILE.FILE_TYPE;
    v_msg_line varchar2(2000);
    -- v_buffer varchar2(20000);
    --ALTER SYSTEM SET utl_file_dir = 'D:\Database\temp'
    --COMMENT='Temporary change on Dec 14'
    --SCOPE=SPFILE;
    SELECT name, value
    FROM gv$parameter
    WHERE name = 'utl_file_dir';
    --drop directory my_directory
    --CREATE or replace DIRECTORY my_directory AS 'D:\database\temp';
    --GRANT read,write ON DIRECTORY my_directory TO PUBLIC;
    begin ---writing data into a file.
    fHandle := UTL_FILE.FOPEN('MY_DIRECTORY', 'pending_pr_summry.txt', 'w');
    UTL_FILE.put_line(fHandle, ' Pending PR to process (detail report)');
    UTL_FILE.put_line(fHandle,TO_CHAR(SYSDATE,'MM-DD-YY HH:MI:SS AM'));
    UTL_FILE.put_line(fHandle, '--------------------------------------------------------------------------------------------------------------------------------------------------');
    UTL_FILE.put_line(fHandle, 'Req.no. li Re Site Prj Id Act seq Part no Description Qty UOM want rec dt lat ord dt' );
    UTL_FILE.put_line(fHandle, '--------------------------------------------------------------------------------------------------------------------------------------------------');
    for pr_temp in pr_rec loop
    begin
    v_msg_line:=to_char(rpad(pr_temp.requisition_no,12,' ')||'|'||
    lpad(pr_temp.line_no,3,' ')||'|'||
    lpad(pr_temp.release_no,3,' ')||'|'||
    rpad(pr_temp.contract,7,' ')||'|'||
    lpad(nvl(pr_temp.project_id,' '),7,' ')||'|'||
    lpad(nvl(pr_temp.act_seq,' '),12,' ')||'|'||
    lpad(pr_temp.part_no,12,' ')||'|'||
    rpad(pr_temp.description,35,' ')||'|'||
    lpad(pr_temp.bal_qty,10,' ')||'|'||
    rpad(pr_temp.uom,6,' ')||'|'||
    lpad(pr_temp.wan_rec_dt,14,' ')||'|'||
    lpad(pr_temp.lat_ord_dt,14,' '));
    UTL_FILE.put_line(fHandle,v_msg_line);
    end;
    end loop;
    UTL_FILE.put_line(fHandle, '--------------------------------------------------------------------------------------------------------------------------------------------------');
    UTL_FILE.put_line(fHandle, ' Regards : IFSAPP ( Application owner ) ');
    UTL_FILE.FCLOSE(fHandle); ------------writing into file is successfuly done here!
    --Reading of file starts here containt will be added in attchment file
    fHandle :=UTL_FILE.FOPEN('MY_DIRECTORY','pending_pr_summry.txt','R' );
    -- establish the connection to the smtp server
    v_smtp_connection := utl_smtp.open_connection(v_smtp_host, v_smtp_port); /** OPEN CONNECTION ON THE SERVER **/
    -- perform a handshake with the smtp server
    utl_smtp.helo(v_smtp_connection, v_smtp_host); /** DO THE INITIAL HAND SHAKE **/
    -- set the 'from' address of the message
    utl_smtp.mail(v_smtp_connection, v_from);
    -- add the recipient to the message
    utl_smtp.rcpt(v_smtp_connection, v_to);
    -- send the email
    utl_smtp.open_data(v_smtp_connection);
    v_msg_line:='Date: ' || TO_CHAR( SYSDATE, 'dd Mon yy hh24:mi:ss' ) || CRLF ||
    'From: ' || v_from || CRLF ||
    'Subject: ' || v_subject || CRLF ||
    'To: ' || v_to || CRLF ||
    'Cc: ' || v_cc || CRLF ||
    'MIME-Version: 1.0'|| CRLF || -- Use MIME mail standard
    'Content-Type: multipart/mixed;'||CRLF ||
    ' boundary="-----SECBOUND"'||CRLF||
    CRLF ||'-------SECBOUND'|| CRLF ||
    'Content-Type: text/plain;'|| CRLF ||
    'Content-Transfer_Encoding: 7bit'|| CRLF ||
    CRLF ||v_body|| CRLF;     -- Message body
    utl_smtp.write_data(v_smtp_connection,v_msg_line);
    v_msg_line:='-------SECBOUND'|| CRLF ||
    'Content-Type: application/octet-stream;'|| CRLF ||
    'Content-Type: text/plain;'|| CRLF ||
    'name="pending_pr_summry.txt"'|| CRLF ||
    'Content-Transfer_Encoding: 8bit'|| CRLF ||
    'Content-Disposition: attachment;'|| CRLF ||
    ' filename="pending_pr_summry.txt"'|| CRLF || CRLF;     -- Content of attachment
    utl_smtp.write_data(v_smtp_connection,v_msg_line);
    -- check file is opened
    IF utl_file.is_open(fHandle) THEN
    -- loop lines in the file
    LOOP
    BEGIN -- Content of attachment
    utl_file.get_line(fHandle,v_msg_line);
    v_msg_line:=concat(v_msg_line,CRLF);
    utl_smtp.write_data(v_smtp_connection,v_msg_line);
    EXCEPTION
    WHEN NO_DATA_FOUND THEN
    EXIT;
    END;
    END LOOP;
    END IF;
    --end of attachment containt     
    utl_smtp.write_data(v_smtp_connection,v_msg_line);
    UTL_FILE.FCLOSE(fHandle);
    utl_smtp.close_data(v_smtp_connection);
    utl_smtp.quit(v_smtp_connection);
    exception
    when utl_smtp.invalid_operation then
    dbms_output.put_line(' Invalid Operation in Mail attempt using UTL_SMTP.');
    when utl_smtp.transient_error then
    dbms_output.put_line(' Temporary e-mail issue - try again');
    when utl_smtp.permanent_error then
    dbms_output.put_line(' Permanent Error Encountered.');
    when others then
    dbms_output.put_line('Exception: SQLCODE=' || SQLCODE || ' SQLERRM=' || SQLERRM);
    RAISE;
    end;
    end bec_file_test;

    Pending PR to process (detail report)01-17-13 12:43:19 PM--------------------------------------------------------------------------------------------------------------------------------------------------Req.no. li Re Site Prj Id Act seq Part no Description Qty UOM want rec dt lat ord dt--------------------------------------------------------------------------------------------------------------------------------------------------MAT/250370 | 2| 1|ISCSP | 4977| 100004207| 0104000016|Angle 50 X 50 X 6 IS:2062 Grade |500|kg |30-NOV-2012| 20-nov-2012MAT/250370 | 3| 1|ISCSP | 4977| 100004207| 0105000002|Channel 100 X 50 IS:2062 Grade A | 1000|kg | 30-NOV-2012| 20-nov-2012MAT/250579 | 2| 1|NMDCJ | 6001| 100005580| 0109020002|TMT Bar 10 mm Fe 415 IS:1786 | 2991|kg | 13-DEC-2012| 03-dec-2012MAT/250606 | 2| |NMDCJ | 6002| 100005860| 0109020002|TMT Bar 10 mm Fe 415 IS:1786 | 4500|kg | 29-DEC-2012| 19-dec-2012MAT/250607 | |1|NMDCJ|6001|100005580| 0109020002|TMT Bar 10 mm Fe 415 IS:1786 | 1500|kg | 29-DEC-2012| 19-dec-2012MAT/250194 | 3| 1|NMDCJ | 6002| 100005818| 0109020002|TMT Bar 10 mm Fe 415 IS:1786 | 3939|kg | 29-DEC-2012| 19-dec-2012MAT/250606 | 4| 1|NMDCJ | 6002| 100005860| 0109020004|TMT Bar 16 mm Fe 415 IS:1786 | 39000|kg | 29-DEC-2012| 19-dec-2012MAT/250607 | 4| 1|NMDCJ | 6001| 100005580| 0109020004|TMT Bar 16 mm Fe 415 IS:1786 | 17500|kg | 29-DEC-2012| 19-dec-2012MAT/250194 | 2| 1|NMDCJ | 6002| 100005818| 0109020004|TMT Bar 16 mm Fe 415 IS:1786 | 12183|kg | 29-DEC-2012| 19-dec-2012MAT/250606 | 6| 1|NMDCJ | 6002| 100005860| 0109020006|TMT Bar 25 mm Fe 415 IS:1786 | 9500|kg | 29-DEC-2012| 19-dec-2012MAT/250607 | 6| 1|NMDCJ | 6001| 100005580| 0109020006|TMT Bar 25 mm Fe 415 IS:1786 | 4500|kg | 29-DEC-2012| 19-dec-2012MAT/250194 | 6| 1|NMDCJ | 6002| 100005818| 0109020006|TMT Bar 25 mm Fe 415 IS:1786 | 17500|kg | 29-DEC-2012| 19-dec-2012MAT/250607 | 7| 1|NMDCJ | 6001| 100005580| 0109020008|TMT Bar 32 mm Fe 415 IS:1786 | 22000|kg | 29-DEC-2012| 19-dec-2012MAT/250194 | 7| 1|NMDCJ | 6002| 100005818| 0109020008|TMT Bar 32 mm Fe 415 IS:1786 | 27060|kg | 29-DEC-2012| 19-dec-2012MAT/251138 | 1| 1|NMDCJ | 6002| 100005825| 3501000001|Cement 50 kg | 1|pkt | 25-DEC-2013| 14-dec-2013--------------------------------------------------------------------------------------------------------------------------------------------------
    where as source file is like that:-
    Pending PR to process (detail report)
    01-17-13 12:43:19 PM
    Req.no. li Re Site Prj Id Act seq Part no Description Qty UOM want rec dt lat ord dt
    MAT/250370 | 2| 1|ISCSP | 4977| 100004207| 0104000016|Angle 50 X 50 X 6 IS:2062 Grade | 5500|kg | 30-NOV-2012| 20-nov-2012
    MAT/250370 | 3| 1|ISCSP | 4977| 100004207| 0105000002|Channel 100 X 50 IS:2062 Grade A | 1000|kg | 30-NOV-2012| 20-nov-2012
    MAT/250579 | 2| 1|NMDCJ | 6001| 100005580| 0109020002|TMT Bar 10 mm Fe 415 IS:1786 | 2991|kg | 13-DEC-2012| 03-dec-2012
    MAT/250606 | 2| 1|NMDCJ | 6002| 100005860| 0109020002|TMT Bar 10 mm Fe 415 IS:1786 | 4500|kg | 29-DEC-2012| 19-dec-2012
    MAT/250607 | 2| 1|NMDCJ | 6001| 100005580| 0109020002|TMT Bar 10 mm Fe 415 IS:1786 | 1500|kg | 29-DEC-2012| 19-dec-2012
    MAT/250194 | 3| 1|NMDCJ | 6002| 100005818| 0109020002|TMT Bar 10 mm Fe 415 IS:1786 | 3939|kg | 29-DEC-2012| 19-dec-2012
    MAT/250606 | 4| 1|NMDCJ | 6002| 100005860| 0109020004|TMT Bar 16 mm Fe 415 IS:1786 | 39000|kg | 29-DEC-2012| 19-dec-2012
    MAT/250607 | 4| 1|NMDCJ | 6001| 100005580| 0109020004|TMT Bar 16 mm Fe 415 IS:1786 | 17500|kg | 29-DEC-2012| 19-dec-2012
    MAT/250194 | 2| 1|NMDCJ | 6002| 100005818| 0109020004|TMT Bar 16 mm Fe 415 IS:1786 | 12183|kg | 29-DEC-2012| 19-dec-2012
    MAT/250606 | 6| 1|NMDCJ | 6002| 100005860| 0109020006|TMT Bar 25 mm Fe 415 IS:1786 | 9500|kg | 29-DEC-2012| 19-dec-2012
    MAT/250607 | 6| 1|NMDCJ | 6001| 100005580| 0109020006|TMT Bar 25 mm Fe 415 IS:1786 | 4500|kg | 29-DEC-2012| 19-dec-2012
    MAT/250194 | 6| 1|NMDCJ | 6002| 100005818| 0109020006|TMT Bar 25 mm Fe 415 IS:1786 | 17500|kg | 29-DEC-2012| 19-dec-2012
    MAT/250607 | 7| 1|NMDCJ | 6001| 100005580| 0109020008|TMT Bar 32 mm Fe 415 IS:1786 | 22000|kg | 29-DEC-2012| 19-dec-2012
    MAT/250194 | 7| 1|NMDCJ | 6002| 100005818| 0109020008|TMT Bar 32 mm Fe 415 IS:1786 | 27060|kg | 29-DEC-2012| 19-dec-2012
    MAT/251138 | 1| 1|NMDCJ | 6002| 100005825| 3501000001|Cement 50 kg | 1 |pkt | 25-DEC-2013| 14-dec-2013
    Ignore alignment. It is well formatted in source file.

  • KE24 line item report  ( profitability line item report)

    Hi all,
    we need sub total sale order wise automatically in KE24 line item report  ( profitability line item report)  . How can i do for this .
    could you please help me.
    Regards,
    K.Satish
    [email protected]

    Hi,
    Please forward the same to my mail id:[email protected]
    Thanks in advance.
    Regards,
    Prasad

  • Move Order lines and Delivery Detail lines - Relationship

    Hi All,
    Is there a one - to - one realtionship between Move Order Line and Delivery Detail Line?
    i.e., Each Move Order line will correspond to only one Delivery Details line Record?
    Thanks in advance.
    Regards,
    Gowri

    Hello,
    There is a one - to - many relationship between Move Order Line and Delivery Detail Line when you split lines in delivery.
    select * from mtl_material_transactions t you have source_id.
    select * from WSH_DELIVERABLES_v t you have move_order_id.
    Regards,
    Luko

  • What is the direct link between Schedule Line item and Delivery line item?

    Hi SAP SD Gurus,
    The question is simple.  I would like to calculate the Open order quantity for a particular month based on the Schedule Line Date.
    I am taking all the Schedule lines falling below the running date of the month and sum up that and look for the deliveries happened for that Schedule lines.
    I am unable to link that Schedule line with that Delivery line item.
    The only link is Schedule Line Number in VBEP table which is not available in LIPS.  I would like sum up the Schdule line Quantities and Subtract the sum of the Delivery quantities which will give me the Open orders for the particular day of the month.
    Can anyone help me to link this VBEP table to LIPS table to connect the Schedule line number with the Delivery line item?
    Thanks in advance for your help..
    Augustine

    Anuj,
    I am aware of the Functional Modules. 
    I wanted to know for this Schedule Line, this is Delivery document created.
    Where in SAP through Tables it is linked?  Because, I need to source the Tables to calulate the open orders by way of external report through Business Object.
    The table link from VBEP to LIPS is not directly linked.  It is linked from Sales order line item level.  Because we are capturing all the Sales order Line tiems through the Delivery Status which is not equalled to C. But if there are partial deliveries against the Scheuld Line item level, we need to identify.  The only common joint should be Scheldule line number which is not available in LIPS.
    If we are developing report inside SAP, we can use the said Functional Modules to capture through Structures VBEPD.  Since it is a external reporting , we need to give correct tables and the joints.  Hence I am looking for any other way to solve this.
    Thanks
    Augustine Ponraj

Maybe you are looking for