Single production order for many materials

Dear Experts,
We can create a single purchase order for many materials. Like wise can we create a single production order  for many materials which is produced from single raw material in same operation?
Thnaks,
Chetan

Chetan,
You can not create a single production order for multiple materials.
However, the workaround would be create one material as BOM header and and assign the remaining materials (for which you want to have production order) as BOM components with by-product or co-product. With this you can receive all the materials against one single production order.
This will have implication in many areas like planning and costing.
Evaluate the option with your FICO consultant also, before going ahead.
Regards,
Himanshu

Similar Messages

  • How do we Prevent Creation of Production Orders for Phantom materials.

    Dear Experts;
    We have some materials which are Phantoms.
    We have set "special procurement type" as 50 in MRP2 and "Strategy Group" as 59 in MRP3
    These are non stchable items, but have BOMS.
    We dont create orders for them, however at the mement the system allows order creation. How do we prevent creation of production orders for these items in the system.
    Thanks in Advance
    Richard.

    Dear Richard,
    Check using this BADI - WORKORDER_UPDATE using method IN_UPDATE or Release by including a check if MATNR and for
    WERKS combination if SOBSL = 50 from table MARC,then do not allow to save.
    Check whether this works or else you have to set a plant specific status using OMS4  for not allowing production order
    creation and assign this value in the material master of the phantom assemblies.
    Check and revert
    Regards
    Mangalraj.S

  • Production order for a multiple materials codes...

    Dear...
    Could you please suggest me the SAP solution for the below production strategy.
    This production process is of heat treatment. Actually I am doing heat treatment of Cast and Forge items. These items weights are in the range of 150 kgs to 40000kgs. For example I am having a 40 tons heat treatment furnace. So at a time I can load the materials upto 40 tons. I am having different materials of different sizes and chemical compositions.  But heat treatment cycle(Routing) is same. So I can load different types of materials i.e. upto 40tons for the heat treatment for which same type of heat treatment is required. Sometimes this may be a single item .. if the weight of the items is 40 tons. If it is single item...then there is no problem. If I am loading different items...and if execution process is same for all the items, then how can I map this in the SAP. So that I can create a single order for different Items of different materials and quantity. I need to do the confirmation of these items with respect to the same item. Please suggest me...how can we map this scenario into the SAP.
    Thanks in advance.
    Regards,
    Surya.

    Hi surya,
    As per the heat treatment process concern, total cycle time is constant, and load is also constant (if we havenot changed).
    i hope u have defined workcenter formula and routing accordingly.
    i think creating single production order for multiple material is not possible, instead of thsi, i would suggest one way,
    > Since u have to maintain stock for Heatreated items, create sepearte Material code for each item to be heatreated.
    > Create BOM ,Routing  for New Material code.
    > Acitvate Batch management for New Material Code has been created.
    >Now create Production order for each material to be processed in one cycle, Assign the Batch Number manually.Batch number repersents your Heat treatment cycle number and same can de used for traceability.
    >Confirm the each order seperately, Now the Heatrement process cost will be updated and stock will be posted to heatreated storage loaction.
    But i am worrying about capacity planning and scheduling, For my knowlegde purpose i would like to know your existing scenoria, like workcenter formula and  routing operation values has been assigned , if u wish plz share with us.
    Please come back with your ideas..
    regards
    Pradeep

  • How to create production order for multiple items having common raw materia

    Dear all,
    We are running a sheet metal fabrication company at Vadodara Gujrat.
    Please guide us how to create single production order for multiple items using single raw material??
    For example, We want to produce baby shirt(item code AAA001), shirt with full sleeve(item code AAA002), shirt with half sleeve(item code AAA003),shirt slim fit (item code AAA004),shirt loose fit(item code AAA005) from single raw material say(item code XXX001).
    Right now we have to create 5 production order to produce above 5 items of single sales order  in SAP B1 though it is made from single raw material which is foolishness and time consuming too. (Please also note that to produce any finfish good item, raw material required for that item may vary every time in our process.)
    Kindly guide us how to solve the problem.
    Thanks.
    RUPESH  +91-9227744273
    WEB : www.gorasia.co.in

    Hi Rupesh Gorashiya,
    This is possible through MRP for that you have to put Sales Order first and Run MRP Wizard
    MRP Wizard Put Multi Production Order as per Item Taking in Sales Order just click it on and execute.
    Thanks,
    Srujal Patel

  • Single Transfer Order for Multiple Handling Units

    I have been researchig the ability to create a single transfer order for multiple handling units.  My assumptions are if it can be done that:
    1) A transfer order can have a single source, so if the source document for the handling unit (delivery) is different, that means different transfer order
    2) A TO can have multiple materials (line items) with different destination bins and quantities per bin
    I looked at the configuration for TO Split, but it's not clear that this will handle my requirement.
    I also saw this http://aq33.com/material-management/Articles-005798.html and it also says that my requirement can't be meant.  I'm just checking before I tell my customer this cannot be done.

    Yes you are right, if Source document is different, you need to go with different TO.
    But you can choose the Handling unit split, while creating a TO itself. i.e., You can quantify the goods for each handling unit.
    Edited by: Ganesh M on Feb 29, 2012 6:20 AM

  • How to get all production orders for a workcenter

    Hello ...
    I have a requirement to create a report of all production orders for a given workcenter.  The user enters the workcenter (CRHD-ARBPL), plant (CRHD-WERKS) and a date range, and wants to see a list of orders (AUFNR) that fall within that date range along with some other data from AFKO and AFPO. 
    I can't figure out a good, consistent way to get from workcenter to production orders.
    Any ideas?
    Thanks!
    Sharon

    Hi there check this program for relation between SO PO and Production order
    REPORT z_so_info.
    TABLES: vbak, vbap, afko, afpo.
    *Field catalog
    TYPE-POOLS: slis.
    DATA: lv_repid TYPE sy-repid VALUE sy-repid,
    xfield TYPE slis_t_fieldcat_alv,
    afield TYPE slis_fieldcat_alv.
    SELECTION-SCREEN BEGIN OF BLOCK b1 WITH FRAME TITLE text-001.
    SELECTION-SCREEN BEGIN OF LINE.
    SELECTION-SCREEN COMMENT 1(25) text-002.
    SELECT-OPTIONS: so_so FOR vbak-vbeln OBLIGATORY.
    SELECTION-SCREEN END OF LINE.
    SELECTION-SCREEN END OF BLOCK b1.
    SELECTION-SCREEN BEGIN OF BLOCK b2 WITH FRAME TITLE text-003.
    PARAMETERS:
    p_kunnr LIKE vbak-kunnr, " sold-to
    p_kunwe LIKE vbak-kunnr. " ship-to
    SELECTION-SCREEN END OF BLOCK b2.
    *Constants
    CONSTANTS: c_zor TYPE vbak-auart VALUE 'ZOR',
    c_we TYPE vbpa-parvw VALUE 'WE',
    c_ag TYPE vbpa-parvw VALUE 'AG'.
    * c_space TYPE space.
    *Ranges
    RANGES: ra_parvw FOR vbpa-parvw,
    ra_kunnr FOR vbpa-kunnr.
    *Tables
    DATA: BEGIN OF gt_output OCCURS 0,
    vbeln LIKE vbak-vbeln, " sales order number
    posnr LIKE vbap-posnr, " SO item number
    matnr LIKE vbap-matnr, " material number
    sh LIKE vbpa-kunnr, " Ship-to
    sp LIKE vbpa-kunnr, " Sold-to
    lifnr LIKE ekko-lifnr, " Vendor
    bstnk LIKE vbak-bstnk, " PO number
    banfn LIKE vbep-banfn, " Purchase requi
    po_st TYPE char30, " PO status text
    pstyv TYPE vbap-pstyv, " Item catagory
    aufnr LIKE afpo-aufnr, " Production Order
    prd_stat TYPE string, " Prd order status
    END OF gt_output.
    DATA: wa_output LIKE gt_output.
    FIELD-SYMBOLS: <fs_output> LIKE gt_output.
    *Table for sales order and PO
    TYPES : BEGIN OF gs_data,
    vbeln TYPE vbak-vbeln,
    posnr TYPE vbap-posnr,
    pstyv TYPE vbap-pstyv,
    matnr TYPE vbap-matnr,
    END OF gs_data.
    DATA: gt_data TYPE STANDARD TABLE OF gs_data,
    wa_data TYPE gs_data.
    *Table for Production Orders
    TYPES: BEGIN OF gs_prd,
    aufnr TYPE afpo-aufnr,
    posnr TYPE afpo-posnr,
    kdauf TYPE afpo-kdauf,
    kdpos TYPE afpo-kdpos,
    wepos TYPE afpo-wepos, "Goods Receipt Indicator
    elikz TYPE afpo-elikz, "Delivery Completed Indicator
    objnr TYPE aufk-objnr, "Object number
    * getri TYPE afko-getri, "Confirmed Order Finish Date
    * gltri TYPE afko-gltri, "Actual finish date
    END OF gs_prd.
    DATA: gt_prd TYPE STANDARD TABLE OF gs_prd,
    wa_prd TYPE gs_prd.
    *Table for partner data
    TYPES: BEGIN OF gs_partner,
    vbeln TYPE vbak-vbeln,
    posnr TYPE vbap-posnr,
    parvw TYPE vbpa-parvw,
    kunnr TYPE vbpa-kunnr,
    END OF gs_partner.
    DATA: gt_partner TYPE STANDARD TABLE OF gs_partner,
    wa_partner TYPE gs_partner.
    TYPES: BEGIN OF gs_po,
    ebeln TYPE ekkn-ebeln,
    ebelp TYPE ekkn-ebelp,
    vbeln TYPE ekkn-vbeln,
    vbelp TYPE ekkn-vbelp,
    END OF gs_po.
    DATA: gt_po TYPE STANDARD TABLE OF gs_po,
    wa_po TYPE gs_po.
    TYPES: BEGIN OF gs_preq,
    vbeln TYPE vbep-vbeln,
    posnr TYPE vbep-posnr,
    banfn TYPE vbep-banfn,
    END OF gs_preq.
    DATA: gt_preq TYPE STANDARD TABLE OF gs_preq,
    wa_preq TYPE gs_preq.
    TYPES: BEGIN OF gs_po_stat,
    ebeln TYPE ekko-ebeln,
    procstat TYPE ekko-procstat,
    lifnr TYPE ekko-lifnr,
    END OF gs_po_stat.
    DATA: gt_po_stat TYPE STANDARD TABLE OF gs_po_stat,
    wa_po_stat TYPE gs_po_stat.
    *Field symbols
    FIELD-SYMBOLS: <fs> TYPE tj02t-txt04,
    <fs_temp> TYPE tj02t-txt04,
    <fs_stat> TYPE char30.
    START-OF-SELECTION.
    PERFORM fr_build_range.
    PERFORM fr_get_data.
    PERFORM fr_build_fc.
    PERFORM fr_output.
    *& Form fr_get_data
    * text
    * --> p1 text
    * <-- p2 text
    FORM fr_get_data.
    *Get SO
    SELECT a~vbeln a~posnr a~pstyv a~matnr
    FROM vbap AS a
    JOIN vbak AS b
    ON a~vbeln = b~vbeln
    JOIN vbpa AS c
    ON b~vbeln = c~vbeln
    INTO TABLE gt_data
    WHERE b~vbeln IN so_so
    AND b~auart EQ c_zor "Only Sales Orders
    AND c~kunnr IN ra_kunnr. "from selection screen
    DELETE ADJACENT DUPLICATES FROM gt_data COMPARING vbeln posnr.
    *get data of the production order
    IF NOT gt_data[] IS INITIAL.
    SELECT a~aufnr a~posnr a~kdauf a~kdpos a~wepos a~elikz
    b~objnr
    FROM afpo AS a
    JOIN aufk AS b
    ON a~aufnr = b~aufnr
    INTO TABLE gt_prd
    FOR ALL ENTRIES IN gt_data
    WHERE a~kdauf EQ gt_data-vbeln
    AND a~kdpos EQ gt_data-posnr.
    ENDIF.
    *Get partner data
    IF NOT gt_data[] IS INITIAL.
    SELECT vbeln posnr parvw kunnr
    FROM vbpa
    INTO TABLE gt_partner
    FOR ALL ENTRIES IN gt_data
    WHERE vbeln EQ gt_data-vbeln.
    ENDIF.
    *Get Purchase Order
    IF NOT gt_data[] IS INITIAL.
    SELECT ebeln ebelp vbeln vbelp
    FROM ekkn
    INTO TABLE gt_po
    FOR ALL ENTRIES IN gt_data
    WHERE vbeln EQ gt_data-vbeln
    AND vbelp EQ gt_data-posnr.
    SELECT vbeln posnr banfn
    FROM vbep
    INTO TABLE gt_preq
    FOR ALL ENTRIES IN gt_data
    WHERE vbeln EQ gt_data-vbeln
    AND posnr EQ gt_data-posnr.
    ENDIF.
    IF NOT gt_po[] IS INITIAL.
    SELECT a~ebeln a~procstat a~lifnr
    FROM ekko AS a
    JOIN ekpo AS b
    ON a~ebeln = b~ebeln
    INTO TABLE gt_po_stat
    FOR ALL ENTRIES IN gt_po
    WHERE b~ebeln EQ gt_po-ebeln
    AND b~ebelp EQ gt_po-ebelp.
    ENDIF.
    *Move data to output table
    LOOP AT gt_data INTO wa_data.
    wa_output-vbeln = wa_data-vbeln.
    wa_output-posnr = wa_data-posnr.
    wa_output-pstyv = wa_data-pstyv.
    wa_output-matnr = wa_data-matnr.
    READ TABLE gt_po INTO wa_po WITH KEY vbeln = wa_data-vbeln
    vbelp = wa_data-posnr.
    IF sy-subrc EQ 0.
    wa_output-bstnk = wa_po-ebeln.
    READ TABLE gt_po_stat INTO wa_po_stat WITH KEY ebeln = wa_po-ebeln.
    IF sy-subrc EQ 0.
    wa_output-lifnr = wa_po_stat-lifnr.
    CASE wa_po_stat-procstat.
    WHEN '01'.
    wa_output-po_st = 'Version in process'.
    WHEN '02'.
    wa_output-po_st = 'Active'.
    WHEN '03'.
    wa_output-po_st = 'In release'.
    WHEN '04'.
    wa_output-po_st = 'Partially released'.
    WHEN '05'.
    wa_output-po_st = 'Released Completely'.
    WHEN '08'.
    wa_output-po_st = 'Rejected'.
    ENDCASE.
    ENDIF. "inner read subrc
    ENDIF. "outer read subrc
    READ TABLE gt_preq INTO wa_preq WITH KEY vbeln = wa_data-vbeln
    posnr = wa_data-posnr.
    IF sy-subrc EQ 0.
    wa_output-banfn = wa_preq-banfn.
    ENDIF.
    READ TABLE gt_prd INTO wa_prd WITH KEY kdauf = wa_data-vbeln
    kdpos = wa_data-posnr.
    IF sy-subrc EQ 0.
    wa_output-aufnr = wa_prd-aufnr.
    *get the purchase requisition for production order as well
    SELECT SINGLE banfn
    FROM ebkn
    INTO wa_output-banfn
    WHERE aufnr EQ wa_prd-aufnr.
    *Get the status of the production order
    PERFORM fr_get_prd_stat USING wa_prd-objnr
    CHANGING wa_output-prd_stat.
    ENDIF. " sy-subrc
    READ TABLE gt_partner INTO wa_partner WITH KEY vbeln = wa_data-vbeln
    parvw = c_we.
    IF sy-subrc EQ 0.
    wa_output-sh = wa_partner-kunnr.
    ENDIF.
    READ TABLE gt_partner INTO wa_partner WITH KEY vbeln = wa_data-vbeln
    parvw = c_ag.
    IF sy-subrc EQ 0.
    wa_output-sp = wa_partner-kunnr.
    ENDIF.
    APPEND wa_output TO gt_output.
    CLEAR: wa_data, wa_prd,wa_partner,wa_output.
    ENDLOOP.
    ENDFORM. " fr_get_data
    *& Form fr_build_range
    * text
    * --> p1 text
    * <-- p2 text
    FORM fr_build_range .
    *Range for partner function
    MOVE 'I' TO ra_parvw-sign.
    MOVE 'EQ' TO ra_parvw-option.
    MOVE 'SH' TO ra_parvw-low. " we
    APPEND ra_parvw.
    CLEAR ra_parvw.
    MOVE 'I' TO ra_parvw-sign.
    MOVE 'EQ' TO ra_parvw-option.
    MOVE 'SP' TO ra_parvw-low. " ag
    APPEND ra_parvw.
    CLEAR ra_parvw.
    *Range for ship-to and sold-to
    MOVE 'I' TO ra_kunnr-sign.
    MOVE 'EQ' TO ra_kunnr-option.
    MOVE p_kunnr TO ra_kunnr-low.
    APPEND ra_kunnr.
    CLEAR ra_kunnr.
    MOVE 'I' TO ra_kunnr-sign.
    MOVE 'EQ' TO ra_kunnr-option.
    MOVE p_kunwe TO ra_kunnr-low.
    APPEND ra_kunnr.
    CLEAR ra_kunnr.
    ENDFORM. " fr_build_range
    *& Form fr_build_fc
    * text
    * --> p1 text
    * <-- p2 text
    FORM fr_build_fc .
    * sales order number
    afield-fieldname = 'VBELN'.
    afield-seltext_s = 'Sales #'.
    afield-ref_tabname = 'VBAK'.
    APPEND afield TO xfield. CLEAR afield.
    * sales ITEM number
    afield-fieldname = 'POSNR'.
    afield-seltext_s = 'Item #'.
    afield-ref_tabname = 'VBAP'.
    APPEND afield TO xfield. CLEAR afield.
    * Material Number
    afield-fieldname = 'MATNR'.
    afield-seltext_s = 'Material #'.
    afield-ref_tabname = 'VBAP'.
    afield-outputlen = 10.
    APPEND afield TO xfield. CLEAR afield.
    *Vendor Number
    afield-fieldname = 'LIFNR'.
    afield-seltext_s = 'Vendor Num.'.
    afield-ref_tabname = 'EKKO'.
    APPEND afield TO xfield. CLEAR afield.
    * ship-to-party
    afield-fieldname = 'SH'.
    afield-seltext_s = 'Ship-to'.
    afield-ref_tabname = 'VBPA'.
    APPEND afield TO xfield. CLEAR afield.
    * sold-to-party
    afield-fieldname = 'SP'.
    afield-seltext_s = 'Sold-to'.
    afield-ref_tabname = 'VBPA'.
    APPEND afield TO xfield. CLEAR afield.
    *PO number
    afield-fieldname = 'BSTNK'.
    afield-seltext_s = 'PO NUM'.
    afield-ref_tabname = 'EKKO'.
    APPEND afield TO xfield. CLEAR afield.
    *PO status
    * afield-fieldname = 'PO_STAT'.
    * afield-seltext_s = 'Step'.
    * afield-ref_tabname = 'zbacklog_v2'.
    * APPEND afield TO xfield. CLEAR afield.
    *PO step status
    afield-fieldname = 'PO_ST'.
    afield-seltext_s = 'PO.Status'.
    afield-ref_tabname = 'zbacklog_v2'.
    APPEND afield TO xfield. CLEAR afield.
    *Purchase requisition
    afield-fieldname = 'BANFN'.
    afield-seltext_s = 'Pur. Req.'.
    afield-ref_tabname = 'VBEP'.
    APPEND afield TO xfield. CLEAR afield.
    *Item catagory
    afield-fieldname = 'PSTYV'.
    afield-seltext_s = 'Itm. Catg'.
    afield-ref_tabname = 'VBAP'.
    APPEND afield TO xfield. CLEAR afield.
    *Prodcution Order number
    afield-fieldname = 'AUFNR'.
    afield-seltext_m = 'Prod.Order'.
    afield-ref_tabname = 'AFKO'.
    APPEND afield TO xfield. CLEAR afield.
    *PRODCUTION status
    afield-fieldname = 'PRD_STAT'.
    afield-seltext_s = 'Prd. Step'.
    afield-ref_tabname = 'zbacklog_v2'.
    afield-outputlen = 20.
    APPEND afield TO xfield. CLEAR afield.
    *PRODUCTION step status
    * afield-fieldname = 'PRD_ST'.
    * afield-seltext_s = 'Prd. Status'.
    * afield-ref_tabname = 'zbacklog_v2'.
    * APPEND afield TO xfield. CLEAR afield.
    ENDFORM. " fr_build_fc
    *& Form fr_output
    * text
    * --> p1 text
    * <-- p2 text
    FORM fr_output .
    CALL FUNCTION 'REUSE_ALV_LIST_DISPLAY'
    EXPORTING
    i_callback_program = sy-repid
    * I_CALLBACK_PF_STATUS_SET = ' '
    * I_CALLBACK_USER_COMMAND = ' '
    * I_STRUCTURE_NAME =
    * IS_LAYOUT =
    it_fieldcat = xfield[]
    i_default = 'X'
    i_save = 'A'
    TABLES
    t_outtab = gt_output
    EXCEPTIONS
    program_error = 1
    OTHERS = 2.
    ENDFORM. " fr_output
    *& Form fr_get_prd_stat
    * text
    * -->P_WA_PRD_OBJNR text
    FORM fr_get_prd_stat USING p_objnr CHANGING p_prd_stat.
    DATA: lt_status TYPE STANDARD TABLE OF jstat,
    wa_status TYPE jstat,
    lv_status TYPE tj02t-txt04,
    lv_temp2 TYPE char5,
    lv_buff TYPE string.
    CALL FUNCTION 'STATUS_READ'
    EXPORTING
    client = sy-mandt
    objnr = p_objnr
    only_active = 'X'
    TABLES
    status = lt_status
    EXCEPTIONS
    object_not_found = 1
    OTHERS = 2.
    LOOP AT lt_status INTO wa_status.
    IF wa_status-stat(1) EQ 'I'.
    SELECT txt04 FROM tj02t
    INTO lv_status
    WHERE istat EQ wa_status-stat
    AND spras EQ 'E'.
    ENDSELECT.
    lv_temp2 = lv_status.
    CONCATENATE lv_temp2 p_prd_stat INTO p_prd_stat
    SEPARATED BY ','.
    ENDIF.
    CLEAR: wa_status, lv_status, lv_temp2.
    ENDLOOP.
    lv_buff = p_prd_stat.
    *Status of Production Order
    IF lv_buff CS 'CRTD'.
    p_prd_stat = 'Not Active'.
    ENDIF.
    IF lv_buff CS 'REL'.
    IF lv_buff CS 'GMPS'.
    p_prd_stat = 'Printed In Prod'.
    ELSE.
    p_prd_stat = 'Printed'.
    ENDIF.
    ENDIF.
    IF lv_buff CS 'TECO'.
    p_prd_stat = 'Technically Compt.'.
    ENDIF.
    ENDFORM. " fr_get_prd_stat

  • Purchase order from production order for stock material

    Hi,
    Can we issue purchase order for stock materials (item category L) for components in production order. We want a PO account assigned to production order . How can we achieve that.
    With regards,
    Mrinal

    Dear
    1.Goto MM02-Enter componenet item code -Selec MRP4 view -Keep Individula nad Collective indicator as 1
    2.Goto MM02-FG Material -MRP4 view -Keep Individaul and Collective indicator -1 and in Sale.Org1 view keep item categoery as MTO .
    3.Create Sales Order  and run MRP in MD02 (NETCH , 2,1,1,3,2, 2)-If the compoenets are not available , then it will generate PR  with an Account Assing Categery E with sales order refernce and line item .Converthis PR into PO cnd check the same in Accounting Tab .
    This is only possible in MTO scinarion in case you want to have PO account assinged for FG production Order .
    Regards
    JH

  • How do we do production orders for same item code in different sizes

    Hi,
    We have Items which we buy as a single sheet of material and our customers can ask for us to cut the complete sheet into different sizes before despatching it. i.e
    Item Code Sheet1: Sheet size 100mm x 100mm
    Customer asks for sheet to be cut into 10 off 10mm x 10mm sheets, which we presently put on the sales order as a line note
    We then generate a production order for this item and indicate on the production order printout the line note
    We've recently had a customer who has asked for Item 1 in two different sizes on the same sales order ie
    Order Line 1 Sheet1 Qty:1 Line note: cut into 10mm x 10mm sheets
    Order Line 2 Sheet1 Qty:1 Line note: cut into 50mm x 50mm sheets
    When generating the Production order SAP combines the items into
    Product No: Sheet1
    Planned Qty: 2
    Where as we want it to create 2 production orders 1 of each different sizes items.
    I know I can create BOMs for those two sizes, but customers can ask for the sheets to be cut to whatever size they want. Is the best method to create BOMs on the fly for each different sizing option or are there alternative methods that are easier to manage ?
    Thanks
    Carl

    Hi Carl Rutter,
    You have to creat 2 special production order for this item. when issue the component make sure you issue the stock as per the cosumption becaue one have 10mmx10mm and the another item have 50x50 in this case you issue component by square inch wise. for example 10*10 = 100 squre inch.
    50*50 = 2500 square inch so the cost will be approtionate. you can Use multiple uom method to obtain this, other wise you have covert into stock then you issue the component. If you want traxk size wise ,you can use batch option for Finishe goods.
    Regards
    Sridharan

  • Convert multiple planned orders to single production order

    Dear All !
    In our business, same component is used for manufacturing multiple items. In a sales order multiple items are booked. When we do MRP RUN, system creates multiple planned orders for each line item. We can run only one production order as for every item order quantity becomes very small and we cannot process that lot. To have a sizable lot quantity we need to combine all planned orders into a single production order.
    Can someone please help.

    Govinder,
    Define those components for collective processing. You need to define "2" - for Field Indv/Coll in MRP4 view of those material master and you can have daily/weekly/monthly lotsize defined for those items.
    Regards,
    Prasobh

  • Cannot release production order for a plant

    Hi:
    When I try to release a process order , I get this error message:
    "CAnnot release production order for plant".
    I get this message  for a particular material in the plant. For other materials, it's working fine.
    Please give your suggestions!
    Gautham

    Hi,
    Check the Tasklist usage for your routing for that material.
    For this usage ,check in op45 against the task list type whether until release indicator has been enabled.If so remove
    and do the release.
    or
    check whether workcenter which is used for producing the   material has been locked in work center itself.
    Indicator: Usage only until release in orderIndicator used to specify for a task list usage and a task list type that an operation in the order cannot be released.  This occurs when a work center group that is not intended for production is allocated to this operation.
    When this type of operation in the order is released you must enter the work center where production should take place.
    Regards,
    nandha

  • Production order for configurable subassemblies

    Dear experts,
    we have a situation with configurable end products with very complex multilevel BOM, were some of the assemblies and subassemblies on the lower levels (1, 2, 3 etc.) are configurable materials too.
    The SOP planning strategy is 56 (or 89). The MRP planning run results in planned orders for the MTS details and PIR's for the configurable materials.
    The question is: is it possible to manualy create planned (production) orders for the configurable subassemblies before the sales order? How can we manualy valuate the characteristics of the subassemblies?
    Thank you in advance,
    Peter

    Hi,
    Characteristics Based Planning will let you create demand for lower level assemblies to drive in inventory for commonly used components or raw materials prior to receiving a firm customer order for a finished assembly.
    Please refer the following SAP link to know more about Characteristics Based Planning
    http://help.sap.com/saphelp_erp2004/helpdata/EN/75/504853a39a11d191930000e8a5f6e6/frameset.htm
    Regards,
    Brahmaji D

  • In the production order for 1 of the component material no 261 movement

    Hi SAP Gurus,
    In the production order out of 8 components for 1 of the component material 261 movement is not happening ( Not getting backflushed) Please give some input on this issue.
    Thanks and Regards,
    SHARAN.

    Hi Dhaval,
    In MRP2 view the backflush indicator has been set. But in the parent material BOM setup this material itself not there I informed the user about this, please refer the below user comment ( In BOM the material:Q7829-60184 is appearing and mat:Q7829-60140 not there in BOM, in production order for both the materials 261 movement not happened ) Please give your input on this issue.
    Hi Sharanappa
    We just did a PCO roll  PCO #4619999R3 on Tuesday 30th Dec.
    From Q7829-60140 to Q7829-60184
    All options for Q7840A, Q7829A, Q7830A (except #ACJ, already completed), Q7831A.
    That's why you are not able to see the part in BOM
    How can we rectify this from here?
    Thanks and Regards,
    SHARANAPPA.

  • Single Purchase Order for different Plants of Different Company Codes

    Hi Experts,
    I have a scenario, My Client has 3 Company Codes (1000, 2000, 3000 )
    Company Code 1000 has 2-Plants    ( A001 and A002 )
    Company Code 2000 has 1-Plant      ( B001 )
    Comapny Code 3000 has  3-Plants   ( C001, C002, C003 )
    All these 3-Company codes has centralised purchase organisation.
    My Client requirement is to raise a single purchase order for external vendor, for all the plants A001, A002 which is in one company code and similarly in same Purchase Order for B001 plant which belongs to 2000 Company Code and Similarly for same purchase order for C001, C002, C003 plant which belongs to 3000 Company Code.
    1)Is it possible to raise a Single Purchase to External Vendor for plants of Different Company Codes ?
    2)Does it affect the accounting document ?
    3)How to inward and where to inward these goods ? with respect to plant wise ?
    Please Guide with Valuable inputs.
    Thanks in Advance
    Best Regards
    Javeed
    Best regards
    Javeed Ahamed

    1) How about Profit Centre ? We have Framed each Profit Centre with respect to Plant
    Why should there be a problem?
    2)In Case of Migo does we have to be careful and do stepwise MIGO with respect to different Plants ?
    of course people have to be careful when performing transactions.
    if you have multiple items in a PO then you can easily receive all items in one go. So people have to careful and need to check if they really received each of the PO items. Especially if people have authorization for many plants, then the user who is usually performing the receipts for plant A can easily post the receipts of plant B too.
    3) How to Process MIRO ? Can we process Partial MIRO"S with respect to Line-items of those particular Plants ?
    MIRO allows to post the invoice like it is send to you from your vendor. If it is just for a part of your PO then this is just a fact and MIRO allows to post this kind of invoices too.

  • Can I create 1 repair order for many equipments / functional locations?

    Dear Experts,
    I'm trying to create 1 single order for many equipments in different functional locations but it seems like the fields for "equipment" and "functional location" in Operation tab are not allowed to enter.
    What is the Tcode to open up those fields?
    Or is there any other ways of doing?
    regards,
    Abraham

    1. Object list Activate
    IMG => PM & CS => Maintenance & Service Processing => Maintenance & Service Orders => Functions & Settings => Define notification & Order Integration
    Select Assignment of operations to Object List entries active in Enh. Object list column for your order type.
    2. Then create the order in IW31. Assign all the equipments in object list tab. Define the operations in operation tab. Go to object list & select equipment one by one & click Assignments button in the bottom. In pop-up window, select the operations for that particular equipment. One operation can be assigned to only one operation. If same operation requires for more than one equipment, then different operation rows should be defined.
    3. Click Settlement rule button in the top (If you want to create settlement rule manually). Based on your equipment entry in object list, enter the cost center & % of cost to be settled.
    4. If you want to automate settlement rule creation, as mentioned in previous posts, use the user exits. Transaction code for user exit is SMOD. ABAP people will write the code based on your input for settlement rule creation.

  • Production Order For Project with plant stock

    Hi,
    We have a scenario where in we are required to create a production order for a project.
    But the material(raw material) is in a storage location and is a stock item. Even the header material is also a stock item and it to stored in the storage location.
    But the order is to be created for Project and to be settled to the Project. Now the system is not allowing me to create the order.
    The error is :
    "Project  does not allow make-to-order stock
    Message no. CO746
    Diagnosis
    There is no project stock for the project.
    To create a production order with reference to a WBS element the project must allow project stock to be maintained.
    Procedure
    You should select a project that allows project stock."
    Now,
    I don't want to have a project stock. How to go forward...
    Regards
    Pavan

    Hi,
    What is the strategy you are using. If you are using strategy 20, then chnage it to 40.
    Also maintain individual/collective indicator to "1" - individual in MRP-4 view. So that when the order is created, the stock will be reserved as Q-project stock.
    thanks and regards
    Murugesan

Maybe you are looking for

  • How do I access the music on photos on my external hard drive, on my MBA?

    I bought a 64Gb MBA slightly used, and knew the space wasn't going to be enough for my music and photos, so I bought an external hard drive, (the iomega helium), thinking that I could just load it with my pics and music, and access it from there, whe

  • Greek character problem

    Hi, I've this problem using BW 7.0: When I try to load some data from a table, the system find a greek character (µ) and it stop the data loading. The error's message is this: "Record 982 :0UNIT : Data record 982 ('0CSQA0787 '): Version 'µM ' is not

  • SAP BW 7.4 - Web results differ from RSRT (HTML) results

    Hey Guru´s We are running SAP 7.4 under SP7. When we execute queries in web environement (IE, Chrome, etc) the results do not match the data in the cube. Furthermore when running the same query under RSRT using the HTML option, the results are correc

  • Exception 'CX_SY_NO_HANDLER' occured while loading data from EKKO

    Hi Friends, An exception occurred which is explained in detail below. The exception, which is assigned to class 'CX_SY_NO_HANDLER', was not caught and therefore caused a runtime error. The reason for the exception is: An exception with the type CX_SY

  • WAD issue - List Box

    Hi Everyone, In my web application I use List Box. The user has the possibility to chose one or more values in this Box. Now I am looking for the possibility that one of the values in the List Box is always chosen. How can I do that? Regards Erwin