Hi,
I am trying to use a Statistical Key Figure as a user defined tracing factor for a periodic settlement (KEU5) of overhead costs into PA.
However I am running into difficulties trying to configure this.
Has anyone out there know how to do this and give me some pointers
I am getting an error message GA733. Incidentally I get the same error message when trying to perform a similar settlement in CCA using KSU5.
Im using ECC6.0
Many thanks.

Hi Dawn
Not clear about your requirement... You have captured expenses in IOs? or In Cost Center?
Your question is bit confusing as you want to capture SKF against IO, but you said you want to allocate cost centers.. So, I am confused
You can capture SKF against IO in KB31N... If you want to allocate expenses from IO based on SKF to COPA - use note 605281 so that IOs can be used as senders in assmt or dist cycle...
Regards
Ajay M

Similar Messages

  • SOS for CO - Overhead Cost Controlling (COOM)

    Dear FICO GURU,
    I am PP/PM Consultant , Would request some knowledge sharing about CO.
    Understand in standard SAP Overhead Cost Controlling consist of 3 component following :
    o        Cost Center Accounting
    o        Internal Orders
    o        Activity based costing
    Overhead costs are defined as costs that cannot be assigned directly to cost objects.
    My Question :
    In one Plant , can we use all the above ? Or we can only use either one ?
    Understand there is cost apportionment in CO , If we using Overhead cost controlling , can we still use this function ?
    Is cost Apportionment only applicable for CO Product in Production Planning ? What's the prerequisite ?
    Thank you.

    Yes, sure you can. However it would be a long story to convince you. But first I revert the question:
    Can we use different material groups in one company code?
    The above mentioned 3 areas generally doing the same but with different functionalities but the story is the same:
    Storing and sending costs from one place to another, sometimes grouping them sometimes transforming them.
    Cheers
    M

  • How to analyse the Receiver Tracing Factor in COPA Assessment cycle -KEU5

    Hi
    While executing the COPA Assessment cycle,we will get receiver tracing factor.My client wants to know how we got that.How can i analyse that Receiver tracing factor?Kindly advice me...
    How can I recalculate the tracing factor for assesstment?
    For example, Actual Assessment Cycle RS_A01 under Segment ITCMFG2AD uses Variable Portions Rule for Receiver tracing Factor with Value Field of 62 Sales.
    The intent of this assessment was to be allocated based upon sales dollar values however when I review the test calculation, it appears the tracing factor is in billions of dollars when our monthly sales are in the million of dollars range.
    Supriya

    Hi,
    If Receier Tracing Factor Rule is Variable Portion, then please also check the Receiver Weighting factor (the last tab in the assessment cycle, it normally is 100 for the receivers.
    Secondly also check if there is different currency setting in CO Area & the Operating Concern which translates into different figures.
    Hope this works.
    Regards
    Saket

  • Overhead Cost in Process Order

    Hi All
    I need your expert inputs  / suggestions to apply the correct method of calculating overheads in process order.
    Requirement:
    To calculate
    a. Labor cost
    b. Overhead Cost
    c. Depreciation Cost of Machine
    in a process order. Also .b. and .c. are dependent on labor time entered (a.)
    What I have done:
    I am new to PP and CO, so with my limited understanding I have done the following:
    1. Created activities for labor, overhead cost and depreciation.
    2. Created secondary cost elements
    3. Created Standard Value Key
    4. Added all the parameters (Labor, OVH, DEP)
    5. Created a formula for these parameters
    6. And used them in Resource and KP26
    Problem:
    With the above setup I get three values (Labor, OVH, Dep) to enter in the process order confirmation. However I need just one field : Labor time, for all the values to be calculated.
    As OVH and Dep should use the same time as for Labor parameter but with different rate (as mentioned in KP26) is there a way out where I can just show Labor variable to be entered to the user and other two use that time also!
    Or if you feel there can be different approach for the overheads and depreciation to be calculated kindly write back
    Thanks in advance
    -Rahul

    Hi rahul
    I understand you want to use same formula for cossting for the
    a. Labor cost
    b. Overhead Cost
    c. Depreciation Cost of Machine
    Then in work center->  costing tab you can mention same formula for the overhad and Depreciation which was using for  labour cost.
    Please check and come back.
    Regards,
    srihari.M

  • Re:Tracing Factor - SKF

    Hi All,
    I would like to know whether we can use the numbers with decimals as tracing factors in SKF (cost allocations).
    What is the maximum and minimum numbers we can use in tracing factors
    Thanks,
    Krishna

    hi Krishna,
    To create UOM go to
    R/3 4.7
    SPRO> IMG> General Setting > Check Unit of Measurement
    ECC 6.0
    SPRO> IMG> SAPNet Weaver > General Setting > Check Unit of Measurement
    thx.
    Ganpat

  • Reciever tracing factor in COPA assessment cycle

    Hi All,
    I have account-based COPA and am trying to create COPA cost center assessment cycle in Tcode KEU2. While filling the reciever tracing factors, i can see the following values
    RCMEGI     Total Quantity
    RCWKFI     Fixed Costs
    RCWKGI     Total Costs
    However i need to define another key figure based on headcount
    Can anyone help me with how to create additional Amount/Qty Field for the assessment cycle. Where would be above be defined?
    Thanks & Regards
    Pooja Saxena

    Hi Christian
    Are you suggesting that the costs from cost center be allocated upon, say, some IOs based on SKF and then settling the IOs to COPA?
    This would be very cumbersome to create as many IOs as the possible combinations of Customer/ product / Other receiver chars
    Or are you suggesting some thing else which I could not catch?
    Also, new qty field can be created in KEA6... Values updated for this thru KE21N will work for acct based COPA?
    Regards
    Ajay M

  • Tracing factor

    Hi Friends,
    In assessment cycle, if skf is used as tracing factor, how can I see this setting of skf in the cycle?
    How does an SKF work?
    Is my understanding correct , as described:
    1. Canteen is used by 3 departments .
    2. Each department has the following number of employees:
    Dept A : 10
    Dept B : 15
    Dept C : 20
    Using the above ratio, is cost allocated using skf of employee numbers simply as follows:
    Cafeteria cost $1000
    Cost allocated to Dept A :   [10 / (101520) ]  *  1000?
    likewise for the rest of departments?
    Is it just like what I described above?  Kindly confirm for me if I am correct.
    regards
    Markus

    Yes, it's exactly works in the same way. SKfs can be displayed using CCA reports or else during run time of assessment cycle in the 'tracing factor'

  • CCA to COPA allocation cycles with cumulative tracing factors

    Hello
    we are looking for a functionality to use tracing factors but cumulating forward and not backwards : hereafter the example.
    Cost occur on cost center in month 1, 2 and 3. We would like to allocate these costs based on the generated revenue in month 2, 3 or more.
    Tracing factors Sales Quantity seem only to work for past sales up to the current period. We have systematically unallocated costs in month 1 as the Sales in COPA only occur in following months.
    Has anyone already encountered this ?
    Thanks for your help
    Best regards,
    Philippe Meyer

    I doubt cumulative ytd allocation is possible in KEU1. The 'cumulative' indicator in the KSU1 header screen, is not visible in KEU1.

  • How to find the receiver tracing factor in COPA assessment

    HI,
    how to  find out the receiver tracing factor in COPA assessment.Kindly help me the logic to anylise.
    Thanks
    Supriya

    Hi,
    If Receier Tracing Factor Rule is Variable Portion, then please also check the Receiver Weighting factor (the last tab in the assessment cycle, it normally is 100 for the receivers.
    Secondly also check if there is different currency setting in CO Area & the Operating Concern which translates into different figures.
    Hope this works.
    Regards
    Saket

  • Tracing factor and cost center

    Hi,
    May I know if I can associate like this. Please advise.
    1)
    SKF quantity is assigned to receiving cost center. Later sender cost center base on the quantity in receiving cost center to apportion out the cost.
    Activity type quantity is assigned to sender cost center. Later receiviing cost center receive the cost base on the quantity in sender cost center.
    2) But I see there are both SKF and AT being the tracing factor as receiver in cycle. This makes me baffled against point 1 above.
    Need advice.
    Thanks

    1)
    SKF quantity is assigned to receiving cost center. Later sender cost center base on the quantity in receiving cost center to apportion out the cost.
    This is how the SKF distribution works by standard
    Activity type quantity is assigned to sender cost center. Later receiviing cost center receive the cost base on the quantity in sender cost center.
    This should not be possible possible, the system only checks the activity type quantities on the receiver side.
    2) But I see there are both SKF and AT being the tracing factor as receiver in cycle. This makes me baffled against point 1 above
    I dint get your point here
    Br Naveen

  • How to calculate Tracing Factor in Assessment cycle

    Hi,
    Kindly help me How to Calculate Tracing Factor in Assessment Cycle
    Is it the total of revenue for that division multiplied by the tracing factor (100)?
    Kindly advice me
    Thanks
    Supriya

    Hi Supriya,
    1. If you are using Assessment Cycle for allocation of cost among cost centers, then, the Receiver Tracing Factor selection will by and large depend on your allocation purpose and basis.
    Whether you want to allocate the costs on fixed percentages, OR , on the basis of Variable Proportions ( in which you can allocate the costs on the basis of some Statistical Key Figures data / already existing costs in those cost centers etc).
    2. If you are using Assessment Cycle for the purpose of transferring values to COPA, in that case, the Receiver Tracing Factor can be selected and the basis can be any Value Field (basis on the value which is there in that value field). Pls chk the transaction code KEU1 / KEU2
    Pls try to explain your complete requirement so as to suggest how u have to create cycle.
    Regards
    Srikanth Munnaluri

  • Difference  between  Receiver  Tracing factors and weighting factor

    Hi
    I   have read  sap help, but   the  difference between  receiver tracing factor and  receiver weighting factor is still not  clear.
    Can u provide an example to  understand it.
    Thanks
    kamala

    Hi Kamala
    As far as I know, the weigh fac is meant to determine the decimal places...and Sender values tab is meant for determining the % to be allocated...
    In the tab "Weigh factor", you would see a field FACTOR PER, which has the following entries
    0000001 No decimal places  
    0000010 One decimal place  
    0000100 Two decimal places
    0001000 Three decimal places
    0010000 Four decimal places
    0100000 Five decimal places
    1000000 Six decimal places 
    By default it is 0000100 which means 2 decimals..F1 help on this field shows that
    You enter 123456 as the weighting factor. Depending on the factor, this number is interpreted as:
    Factor      Decimal places   Weighting factor
    1                 0              123456
    10                 1              12345.6
    100               2              1234.56
    Hope this helps
    Regards
    Ajay M

  • COPA Assessement - reciever tracing factors getting multiplied

    HI All,
    COPA assessment cycle has been defined to send the costs from cost centers to COPA profitability segments.  Posted revenue has been used as tracing factors. My question is regarding calculation of tracing factors.
    The revenue for receivers is 22.22 and 444, however when the cycle is executed, the receiver tracing factors as shown in test run screen is 44 and 888. System is internally doubling the receiver tracing factors while executing the cycle in KEU5. Although the receiver values are correct in absolute terms, Users cannot understand why the receiver tracing factors are multiplied
    Why do the tracing factors get multiplied?
    Thanks & Regards
    Pooja Saxena

    HI Ajay
    Thanks for responding, My error is coming when i am trying to execute the assessment cycle, In some segments, the tracing factor got multiplied by 10!
    So not always doubles
    When you execute the cycles where reciver tracing factor is displayed in the output, is it always equal to the value that is in the system or some multiple of the same
    Thanks & Regards
    Pooja SAxena

  • Receiver tracing factor rule

    Hi all,
    In KSU3, I see there are few selection of receiver rule.
    May I know what are the purpose for the below?
    variable portions
    fixed amount
    fixed percentage
    fixed portion
    Thanks alot
    help.sap.com

    Hi,
    check if these divisions have any postings under cost element 627800. It's because you've selected variable portions with receiver tracing factor cost element 627800.
    Why don't you use fixed percentages or fixed portions instead of variable portions?
    Regards,
    Jasmina.

  • Cost estimate (CK11N)is not picking the overhead cost for some of the mat

    Hi all,
    we are facing a problem. The overhead key is defined. the calculation base is defined in the cost sheet. But the overhead cost is not picking  for some of the materials
    Bad Material 5019-0581 via CK11n.
    As you can see in the itemization, only the material and the routing are listed.  No amounts from the OH of ZPTA ( .10).  It should show a line #5 with an amount of (28 quantity  x .10) = $2.80 added to the Total value.
    first three line items it is picked from material and fourth line item from the internal activity.
    the fifth item from G overhead is not picked.

    Hi,
    Check whether u have assigned the cost sheet in u r costing variant which is being used in CK11N.
    Regards
    SudhakarReddy

Maybe you are looking for

  • Adobe Flash pro cc runing under windows 8 64bit causing a lot of hard drive activity what do i have to do ?

    Hi My Flash pro cc is acting weird, pushing the hard- drive to its limits tried to install and reinstall and do a clean setup , scanned for malwares but nothing came out of this , one more thing bizarre each time i go check my preferences tab every t

  • Issue with Skip Level Hierarchy in OBIEE 11g

    Hi, I have implemented Ragged and Skip Level Hierarchy as explained in the links below in OBIEE 11g RPD. (checked the 'Ragged' and 'Skipped Levels' check boxes) http://www.rittmanmead.com/2010/07/obiee-11gr1-support-for-ragged-skip-level-value-based-

  • Email submit button(s) help

    I have a 5 page form and I need each page to go to a different email adress.  I have put a different email submit button on each page, but is there a way to script the button to only send the current page and not any of the others?  Or have one main

  • I often get a black screen when I click on a site--drives me crazy!

    This only happens with Firefox--not with Internet Explorer, etc. I often go to a site--e.g., government forms, etc.--and when I try to download the form, or view certain info, the screen simply goes black. So, then, in order to access, I need to star

  • EMac HD dead?

    I have an eMac 1.25 Ghz that suddenly crashed and won't boot up. I am pretty sure it sounds like a dead hard drive because I hear clicking noise as it tries to access it to boot up. All I get when I try to start is a grey screen and eventually a flas