SLA AND SRVICE CONTRACTS REPLICATION TO ECC IS POSSIABLE? HOW ?

Hi service experts generally contract value and in house order are replicating to ECC. But present requirement is we want replicate the SLA and service contracts and service orders to ECC  what are the setting is require to do this job how the contract product will replicate to ECC for this any middle ware settings is required?
help us please.
Edited by: bindhu madhavi on
May 12, 2008 7:35 PM
Edited by: bindhu madhavi on May 12, 2008 7:58 PM
Edited by: bindhu madhavi on May 13, 2008 5:03 AM

Hi Bindu,
Service Contracts do not get repliacted to SAP ECC, all they do is create an internal order if single object controlling has been activated.
Service Orders can be replicated to SAP ECC, they create a sales order their. The settings requried for this are same as that requried for replicating any transaction, i.e.
1. An order type in ECC with the same name as that of CRM trnasction type (Tcode VOV8)
2. Item category in ECC with the same name as that of CRM Item category (Tcode VOV7)
3. Maintain Item category determination (Tcode VOV4)
4. Maintain Pricing Procedure Deterrmiantion  (Tcode OVKK)
Other than these, u have to ensure that the master data i.e. Business Partner, Product Master and Orgnizational Data exists in both systems.
For service Products to be replicated, you will have to create a product using R3PRODSTYP and category MAT_DIEN.
WIsh this helps.
Regards,
Shalini Chauhan

Similar Messages

  • Replication of quotation and order from CRM to ECC

    Hi experts,
    We are trying to replicate a quotation and order created in CRM to ECC. We have maintained the same transaction types and item categories in both ECC and CRM. Is there anything else that is required to be done for proper replication??
    Now while trying to replicate, we are getting this error: "Partners from account group 0005 are not permitted for partner function BP (Notification E VPD 000)"
    How to solve this??
    Please Guide.
    Regards
    Aakshi Suri

    We maintained Partners from account group 0005  for partner function BP. Now we are again getting these errors:
    u2022     Account Assigment Object Successfully Assigned to Item 0000000010 (Notification S C( 312)
    u2022     SALES_HEADER_IN has been processed successfully (Notification S V4 233)
    u2022     The sales document is not yet complete: Edit data (Notification W V1 555)
    u2022     Sales document 0005000080 was not changed (Notification E V4 219)
    u2022     Status "Obsolete status" of material 101123900 does not allow external procurement (Notification E ME 053)
    u2022     Error in SALES_ITEM_IN 000010 (Notification E V4 248)
    Is there any place where we can check the notifications??
    Kindly help us in resolving this error.
    Regards
    Aakshi

  • SRM 7 - Contract replication from ERP to SRM

    Hi all,
    We have SRM 7 and ECC 6.0 and we have a requirement to have contract handling for invoices functionality, in SRM, in order to create invoices with reference to a contract directly.
    We want to have ERP system as the central repository for all contracts, meaning that we need to replicate the contracts to SRM, and all the changes made to the contract in ERP side should also be replicated to SRM.
    Does anyone know if this scenario can be done as per standard?  And if so, how can we replicate the ERP contracts to SRM and ensure that all the changes made in ERP will be replicated to SRM?
    Thanks in advance.
    Regards,
    AN

    Dear Krupa,
    Thank you for your quick reply.
    So we should consider the scenario where SRM is the central repository for the contracts, and all the changes done in SRM should be replicated to ERP.
    In this scenario, do you know which steps should be done to allow contract replication from SRM to ERP? I already created a central contract in SRM but there is no message sent to PI.
    Thanks in advance.
    Regards,
    Andreia

  • CRM Contract replicate to ECC Debite memo

    HI expert team
    In standard replication from CRM Contract replicate to ECC Debite memo, I have some material in ECC with Material type KMAT Configurial product, same material code and description created in CRM with material type as service material, When i create service contract and release it is giving replication error with "Product Cannot be recorded in ECC", When i create debite memo with same material code system creating debet memo and item category determination in ecc as debet memo item category in debete memo even though material is configural product,
    in the same steps i have some service material in ECC as service material created with service material type, for these material i created in CRM with same code and description, when i create service contract system replicating as debit memo,
    Thanks in advance
    Regards
    Rachappa
    9448472121

    Hi,
    There are prerequisites to be maintained in CRM and ERP for CRM contract to be replicated in ERP as a debit memo.
    Please find the details in the below link:
    http://help.sap.com/saphelp_crm50/helpdata/en/65/9c4d3bcf95926ae10000000a114084/frameset.htm
    In your case I assume Debit memo is not being created for the Service product and giveing error "Product Cannot be recorded in ECC", because system is finding the same product in ECC as configurable material type (Service product in CRM, config material in ECC).
    As per the prerequisite Synchronization of master data (SAP CRM and SAP ERP) should be maintained
        All business partners used in SAP CRM transaction documents also exist in SAP ERP.
        Service products in SAP CRM exist as materials in SAP ERP.
    Hope this helps!
    Regards,
    Chethan
    Edited by: Chethan Kumar C M on Oct 8, 2009 6:12 AM
    Edited by: Chethan Kumar C M on Oct 8, 2009 6:29 AM

  • Multiple contract creation in ECC from a single GOA

    Hi Experts,
    I am working on a solution regarding to GOA in SRM - Contract in ECC creation and i am wondering about the following scenario:
    Create 1 GOA in SRM 5.0 for a central/global purchasing organization and when the appropriate BADI going to transfer it into ECC, it creates contracts for all company codes.
    At my current client they use GOA but until now they created 1 GOA for a specific p.org and the BADI transferred (and created) contract in ECC for the specific company code (they donu2019t have kind of central/global purch organization unit in ppoma). In the future they would like to create GOAs which are usable for all companies, but instead of creating (and changing) them manually (N GOA in SRM for N contract in ECC) they want to have an automatism.
    Does any of you have any experience on this? That would be really good if you can share with me some high level overview about concept.
    Thanks in advance for your help!
    Best Regards,
    Attila

    Hi,
    Let me correct if i am right:
    - Central Contract -> new concept of SRM 7.0. 1 contract which is visible and usable from ECC and SRM as well. (not available in SRM 5.0 - agree)
    - GOA -> it exist in SRM 5.0 for sure! (we are currenlty using it for ECC procurement).
    The solution what you are mentioned is good...but as you said only for SRM 70...we are in SRM 5.0 and we need solution for here. Do you have any idea?
    Currently i am thinking about a new solution based on "standard" functionalities: if a GOA need to be created for mulitple company, it has to be populated in Header distribution (all company will have the same contract header). It item detail all the required information need to be poupulate in SRM (i.e.: item 1 for p.org1/comp.cod1; item 2 for p.org2/comp.cod2).
    When this is done, the BADI need to check the informatoin in SRM GOA and create contract according to that -> in this case 1GOA is created, but the 2 items for totally different p.org/comp.code, the BADI needs to create 2 different contract in ECC (i would like to avoid using reference purchasing organization in ECC!
    Thanks in advance!
    Best Regards,
    Attila

  • How to start and stop a queue in ECC??

    Dear all,
    I have a problem regarding the Start and Stop of queues in ECC. Whenever I change the data in ECC (for example extension of a material to a new distribution chain, or Creating a quotation which has to trigger a corresponding quotation in CRM), replication is not happening to CRM. On analysis of the outbound queue in ECC, we are finding corresponding ernties for the material / quotation. On dbl cliking an entry, we are able to see the queue in STOP status. When tried to reset status and activate, system throws a message saying GENERIC STOP SET.
    1) How to overcome this problem?
    2) How to START or STOP a queue (for Eg: R3AD*) in ECC? 
    Please respond.
    Every point you share will fetch so many points / lot many smiles to you (No surprises.. I am plagerizing the famous quote on SDN)
    Regards,
    Rajesh

    Dear Chandra,
    Thanks for ur quick response. I have awarded you a sixer. Ofcourse, the content is much richer than that. But if i award 10, thread has to be closed. So that stopped me from awarding that
    Dear all,
    Can someone else share their views?
    Regards,
    Rajesh

  • Material Group Replication from ECC

    Dear SRMers,
    System Landscape : ECC 6.0 and SRM 5.0.
    I am doing a material group replication from  ECC to SRM using the DNL_CUST_PROD1 customizing object. Before the replication ECC  was trying to confirm the target RFC destination(SRM) by prompting a logon. I logged in as myself and  the system gave a CALL_FUNCTION_OPEN_ERROR.
    I defined the CRM Consumer as SRM in the CRM middleware parameters..
    My question is do we need to define the User SRM in SU01 and when ECC tries to confirm the target RFC destination, do we need to login as the SRM User ?
    Points will be rewarded for answers.
    Thanks in advance,
    Bob

    Hi,
    The RFC user which you define in the SRM RFC detsination has to be obviously as SU01 user in SRM.Also the RFC user need to have SAP_ALL and SAP_NEW profile attached.See note 642202 for details.
    Also Check:
    http://help.sap.com/saphelp_erp2005vp/helpdata/en/84/d3eb4190966024e10000000a1550b0/frameset.htm
    BR,
    Disha.
    Pls reward points for useful answers.

  • Credit memo Replication to ECC

    Hi Experts,
    Please help me to resolve the credit memo replication to ECC.
    Credit memo Replication to ECC
    * Re raised the thread as the configuration is related to SD
    Thanks in advance

    Hi Ms.Bhargavi,
    Sorry for the delayed response. I just went through your previous thread therein I went through the link provided by Mr.Warren Nash in details. I believe your configurations and data flow is all fine. The problem is:
    The system uses the item object type to determine whether data should be transferred to SAP ERP, and then executes the data replication.
    Only items with the following item object types are replicated: returns requests, substitute deliveries, repair submissions, repair return deliveries, loan device deliveries, loan device pick-up requests, and returns authorizations. Items with the item object type CRM Customer Complaints Item are not replicated.
    The subitems created in SAP CRM (item categories REN, TANN, RSUB, RRET, LOAN, LRET, and RAIN) are replicated to SAP ERP as main items.
    As you can see Credit Memo Request is not one among them or COMP/G2N. The link also says that:
    If you generate billing documents for debit memos or credit memos created in SAP CRM, the billing amounts are posted in SAP FI. Revenues are posted to the relevant profitability segment in SAP Controlling (SAP CO).
    So why not directly generate Creit Memo from FI side of ERP and do a posting of it?
    Regards
    Vijay

  • Issue with Contract Replication from SRM to MDM  - XML structure

    Hi
    We are having an issue with trnsfering a contract to MDM. We have released the contract for update to MDM in the contract through the distribute to catalog option. An XML is generated in SRM that gets sucessfully passed to PI through Catalogupdatenotification_out. In PI the XML fails in the Interface Determination step. the issue that has been noticed is that the XML that is generated in SRM does not contain product category or product ID which is basically what the condition mapping in PI checks for. The conditions in PI were setup as per SAP.
    But now the XML fails in PI because it does not find a combination for Catalog type code = 03 and product category. Please find the XML structure in SRM and you will see that it does not have a product category even though the contract has one.
    <?xml version="1.0" encoding="utf-8" ?>
    - <n0:CatalogTransmission xmlns:n0="http://sap.com/xi/EBP" xmlns:prx="urn:sap.com:proxy:SS1:/1SAI/TASDE808778FFEB81012891:701:2010/10/07">
    - <StandardBusinessDocumentHeader>
      <ID schemeID="0080">56000004100000000220110616202243</ID>
      <CreationDateTime>2011-06-16T20:22:43Z</CreationDateTime>
    - <SenderParty>
      <InternalID schemeID="PartyID" schemeAgencyID="SS1CLNT100">143</InternalID>
      </SenderParty>
      </StandardBusinessDocumentHeader>
    - <Catalog>
      <ID>5600000410</ID>
      <CatalogTypeCode>03</CatalogTypeCode>
    - <NameList>
      <Name>(Copy of Contract 5600000395)</Name>
      </NameList>
      <ActionCode>04</ActionCode>
      <CompleteTransmissionIndicator>true</CompleteTransmissionIndicator>
    - <ValidityDateTimePeriod>
      <StartDateTime>2011-06-13T12:00:00Z</StartDateTime>
      <EndDateTime>2012-06-12T12:00:00Z</EndDateTime>
      </ValidityDateTimePeriod>
    - <CatalogContent>
    - <ItemList>
    - <Item>
      <ID>1</ID>
      <ActionCode>04</ActionCode>
      <CompleteTransmissionIndicator>false</CompleteTransmissionIndicator>
    - <PropertyValuationList>
    - <PropertyValuation>
      <PropertyReference>/CCM/PRICE</PropertyReference>
    - <PropertyValues>
    - <MultipleValue>
      <Index>1</Index>
    - <SimpleValue>
      <AmountSpecification currencyCode="USD">1.0</AmountSpecification>
      </SimpleValue>
      </MultipleValue>
      </PropertyValues>
      </PropertyValuation>
    - <PropertyValuation>
      <PropertyReference>/CCM/PRICE_BASIS_QUANTITY</PropertyReference>
    - <PropertyValues>
    - <SimpleValue>
      <QuantitySpecification unitCode="EA">1.0</QuantitySpecification>
      </SimpleValue>
      </PropertyValues>
      </PropertyValuation>
    - <PropertyValuation>
      <PropertyReference>CCM/PMNTTRMS</PropertyReference>
    - <PropertyValues>
    - <SimpleValue>
      <NameSpecification>0002</NameSpecification>
      </SimpleValue>
      </PropertyValues>
      </PropertyValuation>
      </PropertyValuationList>
      </Item>
    - <Item>
      <ID>2</ID>
      <ActionCode>04</ActionCode>
      <CompleteTransmissionIndicator>false</CompleteTransmissionIndicator>
    - <PropertyValuationList>
    - <PropertyValuation>
      <PropertyReference>/CCM/PRICE</PropertyReference>
    - <PropertyValues>
    - <MultipleValue>
      <Index>1</Index>
    - <SimpleValue>
      <AmountSpecification currencyCode="USD">12.0</AmountSpecification>
      </SimpleValue>
      </MultipleValue>
      </PropertyValues>
      </PropertyValuation>
    - <PropertyValuation>
      <PropertyReference>/CCM/PRICE_BASIS_QUANTITY</PropertyReference>
    - <PropertyValues>
    - <SimpleValue>
      <QuantitySpecification unitCode="EA">1.0</QuantitySpecification>
      </SimpleValue>
      </PropertyValues>
      </PropertyValuation>
    - <PropertyValuation>
      <PropertyReference>CCM/PMNTTRMS</PropertyReference>
    - <PropertyValues>
    - <SimpleValue>
      <NameSpecification>0002</NameSpecification>
      </SimpleValue>
      </PropertyValues>
      </PropertyValuation>
      </PropertyValuationList>
      </Item>
      </ItemList>
      </CatalogContent>
      </Catalog>
      </n0:CatalogTransmission>
    Edited by: vishakhrajeev123 on Jun 20, 2011 6:49 PM

    Dear Krupa,
    Thank you for your quick reply.
    So we should consider the scenario where SRM is the central repository for the contracts, and all the changes done in SRM should be replicated to ERP.
    In this scenario, do you know which steps should be done to allow contract replication from SRM to ERP? I already created a central contract in SRM but there is no message sent to PI.
    Thanks in advance.
    Regards,
    Andreia

  • Replicating authorization roles via HR replication from ECC 6 to SRM 5.0

    Hi,
    I'm interested in knowing whether anyone has used the distribution model to copy roles (AG objects) between ECC 6 and SRM 5.0.
    Someone said that it's possible so I would like to validate that statement as I don't know whether it is possible and practical.
    If you have any knowledge or experience could you please share it?
    Regards,
    Jerry

    Hello Yann,
    I was told that it can be done but I don't know enough about the HR replication process to acknowledge or challenge, hence the question.
    Are you implying that it's not possible or simply that it's not done?
    I had an earlier post regarding assigning roles to positions in SRM Replicating authorization roles via HR replication from ECC 6 to SRM 5.0 that you replied to but never replied to my subsequent question. It can be done because one of my other clients is doing it. We're however unable to get it work at my current client's site. Do you have any experience with this subject?
    Regards,
    Jerry

  • SRM 7.0 Central Contracts Migration from ECC existing contracts

    Hi colleagues
    We are facing the implementation of SRM 7.0 in a client who has ECC installed and we have a doubt with contract migration
    We are considering using SRM Central Contracts in order to get them replicated on ECC
    All the contracts "alive" that exist in ECC should be created on SRM as central Contracts. The problem is that when you create a SRM central contract the system will replicate it to ECC ... in that case we will have the same contract twice on ECC
    Does anybody face this situation?
    I figure out that if at the moment we are creating SRM central contracts we turn off XI/PI the system would not replicate the contract to ECC but I think it would return an error without creating the contract on SRM... and even if we managed to create the central contracts in SRM without replicating them to ECC we would have the problem that both contracts wouldn´t be linked
    We can´t consider the solution to be creating those contracts on SRM as SRM local contracts because we need to follow contract cicle in SRM after migration
    Could anybody help me out with these?
    Thanks
    Regards

    Hello,
    You can upload contracts from ECC to SRM using report BBP_CONTRACT_INITIAL_UPLOAD in SRM.
    If you want take care of document type mappings/ Condition type mappings, use badi BBP_CTR_INIT_UP in SRM.
    Thanks,
    Sushil.

  • How to map service contract data from ecc to crm

    Hi Experts,
    Please help me,how to map service contract data from ecc to crm system.
    is there any perticular process.please let me know.
    thanks in advance..

    Hi Srinivasulu,
    Create the service contract type of ECC and also item categories under it in ECC in CRM. Map the number ranges.
    Check the Partners mapping from R/3 to CRM and that will be all.
    I tried but in CRM in the transaction type internal number range is mandatory. So, if you create service contract in ECC with one number it will replicate to CRM but with different number. But you can see ECC number under the transaction history in CRM.
    Good Luck.
    Sharath.

  • Contract replication from ISU to CRM

    Hi Experts
    I have sucessfully replicated BP master data between ISU and CRM, Contract Account replication is done as well, i would like to replicate Contract from ISU to CRM. Any help will be highly appreciated.

    Hello,
    Please see note  632749 for help with this issue.
    Please also check the foloowing points:
    1.  Are there any contract account entries existing in the table 'TFK_BUAG_REF' (IS-U System).
    2.  Check the contract account entries in your IS-U system with the transaction 'CAA3'. Are they existing ?
    3.  The buag class entry in table 'TFK_BUAG_REF' (IS-U System) is corresponding to the buag class entry in your business agreement (CRM system).
    I hope this is helpful.
    Regards
    Olivia
    Edited by: Olivia Walsh on Jan 24, 2011 5:40 PM

  • Problems in Contract Replication SRM

    Hi Experts,
    I need your help....i'm trying to make the contract replication from backend system by the program BBP_CONTRACT_INITIAL_UPLOAD.
    But there is a message erro in coditions as down
    ''End of discount condition validity > end of price condition validity''
    The replicate will work but all the contract cames in SRM with memorize status and i have to edit all the contracts...
    if i change the date of condition in r/3 contract, i can make the replicate without problem. But this is not a correct solution.
    there is a way to solve this?
    I saw the notes in SAP but my Support Package is the last one (SAPKIBKT11)
    Thanks all
    gustavo

    Hello Gustavo,
    We are facing the same problem and are trying to figure out the solution from you inputs.You have suggested 2 options
    1. BADI : BBP_CTR_BE_CREATE
    But this BADI will be called when a contract is to be created in the backend and how will this BADI be helpful when we are replication/uploading contracts from backend R3 to SRM
    2. Maintain same pricing conditions in both R3 and SRM: could you explain in details what you are trying to say.
    Thanks
    Raghu

  • CRM Contract replication to IS-U

    Hi Guys,
    I'm facing a problem in CRM contract replication to IS-U. Could you please anyone tell me what are the internal statuses that should be set at the contract header and contract item which will trigger automatic contract replication to IS-U.
    Thank you.
    Best Regards,
    Santhosh.

    Hi,
    there is no status that automatically starts the replication. There are just statuses that PREVENT the replication. If those status are in place, the replication will be surpressed. Those are: I2401, I2402, I2404, I2405, I2413. I hope the list is complete. If one of thoese status is active, the replication will not take place. Note 1609458 should prvide details on status I2406 and I2407.
    Kind regards
    Uwe

Maybe you are looking for

  • ComboBox - Setting Selected Values from data

    I am running into a problem in Flex 3 that seems to be different from Flex 2. Maybe someone can help. I have a function for setting a combobox selected item for a location for a value when the titlewindow completes loading. The value is a prior value

  • Inspire 5500 - Speakers Cut Out?

    Hello... I'm using the excellent Inspire 5500 speakers, but occasionally one of the speakers, usually front center, just cuts out. If you pull the power and plug it back in (a simple off/on doesn't work) it'll come back. But sometimes when I turn the

  • Firewire File Transfer Problem/  Dual Drive G4 to iMac

    Bought a new iMac. My old G4 (OSX10.3.9) has two internal HDs (30Gb & 40GB <my startup>) but only 30Gb drive shows up in target mode. Can't mount 40 Gb drive on iMac desktop to do file transfer when G4 is in "Target" mode? Called Apple "help" and was

  • Only letting one instance of my application run

    hi guys, My application will allow the user to interact with the database. The database will be stored on a local machine, and not on a network, so that only one person can access it at a time. The problem is, I believe a user can launch two instance

  • Itunes could not synced with my iphone

    I don't know what's happened, the itunes gave the following error message : " itunes COULD NOT SYNC CONTACTS(CALENDAR) TO IPHONE BECAUSE THE SYNC SERVER FAILED TO SYNC TO PHONE" i cant sync my iphone with my outlook 2007 cause of that. thanks.