SLA in ITSM - IRT/MPT calculated wrong

Hi,
I setup the SLA escalation in our solman according to the wiki pages and the howto guide from Dolores.
However I am facing the issue that whatever priority I choose for a message, IRT is always set to 480 mins, MPT to 960 mins although I deleted the deafult durations and defined SRV_RF_DURA/SRV_RR_DURA for each message priority. In the result the calculated dates/times are completly wrong.. any hints?
Regards, Richard

Hi Richard,
Please check:
1913133 SLA configuration hints for SAP Solution Manager 7.1
Please check into your system in CRMD_ORDER --> open an Incident --> In General tab at the bottom you will need to expand "INVESTIGATION ......." --> select Service Data tab --> Now check your service profile and Response Profile here. Also check Dates section and check if time defined there same as you defined during configuration or different. if different then somethign wrong here.
Duration until First reaction -
Duration until Service End -
Whereas in Service Profile you have defined:
SRV_RF_DURA -      - Duration until First reaction
SRV_RR_DURA -  - Duration Until Service End
Thanks
Vikram

Similar Messages

  • Improper IRT and MPT Calculation in SLA management

    Dear Friends,
         We have configured the standard SLA management process, using the standard SLA determination, wherein SLA gets determined from service profile and response profiles assigned to product INVESTIGATION. We have created our custom service profile and response profile which we have assigned to the product INVESTIGATION. Now the profiles are getting identified correctly upon creation of incident however the IRT MPT calculations are going wrong.
    For instance for Priority 1, we have set 1 Hour as IRT and 2 Hours as the MPT, however the IRT and MPTs are calculated like more then 8 hours or even more  and everytime it does a different calculation.
    Please guide us on this.
    Thanks
    Manas

    Hello Manas,
    Please try to check  SAP notes 1659388, 1999320, 1712653.
    Make sure to check your time zones, business hours, factory calendar and duration types.
    regards,
    Grace

  • Solution Manager 7.1 IT Service Management: IRT, MPT new status

    Hello everyone,
    I am wondering, if  in SAP Solution Manager 7.1 IT Service Management I can customize new status into SLA measurement, for example 'Customer action' duration time at Web browser (similiar fuctionality as IRT(The initial response time) and MPT(maximum processing time)).[IRT & MPT|http://pokazywarka.pl/ysrkhe/]
    Equally, new SLA status should be calculating duration for the other incident status for example "In process". If anyone has idea, please advice.
    Best regards,
    SAPFan
    Edited by: SAPFan on Feb 6, 2012 10:48 PM

    Hi,
    Under the System Prepration section I have 2 questions I need additional clarification:
    1. Under 6.2 Prepare Outside Discovery -> Establish trusted connection-> /usr/sap/hostctrl/exe/host_profile of solution manager server:
    a. I added service/admin_users = daaadm. Am I suppose to include the password? what should the formate be?
    What you have entered is fine. Would not need to provide the password as well. Check the External discovery troubleshooting guide sections.
    https://websmp207.sap-ag.de/~sapidb/011000358700000486362011E
    2. Under 6.3 Connect Diagnostic Agent -> ran the following command on my ECC server:
    ./smdsetup.sh managingconf hostname:"solutionmanager.FQN" port:"50004" user:"ddaadm" pwd:"password1"
    a. Is the user/password referring to SolutionManager admin account?
    b. How do I check if it's running correctly?
    c. How to get my solution manager to see my Ecc server's diag agent?
    The user password should be a Solution Manager Java user like SMD_ADMIN or J2EE_ADMIN
    How to check for diagonstic agents, again check the trouble shooting guide referred above.
    I checked the following:
    Start Visual Administrator and navigate to: Server node -> Services -> Security Provider. Please also make sure that the MBeanAdmin is mapped to the Administrators Security role on both: com.adobe/AdobeDocumentServicesADS-EJB and com.adobe/DocumentServicesLicenseManagerADS-License
    I don't see the Adminstrator role to add to the above. Am I suppose to just enter "administrator"?
    Yes, just add the role "Administrators"
    2. Solution Manager Internal Connection -> Setup DPC/DCC Web Service URL
    a. I'm supposed do the following: You have started the Agent Administration:
    b. How do I start the Agent Administration?
    Make sure you have the role SAP_SMWORK_DIAG assigned to your user ID via SU01. Then call solution_manager tcode and goto the RCA tab. Agent Administration link should be available.
    Regards,
    Srikishan

  • GR/IR clearing account calculating wrong price

    HI
    I am facing the problem with GR/IR clearing a/c, when the user is creating MIGO transation with ref Scheduled agreement PO, its calculating wrong price.
    My scenario is :-
    Scheduled agreement PO has been created in USD currency (Qua 370*356.07)
    While I am doing the MIGO itu2019s not calculating correctly.
    I can give some more information below
    Company code currency is RUB but transaction currency is USD
    PO is creating in USD
    Material ledger is activated for this material
    Currency exchange rates are updated in daily basis
    When I am doing the MIGO the document was created like below
    1709250    Duties accrual                     603.152,52- RUB             19.761,89- USD
    1100100    Comm.Inv.fin.pr.                 4.624.163,80  RUB            151.507,60 USD
    1614000    Transit match.acc.                 422.859,09- RUB             13.870,37- USD
    7774100    Pr.diff.oth.goods.               3.598.152,19- RUB            117.875,34- USD
    Actually posting is (370356.07=131745.9)
    *But here it is showing 13.870.37
    I am very thanking full for your Inputs.
    Thanks
    Ramakrishna
    Edited by: DRS12345 on Oct 27, 2010 11:31 AM

    Hi,
    What has already been posted in SAP has been posted. One alternative in front of you is to create adjustment postings in PCA to post to the correct Profit Center. You can use transaction code 1KEL or 9KE0 for the same but it may not work as most probably you will the GR/IR clearing account set to "Post automatically" in the GL Master. In such a scenario the only option would be to have customized program to create IDOCs with Message Type "PRCMAS" to post the adjustment postings in your system.
    regards

  • Absence Deduction is calculated wrong for one employee

    Hi,  We have an employee who changed his absence booking for the year and all of sudden his absence deduction is not calculating properly.  His total absence quota was 20 days.  He initially booked all 20 days and then cancelled them and created a new booking for 9.5 days but his deduction is saying 16.5 days.
    Is there a way I can check his records why it's only happening to him.  Also I am new to this so not sure where to start investigating.  I did check the deduction rule and it's ok - calculates correctly for other employees, only this particular employee is calculating wrong.

    Hi Joe,
    I did replicate it for another employee belonging to the same group and it calculated correctly.  And the 9.5 days already excludes holidays and weekends.  Not sure what else to check at this point.  Although the only difference in the records of the 2employees is that the problematic employee has a negative carryover from previous year.  not sure exactly what that means.

  • Scheduling Agreement JIT / Forecast calculating wrong

    Hello experts,
    I´m with a problem with JIT / Forecast.
    The forecast are calculating wrong values. For example:
    Cumulative quantity calculated: 584
    JIT schedule:
    DATE             TIME         Order Quantity       Cml. released quantity        Open Quantity
    06.01.2012     00:00     32          32                      
    10.01.2012     00:00     352          384                      
    13.01.2012     00:00     128          512                      
    17.01.2012     00:00     88          600              16
    Forecast schedule
    DATE             TIME         Order Quantity       Cml. released quantity        Open Quantity
    20.01.2012     00:00     112          112                      
    24.01.2012     00:00     224          336                      
    27.01.2012     00:00     128          464                      
    31.01.2012     00:00     200          664          
    The values of forecast are calculating by Cumulative quantity calculated that is 584 and I dont have any Open Quantity and in this case I need to have Open Quantity in Forecast.
    The forecast must not be calculated by the amount in transit
    Help me.
    Tks
    LFC

    Hi ashish
    Check the  planning delivery schedule tab and go to item data -> delivery schedule header and check wheather any proper information has been filled or not
    Regards
    Srinath

  • Error In Posting to accounts - PF  calculated wrong

    Hi,
    I am getting error in Posting to accounts- error - Posting balance is not cleared (Period -
    Following Wage types are calculated wrong  -
    Expense
    MF90 PF adm chrgs * 1,00,000 = 715,000.000
    MF70 EDLI contri * 1,00,000 =6,500.000
    Balance sheet
    MF90 PF adm chrgs * 1,00,000 = 715,000.000-
    MF70 EDLI contri * 1,00,000 = 325,000.000-
    MF80 EDLI adm chrgs * 1,00,000 =6,500.000-
    /3P2 Professional Tax Basis = 8,387.096-
    Symbolic accounts assigned are as standard - no changes made
    Please help me solve this.
    Thanks in advance.
    Monica

    Hi Monica,
    We have solved this issue in our company.
    For this you have to create another wage types & make a "PCR" as it divide the 100000 amount from the technical wage types, & then instead of posting the technical wage types post the new wage types u have created.
    Don't worry about statutory reports as in there SAP is using some factor which will give the correct value.
    Regards,
    Gaurav

  • Planned overhead is calculating wrongly in CK11N run, it is just more than double

    Hi Gurus
    1) While running CK11N overhead cost is calculating wrongly on base (material price). In my case I have maintained 1% Overhead on raw material for Duty in cost sheet. In my case no routing, and my FG is getting produced by process order. My Raw material cost is showing Rs. 2,364.45 but my Duty is showing Rs. 48.73, When I run CK11N for Finished goods.
    When I Check the costing structure it is showing all the material for costing, if i drill down there it is calculating correctly for Raw materials. Say heavy furnace oil material cost is Rs. 36,140.16 /M.T and overhead is Rs. 361.40 and for all raw material it is calculating correct 1%. But for my finished goods it is just more than 2%.
    As per my understanding over head is calculating for RM once @ 1% and later material cost + overhead cost getting calculated by 1% again.
    Please see the attachment. I have furnished a statement for this also.
    2) Also Please tell me the T-Code for costing run as actual cost. and how can I show a comparison report on planned and actual report for a product costing.
    3) My scenario is this is a power generation Co. Not possible to maintain activity cost. What they want to do is. on the last day of a month they will take the trial balance for the plant/ business area and will set the percentage in cost sheet (Actual for current month / planned for next month) for admin, manpower and other costs based on raw material GL values.
    So I have created a cost sheet where I have maintained base and assigned those RM GL/ Cost elements and other costs I have maintained in cost sheet based on row No. 10 (base) and assigned secondary cost elements and percentages assigned as per overhead type and plant, in cost component structure I have maintained same cost elements as set earlier in cost sheet.
    Please find the file attached
    Please suggest me if I M wrong.
    Thanks & Regards
    Subrata

    Hi.
    In itemization of CK11N over head is showing correct. But the material cost for RM is already after charging overhead. I have checked the itemization of Process order there for the first material was Rs. 144.56, but in the itemization view of CK11N it is showing Rs.148.90/- That means exactly after adding 3% overhead which I maintained in cost sheet.
    Itemization of Ck11N
    Itemization of COR2
    Please Help
    Thanks & Regards
    Subrata

  • Delivery date getting calculated wrongly in delivery created via VL10D

    Hi Gurus,
    We have a strange issue, where in delivery date is getting calculated wrongly for replenishment delivery created via VL10D.
    When we are creating via VL10D , delivery date is getting the additional 30 days from MaxDlvCrteDate . With initial investigation i see that VL10D has delivery creation profile 0101 for which no of days maintained in max delv creation date is 30 .
    I assume that the delivery date is getting the additional days from delivery creation profile felid no of max delv creation date .
    I have created the delivery on 24.03.2011, as per the route no of TL time is 9 days , So Ideally the delivery date should be 04.04.2011 , however system has calculated it as 23.04.2011
    Delivery no             No of days in MaxDlvCrteDate                        Delivery  date
    213443158                           30                                                       23.04.2011
    If I create the delivery for the same PO using t-code VL10B, then delivery date is calculating correctly.
    Not sure why system behavior is strange.
    Please help me with your inputs to resolve the issue..
    Thanks in advance

    Please request one Abaper  to solve this problem.
    You cannot due nothing as the problem is in Code.
    Regards
    William

  • Subsequent debit tax calculating wrong

    dear guru
    while doing subsequent debit for the vendor the Excise duty is calculating wrong
    my issue is like this
    i have purchase 100 quty with value 10/kg total amount is 1000 for that
    ED is calculated 140
    Ecess calculated 3
    S&H calculated 1
    i have done goods receipt and posted invoice also
    now i that part of the quantit i have returne
    lets 50 kg i have retune for that MIRO,MIGO,JIS,J1iV i have done
    next vendor will send the suplimentry invocie because the rate is increase for that 50 quantiy, for that i will do J1IH for the additional excise and i will do MIRO subsequent debit for the rate increse in miro the tax amount is calculating wrong, ie
    lets for 50 quantity total amoun increased 100
    ed should calculate 14 but it is calculating 28
    for that i have to apply any note
    pl tell me urgent
    thanks
    regards
    jrp

    My understanding about the Input Tax and Output Tax was wrong. In the issue reported
    Input Tax Calculation should be:
    Vendor A/C.............. Cr 30000-
    Expense A/C............ Dr 29100
    Input Tax A/C............ Dr 900 (@3% on 30000)---my understanding was wrong.
    Input Tax 3% should be charged on Expense amount, in this case Rs 30000. But because in the editing option calculate tax on net amount option was not selected, hence SAP was giving the below entry, which is correct as well.
    Vendor A/C.............. Cr 30000-
    Expense A/C............ Dr 29126.21
    Input Tax A/C............ Dr 873.79 (@3% on 29126.21) which is correct.
    Hence, the Vendor amount should be Expense + Input Tax= 30000 * 3%=900 + 30000 (expense) = 30900.
    Correct Entry should be:
    Vendor A/C...............Cr 30900
    Expense A/C............Dr 30000
    Input Tax A/C............Dr 900
    Resolved. Pankaj has given the correct answer.

  • SECess is calculating wrongly

    Hi All,
    I am facing the problem with SECess.  We are using TAXINJ.
    In MIGO when I change the Base Value in Excise Item Details, only SECess is getting calculated wrongly.
    Suppose
    Base Value = 10000 which I change to 12000
    for Base Value=10000,
    BED=1000
    ECS=20
    SECess=10
    but for Base Value=12000
    BED=1200
    ECS=24
    SECess=11.99
    Please Help
    Regards,
    Ritesh

    Hi
    if your changing the value in migo only your gettimg the problem ?
    other wise nornamal ?
    heck the setoff entry of s.e.cess it should be 100%
    and check the rounding currency also. ( if the value diff minor)
    Laxman

  • JDE worldsoft 9.1 Facing the problem of extending cost is calculating wrong

    IN JDE worldsoft 9.1 we are facing the problem of extending cost is calculating wrongly.
    at the time of shipment confirmation in table F42119 it is calculated with 100 that means with decimals if the extended cost i( Qunatity 1 * cost 100 = Extended cost should be100 but here it is showing 10000 )
    Can any one help on this.

    If I understand your problem correctly I would suggest looking into Sar# 8948245.
    Nichelle

  • Upon editing the budget the system is calculating wrong rates

    Hi all..
    Upon editing the budget the system is calculating wrong rates, for instance i had to modify the budget for a perticular project for reduction in working months for our co -investigators.
    Many thanx..

    Hi
    What budget method are you using? are you editing budget on forms or on the HTML self service page?
    If you are using Forms, the cost amount could be entered in addition to entering the hours. For calculating the cost amount based on quantity entered, there is a need to develop the budget client extension. In such case you have to check the logic of that client extension.
    If you are using the HTML pages, when you generate budget costs, the system would use the rate schedule you have setup as planning rates. Verify the values on that schedule.
    Dina

  • Forecast calculated wrongly

    Hello Team,
    The problem is that movement types 631/632 (deliveries to customer consignment stock) were not taken into consideration.
    I added them manually, but the figures in MC94 after this transaction is not relevant to MB51. And that is the reason that forecast was calculated wrongly.
    Could you please help me in this. Help will be appriciated.

    It may be you aquire the assets in Mid year and calculating the depreciation from that month,but system is  posting total depreciation in that particular month by taking in to account all the previous month depreciation
    Have check the depreciation by changing the depreciation start date to start of your Asset accounting year
    Thanks
    Ansuman
    Edited by: Ansuman mohanty on Mar 31, 2008 1:10 PM

  • Mid month action_Pension (/3f4) calculation wrong

    Hi All,
    I get one problem , when payroll run for employee, whose action run in the mid of the month. for ex. 15.05.2010(Transfer action)
    In that case the pension amount (/3f4) is calculating double or more than 541...which is wrong.
    Kindly provde the input to resolve the same....
    Regards,
    Mahesh
    Edited by: Mahesh Shewale on Sep 1, 2010 1:08 PM
    Edited by: Mahesh Shewale on Sep 2, 2010 7:18 AM

    Hi Mahesh,
    Please make changes in User exit provided as per your requirement and then check the results
    There are 2 user exit
    EXIT_HINCALC0_002 for pension basis.
    EXIT_HINCALC0_007

Maybe you are looking for

  • Struts : creation of new row problem.

    I have a problem with creation of a new row, using struts. I've created simple struts browse-edit page. From browse page I go to 'edit-new' page. My object have a primary key - ID. I'm initializing it from sequence in create() method after call to su

  • Sender side Synchoronous jdbc scenario

    Hii experts, Can we do Sender side synchronous jdbc scenario?? if yes give me an example how the scenario will look like?? and what are the steps has to be done? Regards, Balaji

  • My iphone 4s saw could not activate

    this iphone 4s......i unlock alrd now still cannot activate pls help MODEL: IPHONE 4S 16GB WHITE SERIAL: DN*******TD0 iOS: 6.1.3 MAC Address: 4CB199F00000 Network Unlocked: False Activation Status: No Original Carrier: Unlock (Connect to Itunes) Appl

  • JDBC not working

    HI all when i am running my JDBC app. I'm getting exception that NO SUITABLE DRIVER. I'm using jdbc-odbc bridge for MS-ACCESS database. I've configured my database through control panel/odbc data sources. it has access drivers installed.. Can anyone

  • Mapviewer-demo: a empty map view

    Hi, I imported the Mapviewer demo in a new schema, and deployed the Mapviewer on stand alone OC4J. I can start and configure the Mapviewer how described in the guide without errors but the created JPG is a empty blue picture. What can be wrong ? Than