SLD Bridge
Hello everybody,
I have a few doubts about SLD Bridge, I need to do a bridge between 2 SLD's, I've been reading the documentation about it, and I know where to configure it, but what about as an example with Business Systems, I mean I have for example a BS_QAS1 in SLD1, and I have configured in SLD1 a Bridge to an SLD2, if I need a Business System in SLD2 for BS_QAS1 how do I doit, is automatically visible?, I've been reading about that Business System Information is not reportable in this automatic way, is this true?, and in another examples what about Technical Systems? if I have in SLD1 TS_SYS1, and I need it in SLD2, I have the bridge but I can't see it in Technical Systems area for SLD2, then how does this work?? I want to believe that when doing the bridge SLD1 reports information about landscape to SLD2 so I could see this technical systems in SLD2, maybe I'm understanding wrong the concept, can anyone clarify me this points?, cause I'm a little lost in here, thanks in advance.
Regards,
Julio Cesar
HI,
SLD Bridge is the open Port where one one side its connected to SLDs (SLD1, SLD2 ...etc) and on another side its linked with corresponding Data supplier.
If you have installed multiple SLD servers (for example, for security purposes), the SLD bridge can be configured to send data to each of these servers. In the figure above, one SLD server has been installed locally and multiple SLD servers have been installed remotely.
The SLD bridge converts the system data that is sent by the SLD data suppliers to the SLD server into a CIM-compliant format.
The data between the SLD data suppliers of ABAP-based systems and the SLD bridge is exchanged by means of an RFC connection. Therefore, you have to configure an SAP gateway service. We recommend that you use a local gateway.
Refer
http://help.sap.com/saphelp_nw04s/helpdata/en/8a/361fb70681234fb7d3af841ec2383e/frameset.htm
http://help.sap.com/saphelp_nw04s/helpdata/en/43/da21ba13660aa5e10000000a1553f6/content.htm
Thanks
Swarup
Similar Messages
-
SLD-Bridge / Data Supplier Bridge and new technical systems
Hi,
The data supplier (data collection process) periodically sends data to the SLD bridge. This SLD bridge provides this information to the SLD.
My question: Will new technical systems be created(!) and updated automatically in the SLD by using SLD bridge??
Or do I have to create new technical systems allways manually by SLD browser??
Thanks and regards!How about the "creation" process of technical systems??
I am confused of the idea of the SLD bridge. The idea sounds great to me, but how is the link between the technical systems and all these collected data passed to the SLD realized??
The online documentation is not very helpful... -
SLD Bridge vs SLD Synchronization
Hi all,
Can you please explain the differences between SLD Bridge versus SLD Synchronization ?
And why and when to choose one option over the other ?
Thanks alot.
NadirHi Nadir,
As of version 7.1 the SLD content Sync should be available.
Demo: The Full Automatic Sync Feature in the SLD of SAP NetWeaver 7.1
http://www.sdn.sap.com/irj/scn/weblogs?blog=/pub/wlg/12579
#1372683 SLD content synchronization: Correct configuration of URL
The user you have configured in the bridge need to be valid
for logon on the target SLD. Also each SLD should have a
unique value for the object server parameter.
#935245 - Importance of "Object Server" SLD parameter
As per the page" Configuring the SLD Bridge"
http://help.sap.com/saphelp_nw70/helpdata/de/43/da21ba13660aa5e10000000a1553f6/content.htm
Regards,
Aidan -
Hello,
We have configured SLD bridge between two systems which is PI version 7.0 and Solman 7.1. But the data is not auto transfer,we have configured using this link http://help.sap.com/saphelp_nw70/helpdata/en/43/da21ba13660aa5e10000000a1553f6/content.htm but still no luck.
Are there any options/steps that you can suggest?
Please advise.
Thanks in advance.
Virgilio.Hi,
1) When you press execute button in RZ70 transaction in ABAP and
press "send data to sld" button in SLD Data Supplier tab in Visual
Admin in J2ee it will update data in both SLD simultaneously if SLD
Bridge working fine between the SLD.
2) By default data is updated in 720 minutes means that the data about
current system will be updated in the SLD twice a day. You can change
it by entering a different value in Minute field in RZ70 Tx.
The most common cause of this problem is that the objectserver name
of both SLD's is the same, (generally the default which is localhost)
Please ensure that each SLD has a unique objectserver name
This can be see in Administration -> Profile -> All
Please also see the following SAP Note:
#[935245|http://service.sap.com/sap/support/notes/935245] - Importance of "Object Server" SLD parameter
If you have
configured this correctly and nothing is being forwarded with no
errors in the logfiles i suspect this is the casue of the problem.
Regards,
Aidan -
Hello Gurus,
I have configured SLD Bridge from my production system to Solution manager. I can now import all ABAP information into SOLMAN via RZ70 without problems.
Now i want to send production J2EE information to my SOLMAN for this i goto Visual Admin and Under SLD Data Supplier i trigger the data transfer to SLD. Hope i am doing this right?
The transfer completes successfully and information is reflected correctly on the local SLD but nothing comes up on SOLMAN. I checked the local SLD logs and i get the following error.
#41 06/12/2009 15:58:36.350 [Thread-6063] ERROR com.sap.lcr.sagent.BuilderDirector: Data supplier circular redirection. Check data supplier bridge targets. (Data will be ignored on this server) Redirect list: [com.sap.lcr.sagent.data.Instance@6b05daa9 ]
Do i have to maintain any SLD bridge details for J2ee apart from RZ70. Please let me know.
Regards
Anil Verma BHi,
The AS ABAP (BI) system has to be registered in the SLD. If it is not registered in the SLD logon to the SLD: http ://:/sld. (Your configured SLD (central or local SLD))Please check in Home -> Technical Systems -> select type ABAP. This should have configuration of your ABAP (BI) system.If it is missing, logon to your ABAP (BI) system -> goto transaction RZ70. Fill in the SLD bridge: gateway info -> Activate -> Start data collection.If a error message like "ABAP backend doesn't exist in the SLD" pops up while running the template installer, there could be different possibilities for this error. Starting SP14 more detailed error sources will be popped up. For lower SPS the exact reason of the error can be found in the default trace file.Please look at this link
http://rahulursportal.blogspot.com/search?q=SLDBRIDGEERROR
Regards,
Renu -
SLD Bridge : Automatic data transfer
Hi ,
We have configured SLD bridge between system A ( PI 7.0 ) and B ( Solution Manager 7.0 ).
A------SLD bridge -
>B
Now How can we check data tranfer is successful or not. And how much time does it take for data transfer.
We have already checked log in Sld-.administration-->log. But so far there is no infomration about data transfer.No error either.
Best Regards,
TusharHi Tushar
Please check in the SAP Data Supplier in the Visual Administrator and update the details and test it
Hope it helps
Regards
Arun -
Hi Experts,
Can you plz help me to configure SLD bridge between my BI and Solution manager system.
Regards,
BasisHi Gagan
Thanks , its really very helpful.
But i am not sure what i have to do now!
I have seprate BI ABAP and BI Java system , which i have installed recently, I have configured local SLD as a part of
post installation (It includes RZ70 steps as well).
So Please confirm what should i do now.
It will be a great help for me.
Thanks -
SLD bridge error, unable RZ70
Hi
I have installed WAS Java Only system, the SLD supplier is able to push the data into SLD using HTTP SLD Supplier of Visual Admin.
But now I would like to push an ABAP system's data over, so I try to configure the Data Supplier Bridge in SLD, but hit the following error, so unable to RZ70 as well:
Please advise.
Thanks
Jack
#54 04/19/2006 22:38:37.134 [JCO.ServerThread-9] ERROR com.sap.lcr.sagent.SAPProxyServer: JCO Server exception raised: Server startup failed at Wed Apr 19 22:38:37 GMT+08:00 2006.
This is caused by either a) erroneous server settings, b) the backend system has been shutdown, c) network problems. Will try next startup in 1 seconds.
Could not start server: Connect to SAP gateway failed
Connect_PM TPNAME=SLD_NUC, GWHOST=lpc1, GWSERV=sapgw54
ERROR partner not reached (host 192.168.1.10, service sapgw54)
TIME Wed Apr 19 22:38:37 2006
RELEASE 640
COMPONENT NI (network interface)
VERSION 37
RC -10
MODULE nixxi_r.cpp
LINE 8579
DETAIL NiPConnect2
SYSTEM CALL SiPeekPendConn
ERRNO 10061
ERRNO TEXT WSAECONNREFUSED: Connection refused
COUNTER 1
Thrown:
com.sap.mw.jco.JCO$Exception: (129) JCO_ERROR_SERVER_STARTUP: Server startup failed at Wed Apr 19 22:38:37 GMT+08:00 2006.
This is caused by either a) erroneous server settings, b) the backend system has been shutdown, c) network problems. Will try next startup in 1 seconds.
Could not start server: Connect to SAP gateway failed
Connect_PM TPNAME=SLD_NUC, GWHOST=lpc1, GWSERV=sapgw54Hi JackLim
You had better check RFC Destination by SM59,
and JCo RFC Provider by Visual Admin .
1:Check whether Program ID is matching.
2:Check ABAP System is Unicode or Non-Unicode,
and collect settings.
->if ABAP System is Non-Unicode System,
Check off the Unicode Flag of JCo RFC Provider.
regards.
Yuki Fujioka -
Q1) How to check whether IGS running.
according to GRC guide, i checked in URL http://<hostname>:5<instance>80
but i didnt get any screen/graph..how to solve this.
Q2).After installation of GRC AC CC5.3, to ensure SLD is configured and running
i checked in http://<hostname>:55<instance>00/sld/index.html.
There in technical settings -administraton, i got status running but when i click data supplier bridge
i didnt get any status,,,how to rectify this problem..please let me know ASAP.Hi Joseph
On which instance you have installed SAP GRC ?. By default the IGS URL will be disabled to show graphs.
Have you actually verified that IGS URL is correctly given in the visual administrator? . Also check in the hosts file of GRC server if hostname of GRC server is available with correct ip address.
To Check if SLD is working properly do the following test.
1) login to the SAP j2ee home page of GRC Server. URL will be http://hostname:5<instno>00
then click on Web Dynpro tools -> Content administrator -> click Check SLD connection. When you click test connection , it should be successfull.
Then in the Maintain JCos Destinations -> click the test and ping of your JCos which you have given.
Also confirm that GRC RTAs have been installed on your back end system. -
I cannot start Data Supplier Bridge.
My Bridge have status 'Stopped'.
When I hit 'Start Bridge' nothing happens.
I have checked Server name and Service. They seem right.
Where can I find messages/log telling what is wrong.
Best regards
Hans-JornHi,
Pls check this thread and see if it helps...
btw...Welcome to SDN !
Thanks,
Renjith
this is the link ...
Data Supplier Bridge won't start in URL
Message was edited by: Renjith Andrews -
Hello,
I have installed XI 3.0, have patched the ABAP & JAVA stack to SP14.
During SLD configuration we are getting error in RZ70, while collecting data for transfer it gives RFC error for destination SLD_UC.
Also in http://dqxicom5702:50000/sld while trying to start to the sld bridge it fails to do so.
Error: Bridge not started
In visual administrator, on triggering data transfer it gives error:
data transfeer failed as there is no process to collect data.
Supporting Logs:
RZ70 Output:
0: DQXICOM5702_DXI_00 : Collection of SLD data finish
0: DQXICOM5702_DXI_00 : Data collected successfully
0: DQXICOM5702_DXI_00 : RFC data prepared
0: DQXICOM5702_DXI_00 : Used RFC destination: SLD_UC
0: DQXICOM5702_DXI_00 : RFC call failed: Error openin
0: DQXICOM5702_DXI_00 : Existing periodic jobs remove
0: DQXICOM5702_DXI_00 : Program scheduled: 20051220 0
0: DQXICOM5702_DXI_00 : SLD job for system start: Pro
Server logs in sld shows that data was recived from host, but could not be accepted as SLD Bridge is not running.
defaultTrace.trc Output:
Date : 12/19/2005
Time : 14:57:51:507
Message : User J2EE_GUEST, IP address
HTTP request processing failed. HTTP error [401] will be returned. The error is [Access Denied.No details available].
Severity : Error
Category : /System/Server
Location : com.sap.engine.services.httpserver
Application :
Thread : SAPEngine_Application_Thread[impl:3]_19
Datasource : 5297450:/usr/sap/DXI/DVEBMGS00/j2ee/cluster/server0/log/defaultTrace.trc
2nd Error:
java.net.SocketException: There is no process to read data written to a pipe.
at java.net.SocketOutputStream.socketWrite0(Native Method)
at java.net.SocketOutputStream.socketWrite(SocketOutputStream.java(Compiled Code))
at java.net.SocketOutputStream.write(SocketOutputStream.java(Compiled Code))
Has anyone faced SLD Bridge problems. All suggestions are welcome.
Thank YOu.
Cheers,
Chetan HindujaDear,
Would you don;t mind if I ask your methods to resolve it ?
What authorization(s) for which user(s) can be resolve this problem ?
Thanks in advance.
junior. -
Add sap R/3 enterprise system in solution manager SLD
Dear All
Required solution manager configuration documents.
We have DEV QAS and PRD server on SAP mySAP ERP 4.7 ( SAP R/3 Enterprise )
And during the installation of solution manager I select u201CConfigure a Local SLD u201C
Which steps I follows to connect or configure my sap system with solution manager ( SLD ) then I will configure central monitoring, TMS management, Helpdesk etc
Who to Configure SLD Bridge ( in SLD Server ) ?
in which system Run Transaction RZ70 ( In SAP R/3 Enterprise ) ?
and how to Verify that my system is connected and working fine With SLD
Please help me regarding u201C configuration solution manager u201C
Regards
ShahidHi
Visit for step by step details of Standard Configuration of Basic Settings
http://service.sap.com/rkt-solman-->SAP Solution Manager 7.0->Technology Consultants & System Administrators->Technical Configuration->just drill out there you can find lot of simulator how to install and configure solution manager
http://www.wilsonmar.com/sap_solution_manager.htm
/people/federico.babelis2/blog/2006/04/14/service-desk-configuration-guide-for-dummies
Regards
Uday -
SLD Content Synchronization - PI 7.0
Hello folks!
I have a question for you: I have two PI, a DEV System and a PRD system. We are using PI 7.0 SP 18
Before starting to export the data to PRD, I'd like to synchronize the recently installed SLD PRD system with the DEV SLD server.
I read this article:
http://help.sap.com/saphelp_nwpi71/helpdata/en/46/2f42f114bc59bde10000000a155369/content.htm
Where says:
The SLD content synchronization is fully supported by AS Java 7.1 and above. Additionally, an SLD of version 7.0 SP12 and above can be used as source system for unidirectional synchronization only. Systems with version 7.0 do not support the notification of listener systems.
So, as I have SP 18 it could be feasible, but all the guides I've found were talking about PI 7.1.
Does anybody know the steps to do it in 7.0 ? I'd like to have PRD server taking the info from the DEV one.
Thanx in advance,
JuanYou can achieve that by using an SLD bridge. If you have installed multiple SLD servers, the SLD bridge can be configured to send data to each of these servers. This is described on http://help.sap.com/saphelp_nw70/helpdata/en/43/da21ba13660aa5e10000000a1553f6/frameset.htm
-
Integration Server in SLD shows no System
Hello,
I have the following problem. When I log into the SLD, go to technical System, filter for XI then I See Adapter Engine, Integration Directory etc. For each of them the column System is filled (SAP-System and Host). Only for the Integration Server it isn't.
And when I log into the Runtime Workbench and select Configuration then I et an error that no Integration Server is available in the SLD.
Does anybody know what is the problem for that.
thanks
MichaelaHi,
The best way what you could do is goto transaction RZ70 and enter the appropriate details in the SLD Bridge tab
then do the proposal and finally press the esecute button to start the data collection.
This will automatically create an entry in the SLD then you need to maintain business system manually.
But before executing the data collection remove the existing IS server info if it's already present.
More details on this can be found in XI Post installation document.
RGds,
Vasanth. -
I am trying to set up an SLD.
I have a portal and sld running on the same j2ee (standalone)
I also have an ecc 5 (abap standalone) instance.
Question #1
Do you need an abap instace to use the sld.
Question #2
When you set up the SLD bridge, to which box are you pointing to?
For instance, if I had just the portal and SLD running on the same J2EE, would you point the SLD to "localhost"
Question #3
Where do you find the "roles"
LcrUser
LcrClassWriter Create
LcrInstanceWriter
LcrInstanceWriter
LcrInstanceWriter
LcrInstanceWriter
LcrAdministrator Administrative
Are they in the J2ee that the sld runs on?
Thanks
JeremyHi,
Q1: ABAP not required
Q2: bridge points to the J2ee host, suggest give fully qualified host name
Q3: These roles by default are not present.
The authorizations for the roles are present. Please download the SLD post-instn guide for 640. There you find a page which talks about which authorizations should be maintained for each role.
Go to http://<SLD-host>:<port>
login into user management.
Create a new role with the desired name (example: LcrUser) use the same case as required. Assign the desired authorizations to the role.
Then you could later assign the role to group and then user.
Hope this helps.
Cheers,
Chetan
Maybe you are looking for
-
Problem with date format when ask prompt web-intelligence
Bo XIR2 with 5 SP. Instaled on Windows 2003 with support Russian. Inside BO every labels, buttons - use russian. But when invoke web-report and Prompt appear there is problem with date format. Looks like korean format of date 'jj.nn.aaa H:mm:ss'. I
-
Any ideas on why the numerical keypad on the far right isn't working?
Any ideas on why the numerical keypad on the far right isn't working? I am running Windows Vista Business with ALL of the latest M$ updates. I am running have updated ALL of Apple's updates also. I can't get the numerical keypad to work. All of the o
-
I have created hyperlinks in Incopy and tested them using the hyperlinks panel. The links work. However, when I export to PDF from Incopy, the hyperlinks are not there. I noticed when exporting the PDF from Incopy, there is no option in include hyper
-
IDOC extensions during Upgrade from Ver 4.6 to ECC 6.0
We are working on an Upgrade project wherein we are going from Ver. 4.6 to ECC 6.0. Can you guide us what all we need to do with the IDOC extensions alerady implimented in ver 4.6 in order to confirm them good with ECC 6. Also to be noted, we are mak
-
Question reg Infotypes in HR.
HI all, Can someone tell me what is the difference between 'Table Infotypes' and 'Field infotypes' in personnel planning ( PD Infotypes ) ? found a thread in this site with the same query, but it was not useful much... Thanks mahesh.