SLD Business System Mapping Problem

Hi Experts,
i am facing a problem in Quality Environment, we have imported the all ir and id objects in to QA ,
my problem is the business system showing on integration directory ECCSystem (QA1CLNT400) but  actual Business System want to show on integration directory is ECCSystem(QA0CLNT400) , some where the SLD Mapping we got a problem. Please help me out how to fix this issue.  ,
1. How to Map Exact Business System in SLD. ?
2. To refelect the SLD Changes in ID we need restart ?
Thanks and Regards
G.Praveen Kumar

> my problem is the business system showing on integration directory ECCSystem (QA1CLNT400) but  actual Business System want to show on integration directory is ECCSystem(QA0CLNT400) , some where the SLD Mapping we got a problem. Please help me out how to fix this issue.  ,
>
first check in dev SLD what is the trasported target defined for  Dev bussiness system .
> 1. How to Map Exact Business System in SLD. ?
If trasport target defined as QA1CLNT400 then change it to QA0CLNT400 in Dev SLD.
> 2. To refelect the SLD Changes in ID we need restart ?
>
no need to restart anything.
refer my blog
/people/rajasekhar.reddy14/blog/2011/02/21/transport-targets-and-groups-in-the-sld
Regards,
Raj

Similar Messages

  • SLD Business system not appearinn in Integration Directory Configuration

    Hello,
    I have configured a business system in SLD(defined a Technical system,assigned it to a business system),but when i go to
    Integration directory and assign a business system without a partner,I am not able to see this business system.
    can any one please help.
    regards
    kaushik

    environment -> clear SLD cache

  • SLD Business System with or with out Logical System If so, which Log system

    Hi
    I'm in confuse with the Logical System when creating a Business System in SLD.
    Our requirement is LEGACY -- PI/XI -- ECC.
    When I create Business sytem in SLD, I need to give a Logical System. Which system (Is it xi/pi or ECC ) Logical System to be provided?
    Thanks.

    >
    Pothana Yadav wrote:
    > Hi
    >
    > I'm in confuse with the Logical System when creating a Business System in SLD.
    > Our requirement is LEGACY -- PI/XI -- ECC.
    >
    > When I create Business sytem in SLD, I need to give a Logical System. Which system (Is it xi/pi or ECC ) Logical System to be provided?
    >
    > Thanks.
    if you are using File to IDoc scenario then need to define logical systems for both business systems you are going to create for
    i.e they will be used as sender and receiver partners in case of logical systems
    if need more details check the below blog
    /people/rajeshkumar.pasupula/blog/2009/03/16/unable-to-convert-the-sender-service-to-an-ale-logical-system
    check the same for how logical system are used in this case...
    note above will be helpful in case of only idoc scenario..else no need of creating logical systems even though target sysstem is ECC
    HTH
    Rajesh

  • Business system transport problem.

    Hi,
    I am trying to impor the objects in directory system but i ma getting below erroe message while transport.
    Business system XXX is not assigned a business system in group YYY.
    where YYY is production group.
    Wat i can figure out is I need to create the new business system and assigned that new business system to Production group in SLD.
    Let me know whether I am correct or not?
    chirag

    hello Chirag,
    1)First Create the Business Groups on Both the Server (DXI ,QXI,PXI )
    -     DEV_GROUP  for Development Environment
    -     QA_GROUP for Quality Environment
    -      PRD_GROUP for Production Group
    2) Assing the Business Groups to respective Integration Servers
    3)Assign the Quality Business Systems to QA_GROUP and Production Business systems to PRD_GROUP
    Automatically all the Business Systems are assigned to respective Integration Servers.
    4)Select the Business System Ex : DB2QA00. Under the Details select Transport :
    Click on the Add/Change Target..
    5) On Click of Button we will see the Target Group and Target Business System.
    Here for DB2QA00 target Business System is DB2PRD00 under PRD_GROUP.
    regards
    Gangaprasad

  • SLD, Business System and Missing Communication Channel

    Interesting issue here....
    I created a business system, assigned the logical system, ...etc..etc
    Imported the swcomp into ID.........completed the scenario..
    Now in Communication channel monitoring i dont see the communication channel that i created for the System, i can see it on XI under sxi_cache...........under the business system, I dont see it in communication channel monitoring.
    Venkat

    Hi,
    >>...i dont see it..thats what i meant...no messages for that adaptor,
    Clear the Meta Data IDX1 and check the port as Ravi Mentioned IDX2.
    After clearing the Meta data try to manually load the Meta data and test it.
    Regards
    Agasthuri Doss

  • Creating a Business system in the SLD

    I am receiving an error message when trying to create a business system in the SLD. The error is "The selected client has an associated logical system nae that is already  used for another business system. Select a different client."
    Here is my issue. The business system that I am creating is for our R/3 4.6C production system. I currently have a business system for our R/3 4.6C quality system. Our prodution and quality R/3 systems do have the same logical system name and client number. This is because we recreate our qaulity R/3 system from our production system.
    So, the question is, How do I create a business system in the SLD for my production R/3 system when the logical system name is used assoicated with and business system.
    I should add that all my R/3 systems have been created as technical systems without any problems.
    Thanks,
    Jim

    It is recommended to have all ALE names unique.
    If it is not possible the following workaround can be used.
    Create one system in SLD (business system/technical system) which contains the ALE name. Proposal: The production system
    Create the other systems(dev/QA) without the ALE name
    During configuration the production system will be configured as usual.
    For Dev/QA systems: Define in the receiver agreement the header mapping and use The Receiver service to reference the production system. Because you reference the production system the ALE name of the production system will be used to fill the idoc.

  • Problem by Maintaining a Business System for the Integration Server

    Hi to all,
    I have the following problem. I tried to change some Business systems configuration in SLD but accidentally deleted defined Business System for our Integration Server. After that I tried to create that business system again but I have the following error:
    Integration Server already defined. There is already an integration server defined for the selected technical system. Please select role Application System.
    Since than I’m receiving the following error message when I try to refresh my adapter engine cache:
    com.sap.aii.ib.server.abapcache.CacheRefreshException: Unable to find an associated SLD element
    Do you know how can I define the Business System again currently I can't see it in SLD Business systems?
    I’ve also checked the IS URL (TR: SXMB_MONI) and it seems that it’s ok. 
    Regards
    Naycho

    Hi Naycho,
    i think you have to clean up some sld rubbish
    Go to SLD / Administration / Content Maintenance. Choose left side "all classes" or "landscape description" and right side  "business system". Delete all entries you find for your business system, after that try to recreate it.
    Regards,
    Udo

  • Transport does not map business systems

    Hello,
    we have a problem when transporting XI configuration objects (via normal file export/import, not CMS). In the SLD, we have configured business systems
    T01CLNT010, belongs to group dev  and has transport target PROCLNT010
    T01CLNT020, belongs to group dev  and has transport target PROCLNT020
    the strange thing is the first business system is not converted correctly to the prod business system after transporting the XI config from XI dev to XI Prod. For the second business system, that works fine. I compared the entries in the SLD, both look fine. But one does not work, the other does.
    For the one that does not work, the transport goes fine, does not show any error, but just does not convert the name. (which of course will lead to an error when trying to activate the objects, because T01CLNT010 does not exist in XI prod). So it seems it cannot find the SLD transport target for that object.
    Does anyone know how XI exactly finds out how to convert the business system while transporting it to production ? How does it find the connection between the XI business system object and the corresponding SLD entry ? Just by name ? Or is some kind of internal GUID used which may have been broken ? Can I see that anywhere ?
    Is it safe to re-associate the SLD business system to the XI business system in the XI integration builder ? Or are dependent objects (e.g. receiver det.) then lost ?
    CSY

    Does anyone know how XI exactly finds out how to convert the business system while transporting it to production ?
    The only thing that matters here is properly defining the Transport Targets.
    How does it find the connection between the XI business system object and the corresponding SLD entry?
    Not sure about this but I think the name in the transport target would suffice for this requirement. Also, make sure that the groups are properly defined and target SLD has all business systems properly maintained.
    Is it safe to re-associate the SLD business system to the XI business system in the XI integration builder ?
    How will you be doing this re-association? If you are thinking of changing the Business system name in ID manually, then it would mean almost complete development in ID.
    Regards,
    Prateek

  • How to change the ROLE: Integration server in business system in SLD

    Hi,
    I am facing error in communication, becuase the integration server has been attached to in correct business system with incorrect client (001 instead of 700).
    In SLD, business system, 'integration' tab there is button "Associate with XI'.
    I have selected the role as integration server for the corrrect business system and aslo gave the correct pipeline url for integration server.
    When I press the button "Associate with XI" and Save nothing happened.
    How do i change my integration server.
    Please help.
    Regards,
    Rehan

    Hi Gaurav,
    I have checked the teachnical system  and its of type WEB AS ABAP. and when i click on the business systems tab, there are two business systems. When i double click on the business systems
    I realised that both the business systems has been defined with role: integration server.
    IN one business system i can see that there is "associate with XI" button.
    But when i want to chnage the business system with correct client 700 , i tried pressing the button after entering the correct pileline url.... nothing happens.....
    Can you please let me know the procedure to chnage the technical system with respect to integration engine???
    PLease help as our project is held up due to this.
    regards,
    Rehan

  • Business system does not exist in the SLD

    hi,
    I am trying to export the ID objects into QA, when i get the error saying that "Business system D01 does not exist in the SLD".
    I have created the Transport target for the D01 business system in the SLD to point to the QA system T01.
    When i try to export the objects and reimport them into QA i get the above error.
    Any ideas what could be missing?
    Thanks,
    Tirumal

    hi,
    Prashant -
    I did refresh the cache but no luck. I still see only the QA Business system but not able to see the Dev SLD Business systems at all.
    Stefan -
    They are pointing to the same sld. If i do an sldcheck from QA XI Server it directs me to the dev SLD. So this is good.
    I am using only 1 SLD. Is there a way that i can tell QA to look for DEV SLD instead of QA SLD?
    Thanks,
    Tirumal

  • SLD - Logical System Management

    Hi,
    We are implementing XI and we have the problem with SLD logical system management. The problem is that we use the same Logical system name (Ex. PRDclnt350) for all the systems to avoid running lengthy BDLS process when we hook our R3 systems to their respective BW systems.
    Can you please suggest how we take care of this in XI -SLD landscape as it requires unique logical system names for each Business System when maintaining in SLD.
    Can we have multiple SLDs and will it take care of the issue. If so can we take one of them as the master SLD and the rest as slave SLDs. What would be the best practices for synchronizing them. Any help in this regard is greatly appreciated.
    Thanks and regards..
    Haritha

    Hi All,
    We opened an OSS note with SAP regarding this. Please see the question we asked and the response we got from them regarding the SLD maintenance:
    Hi,
    We are on BW 3.5 and SAP ERP 5.0. We are implementing XI now. So we
    need to configure SLD and register our Business systems. The problem is
    we have the concept of using the same logical system for all our SAP
    systems, say WRPCLNT750, when we are hooking our systems to their
    respective BW systems. And in SLD, we have problem becuase of this, as
    it recommends to have unique logical system name for each Business
    System being registered.
    We want to mention some points in here about our landscape and some of
    the recommendations we got from SAP regarding this. Ours is a very big
    warehouse system and in order to avoid the lengthy "BDLS" runs, SAP
    recommended using the same Logical System name for all the SAP systems.
    Hence we are using the same logical system name for our systems.
    So now coming to our problem, can you please tell us what would be the
    best practice that needs to be followed now for SLD Business System
    registration. How can we overcome the hurdle of NOT having a unique
    logical system name for our systems in central System Landscape
    Directory.
    Please let us know the solution as early as possible.
    Thanks and regards..
    Haritha.
    The Response:
    Hello Haritha
    I have found some pass cases with the same question that you have,
    however, the replies from developer are as below.
    Logical systems cannot be duplicated within the SLD, that means one
    Business System per Logical System name, both need to be unique, the SLDis working a designed here.
    I would suggest you rename one of the copies of the productive system
    to solve this.
    My apology that I couldn't provide you a better answer for this.
    Thanks & Best Regards
    Andy Lam
    Active Global Support - SolMan & Technology
    Kindly, please let me know your suggestions.
    Thanks and regards..
    Haritha.

  • Business system issue

    Hi All,
    I am working on SAP PI 7.31 dual stack ( SP8).
    Our non- Prod SLD ( dev and QA)  is pointing to QA system. Basis team have created one Third party Business System in QA System SLD .
    The issue is while importing the Business system in  Dev system i am not able to see the required Business system.
    Moreover while checking the QA system i can see the same Buisness system present in the import queue of QA system.
    I have done the SLD cache refresh and also done the delta cache refresh as well!
    Can some one please help me out in this or anyone faced this issue before please revert back.
    Thanks for your inputs on this.
    Rgards
    Prashanthi

    Hi
    Normally the transport path is like that
    Dev----> quality--->production
    In the SLD, the business system mapping should be like this
    Source               target
    DEV BS            QA and PRD PS
    QA BS              PRD BS
    How you are importing the business system in DEV ? by using transport ? have u check the log of transport request in SE01 or SE10
    You can directly assign the business system in dev
    Goto  Business System--right click and select assign business system-->select the business system from SLD.

  • CIM_ERR_FAILED: while importing the Business System in quality sytem

    Hi Experts,
    I got error while importing the SLD (Business system) from Devolopement system to quality system.
    Business system is third party system.
    note i created business systemaaa(third party) using the quality system integration server and assign this to as target in the dev business system in transport tab.
    like i have Business system in DEV like this : BS_DEV(integration server is DEV) ( using this i was devloped the objects using this business system the like Communication channel,RD,ID,RA etc.)
    i was created  another business system:BS_QA(integration server is QA)
    the transport tab of the BS_DEV i puted the BS_QA as target.
    i used same technical systems,product,SWCV for the both Business systems
    but while importing the BS_QA i got the following error:
    CIM_ERR_FAILED: Instance referenced in role Antecedent of association SAP_BusinessSystemPath does not exist:
    BS_DEV not imported in quality is this is cause for this problem ?
    which one i need to import either BS_DEV or BS_QA to quality?
    thanks in Advance

    Hi,
         Check if CIM content versions are same in DEV and QA.If there is any version difference you might need to update CIM content if there is any inconsistencies in CIM content there are chances to get such kind of errors.
    Regatrds,
    Naveen.

  • Business system not known to SRM

    Hi,
    We are able to send and xml PO to SRM server, but we are getting ABAP Application error in the pipeline service of the IE of SRM.
    In SXMB_MONI in SRM:
    Under Trace:
    <CONTROLLER />
    <FAULT_TEXT>An error occured within an XI interface: SLD system QA2_220 is not known Programm: SAPLBBP_BD_MAPPING_SAPXML1; Include: LBBP_BD_MAPPING_SAPXML1F1Y; Line: 92</FAULT_TEXT>
    <FAULT_URL />
    <FAULT_DETAIL />
    Under Error:
    <?xml version="1.0" encoding="UTF-8" standalone="yes" ?>
    - <!-- Call Inbound Proxy
    -->
    - <SAP:Error xmlns:SAP="http://sap.com/xi/XI/Message/30" xmlns:SOAP="http://schemas.xmlsoap.org/soap/envelope/" SOAP:mustUnderstand="">
    <SAP:Category>Application</SAP:Category>
    <SAP:Code area="ABAP">APPLICATION_ERROR</SAP:Code>
    <SAP:P1 />
    <SAP:P2 />
    <SAP:P3 />
    <SAP:P4 />
    <SAP:AdditionalText />
    <SAP:ApplicationFaultMessage namespace="http://sap.com/xi/SRM/Basis/Global">StandardMessageFault</SAP:ApplicationFaultMessage>
    <SAP:Stack>The application triggered an exception</SAP:Stack>
    <SAP:Retry>M</SAP:Retry>
    </SAP:Error>
    QA2_220 is defined in the XI SLD, and it is the sender service. I am not sure why it is saying "QA2_220 is not a known programm." Does anyone know why we are getting this error?
    Any help is appreciated.
    Thanks,
    Karma

    You need to associate the Logical System in SRM with the SLD Business System.
    This is how to do it.
    In the SRM system, go to the IMG through SPRO:
    Goto SAP Implementation Guide->Supplier Relationship Management->SRM Server->Technical Basic Settings->Define Backend Systems
    You should have the logical systems defined there.  Scroll to the right and add the SLD Business system name under the "System Landscape Directory Name"
    This should do it.  Now when SRM tries to process the message from the Business system, it will look up the corresponding logical system from this entry.
    Regards,
    Jay

  • SLD Business transport groups

    Hello,
    I inherited a PI 7.1 system.  I'm trying to determine if the current SLD transport groups are setup correctly.  We currently have two SLDs:  Design time (BS_DEV, BS_QA) and runtime (BS_PRD).
    The current configuration is as follows:
    In the design time SLD
    Business system BS_Dev (development) is in the BS_DEV_GROUP and has a target group BS_QA_GROUP with a target system BS_QA.  I think this is correct.
    Business system BS_QA is in the BS_QA_GROUP  and has a source group BS_DEV with the source group BS_DEV_GROUP with business system BS_DEV.  But, there is no target for this system.  I think it should be the BS_PRD system in the BS_PRD_GROUP.
    In the second SLD, the runtime SLD has the following configuration:
    The BS_DEV system is part of the BS_DEV_GROUP and has a target system of BS_PRD in the BS_PRD_GROUP.  The BS_QA system has no source system and no target.  I think this is wrong.  The DEV_PRD system has a source system of BS_DEV of BS_DEV_GROUP.  There is no reference to the BS_QA system.
    Also, when the BS_QA system is configured it should have a source system BS_DEV system and a target system BS_QA, right?
    I think this is configured to bypass the QA system.  Do you agree?  Sorry for the long post.  Oh,, CTS+ is working.

    Hi George,
    Business system BS_Dev (development) is in the BS_DEV_GROUP and has a target group BS_QA_GROUP with a target system BS_QA. I think this is correct.
    Business system BS_QA is in the BS_QA_GROUP and has a source group BS_DEV with the source group BS_DEV_GROUP with business system BS_DEV. But, there is no target for this system. I think it should be the BS_PRD system in the BS_PRD_GROUP.
    This setting is fine, just that the BS_QA should point towards the BS_PRD.
    The BS_DEV system is part of the BS_DEV_GROUP and has a target system of BS_PRD in the BS_PRD_GROUP. The BS_QA system has no source system and no target. I think this is wrong. The DEV_PRD system has a source system of BS_DEV of BS_DEV_GROUP. There is no reference to the BS_QA system.
    Well, Technically this is not exactly wrong. Means, as you have mentioned, you inherited this environment. So, might be the QA was facing some technical issues for which QA was being by-passed, rather QA was being isolated.
    Architecturally, this is completely wrong. So, you might have to change this and point the systems in the right directions.
    Let us know if you have more queries.
    Regards,
    Neetesh
    Edited by: Neetesh Raj on Aug 24, 2009 1:14 PM
    Edited by: Neetesh Raj on Aug 24, 2009 1:15 PM

Maybe you are looking for

  • Mapping Error during BPM

    Hi Gurus,   Im configuring a scenario to perform idoc collections using BPM.   When im testing the scenario, the SXMB_MONI transaction is telling me that there is a mapping error. I went thru the messages in SXMB_MONI but im unable to find out where

  • Entity beans - Deployement tool

    Is there any option to map the tables in the MySQL database using the deployment tool ?In the CMP-Datbase option in Sunspecific settings of deployement tool doesn't contains the option for MySQL .There is one more option for Map to tables in Database

  • Vga (laptop) to rca video

    Thought I would ask this of the resident geniuses here.  Anyone know what I need by way of cable, connector, converter devic.... to get a Powerpoint Project out of my laptop to display on an Autocue Monitor. Laptop has HDMI and vga.  Autocue only has

  • Standard report that will allow monitoring of purchasing procedures

    Hello SAP Gurus, I am looking for any reports that will allow monitoring of our purchasing procedures for example: Reports identifying date of invoice v's date of order / requisition Thanks

  • Facebook/Twitter missing from drop down menu.

    For some reason my Facebook/twitter "quick" posts from the notification center pull down are not there and I have spent hours trying to figure it out... Any suggestions??