SLoc - SLoc stock transport rek within a plant

we have a SLoc that is geographically located far away from the plant. according to legal requirements and to capture shipping costs we want to have stock transport reks to handle shipping.
I tried to explore storage location mrp and mrp area options and according to help document,
1) if I use MRP areas and have the special procurement key "stock transfer from plant to mrp area" system will create stock transfer reservation, which i dont want because i cant do shipping against reservation
2) if I use storage location mrp, looks like it wont give me expected results too. please correct me if I am wrong here.
what are my options to have mrp run create STR for my situation?

DB49,
yes I agree that I cant do shipping against STR. but I convert mrp created STR to STO and then do shipping against it.
I cant convert a stock transfer reservation into STO and do shipping , right?
Anyhow, when you were testing your version of SPK 45, did you try selecting 'purchase req' in the "Stk Transf." parameter?
Thanks, will try that.
Also,
can I do that same thing using storage location mrp instead of creating mrp area? or mrp area is the only thing that is suitable to my situation. I appreciate your help answering this. Thanks

Similar Messages

  • Stock transport orders within one plant

    Hi all,
    I am wondering how to process a stock transport order, that is created to transfer stock within one plant (from one stor.loc to another). My general scope is to use the shipping module to process the logistic part of that transaction.
    So I created a stock transport order (purch. order type UB) where the shipping plant and the receiving plant are identical. Now I can't create the delivery note (VL10B does not show the order. In SAP docu, I found only a hint that a STO can be also used within one plant, but how to create the delivery note?
    Thanks to all for answers
    Jörg

    Hi
    Please go thru the following navigation to set up STO between Storage location with delivery.
    SPRO-> Material management -> Purchasing -> Purchase order -> Set up stock transport order -> step up stock transport order between storage locations
    In first step Activate Stock transfer between storage locations and do other configurations.
    Regards
    Ramakrishna

  • Stock Transport Orders within AII, also using HUM

    Dear all,
    we currently have the following issue at my customer:
    We are implementing SAP AII on top of an existing solution, using WM and HUM.
    In the current solution for STOs from 1 plant to another, the GI of an outbound delivery triggers the SPED output and an inbound delivery will automatically be created in the receiving plant, copying the batches and HUs. All pretty standard so far.
    However, when using AII, the GI of the outbound delivery triggers an eASN, which will load the serial numbers in AII and at the same time create an inbound idoc DESADV that is supposed to create the inbound delivery in the receiving plant. IF we would not be using HU, this process works fine and the IBD is created.  BUT when using HU's we get the message that the HU is already GI'd and cannot be used again.
    When we take out the HU of the idoc, have the inbound delivery created and later on add the HU manually to the delivery it works fine as well, so the error is really linked to the idoc (HUSELECT008). We have already checked each and every note related to inbound idocs and the mentioned error, but no solution was found.
    Did any of you also experience this problem while implementing AII for a complex environment with STO's?
    Any help would be very much appreciated.
    Thanks in advance!

    Hi
    Please go thru the following navigation to set up STO between Storage location with delivery.
    SPRO-> Material management -> Purchasing -> Purchase order -> Set up stock transport order -> step up stock transport order between storage locations
    In first step Activate Stock transfer between storage locations and do other configurations.
    Regards
    Ramakrishna

  • Stock transport scheduling agreement between plants under same company code

    We created outbound delivery and post goods issue in the supplying plant.When I do GR for outbound delivery  for receiving plant" The message displayed is PL stock in transit is excceded by the quantity to be posted ". So I could not post GR using MIGO.
    The Master data created are
    1) Created customer master for receiving plant with account control vendor number for supplying plant ( Account control customer no for receiving plant)
    2) Created vendor master for supplying plant with additional purchasing data for supplying plant
    3) maintained sales views of the material for both the plants.
    4) in IMG shipping data shipping data for plants: receiving plant - customer no for the receiving plant ; sales org for supplying plant and distribution channel and division.
    After posted goods issue in outbound delivery I check plant stock for supplying plant I could see the stock in transfer of the amount issued.
    Can anyone could explain How I could resolve this issue.
    Thanks in advance,
    Nathan

    We created outbound delivery and post goods issue in the supplying plant.When I do GR for outbound delivery  for receiving plant" The message displayed is PL stock in transit is excceded by the quantity to be posted ". So I could not post GR using MIGO.
    The Master data created are
    1) Created customer master for receiving plant with account control vendor number for supplying plant ( Account control customer no for receiving plant)
    2) Created vendor master for supplying plant with additional purchasing data for supplying plant
    3) maintained sales views of the material for both the plants.
    4) in IMG shipping data shipping data for plants: receiving plant - customer no for the receiving plant ; sales org for supplying plant and distribution channel and division.
    After posted goods issue in outbound delivery I check plant stock for supplying plant I could see the stock in transfer of the amount issued.
    Can anyone could explain How I could resolve this issue.
    Thanks in advance,
    Nathan

  • Stock transport order for same plant -UB

    Hi,
    I created STO with UB and when created delivery giving error material has zero quantity. I checked in MMBE , stock is available.
    Can nyone plese give soem solution and suggestions.
    Thanks in Advance.
    Smitha

    Hi,
    Then please check any safety stock has been assigned to the material, check it in the respective material master.
    Also,
    1. check the material movement in MB51.
    2. check the STO's delivery  schedule line, whether any delivery block has been maintianed.
    3. check   whether order is blocked for credit, you cna check it in VKM1.
    Please check delivery date in schedule line of sales order same as delivery date in VL01N
    Thanks
    Hrishi
    Edited by: Hrishi on Apr 18, 2011 3:54 PM

  • Stock transport orders between 2 plants

    Hi,
    Daily lot of STO orders will be booked,but i am getting one planned order comibining all STO's when i run MRP,i want individual planned order per each STO for finished product.

    Hi,
    In MRP4 view put 1 in individual/collective field and than again run MRP.
    Probably this will solve your problem.
    Reward points if it helps.
    Rgds,
    Anup Dubey

  • Cross company Stock Transport with Intercompany billing

    hi,
    I'm trying to use the standard cross company stock transport order process, however, when i create the initail purchase order in the ordering company, the shipping tab does not appear, preventing me from creating a delivery. The customers and vendors have been assigned correctly. Can anybody help ???

    dear govender
    refer this
    STO PROCESS
    Stock Transfer Orders comes into picture when the stock is moving / Transferring between two different plants with two Different Company Codes or Stock Transfer between two plants with One Company Code the Difference are given below:
    P.O Order types and Delivery Types
    STO: - Stock Transfer Order – Intra Company
    Stock Transfer between Two Plants with One Company code.
    The Purchase Order Type is Used in this case is "UB".
    And the Delivery Type Used here is "NL".
    Goods Movement type: 641
    Item Category in delivery is NLN
    STPO: - Stock Transfer Purchase Order – Inter Company
    Stock Transfer Purchase Orders between Two Plants with Two Different Company Codes.
    The Purchase Order Type is Used in this case is "NB".
    And the Delivery Type Used here is "NLCC".
    Goods Movement type: 643
    Item Category in delivery is NLC
    A. Configure Intercompany Stock Transport Order
    Material should exist in both the plants (Delivering & Ordering),
    Internal customer should be assigned to the ordering plant ( MM -> Purchasing -> Purchase Order -> Setup stock transport order -> assign the internal customer to the ordering plant and assign the Sales area of the internal customer.
    Assign its Sales area to the delivering plant
    Assign the document type and Delivery type NB and NLCC
    Assign the Supplying plant --> Receiving Plant --> NB
    Take the delivering plant and assign the sales area.
    Vendor master has to be created and assign the supply source (Delivering Plant).
    Create a purchase order ME21N ---> Save
    Delivery VL10 G ---> Calculation rule (appropriate) --> Assign the purchase order number here and execute.
    Select the Delivery creation line and do the back ground process.
    Start the log display and see the delivery document number by the documents button
    Goto VL02N --> do picking and PGI --> Then do the MIGO with respect to the delivery document.
    Billing (Intercompany pricing conditions should be set).
    AND
    1. Customer No. for the Goods Receiving Plant - OMGN
    2. Availability Check- Checking Rule (if necessary) - OMGN
    3. Assign a Delivery Type for the Delivering Plant - OMGN (for Stock Transport Orders, NLCC)
    4. PO type (which i believe you have done) - OMGN
    5. Assign Vendor No. to the Supplying Plant (done) - VK02
    6. Assign Customer No. to the Purchasing Plant for the Inter-Company Invoice (but you need to assign this to the Sales Organization pre-assigned to the Purchasing Plant),
    IMG-SD-Billing-InterCompany Billing-Define Internal Customer No. by Sales Org
    ***and by the way for the Invoice to work between Cross-Company Plants, you need also to have a Sales Org for the Supplying Plant and a Pricing Determination Procedure
    INTERCOMPANY PRICING:
    PI01 Intercompany: fixed amount per material unit
    PI02 Intercompany: percentage of the net invoice amount
    These condition types specify that the price charged by the delivering plant to the sales organization is shown as a statistical value in the sales order and an effective charge in the internal invoice.
    The condition records you create and maintain for intercompany billing are the same kind of records that you create for pricing in general.
    IV01 Inter-company Price ERLOS Revenue
    IV02 Inter-company % ERLOS Revenue
    STO CONFIG:
    The following steps have to be followed in order to configure stock transport order between two plants.
    1. Create a vendor for the Company code of the receiving plant using account group 0007 via T-Code XK01.
    2. In the purchasing data view assign the supplying plant and the schema group
    3. Create customer with the sales area of the vendor.
    4. The shipping conditions, the delivering plant and the transportation zone determine the route in the STO.
    5. In the pricing procedure determination relevant to the STO assign document pricing procedure and customer pricing procedure to get the pricing in the invoice.
    6. Maintain condition records for pricing condition.
    7. Maintain carrier as a partner in the customer master.
    8. In OMGN select the supplying plant and assign the company code and sales area. Similarly select the receiving plant and assign the company code and sales area (The company code to which the plant is assigned to).
    9. Assign the delivery type and checking rule to the document type.
    10. And finally, assign the purchasing document type to the supplying plant and the receiving plant.
    11. Create the STO using T-Code ME 21N and save.
    12. Check for release strategy if any and release using T-Code ME 28.
    13. Create delivery in background using VL10G.
    14. If delivery is created, it is an indication of correct configuration and master data creation.
    Stock transfer between two plants in different company codes is known as inter company stock transfer.
    Material should be maintained in both supplying and receiving plant MM01
    Stock should maintain only in supplying plant MB1C
    Create receiving plant as a customer in supplying plants company code and sales area XD01
    Assign this customer number in receiving plant details OMGN
    Assign supplying sales area in supplying plant details OMGN
    Assign delivery type NB for in combination of supplying/ receiving plants.
    Create STO ME21N
    As it is normal there in the item details we should get shipping date i.e. customer number
    Go for Delivery VL10B
    Shipping point *****
    Select PO go for execute
    then select the delivery then go for delvy ............create delvy,,,, delvy number generated.
    Goods Issue VL02
    Delvy doc **********
    Click on picking
    enter the picking qty
    Click on PGI
    in the mean time check in the PO history you will get the details
    Goods receipt MIGO
    Stock overview the stock will be updated....
    Check the below link
    http://help.sap.com/saphelp_47x200/helpdata/en/4d/2ba31643ad11d189410000e829fbbd/frameset.htm
    Stock transfers that include deliveries and billing documents/invoices are only possible between plants belonging to different company codes.
    If you want to carry out a cross-company-code stock transport order with delivery but without a billing document, you must set the Relevant for Billing (data element FKREL) indicator in Customizing of the item type to "blank" (Not relevant for billing).
    The following applications are involved in this type of stock transfer:
    • Purchasing (MM-PUR) in entering the order
    • Shipping (LE-SHP) in making the delivery from the issuing plant
    • Billing (SD-BIL) in creating the billing document for the delivery
    • Inventory Management (MM-IM) at goods receipt in the receiving plant
    Invoice Verification (MM-IV) at invoice receipt in the receiving
    Transfer of goods from one location to another location, it may be between plants within the same company code or in different company code's plants.
    within the company code, but plants,
    receiving plant will raise the STO in Supplying/issuing plant-ME21n,
    Supplying plant will deliver the goods to receiving plants ,
    then we need to pick n post the Goods Issue-VL02n,
    now when we can observe that the STO qty will be added into receiving plant and reduced in Delivering plant,
    To do this, we need do prior customization in SPRO-IMG,-
    material should be created in both plants( receiving & Supplying)
    -maintain the stock only in supplying plant
    -create a dummy customer in supplying plant's sales area(if u have one sales area, create in tat comp code n sales area)
    -assign this customer number to receiving plant's details along with the sales area,
    -Assign the STO doc type(UB) to Supplying plant, along with checking rule
    -Assign the Del type (NL/NLCC) to Supplying n receiving plant.
    *Del type=NL is not relevant for billing, where as NLCC is relevant for billing
    rewards if it helps
    siva

  • Stock Transport Order Without Delivery

    I m trying to transfer stock from one plant to another (within same company) without delivery.
    what all configuration do i need to do.
    pls. guide.
    I m little bit confused over stock transfer,
    Regards,
    Pramod Kumar

    Oh no, not at all!  This forum is meant to answer all your problems!
    Configure Inter company Stock Transport Order
    Material should exist in both the plants (Delivering & Ordering),
    Internal customer should be assigned to the ordering plant ( MM -> Purchasing ->
    Purchase Order -> Setup stock transport order -> assign the internal customer to the
    ordering plant and assign the Sales area of the internal customer.
    Assign its Sales area to the delivering plant
    Assign the document type and Delivery type NB and NLCC
    Assign the Supplying plant --> Receiving Plant --> NB
    Take the delivering plant and assign the sales area.
    Vendor master has to be created and assign the supply source (Delivering Plant).
    Create a purchase order ME21N ---> Save
    Delivery VL10 G ---> Calculation rule (appropriate) --> Assign the purchase order
    number here and execute.
    Select the Delivery creation line and do the back ground process.
    Start the log display and see the delivery document number by the documents button
    Goto VL02N --> do picking and PGI --> Then do the MIGO with respect to the delivery
    document.
    Billing (Intercompany pricing conditions should be set).
    AND
    1. Customer No. for the Goods Receiving Plant - OMGN
    2. Availability Check- Checking Rule (if necessary) - OMGN
    3. Assign a Delivery Type for the Delivering Plant - OMGN (for Stock Transport Orders,
    NLCC)
    4. PO type (which i believe you have done) - OMGN
    5. Assign Vendor No. to the Supplying Plant (done) - VK02
    6. Assign Customer No. to the Purchasing Plant for the Inter-Company Invoice (but you
    need to assign this to the Sales Organization pre-assigned to the Purchasing Plant),
    IMG-SD-Billing-InterCompany Billing-Define Internal Customer No. by Sales Org
    ***and by the way for the Invoice to work between Cross-Company Plants, you need
    also to have a Sales Org for the Supplying Plant and a Pricing Determination Procedure
    STO:
    STO CONFIG:
    The following steps have to be followed in order to configure stock transport order
    between two plants.
    1. Create a vendor for the Company code of the receiving plant using account group 0007
    via T-Code XK01.
    2. In the purchasing data view assign the supplying plant and the schema group
    3. Create customer with the sales area of the vendor.
    4. The shipping conditions, the delivering plant and the transportation zone determine the
    route in the STO.
    5. In the pricing procedure determination relevant to the STO assign document pricing
    procedure and customer pricing procedure to get the pricing in the invoice.
    6. Maintain condition records for pricing condition.
    7. Maintain carrier as a partner in the customer master.
    8. In OMGN select the supplying plant and assign the company code and sales area.
    Similarly select the receiving plant and assign the company code and sales area (The
    company code to which the plant is assigned to).
    9. Assign the delivery type and checking rule to the document type.
    10. And finally, assign the purchasing document type to the supplying plant and the
    receiving plant.
    11. Create the STO using T-Code ME 21N and save.
    12. Check for release strategy if any and release using T-Code ME 28.
    13. Create delivery in background using VL10G.
    14. If delivery is created, it is an indication of correct configuration and master data
    creation.
    Stock transfer between two plants in deffernet company codes is known as inter company
    stock transfer.
    Material shoud be maintained in both supplying and receiving plant MM01
    Sotck should maintain only in supplying plant MB1C
    Create receving plant as a customer in suplying plants company code and sales area
    XD01
    Assign this customer number in receving plant detials OMGN
    Assign supplying sales area in supplying plant details OMGN
    Assign delivery tupe NB for in combination of supplying/ receving plants.
    Create STO ME21N
    As it is normal there in the item details wer should get shipping date i.e customer number
    Go for Deliveryy VL10B
    Shipping point *****
    Select PO go for execute
    then select the delivery then go for delvy ............create delvy,,,, delvy nubmer generated.
    Goods Issue VL02
    Delvy doc **********
    Click on picking
    enter the picking qty
    Click on PGI
    in the mean time check in the PO history you will get the details
    Goods receipt MIGO
    Stock overview the stock will be updated....

  • Inter - Company Stock Transport Order Issue

    MM SAP Gurus,
    When I try working on "inter company stock transport order between two company codes."
    I found the errors while creating PO(using document type UB)
    ie.
    *1st Error -Material 1 not maintained in Plant 2.
    2nd Error - Customer 1 does not exist (please check entry in plant 1)
    3rd Error - Not possible to determine shipping data for material1)*
    i couldnt find out the error................................
    Here is the configuration done by me......
    Company codes:c1,c2
    Plant for c1:p1
    Plant for c2:p2
    I m going to create and transfer stock from p2 to p1.
    Here i m using stock transport order with billing(SD)
    Purchase org for c1:porg1
    Vendor for c1,porg1:v1
    I assigned plant p2 in additional purchase data of vendor v1.
    Sales area for c2:sorg2,ds2,d2
    Customer for sales area(sorg1,ds1,d1):cust1
    Now i go to mm->purchasing->purchase order->setup for stock transport order
    > for receiving plant p1 i assign cust1,sales area(sorg1,ds1,d1)
    > delivery type for supplying plant:NLCC
    >checking rule RP.
    i assigned doc.type UB into receiving plant p1 and supplying plant p2.
    Then, in ME21N used doc type UB, these r the errors::::::::::::::::::::::::::::::
    *1st Error -Material 1 not maintained in Plant 2.
    2nd Error - Customer 1 does not exist (please check entry in plant 1)
    3rd Error - Not possible to determine shipping data for material1)*
    I already maintained all this.
    The doc type NB also I tried ,,,,,,,but same errors r being shown.
    Also where to create the inter company a/cs for billing?
    Please check the attached file for the error and let me know.
    Thanks & Regards
    Keerthi ...

    Business partner
    ●     Vendor master u2013 supplying plant
    Create the vendor for the purchasing organization of the receiving plant.
    Assign the vendor to the supplying plant in the vendor master record.
    From the menu, choose Logistics ® Materials Management ® Purchasing ® Master Data ® Vendor ® Purchasing ® Change (Current). Go to the Purchasing View and choose Extras ® Additional Purchasing Data.
    ●     Customer master u2013 receiving plant
    Create a customer master record for the receiving plant. From this, both the address and the data that is relevant for shipping point determination, such as transportation zone and shipping condition are taken.
    From the menu, choose Logistics ® Sales and Distribution ® Master Data ® Business Partner ® Customer ® Create.
    The above is from help.SAP:
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/4d/2b90dc43ad11d189410000e829fbbd/frameset.htm
    Plz check this link for tht information.
    So, basing on this: I have customer 1 and vendor 1 for CC1......
    --> Customer 1 is assigned to the receiving plant with sales area1 in setup STO configuration.
    --> Vendor 1 is assigned to the supplying plant in the vendor master.
    --> My question for u is:
      1)  In ME21N, in the vendor field u assign the vendor from CC1 or CC2 (Because it says the vendor - external supplier if u read in F1 in tht vendor filed)
      Company code , Purc Org, plant all this will be from CC1 in ME21N, right?????????
    Material exists in both the plants P1 and P2.......right?????
    2) How to configure the inter - company accounts for the billing in sd for this STO scenario.???
    Please clarify these things.....
    You will be appreciated and rewarded too.
    Thanks
    Keerthi

  • Cannot Input Goods Receipt for a Stock Transport Order

    Dear all,
    I created a stock transport order from one plant to another. But in the following "MIGO" transaction, the system indicates "Document xxxxxxxxx does not contain any selectable items".
    In the stock transport order, I simply input the supplying plant, material, the receiving plant for the material. The item category is "U" (Stock Transfer).
    Anybody have any idea?
    Thanks, Jerome

    Hi
    What is your process? is it via shipping or via only purchasing?
    If it is ony via purchasing, have you moved stock from Supplying plant to stock in transit. Then you can make MIGO.
    If it is via shipping, create delivery VL10B and PGI, Then do MIGO.
    regards
    Srinivas

  • Stock Transport Order Pricing Procedure

    Dear Experts,
    Please let me know the opssibility to configure pricing procedure for STO (Stock Transport order between two plants of same Company code..
    Pls explain in detail

    Hi,
    In SPRO > MM > Purchasing > Conditions > Define Price Determination Process > Define Schema Determination > Determine Schema for Stock Transport Orders > Here assign Calculation Schema "RM2000" i.e. Stock Transfer Document to Schema Grp Pur. Org, STO Type (For e.g. UB) and Supplying Plant.
    Calculation Schema "RM2000" has condiiton type P101 which will pick up the MAP of supplying plant automatically during creation of STO in ME21N ("Conditions" Tab).
    You can create new freight/delivery cost conditions in M/06 and assign in pricing procedure "RM2000" in M/08

  • Stock Transport Order deletion in case of GR

    Hi all,
    I have an stock transport order (STO) between plants with delivery output posted (Goods Issue) and also with a goods receipt in destiny plant.
    Problem is that if I set deletion flag in STO, system allows me to do that without any warnings.
    Is there a way to validate when a STO has been received by the destiny Plant?
    Thanks & Regards,
    AW

    Yes. It is a standard behavior. System will allow to delete the line item which has completed the good issue and goods receipt both.
    Actually the status of this STO got completed after you post goods issue and goods receipt.
    It is also like normal PO, when goods issue and MIRO has done, then you can set deletion flag to line item. System will allow deletion flag for archive process.
    If you want to restrict that, then you have to use badi or exit for that by your own logic.
    You can use the badi ME_PROCESS_PO_CUST.

  • HELP for all 5 TYPES of  STO  Stock Transport Orders with detailed scenario

    PLEASE help me understanding the detailed scenarios for all 5 TYPES of STO s
    as in my day to day job activities , i frequently handles issues related to STO s
    PLEASE HELP WITH DETAILED STEP BY STEP SCENARIOS

    Hi Jagatram,
    Standard SAP has the following methods For Stock transport order:
    1) One Step Transfer stock without using purchasing documents; Use movement type 301.
    2) Two Step Transfer stock without using purchasing documents; Use movement type 303 in Supplying plant and movement type 305 in receiving plant.
    3) Using Standard Transport Order (STO) without delivery in two steps. STO created in T-Code ME27, receiving plant posts goods issue (for returns), movement type 351 and supplying plant post goods receipt from using movement type 101.
    4) Using Standard Transport Order (STO) with delivery in one step. STO created in T-Code ME27, Receiving plant creates shipment and Goods issue document (for materials to be returned) with movement type 647 and goods receipt document with movement type 101 both created in one step.
    5) Using Standard Transport Order (STO) with delivery in two steps. STO created in T-Code ME27, Receiving plant creates shipment and Goods issue posted (for materials to be returned) with movement type 641.Goods receipt is posted in the supplying plant, movement type 101.
    6) Using Transportation scheduling agreement (TSA) with delivery in two steps. TSA created in T-Code ME37. Receiving plant creates shipment and Goods issue document (for materials to be returned) with movement type 641. Goods receipt is posted in the supplying plant, movement type 101.
    To achieve it, necessary configurations has to be done in Tcode- OMGN.
    SPRO>> Materials management>> Purchasing>> Purchase Order>> Set up Stock transport Order:
    1. Plant: For the receiving plant, maintain customer No-Plant (If using STO with delivery), for the Sales Org, Dist channel and Division.
    2. Checking Rule: Create checking rule.
    3. Define checking rule : Usually no change required here.
    4. Assign delivery type/checking rule: Assign the document type(UB) - Supplying plant- Delivery type(NL).
    5. Purchasing document type: Maintain the supplying plant- Receiving plant relationships for the doc type-UB, either 1-step or 2-step, as per business.
    Hope this helps!
    Regards,
    Shilpa

  • Stock Transport order with Freight Charges- Payable to an external vendor

    Hello
    we are implementing the stock transport order between two plants in SAP 4.7. The document type is UB and it has to be a two step process. We need to post the Freight Charges as well. The freight Provider is external vendor.
    What is the best way of configuring this scenario for freight cost?
    I did put the freight forearder vendor code on the conditiond tab detail of condition tyep FRA1 but  can't do the invoice verification for the same.
    Any tips are appreciated.

    Hello,
    This EhP4 feature addresses only the one step Stock Transport Order to subcontracting vendor for intra company.
    Does anybody know how to do a two steps Stock Transport Order to subcontracting vendor for intra company?
    By "two steps" I mean:
    1- Goods Issue from supplying plant A to in-transit stock of the subcontracting vendor at receiving plant B.
    2- Inbound Delivery Notification (IDN) at receiving plant B + Goods receipt against this IDN into the subcontracting stock at receiving plant B.
    Thanks and regards,
    Stéphane

  • Excise Pricing procedure for Stock Transport Order in MM  with TAXINN

    I am an SD guy running STO  from manufacturing plant to sales depot
    AND not able to create JEX proforma excise invoice from NL
    to TEST my configuration, I created excise invoice in J1IS with respect to goods issue from NL from UB  means configuration is ok
    BUT base amount in J1IS is coming as zero because of missing excise conditions in MM  STO pricing procedure
    CAN anybody give me a sample EXCISE pricing procedure for STO
    AND  do i need to create records for the condition types in FV11 OR  MEK1 please clarify
    I know that calculation type 362 attached to BASB in TAXINN has something to do with this
    I am able to see chapter ID in J1IS
    And the relation between condition types in TAXINN and excise pricing procedure for STO
    And I am able to create excise invoice in J1IG with zero excise values
    I also maintained pricing procedure determination for JEX in OVKK that is document pricing procedure N pricing procedure JINSTOCK
    I think my explanation is sufficient enough
    please give A sample of TAXINN

    Hi Yoga,
    Here u not need to do VL10b.just follow this steps and try.
    In PO,Document type is UB and Item Category is U.
    After creating PO,In MB!B with reference that PO number and using movt type 541
    then u can see that stock in Transit.Now u do GR with respect to PO number.
    Thanks & Regards
    Suresh.
    > Hello MM Gurus,
    >
    > I am doing Stock transport order between 2 plants
    > under same company code.
    > I have maintained all the required settings.Following
    > is the process flow.
    >
    > 1.Creation of Purchase order with document type
    > UB.(ME21N)
    > 2.Creation of outbound delivery with respect to
    > Purchase order.(VL10B)
    > 3.Post Goods Issue from the supplying plant. (VL02N)
    > 4.Creation of Excise Invoice in supplying plant.
    > (J1IS)
    > 5.Goods receipt at the receiving plant.(MIGO)
    >
    > While I am doing Goods receipt in the receiving
    > plant, system is giving an error
    > message "Maintain Vendor for the Excise Invoice" -
    > Message no. 4F185.
    > Why this message is coming and how to resolve this?
    >
    > Thanks & Regards
    > Yoga

Maybe you are looking for

  • Crystal reports 13.5 : Export to excel formatting

    Hi. We are developing web application using VS 2010. We are using crystal reports 13. Initially we had VB6 application which used crystal reports 8.5. The format for excel report generated by crystal report 8.5 and crystal report 13.5 is different. W

  • SQL Server 2005 replaced with SQL Server 2014 trying to connect front end Access as guest (read only ODBC)

    We have replaced a SQL Server 2005 with a SQL Server 2014 (new physical server.)  Have the new server set up to use SQL Server login OR Windows user login. Had old server connecting (for a particular DB) to front end Access (2010 or 2013) as guest fo

  • What is wrong with my login screen?

    Hello. I have a imac running with leopard. Today when i turned it on it went to its login screen then started violently shaking and saying something about typing in the master password.  It has never done this and you cannot ype anything. Does anyone

  • Mac Mini sound goes to zero on its own.

    I have had my mini since 2009. This issue has happened intermittantly since I got it but has happened several times in the last while. The sound output goes to zero. On it's own. I go into system preferences to sound and slide the bar back to my desi

  • Unreported exception java.rmi.RemoteException; must be caught or declared t

    I am receiving an: unreported exception java.rmi.RemoteException; must be caught or declared to be thrown error when I attempt to compile the Client.java file. The Client.java file implements the ATMListener.java interface. As you will see below, I'v