SM35: Batch mass processing

Hello Gurus,
I have more than 8000 Batch input to process because of the warning message #00349 saying that "Field &1&2 does not exist in the screen &3 &4" (these are batch input for transaction FB01).
when I process it in foreground and click on "Enter" at the time the message is displayed I can record the posting with no problem since this message is just a warning, it is however blocking the background processing...
I try to find a soculiton to process these batch in mass to avoide correcting each of them one by one...
I tried to use an LSMW but it is not possible for the transaction SM35...It is neither possible to deactivate the message with OBA5.
Do you have any smart solution?
Thank you in advance for your help
pascal

Essentially your session content is incorrect, it has not been filled factoring in the various available or non available fields based on the circumstances of each line item (tax indicator, field status, coding block etc.).
Foreground processing (e.g. by parking a heavy object on the enter key, done that...) is just a nasty workaround.
The sessions should be created again with the correct content, so they can be properly processed in background. Even better would be to use program RFBIBL00 for mass FB01 postings.
Thomas

Similar Messages

  • Cannot delete old sessions from SM35 - Batch Input...

    Cannot delete old sessions from SM35 - Batch Input...                
    We have an issue, we are trying to delete old batch input sessions via SM35 and no
    matter how hard we try we cannot get rid of them. They are still in status "In Process" but they are status incorrect.
    Those sessions have long finished and some are more than 5 years old.
    We have tried running rsdbcreo and RSBDC_REORG but it only returns with
    Temse Error, running SP12 does not list any inconsistencies. Basically we want all jobs in SM35 that ran this year only available in the SM35 queue, we have sessions that have run from year 2004 to 2008 we wish to
    delete.
    Anybody experience anything similar or have any advice, sorry this is an environment that i have inherited and wish to cleanup.
    We have checked the following notes 706478,76422,706478,76422 and many more.
    Thanks
    Suleman

    When you try to delete, you will be asked whether you want to delete logs too.
    Here try with 'No'.
    hope this helps

  • Mass processing of TO

    Hello all,
    I have a client scenario, in which picking is done. i want to know any SAP fuctionality that exists for mass processing of TOs. IF so, pl. post it the t-code and the procedure.
    Thanks,
    Maxx

    Hello Maxx,
    Instead of using very generic words, please be specific.
    btw,
    In picking process you can have the following optimization:
    1. Auto Delivery creation: You need to setup batch job to create outbound delivery automatically.
    2. Auto TO creation: You need to configure WMTA output type to create auto TO (Search forum for settings), for all WM relevent delivery will be picked automatically.
    3. When you go for auto TO creation, your search stretagy must be set.
    4. Auto TO confirmation: need to set configuration.
    Hope this helps.
    Regards
    Arif Mansuri

  • Mass processing of Workitems in UWL

    Hi, Gurus,
    i configured UWL for mass processing of decision steps, as shown in this blog - Mass/Batch Processing of Work items in UWL
    Now I need to pass some parameters for all selected workitems to workflow container, i need to transfer date to container of each selected wi.
    Standard action  "submitUserDecisions" working good, and before approval it shows window with 'Are u sure?".  I need to replace this window
    with own window, where the user can enter the date, and then pass it to container and complete tasks. Is it possible?
    I'm not familiar with UWL, an have no idea how to do this...
    Maybe I need to add button to view wich starts my WD4Abap application, but how I can pass selected items (items where user select custom attribute - radiobutton) into it? please help....
    Thank you.
    Regard's,
    Mayorov Oleg.

    Hi,
    Interesting question. I am a bit sceptical about that this would work. I see the following things that you should be able to achieve:
    -You need to have your own custom application instead of the standard pop-up (somehow implemented within submitUserDecisions) -> might be difficult/impossible(?)
    -You need to add a new container element to the task that will take the date value -> easy
    -You should be able to transfer the value entered by the user to the container element -> again I see this difficult. Event with standard "single" user decision you don't have this kind of functionality (well you have an option to use a free text box, but you cannot for example define a date field), so I don't understand how SAP would support something like that with this mass approval functionality.
    Not much help, but at least something. Maybe I would start investigating that what happens when you press the mass approval button (probably some function module is executed). Finally I guess that you should somehow be able to build your custom action & action handler, and when you would press that, a web dynpro application would pop-up, etc. I am not sure whether this is even possible. I hope someone else will have better ideas.
    Regards,
    Karri

  • Mass Processing for Forecast SOP

    Hi Experts,
    I have one requirement, I have to run Mass Processing for Forecast SOP in background Job based on consumption values updated in Material Master.
    I have followed all instruction give for doing this process (SAP SOP Mass Processing - SAPs'WORD - We SAP For Your Cause) but could not achieve.
    Can any one help to run in background job for Mass Processing for Forecast SOP.
    Thanks in Advance
    V.Sundeep

    Hello,
    Refer KBA    1778072 - Error message MA 653 when running mass processing forecast (program RMCP6BIN)
    Internal condition NOT IPRWA-VGVON IS INITIAL not fulfilled
    Internal condition NOT IPRWA-VGBIS IS INITIAL not fulfilled
    Forecast/historical period cannot be calculated MA 653
    Check your planning type which is used for your batch job. The number of historical periods in planning type (transaction MC8B) must not be smaller than the number of historical periods in forecast profile (transaction MC96). If the number of forecast period is maintained in the forecast profile (transaction MC96) the number of future period in the planning type must not be smaller than the number of forecast period in the forecast profile.
    A not appropriate entry in SOP User Settings (transaction MC79) in Number of periods in the planning horizon can have an effect on this also.
    Best Regards,
    R.Brahmankar

  • Mass processing & Back jobs

    Hi Gurus
    Can any one give me different background jobs and mass processing available in R3.
    This is reqd urgent
    Regards
    Subbaraya

    Mass Processing of Production Orders
    Use
    Mass processing enables you to carry out functions for multiple orders.
    Features
    Functions
    The following lists contain the mass processing functions that are available:
    Order headers
    Material availability check
    Release
    Printing of shop floor papers
    Costing
    Scheduling
    Generate capacity requirements
    WM material staging
    Picking
    Set/delete user status
    Confirmation
    Technically complete
    Close
    Log display
    Operations
    Release
    Print shop floor papers
    Picking
    Set/delete user status
    Confirmation
    Log display
    Components
    Print shop floor papers
    Picking
    Log display
    Production resources and tools
    Printing of shop floor papers
    Log display
    Starting Mass Processing
    Mass processing can be started in the following ways:
    Triggering the execution of a function
    The execution of a function can be triggered as follows:
    Execute function immediately
    The functions are executed directly after mass processing has been triggered. This can take a long time for functions that require a lot of system resources. However, you can immediately check whether the function was successfully executed.
    Execute function with dialog transaction
    Further processing is controlled by a dialog that is specific to the function. This option is available for the following functions: Confirmation, Picking, Log display.
    Create a function request (refer to Processing Requests)
    First, requests are created without any further checks. The requests are created very quickly. Mass processing is actually executed with the program COWORKDISPATCH. As a result, it is delayed until the next time the program starts. You can decouple the function in terms of time, so that the main work takes place at night, for example. The end users create requests and system administration takes care of their execution.
    Execute function in the background
    First, requests are created without any further checks. Then a background process is started, which processes these requests immediately. Scheduling a background job does not create any administrative work and reduces the workload for the dialog.
    Parallel Processing
    For parallel processing, you define server groups for mass processing (COWORK-DIALOG, COWORK-BATCH). This enables you to speed up the execution of processing.
    Mass processing online/ in the background.
    You can either execute mass processing online or you can schedule it in a background job (no online steps are possible).
    Application Toolbar with Mass Processing Functions
    You can define that an application toolbar, with selected mass processing functions, is displayed in the list of the selected objects. You can use this application toolbar to execute the functions in the dialog.
    For more information refer to Display Application Toolbar with Mass Processing Functions.
    Test Run
    You can decide whether changes caused by a mass processing function are executed in the form of a test run only. Error messages that may occur are collected. No changes are updated to the database.
    You can use the test run for these functions:
    Close
    Set/delete user status
    Release
    Costing
    Generate capacity requirements
    Technically complete
    Scheduling
    WM material staging
    To test a function, select the option Test function without changes to data on the Mass processing tab page.
    Log
    Log records are written and saved as a function is being executed. They provide information about the execution of a mass processing function. If no log record exists, the function was executed without any problems. The log records are assigned to the order or the collective order
    Regards,
    nandha

  • TECHO by mass process or via Job run ??

    Hi Experts
    Need one clarification on below issue on Production order Tech (Technical Completion)
    We have nearly 100 Orders which need to identify whether TECO by auto job run or via Mass process by using COHV transaction.
    Any thought to check which production orders are done via batch job or through COHV transaction.
    Thanks in advance
    Upinder

    Dear Upiner,
    Use T.Code COHV,after giving the inputs,select the mass processing tab,mention the function as 220 - Technically Complete
    and execute the program in background(Press F9) and check the results in SM37.
    Regards
    Mangalraj.S

  • Mass Processing pop up in BI 7.0

    Dear Experts,
                         I am getting popup window "mass processing" while doing status not ok(RED) for some delta loads in monitor screen(Before going for Repeat delta)
    Here it is asking for :
    " 2 Infoproviders still have to be checked ?
    Interactive or Automatic (without asking for confirmation)?
    Which option i need to select ? What is Interactive & Automatic ? I haven't seen this popup earlier. What could be the reason for this popup screen ? Please suggest how to proceed in this case .
    Thanks & Regards,
    Pcrao.

    Hi,
    One option I thought of, but never applied in practice. Create an excel with all the field related information in the structure of table,
    RSDIOBJ Directory of all InfoObjects
    RSDCHABAS Basic Characteristics (for Characteristics,Time Characteristics, and Units)
    *RSKYF Key Figures
    RSDTIM Time Characteristics
    RSDUNI Units*
    And upload this table with the flat using function module etc.
    But then you would need to update below tables to with relevant details.
    RSDIOBJT Texts of InfoObjects
    RSDIOBJ Directory of all InfoObjects
    RSDIOBJT Texts of InfoObjects
    RSDATRNAV Navigation Attributes
    RSDATRNAVT Navigation Attributes
    RSDBCHATR Master Data Attributes
    RSDCHABAS Basic Characteristics (for Characteristics,Time Characteristics, and Units)
    RSDCHA Characteristics Catalog
    RSDDPA Data Package Characteristic
    RSDIOBJCMP Dependencies of InfoObjects
    RSKYF Key Figures
    RSDTIM Time Characteristics
    RSDUNI Units
    Edited by: Parth Kulkarni on Jun 22, 2011 4:56 PM

  • Mass processing of Workorders-Reg

    Hi,
    We are having standard Tcode COHV for mass Processing of Production Order.
    Like that do we have any tcode for mass processing of Workorder.
    The reason behind is instead of having CO99 for closing the order with only one plant(my requirement is multiple plants and multiple order types) ,Is it possible to use IW38 in Background to change the order from TECO to CLSD.
    Because the option is given in IW38(Menu- Program-Execute in Background).If so how to do that?
    Pl throw some light on this.
    Regards
    KRISHNAN

    Krishnan,
    In my 4.7 A&D IS system, we don't even have a menu path starting with Program in IW72 or
    IW38 (Menu- Program-Execute in Background).
    Only Order > Completion > Complete business, but these programs are designed to release, TECO etc all from within the transaction.
    Additionally, you are not restricted to one plant and one order type in CO99. You can leave these open, you are then only restricted by one Controlling Area.
    Problem with that is that you are not restricted to PM orders, all order types are processed.
    If you are using PM task lists in all your orders, that may work for you as a selection criteria, but that's an unlikely case.
    If not, you should be able to reach an agreement with all internal order type users that all orders should be (financially) closed after n days in state of TECO.
    Most companies are keen not to leave any 'finished' orders open and available to financial postings.
    The usual late postings are differences in invoices and purchase orders. If there are a lot of these it is practical to wait a number of days and then close.
    The errors that occur afterwards can always be processed by reversing the closure.

  • Problem in COHV with mass processing function Release.

    Hello,Guru's
    I have problem in COHV with mass processing function Release.
    even after execution of COHV the status of Orders remains unchanged.i.e. remain Created instead of Release
      My user require all Orders should release in mass process
    with material availability Check .
    and OPJK setting is
    material availability
    Check availability during order release=X
    Release material = 1(User decides on release if parts are missing)

    > with material availability Check .
    > and OPJK setting is
    > material availability
    >  Check availability during order release=X
    > Release material = 1(User decides on release if parts are missing)
    Hi,
    With these two settings in OPJK, there will not be any impact on COHV.
    Any dates, date ranges you are inputing in the COHV.
    Try with Manually inputing some of the Orders in COHV and in the Foreground you try.
    Afterwards, try with Some selected Orders in the Background..
    You may get the clue for the problem..
    Regards,
    Siva

  • Batch determination process in SD- Delivery: any Function module?

    Hi All,
    I want to use the logic used in SD-Delivery for batch determination in Batch Search Strategy report.
    Is there any function module avaialable for batch determination process done in SD so that I can make use of it?
    Thanks in advance,
    Rgds,
    MAdhuri

    Hi Madhuri,
    My requirement is to select that batches that were picked up by the delivery (i.e. those that passed the search strategy) using the Material and Plant combination, Customer as an optional parameter.
    Could you please provide the function modules that are required to make use of the function module "VB_BATCH_DETERMINATION"? Also, could you please let me know if we need to take into consideration any other factors when using the function module VB_BATCH_DETERMINATION
    Thanks in advance!
    Thanks,
    Manohar. Dubbaka.

  • Mass processing by T.code COOIS

    Hi,
    How can I execute some mass processing in the T.CODE COOIS and  not only reporting.
    I canu2019t use u201Csettingsu201D and u201Cmass processingu201D in my system. They are deactived. Do I need some customizing.
    Thanks
    Dede

    Hi Glenn,
    Please use COHV - Mass processing by which you can execute the required changes.
    COOIS is purely used to collectively get the desired reports for the discrete production process( production orders, etc)
    Hope this clears your question.
    Thanks & Regards,
    Abhijeet Guha

  • QAC2 in mass processing

    Dear Experts,
    I know the transaction QAC2 for transfering inspection lot qty from plant to plat or storage location to storage location.
    When it is executed for an inspection lot and SL is changed or plant is changed a material document of mvt-323 is generated for each individual posting.
    But is there any transaction for mass processing of this activity and to create only one material document for bulk inspection lots.
    If any one knows about this, please update ASAP
    Regards
    Vivek

    There is no std SAP  T- code available which could process this in Mass .

  • Mass processing

    HI,
    Is it possible to st the Deletion flag to the process order through mass processing.
    Regards,
    Amit

    Hi ,
    Thanks for the reply.
    Actuallay in my senario we have a user status NDLF - No deletion Flag.
    So in mass processing i want to deactivate the NDLF status and want to activate the DLFL status. we are scheduling background job monthly once to do this activity.
    So  i was just trying through COID / COHV / COHVPI. Whether it can possible or not.
    But in COID mass processing we can update user status NDLF but we can not update  DLFL deletion flag.
    So i need to run 2 different  variant
    1 for Removing NDLF stataus through COID and
    2 for Updating DLFL status through program .
    Do you have any better solution than this.
    Regards,
    Amit

  • SOP mass processing problem

    Hi All,
    I am working on flexible planning in SOP.. I am trying to transfer the SOP plan to demand management through mass processing function..
    I have done the following...
    I created transfer profile through MC8S
    i created activity through MC8T  and assigned the transfer profile created earlier..
    then created a mass processing job through MC8D and then finally scheduled it... SOP plan is not getting transferred to demand management.
    I am getting the below error...
    When I transfer the plan manually through MC90 for each material transfer is successful...
    why  the plan is not getting transferred through mass processing.. can somebody help me out...
    Thanks
    Kumar

    Hi,
    Thanks for reply.. our planning periodicity is weekly buckets....
    I am sending the screen shots of the same....
    Screen shot of planning type...
    Screen shot of MC8D...
    I have entered plan in weekly buckets
    Now this is not getting transferred to demand management...
    Can you help me out...
    Thanks
    Kumar

Maybe you are looking for

  • Iphone 4 digital AV adapter will not display on tv while also charging iphone

    I was watching a video from my iphone 4 on my tv using the original (2011) version of the digital AV adapter (MC953ZM/A). This is the first time I've tried this. My iphone battery went dead, and cut off the video. So, I plugged the power adapter into

  • MBA glitches, esp menu bar

    So I've had some glitches with my 10-day old top-end 11" MBA First, Flash and Java worked for 3 days, then didn't for another 3 days, then started magically working again--no updates, no nothing, just decided to work again. The sleep/power/down/wake

  • Service PO Closer

    Hi Everyone, I would like to close the partial open service PO for the balance services. How do i do it? Regards Nitin

  • Need info on installing CRM 4.0 System

    Hi Gurus, I have questions related to CRM 4.0 systeminstallation. 1.Can I install CRM 4.0 system on Web AS ABAP + Java Add in system.Since,it will be a demo system,I want to install all the features/components of the CRM system. 2.What are the prereq

  • Rearranging clips in i movie

    Is there any way of arranging your clips automatically so the go back in order after you have shuffleed them around? Dan