Smpte counting meter for 24fps timeline

I am in urgent need of a smpte counting meter for 24fps timeline. Pls help. I need the 2 second beep for my sound mix. I know that I can get the count down when I burn to tape, but I need it built into the timeline. ANy suggestions? Or websites where I can find a free download.

Do a quick search of your computer for "Head Leaders for Cinema Tools" and you'll find a folder full of them.

Similar Messages

  • Movie playback lags SMPTE counter, self-corrects when advance by frame

    Recently playback of my QT movies has begun to lag the SMPTE counter by about 15 frames. At any given point when playback is stopped, the timecode burn in the QT reads appx 15 frame behind the SMPTE counter. Curiously, when I advance by 1 frame (using key command), or advance by measure, or jump to marker, pickup clock of region, etc., the video instantly snaps forward to the exact SMTPE code in the counter. Lag only occurs during playback. This actually makes the problem worse, because I can't merely change the start time of the movie to compensate.
    I've been using Logic for years without any sync problems. The problem is not file specific — the same lag occurs in Logic sessions I did just weeks ago with no sync problem.
    Any thoughts or insights much appreciated.

    Solved it – hope this helps someone else.
    By moving (and saving elsewhere) my Logic preferences, I narrowed it down a preferences problem. Turned out to be my setting for plugin delay compensation – not an early suspect, given that it is for AUDIO. I had it set to "All", in order to eliminate the several frame shift rendered to my bounces when using the AdaptiveLimiter. After setting it to "audio tracks and instruments", the video lag ceased.
    It will difficult to remember to change that setting every time I bounce a final mix, but at least the problem is solved.

  • Using J-meter for testing PI interfaces

    Hi all,
    I am planning to use j-meter for performance testing of PI interfaces. The concerned interfaces have an abap proxy to trigger the message at the sender SAP system. The receiver end is a database.
    Need information on how to use/configure the j-meter for this scenario. Also, using j-meter can we send message payload to integration engine directly or is it sent to through adapter engine only?
    Any kind of help is appreciated.
    Thanks,
    Amit

    Thanks for the response Ajay.
    I have configured the j-meter to send http request to inegration engine of PI.
    The request xml that I am sending is as follows:
    <SOAP:Envelope  xmlns:SOAP="http://schemas.xmlsoap.org/soap/envelope/"> 
    <SOAP:Header>
    <SOAP:Main xmlns:SAP="http://sap.com/xi/XI/Message/30"
    versionMajor="003" versionMinor="000" SOAP:mustUnderstand="1">
    </SOAP:Main>
    </SOAP:Header> 
         <SOAP:Body>
              <ns1:UnitOfMeasure xmlns:ns1="urn:sapappl:mdm:cp:eame:masterdata:uom:620"> 
                   <Record>
                        <FinishedMaterialCode>000000000000000233</FinishedMaterialCode>
                        <BaseUOM>KG</BaseUOM>
                        <AlternateUOM>GEB</AlternateUOM>
                        <UnitsInAlternateUOM>100</UnitsInAlternateUOM>
                        <UnitsInBaseUOM>2268</UnitsInBaseUOM>
                        <Active_Deleted></Active_Deleted>
                   </Record>
              </ns1:UnitOfMeasure>
         </SOAP:Body>
    </SOAP:Envelope>
    I am getting the following response from the XI:
    <SOAP:Envelope xmlns:SOAP="http://schemas.xmlsoap.org/soap/envelope/">
    <SOAP:Header>
    </SOAP:Header>
    <SOAP:Body>
    <SOAP:Fault xmlns:SOAP="http://schemas.xmlsoap.org/soap/envelope/"><faultcode>SOAP:Client</faultcode><faultstring>Error during parsing of SOAP header</faultstring><faultactor>http://sap.com/xi/XI/Message/30</faultactor><detail><SAP:Error xmlns:SAP="http://sap.com/xi/XI/Message/30" xmlns:SOAP="http://schemas.xmlsoap.org/soap/envelope/" SOAP:mustUnderstand="1"><SAP:Category>XIProtocol</SAP:Category><SAP:Code area="PARSER"/><SAP:P1/><SAP:P2/><SAP:P3/><SAP:P4/><SAP:AdditionalText/><SAP:ApplicationFaultMessage namespace=""/><SAP:Stack>System error in parser
    </SAP:Stack></SAP:Error></detail></SOAP:Fault>
    </SOAP:Body>
    </SOAP:Envelope>
    Any pointers as to why PI is not able to parse the request header?
    Thanks,
    Amit

  • I see people from different ages at my work and every month I need to count how many people from each age I've seen that month. How can I do to give the entries to numbers in a single cell and make numbers count them for me?

    I see people from different ages at my work and every month I need to count how many people from each age I've seen that month. How can I do to give the entries to numbers in a single cell and make numbers count them for me? The final result would be a spreadsheet telling there were 8 people from 20 to 39 years old, 14 peolple from 40 to 59 and so on...

    jpqcampos wrote:
    This appears to be an 'input form' using 'Radio Buttons' to select the category. Neither of these features are supported in Numbers '09.
    You can input the data on one table and summarize it on a second table, but the input table will continue to hold data for each event.
    And by using the Reorganize button, you can hide all but two rows of that table to approximate the appearance and performance of an input form.
    Here are the two tables, Data on the left and Summary on the right. Notes below.
    The grey-filled columns in both tables are 'working' columns, and may be hidden (as shown in the image below).
    Data table:
    D1 contains the word "TRUE" (in capital letters). (This row is always shown.)
    D2 is empty, or may contain any value except "TRUE" (This row is always hidden under the Reorganize rule.)The rest of Row 2 of this table requires the data shown: a number outside the range to be counted (999), and two checkboxes, both checked.
    D3 (and filled down the rest of column D):   =AND(OR(B2,C2),NOT(OR(B3,C3)))
    The formula returns TRUE only for the first unused row in the table (ie. the first row for which neither checkbox has been checked)
    Summary table:
    Column A contains labels for the age ranges to be counted.
    Column B contains the same information in the form necessary for the formulas in columns C and D. They need a numeric value, and that value must be the largest acceptable value in the range to be counted.
    C2 (and filled right to column D, then both filled down to row 5):
        =COUNTIFS(Data :: $A,"<="&$B,Data :: B,TRUE)-SUM(C$1:C1)
    Two changes from the previous example:
    COUNTIFS is used to separate the Native and Foreign counts as well as the age range to be counted.
    The amount subtracted from each result is the SUM of the earlier results, and includes the text value in the first cell of the column (which is interpreted by SUM as a zero).
    See note below regarding my earlier formula.
    When the greyed columns are hidden and the checkbox in the Reorganize pane is checked, the two tables will appear as shown below:
    Close the reorganize pane, and the 'data entry form' is ready to use.
    To use, enter the age first, then check one of the boxes.
    As soon as one box is checked, the row will be hidden, and the next (unused) row will be shown.
    Regards,
    Barry
    Note regarding formula in my earlier post:
    The earlier formula will give erroneous results as it subtracts only the count directly above it from its count of persons in the age range 0-n.
    In E2 of that table, replace "-E1" with "-SUM(E1:E$1)
    Fill down to E8.
    Ignore the instructions (in that post) following "Fill down to E8."
    B

  • Why is the preview window for my timeline so pixilated?

    why is the image in my preview window for my timeline so pixilated? im using a mac pro 16gb ram/ 6 core / firepro d300

    thanks for your feedback!  This is my first week with premiere and its been a lot of fun, but im still learning my way around and the terminology, so i appreciate all feedback and correction. 
    What I'm seeing in the program monitor is a sharp image when it's paused and a pixilated image when it's playing.  I'm not sure how, or where i would make the adjustments.  Also,  I have been using lots of educational videos on youtube to learn my way around, but is there like a book or something that will teach me the basics?  I don't want to be asking basic stuff on here.  Thanks again

  • What is the "Count" property for Servlet in Console?

    Wondering what the "Count" property for Servlet means in the Console. Is it instances
    or current uses? In other words, if the number is >1 does this mean that the Servlet
    implements the single-threaded model?
    Thanks,
    -Daniel

    btw one of the nice things about java is if you can't find the answer
    in the API or you are not sure what the API is saying you can always
    look at the source for the class your are looking at. the source files
    are in a file called src.zip or src.jar depending on the version.
    anyway just to make sure i understood i looked at the properties method
    in question.
    public String getProperty(String key) {
         Object oval = super.get(key);
         String sval = (oval instanceof String) ? (String)oval : null;
         return ((sval == null) && (defaults != null)) ? defaults.getProperty(key) : sval;
        public String getProperty(String key, String defaultValue) {
         String val = getProperty(key);
         return (val == null) ? defaultValue : val;

  • How do you change the view for the timeline in a movie

    not sure in new version how to do it

    Not sure what you mean by the "view" for the timeline.
    You can choose View>Wrapping Timeline to wrap the timeline.
    Double cliccking a clip in the timeline will open the Clip Trimmer for precise work.
    Matt

  • IBooks Author v. Keynote for digital timeline--URGENT

    I have been working on a digital timeline project that will be viewed on an ipad in a museum that a visitor can scroll through and also see on a large screen above the kiosk. I have gone back and forth on the best application to use for this project and had decided on Keynote. However, there are some limitations that I'm concerned about and am now wondering if iBooks Author would be the better choice.
    General design elements of timeline:
    background image on each page (created in PS)
    text boxes for each event, some with images
    The basic requirements for this timeline:
    being able to scroll forward and backward through five historical periods (used the "push" animation in Keynote)
    a navigation bar at the bottom of each page where a viewer can jump to any of the five periods
    being able to select an event for a "pop-up" screen with a larger version of the image and extended text description
    I have been able to accomplish most of this with Keynote. However, here are the problems I've encountered:
    Using animation effects for the "pop-up" screen won't allow a viewer to skip this option since as you click through, it triggers the action
    My work-around solution (going to a new slide to "fake a pop-up window") yields a pretty obvious powerpoint--looking transition
    When you scroll backwards, the slide "push" transition doesn't work. The basic way you scroll through pages in ibooks is actually preferable to slide transitions
    I really have to resolve this as soon as possible so that I can complete the entire timeline. So far, I have worked on one section to figure out a method. Any advice about which software to use would be very very appreciated. At the moment, I am leaning toward switching to iBooks Author but I want to make sure it can do what I need it to do.
    Thanks so much

    Hi,
    i have produced something similar in the past.
    whilst my answer is not to use either application you have mentioned, i must urge you to look at "Easy Timeline 3D"
    this really does give an awesome professional looking product that is simple to create.  search the app store or look at their website for more info:
    http://www.beedocs.com
    i do not work for them in anyway, but was really impressed with thier product ( it was this product, and its non availability on anything other than MAC that pushed me to ditch teh PC...!)
    hope this  helps
    Arran

  • Is there any "skip page count" command for last page?

    Hello,
    May I know if there is a command(such as even-skip-page-count) specifically for the document last page?
    I have a requirement where PO/Invoice T&C should be printed at the back of the last page only.
    The blog of Tim (http://blogs.oracle.com/xmlpublisher/2007/10/here_are_my_terms_conditions.html) covers
    only odd/even printing.
    Thanks in advance.
    Rownald

    nagornyi is correct.
    i will just expand a bit on the use but it can be found in the documentation.
    you will need to add a section break to the last page of your report
    and also remember to add the header information of you report.
    I may be wrong but when I left the header info out it was not printing.
    header information goes above the tags and footer(totals and stuff like that) below the tags
    Edited by: tarmenel on Feb 26, 2009 9:02 AM

  • WARNING: DW065: Display requirements not met for {7D4E9D10-AED6-485D-A2B0-9A1DF1A55545} Adobe Illust

    Exit Code: 6
    Please see specific errors and warnings below for troubleshooting. For example,  ERROR: DF024, DW063 ... WARNING: DW065 ...
    -------------------------------------- Summary --------------------------------------
    - 0 fatal error(s), 5 error(s), 1 warning(s)
    WARNING: DW065: Display requirements not met for {7D4E9D10-AED6-485D-A2B0-9A1DF1A55545} Adobe Illustrator CS6 Core 16.0.0.0
    ----------- Payload: {97BA0109-F6BE-4F50-8904-C19442D7216E} Adobe Bridge CS6 5.0.0.0 -----------
    ERROR: DF024: Unable to preserve original file at "C:\Program Files\Common Files\Adobe\Bridge CS6 Extensions\Adobe Output Module\mediagallery\resources\flashgallery\AUTORUN.inf" Error 5 Access is denied.(Seq 237)
    ERROR: DW063: Command ARKDeleteFileCommand failed.(Seq 237)
    ERROR: DR011: Deleting Registry Key - failure. E(Seq 69)
    ERROR: DR011: Deleting Registry Key - failure. E(Seq 66)
    ERROR: DW050: The following payload errors were found during install:
    ERROR: DW050:  - Adobe Bridge CS6: Install failed

    Nobody can help you without proper system info. If it throws a "display requirements not met" then it probably means what it says - your screen is too small.
    Mylenium

  • Setting column count dynamically for a Group

    Hi Experts,
    i want to set the column count dynamically for a group.
    Thnks,
    Ramani.

    You probably mean you want to change the colCount value for a GridLayout (assigned to a Group), right?
    To change this property from a view controller method, you can
    - create a boolean context attribute "changeColCount" and set it to true in the controller method
    - check this flag in method wdDoModifyView(), access the GridLayout instance and change the colCount value
    - reset the flag afterwards
    Armin

  • MOST OPTIMUM RT SETTINGS for sequence/timeline when cutting HD

    i cutting 720/24p HD on a MBP and am wondering what are the optimum settings?
    here's what i'm using as of now:
    http://f.imagehost.org/0132/FCPtimelinesettings.png
    i'm getting random dropped frames, have to render clips often, etc etc...
    just want to see what people are setting for their timeline.
    thanks!!

    720p24...wha? HDV? DVCPRO HD? ProRes? Optimal settings are those that match your codec. Look in the Easy Setups and choose the one that matches the codec you shot, then make a new sequence and use that sequence.
    #28 Having to render every clip in the timeline
    Shane's Stock Answer #28: When I put a clip in the timline, I have to render it before it will play. Why?
    Your clip settings MUST match your timeline settings. If you have DV/NTSC material, you need a DV/NTSC timeline. The frame rate, audio rate and dimensions (4:3, 16:9) all need to match exactly. In Final Cut Pro 6, this is easy, because when you drop a clip into the timeline, it asks if you want to set up the timeline to match the settings of the first clip you drag into it. Click YES and you are ready to go.
    However, in FCP 5.1 and earlier, it is a bit trickier.
    The most important thing you need to do is properly set up your project from the start, and the best way to do this is to choose a setting from the Easy Setups, located under the Final Cut Pro menu.
    Once you do this, you’ll need to create a new sequence. This is because the sequence that is already in your new project is setup for the typical default setting of DV/NTSC, or for the settings of your last project, which might not match what you are currently working with. So delete SEQUENCE 1 and create a new sequence:
    This new sequence will contain the settings you chose in the Easy Setup menu, and should match the format you captured.
    Shane

  • What is the reasonable battery count cycle for a new macbook pro?

    what is the reasonable battery count cycle for a new macbook pro? I just bought it and i found that the count cycle for the battery is 6, is that normal?

    First off, a MacBook Pro is not a Power Mac.  Power Mac is the nomenclature for Apple desktop machines prior to mid-2006.   Mac Pros also are desktops, but later than mid-2006.    http://www.apple.com/batteries/ covers Apple notebook batteries and other battery performance.  I've asked this thread be moved.

  • Play Count Zero for Songs Previously Played

    Does Play Count reset to zero if a song is not played after a certain amount of time? I have Play Count = 0 for songs that I know I have played.
    I am looking for ideas for why I have zero play count for songs that I have played.

    That's the answer then. Syncing is a "procedure" which, among other things, does all the work for you of finding out how many times each song has been played on the iPod and transferring that information back to iTunes. When you Manual Manage, all you are doing is manually dragging songs on and off, nothing else.
    Phil

  • "frags delayed" counter incrementing for Voice PVC

    Hi,
    We are using VoFR between two Cisco 2610 using FXO\FXS Cards. It is a point-point link with two PVCs, one for Voice and one for Data.
    I have implemented Traffic-Shaping and FRF. However when i do a "show frame pvc " command, i can see "frags delayed"counter incrementing for the Voice PVC, indiciating delay in sending packets and thus compromising Voice Quality.
    1. Is it normal to have this counter increasing ? What is the acceptable percentage i.e "frags delayed \ total frags" ?
    2. Is there anything i can do ? Would PVC Priority Queuing help ?
    I need to be sure if PVC Priority is the solution, as we would have to do a Flash Upgrade to install the new software with this feature.
    ++++++++++++++++++++++++++
    show frame pvc 103
    PVC Statistics for interface Serial0/0 (Frame Relay DTE)
    DLCI = 103, DLCI USAGE = LOCAL, PVC STATUS = ACTIVE, INTERFACE = Serial0/0.3
    input pkts 373951 output pkts 374604 in bytes 11542352
    out bytes 12245392 dropped pkts 0 in FECN pkts 0
    in BECN pkts 0 out FECN pkts 0 out BECN pkts 0
    in DE pkts 0 out DE pkts 0
    out bcast pkts 5474 out bcast bytes 1571038
    pvc create time 11w3d, last time pvc status changed 04:06:31
    Service type VoFR-cisco
    Voice Queueing Stats: 0/100/0 (size/max/dropped)
    Current fair queue configuration:
    Discard Dynamic Reserved
    threshold queue count queue count
    64 16 2
    Output queue size 0/max total 600/drops 0
    configured voice bandwidth 30000, used voice bandwidth 0
    fragment type VoFR-cisco fragment size 320
    cir 32000 bc 320 be 0 limit 40 interval 10
    mincir 32000 byte increment 40 BECN response no
    frags 374604 bytes 12261814 frags delayed 6501 bytes delayed 1609296
    shaping inactive
    traffic shaping drops 0
    +++++++++++++++++++++++++++++++++++

    The following links explains the delay in voice traffic and gow to do traffic policing
    VoIP over Frame Relay with QoS (Fragmentation, Traffic Shaping, LLQ / IP RTP Priority)
    http://www.cisco.com/warp/public/788/voice-qos/voip-ov-fr-qos.html#15
    Troubleshooting Output Drops with Priority Queueing
    http://www.cisco.com/warp/public/105/priorityqueuedrops.html
    Understanding Delay in Packet Voice Networks
    http://www.cisco.com/warp/public/788/voip/delay-details.html
    Voice QoS: ToS-CoS Mapping Via LLQ
    http://www.cisco.com/warp/public/788/voice-qos/tos-cos.html
    Frame Relay Traffic Shaping for VoIP and VoFR
    http://www.cisco.com/warp/public/788/voip/fr_traffic.html

Maybe you are looking for

  • Can't get phone to sync with multiple Google Calendars?

    I set up multiple calendar accounts with Google but have run across an issue..... When I perform a sync from my phone it only syncs with my first "primary" calendar. The items in my "primary" calendar are the only ones that appear on Google Calendar.

  • BPM 11g development environment

    I'm wondering what people are developing 11g BPM processes on. Running JDeveloper, Admin Server and a seperate soa suite server and a browser (database is remote) is killing my PC. The machine is decent spec: 4GB RAM, dual core cpu but things are slu

  • Issue with Safari (passwords)

    It used to be that when I went to a password site like my Amazon or the Wall Stree Jorunal that I was able to bypass the log in page and go right into the sites. Now whenever I go to a site that requires me to log in I have to go through the log in p

  • BADI_LE_SHIPMENT

    What does this BADI do? Can I use it to update deliveries on my shipment through vt02n?

  • IPhone 5 - when will there be an unlocked version offered?

    Not seeing an unlocked version offered in the pre-order.... any clues as to when the unloced version will be available?