SNP PPM schedule duration

Hi dear APO experts,
In SNP PPM, for each activity duration only days allowed. So if there are 2 activities in one PPM and each take 1 day, then SNP planned orders created with such PPM will take 2 days in scheduling. Is it possiblle to set the schedule duration to only 1 day in such case?
Best regards

Hi,
the details of SNP PPM is as below:
For example, the SNP PPM only have one operation and under this operation there are 2 activities -
activity 1 and 2, which are both of type Produce. Each activity will take a fix duration of 1 day. The sequence relationship between these two activities will  be activity 2 to follow activity 1.
And dear Digambar Narkhede, could you kindly tell me where in PPM to define the "increment"?

Similar Messages

  • Multiple Resource in SNP PPM

    Hi Experts,
    I have scenario where bottleneck resources changes with time. Lets say that I have two workcenters WC1 & WC2. Operation 10 will be performed through WC1 and operation 20 will be performed through WC2. SFG1 is input material for operation10 and FG1 is output material through WC2. So SFG1 will be processed through WC1 & WC2 and output material is FG1. Operation 10 & 20 are sequential operations. WC1 & WC2 have the same scheduling time for both the operations 10 & 20
    Now, WC1 runs in three shifts in May'10 and WC2 runs 2 shifts in May'10. So WC2 is bottleneck resource in May'10. In June'10 WC1 runs in two shifts and WC2 runs in three shifts so WC1 is the bottleneck resource in June'10. Simply, bottleneck resource can be either WC1 & WC2 depends on time.
    So in my routing I have two operations and operation 10 contains WC1 & operation20 have WC2. Further, we created Production Version (PV) and CIFed as PPM. When converting PP/DS PPM to SNP PPM I can chose only one mode so only one work center (resource) in one PPM and another work center in another PPM. We need both workcenters in one SNP PPM.
    Could any one guide to meet this scenario.
    Thanks,
    Naveen
    Edited by: Wilian Segatto on May 14, 2010 11:54 AM

    Hi Bandana,
    I am trying the same but I am not able to create single Resource,
    Would u plz briefly explain me what parameters u are providing,
    Thanks,
    Radhey

  • Mass Upload of Define Mode Combinations_PPDS to SNP PPM

    Dear All ,
    I am converting huge numbers of PPDS PPMs to SNP PPMs , I would need your support in telling me a mass upload ( program ) for defining Mode Combinations transaction .
    As such a BDC has been prepared but that takes a very long time for pushing data in this transaction .
    Thanks and Regards ,
    Prashant Kumar

    Dear Murali ,
    I have specific field values e.g. variable lot size , without PPDS Campaign , Blank Mode Combination to be selected .
    When we select the PPDS PPM no. or Product Location Combination inserting all these values in the table after execute done on the selection screen needs manual entry of all the field values .
    Data is really very huge and was wondering if there could be a quicker way out . There is more SNP PPM converted from PPDS PPM due to alternate modes of 10-15 in many of the PPDS PPMs .
    Would appreciate any further help .
    Thanks and Best Regards ,
    Prashant Kumar

  • Error In SNP PPM Creation . . .

    Hi All,
    I am getting following error message while converting PPDS PPM to SNP PPM. . .
    " SNP-relevant and non-snp relevant modes exist in operation "
    Please can someone let me know the solution on this. .
    Thanks in advance.
    Regards,
    PP.

    Hi,
    Please  check if any  single or multi-mixed resource has "Not SNP Rel. indicator" has  been set on the Planning Parameters tab page is in the PPDS ppm.
    Regards
    Datta

  • Getting error while trying to generate SNP PPM

    Hi Experts,
    I am getting error, while trying to generate SNP PPM fron PP/DS PPM. It says Set up matrix for resource in planning version is not define. But I checked that i havea set up matrix as well as setup group.
    Any help will be appreciated. Thanks In advance.
    Sani

    Hi Sani,
    Try running resource & ppds ppm consistency check against
    their respective transactions (/sapapo/res01 & /sapapo/scc_03)
    and check any inconsistencies found.
    Regards
    R. Senthil Mareeswaran.

  • Upload single level variable cost in SNP PPM in mass by MASSD

    Hi experts,
    I am trying to upload single level variable cost in SNP PPM in mass by MASSD by following selections:-
    Selection
    Object Type:- PPM
    Selction Criteria:-
    Component:- Plan        Attrib:- Use of Plan
    Component:- Plan        Attrib:- Plan
    Components & Attributes to be Maintained
    Component:- Plan        Attrib:- Var.Sing.Lvl Costs
    While maintaining the cost, under selection criteria, compoment: PLAN and attribute: PLAN I am unable to maintain multiple plan names.
    The single level variable cost that I have to maintain for all these plans is the same and therefore was trying to use transaction MASSD
    Can you please throw some light on how multiple PLAN selections can be done?
    Regards
    Chetan

    DEAR GURUS,
    *There is a question regarding the resoucre  consumptions  relevant to PDS in SNP,*
    ****The inputs are:****
    ****1) Base Qty= 7700 TH****
    ****2) Set Up =45 MIN****
    ****Resource consumed by operation activity is 112 207 seconds = 31,17 hours.****
    ****Unfortunately we didnu2019t understand how this figure is calculated.****
    ****Can you please help us in this****

  • PPDS PPM to SNP PPM

    Hello Experts,
    I am CIFfing production versions to create PPDS PPMs in APO. From there I am creating SNP PPMs.
    The question is, when I do initial CIF of all the production versions(some production versions are old and some are new), how do I find a list of the PPDS PPMs that are still not converted to SNP PPMs.
    Also is there a list which shows PPDS PPM plan along with the respective SNP PPM plan?
    I tried referring the table /sapapo/plan, but it just gives the plan number, date of creation etc etc. Not even the Input/ouput products and the location.
    Regards
    Manotosh

    Hi,
    Use the BAPI : BAPI_PPMSRVAPS_GETLIST to get the PPM details.
    /SAPAPO/PLAN_GEN to get the details of SNP PPM generated from PPDS PPM in the coloumn Plan generated.
    Thanks,
    nandha

  • SNP PPM Generation from PPDS PPM - Time less than 1 sec. in snp bucket con

    Dear All,
    Request immediate help .
    (a) My PPDS PPM have time elements less than 1 seconds towards processing time and there are operations without a set up time .
    (b) While converting such a PPM PPM into an SNP PPM I get an error of bucket consumption as SNP cannot convert less than 1 second into a daily bucket .
    (c) I have to maintain the base qty in BOM and Routing as 1 unit hence cannot increase the same .
    (d) Is there a way in which SNP PPM can be generated from a PPDS PPM wherein the PPDS PPM has only a processing time of 1 second and no set up time .
    (e) Infact I have tried to convert the PPDS PPM with a time of 1.5 seconds but now I have lot of products where the routing suggests a processing of less than 1second and no set up . This is leading to a PPDS PPM of time less than 1 second and SNP PPM is not getting generated as guess it cannot convert a PPDS PPM with less than 1.5 seconds in a day .
    Would appreciate a quick response .
    Thanks and Best Regards ,
    Prashant Kumar

    Hi
    Firstly, can I ask why the base unit has to be 1, this seems a strange restriction?
    If it has to be, then two possible solutions:
    1) In the CIF enhancement CIFPPM01 you could multiply all values by, for example, 100 to give you larger values in the PP/DS PPM in APO and hence of a size that SNP conversion can cope with.
    2) In one of the BADI's /sapapo/ppm_calc or /sapapo/ppm_gen you can do the same conversion factor if the PP/DS PPM has to also be 1 unit.
    Hope this helps
    Ian

  • Converting PPDS PPM to SNP PPM

    Hello,
    On converting a PPDS PPM to an SNP PPM which has multiple activities(operations).  Is there a way to generate the SNP PPM the same number of activities included in the PPDS PPM to capture one Resource for each SNP PPM.  Or it has to be converted multiple times?
    Thanks.
    Edited by: Wilian Segatto on Aug 18, 2010 3:19 PM

    Hi,
    Below is an example:
    PP/DS PPM A
    Activity 1 - Resource A
    Activity 2 - Resource B
    Activity 3 - Resource C
    If PP/DS PPM is set-up like the example above, can this be converted to 3 different PPMs for the 3 different resources in one conversion?  Or i would need to do the conversion three times to generate the SNP PPMs (examples below)?
    SNP PPM 1A    
    Activity 1 - Resource A
    SNP PPM 1B    
    Activity 1 - Resource B
    SNP PPM 1C    
    Activity 1 - Resource C
    SNP PPMs are set-up per resource to monitor utilization and capacity per resource.  Also, resources are set up per production line in ERP.
    Thanks
    Edited by: pipsquik on Aug 17, 2010 3:03 AM

  • Linking SNP PPM to desired ECC production version

    Hi
    We have a need where we manually create SNP PPMs and so the APO and ECC have no connection in terms of the PPM or production version.
    I have two SNP PPM1, PPM2 in APO and I have two production versions in SAP ECC, VA and VB.
    The requirement is to some how maintain a table in APO where we can choose to map the SNP PPM to ECC production version.
    something like
    SNP PPM1 and PPM2 both need to refer to version VB so that an SNP planned order pushed into ECC would automatically pick up production version VB.
    Appreciate if any one can throw some light on how we can create a user maintained table or Z transaction  in APO to achieve this.

    Hello KA,
    Could you please let me know why you want to change the source of supply in ECC only?
    Do you have PPDS? If yes then you can have one source of supply for that production version VB and transfer these orders to ECC system.
    Apart from that if you want to do the development then check FM /SAPAPO/DM_PROD_ORDER_CHG_OLTP inside that with your own custom logic you can update the production version.
    Best Regards,
    R.Brahmankar

  • SNP PPM Activation

    Hi All:
    I have created a SNP PPM which is also activated .I have a PIR for same product for which produrement type is production.While running SNP heuristic I am getting Planned Order but source is supply is shown as blank.Can some one tell me how this inconsistency can be resolved ?
    Ashish Gupta

    The demand is in Location A.
    The PIR says to get the product for Location A from Location B.
    The PPM is in Location B.
    Product in Location B says in-house.
    Version is set to "no orders without source of supply".
    Is that your setup?

  • Switch between SNP-PPM and SNP-PDS

    Hi,
    In APO I have both SNP-PPM and SNP-PDS, but right now I am having some trouble with the bucket time from the PDS so I am trying to temporarly change my PDS to PPM.
    My query is:
    - Is there a way in APO to make the SNP-PPM the default production model over theSNP- PDS?
    I was searching for some kind of documentation on this topic and I found that I should change the priority for the PDS throught the PDS_MAINT transaccion in ECC, is this the only way to do it?
    Thank you in advance,
    Fernando

    Hi ,
    SNP heuristics  planning source determination gives first preference to Quota arrangement.
    You may include PDS as a source of supply in the inbound quota arrangement of the product.
    There is a BADI  BAdI /SAPAPO/PWB_SOS to modify the content and the sequence of the sources of supply in the ranking list.
    The normal ranking list for SNP source determonation  is as below:
    Quota arrangements
    Procurement priority
    Procurement costs
    Procurement type
    There are two other BADIs releveant as below:
    u2022        /SAPAPO/CURTO_SNP ) Enhancements When Creating an SNP PDS (R/3) (Generation)
    u2022        /SAPAPO/CULLRTOSNP ) Change SNP/CTM Production Data Structure Data (Generation)
    Hope this gives some options.
    Regards
    Datta

  • SNP PPM and Co-products

    Hello All,
    Our design is to have one SNP PPM with more than one output products. Howeverm when there is demand for one product, the receipt for only that product should be generated. For example:
    Product A - Demand = 100
    Product B - Demand = 0
    Product C - Demand = 0
    When I run heuristic, I get a planned order of 100 for Product A which is good. But what i am also seeing that manufacture of products for Product B and Product C.
    Is there a way to prevent the creation of the manufacture of co-products eventhough the SNP PPM has more than one output components.
    Any ideas?
    Thanks in advance.

    Hi Virendar,
    Thanks for the input. But the flag you were suggesting wouldn't really help because all the products that are in PPM are output products and not components. As per my requirement,
    If
    Product A - Demand = 100
    Product B - Demand = 0
    Product C - Demand = 0
    I need a planned order for only product A and nothing for the other 2 products
    If
    Product A - Demand = 0
    Product B - Demand = 100
    Product C - Demand = 0
    I need a planned order for only product Band nothing for the other 2 products
    And so on and so forth.
    Thx

  • SNP Interactive Planning. Problems for SNP PPM plant

    Hi All
    Can you advise please why SNP interactive planning does not create SNP planned order when there are SNP and PP/DS related PPMs together.
    And once i delete SNP PPM, SNP interactive planning creates SNP Planned Order without any problems.
    Once i again create SNP PPM and run SNP interactive planning- it does not create planned order to fullfill demand.
    Thanks
    Best Regards
    Andrey

    Hi Nandha
    Thanks! You solved a problem. PPM had maximum/minumum lot size 100 while in product master in Quantity determination max/min lot size fields were empty.
    I've added the same values to product master as in PPM and run again SNP interactive planning.
    And planned order was created.
    Thanks!
    Best Regards
    Andrey

  • SNP PPM Selection Criteria

    Hi Experts,
    I would be really glad if you could help me regarding this issue.
    I have 2 Materials with 2 SNP PPMS. The SNP PPMS were generated by converting PPDS PPMS  which was cifed from R/3. The production versions in R/3 has the same validity date.
    Lets say for Material A:
    - It has 2 production versions and 2 SNP PPMs
    - PRD1 and PRD2
    - when I had run the SNP location heuristic it had selected PRD1.
    Material B
    - It has 2 production versions and 2 SNP PPMS
    - PRD1 and PRD2
    - when I had run the SNP location heuristic it had selected PRD2.
    May I kindly ask therefore how PPMs are selected by the APO system in the case of SNP PPMs running SNP location Heuristic? Unless I understand the process, I cannot still create alternative PPMs. I cannot always assign manually the Procurement Priority of all the PPMs generated.
    I am really hoping you'd help me regarding this issue.
    Thank you so much.
    Sincerely Yours,
    Ria
    Edited by: Ria Montealto on Jul 31, 2008 10:16 AM

    Hello ,
    As you must be aware the basis for selection of ppm are 'quota arrangment' ,'procurement priority' ,'costs(multilevel cost)' ,'procurement type' .
    Kindly refer to following link for more detailed information and how this ranking list can be changed. "http://help.sap.com/saphelp_scm2007/helpdata/en/1c/4d7a375f0dbc7fe10000009b38f8cf/frameset.htm ".
    Also if all the parameters are same , it will refer to nomenclature of the ppm as the ppm name contains the version number ciffed from r/3.
    For example, if there are versions "0001 " and  "0002 " in r/3 and these versions are ciffed to APO to create ppm .
    The snp hueristics will select the ppm of prod. version 0001 .
    Thanks & Regards
    Abhijit S Nakhwa

Maybe you are looking for

  • Panel fixed width

    My frame contains a panel, which contains 2 buttons and a label, like this: button1 | button2 | label The panel layout is GridBagLayout, all 3 components are anchored WEST, fill is none. The text of the label varies dynamically: it represents a numbe

  • How do i reset my security questions? I can't find anything that will let me change them

    I need to reset my security questions but i can't find anything that says reset questions here.

  • New to MDM

    Hi Recently i got new project on MDM ,my requirement is like this Here is the information on the requirement we have in the procurement area to report on u201CDiversity Indicatoru201D. we have to analysis at some point on bringing vendor data in.  Wh

  • Fonts hard to read at small font sizes in browser.

    Hi! Recently i switched to Arch 64-bit and everything seems fine but the fonts at some places. This is what they look like: This is my .fonts.conf: <?xml version='1.0'?> <!DOCTYPE fontconfig SYSTEM 'fonts.dtd'> <fontconfig> <match target="font"> <edi

  • Flashback OS X 10.5.8

    Have been having some issues lately and just read about flashback.  I saw a patch was available, but only for more recent OS, not 10.5.8.  I do keep getting an Adobe pop up, so that is why I am suspecting flashback.  I'm computer illiterate.  I use m