So is my plan pricing getting lowered automatically?
I'm on the 15 GB plan for $110 which is now $100. So is Verizon going to automatically give me the lower price?
I just called about the new more everything promotion just started today. Your discount is because of the promotion. I was at 6gb for 80.00 with the promotion would be 6gb at 60.00.
I decided to go with 10 gb for 80.00.
Similar Messages
-
Issue with Planning service getting crashed Automatically due to dll file
Hello,
I am having an issue with the Hyperion Planning service which is getting crashed and the following is noted in the Eventviewer:
Faulting application name: HyS9Planning.exe, version: 1.0.0.2, time stamp: 0x4d110efc
Faulting module name: jrosal.dll, version: 0.0.0.0, time stamp: 0x4e8c8104
Exception code: 0x40000015
Fault offset: 0x000000000000cb0b
Faulting process id: 0x1960
Faulting application start time: 0x01ce14f7a8434b04
Faulting application path: D:\Oracle\Middleware\user_projects\domains\EPMSystem\bin\HyS9Planning.exe
Faulting module path: D:\Oracle\Middleware\jrockit_160_29\jre\bin\jrosal.dll
Report Id: 967733e6-8152-11e2-9257-5cf3fc335086The following is recorded in the log file:
<Mar 2, 2013 2:45:22 PM CST>
<Error> <HTTP> <BEA-101017> <[ServletContext@271625046[app:PLANNING module:HyperionPlanning path:/HyperionPlanning spec-version:2.5 version:11.1.2.0]]
Root cause of ServletException.
java.lang.OutOfMemoryError: classblock allocation, 11312928 loaded, 11M footprint, in check_alloc (src/jvm/model/classload/classalloc.c:215).
Attempting to allocate 2G bytes
There is insufficient native memory for the Java
Runtime Environment to continue.
Possible reasons:
The system is out of physical RAM or swap space
In 32 bit mode, the process size limit was hit
Possible solutions:
Reduce memory load on the system
Increase physical memory or swap space
Check if swap backing store is full
Use 64 bit Java on a 64 bit OS
Decrease Java heap size (-Xmx/-Xms)
Decrease number of Java threads
Decrease Java thread stack sizes (-Xss)
Disable compressed references (-XXcompressedRefs=false)
at java.lang.ClassLoader.defineClass1(Native Method)
at java.lang.ClassLoader.defineClassCond(ClassLoader.java:631)
at java.lang.ClassLoader.defineClass(ClassLoader.java:615)
at java.security.SecureClassLoader.defineClass(SecureClassLoader.java:141)
at weblogic.utils.classloaders.GenericClassLoader.defineClass(GenericClassLoader.java:343)
Truncated. see log file for complete stacktraceI checked the following forum
Re: Oracle JRockit R28.2.2. OutOfMemoryError: classblock allocation
Should I need to increase -XX:MaxClassBlockMemory to 75M. If so, how should I do it, I am unaware of how I can set the values? My Planning server has 136GB Ram and 18 Cores.
Thanks,
hyperionEPMThe issue was related to the heap size being too much and as a result the Class block memory was not getting enough memory. I think we can make a use of -XXCompressedRefs:32 parameter in the Java start up to allow the heap size to increase till 32 Gb.
-
I want to delete my old account: [email protected] and start over with my correct email-account: [email protected], but every time, I try to by a plan or get a new membership, the site tells me, that Creative sui is not available in my country, the democratic republic of Congo!!!!, but I live ind Denmark. Hoew can I buy, and how doo I change my Adobe Id in my CC desktop. Ive tried for several days, but no matter which membership, I ask for, the answer (congo is the same. What to do???
Change/Verify Account https://forums.adobe.com/thread/1465499 may help
-http://helpx.adobe.com/x-productkb/policy-pricing/change-country-associated-with-adobe-id. html -
Sales order quantity gets confirmed Automatically
Dear All,
I have make to order Scenario. i have done all setting required for MTO.
however i create sales order my order quantity gets confirmed automatically. same time there is not stock available for material.
plz suggest how to stop confirm qty. in sales order?
Thanks & Regards
RatishHi Ratish,
Please check the configuration settings in the IMG for Availability check.
You check have maintaining availability checking group 01 or 02 in the Material master.
Have you assigned Checking rule AE -SD order; make-to-order stock for checking group 01 or 02 in the IMG
Spro>sales and distribution>Basic functions>Availability check and transfer of requirements>Availability check>Availability check with ATP logic/Against planning>Carry out control for availbility check.
I hope it will help you,
Regards,
Murali. -
How Preventive Maintenance Order Gets Generated Automatically
Dear Sir,
We have defined an equipment requiring Preventive Maintenance every month . We want that Preventive Maintenance Orders for this Equipment should get generated automatically for next comming 3 months .
Kindly guide us as what steps need to be followed so that Orders are generated automatically .
With Thanks & Rgds
SoniaHi for this please refer below link as u want call object in monthly basis kindly use single cycle plan for this.
[Please see|http://help.sap.com/saphelp_erp60_sp/helpdata/en/3c/abbcf6413911d1893d0000e8323c4f/frameset.htm]
Revert for any queries.
Rip -
Have you had high cc usage for a planned expense that lowered your FICO scores?
In a week or so I am initiating some home improvements and repairs. I know the charges to my cc will be way over the ideal limit until I pay it(them) down, but I now have zero interest on several cards so now is the time to do it. Has someone done this and seen their credit scores sink to the bottom of the barrel? I am thinking I should just not look at scores while I am doing these necessary things and just continue paying down the balances until my credit scores recover. How badly did your credit take a hit if you have done this? Was it worth it to you? (I only just got these scores in the last weeks due to utilization and new accounts.) Oh, and what is considered 100% usage? How close to the limit can I go? Thank you for any responses. In my wallet: Venture 15k; Barclay Ring 12.5k; Discover 10k; CareCredit 7.7k; Amazon Store Card 5k. QS 5k; Band of A Travel Rewards 3.5k; Bank of A Travel Rewards 3.5k; Bank of A Platinum Visa 2k; Barclay Apple Rewards 2k. Total Credit: 66,200. 7/2-FICO: EQ - 788; TU - 777; EX - 690; Utilization: 12%; GOAL: 780 across the board then 800 across the board. Inquiries: EQ: 5 TU: 7; EX 3; Chapter 13 seven years May, 2015. Reset my garden date to 6/27. Gardening until further notice.
Musiclover wrote:
Have you had high cc usage for a planned expense that lowered your FICO scores?I don't recall but I have been up to 76% recently. However, the balance was immediately paid off. I don't recall if reported or not. The impact didn't really matter since it was going to be paid off immediately. Musiclover wrote:
Oh, and what is considered 100% usage?
Utilization is balance/limit. If the balance equals the limit it's 100%. Musiclover wrote:
How close to the limit can I go?Depending on the card you may be able to exceed the limit. However, such cards would require that you immediately pay any balance exceeding the limit. For scoring purposes it is recommended to not exceed 30%. However, short term high utilization generally isn't an issue. It's prolonged high utilization that can get you into trouble. Be aware that there is a double hit from having high utilization on a card and having itmaxed out (generally >90%). Musiclover wrote:
I know the charges to my cc will be way over the ideal limit until I pay it(them) down,How long will that take? What utilization would you be at initially? How long would it take to get it down to 50%? Under 30%? -
on my windows 8.1 pc (i5 processor with 8GB ram) I can't get the automatic update voor CS4 master collection. I removed my panda antivirus and still can't automatically update. somebody any suggestion?
thanks for your reply.
in Dutch it says that there are no updates available. I know that after
installing cs4 there are updates but i can't load them automatically. I did
a delete and reinstall, but still get the message.
kind regards,
2014-09-23 16:28 GMT+02:00 Atul_saini123 <[email protected]>:
on my windows 8.1 pc (i5 processor with 8GB ram) I can't get the
automatic update voor CS4 master collection. I removed my panda antivirus
and still can't automatically update. somebody any suggestion? created
by Atul_saini123 <https://forums.adobe.com/people/Atul_saini123> in *Downloading,
Installing, Setting Up* - View the full discussion
<https://forums.adobe.com/message/6755843#6755843> -
Open Item not getting Cleared automatically
Dear Sir,
For a GL "Cenvat Clearing" , we have ticked the option "open Item Management" in FS00 .
Our business scenario is as below :
After MIGO , we do excise posting using J1IEX and here in the posted Fi document the GL "Cenvat Clearing" gets Credited . Subsequently during the MIRO this GL i.e "Cenvat Claering" gets Debited .
My problem is that when I see in FBL3n for this GL the relevant transaction still appear under the open Items . Pl guide me , as what is the reason for this entry not getting cleared automatically .
Regards
B Mittal
RegarPO number cannot be taken as sort feild hence the value is in blank always.
You need to identify some value for this feild and as a process you need to tell your users to incorporate the same at the time of doing MIRO.
Or other wise you can take out the assignment of sort key to this GL account, and as a process you can instruct your user to use reference feild and input a value. If you fell that this is a tedious process,
the Identify another feild that is common for both debit and credit line items and try to post with a common valuie using, one ABAP program which will update this feild. Mind that this feild need to be in the OB74.
reward if useful
sarma -
The delivery schedule lines don't get created automatically on MRP run.
Hi All,
The delivery schedule lines don't get created automatically on MRP run for subcontracting material. I have maintained source list as follow eg.
Valid from | Valid to | Vendor | Porg | PPI | Agreement | Item | Fix | MRP | MRP area
02.11.2009 | 31.12.2999| XYZ | XY01| |AA0000XYZE |10 | X |2 | ABC
Could you please help me about this issue
Thanks in advance.Hi Amit,
Please ensure the value of Special procurement key in the MRP2 view for the material. It should be maintained as 30 - subcontracting.
Thanks and Regards, -
Do i need a Blackberry SIM (Data plan to get connected)
Hello, i have recently purchased a blackberry playbook 32GB.
i have below queries.
1. Do i need to have a BB data plan to get connected..even for the first time or may be later too.
2. Can a micro SIM with normal 2G or 3G data plan work on it say from AIRTEL or VODAFONE.
3. I tried connecting my Nokia E6 as a WIFI hotspot (using JOKU) , but playbook does not detect so..however it detects all other WIFI spots say from SAMSUNG phone.
4. Finaly i got connected with WIFI hotspot provided by SAMSUNG phone and was able to register. But that may not be always available with me. Thats where my second/third question is important.
5. After getting connected as in point 4, software upgrade was in process which was interupted owing to low internet speed. (being EDGE n/w). i am sure after S/W update i shall be able to use it for other purpose.
6. Even if i get a BLACKberry data plan micro SIM, will it work on NON BB smart phones?
7. I am new to BLACKBERRY, please help me.My first guess is that you bought a former Sprint (US) Playbook, which might not be operable in India.
I just don't know. You might try to return it to your eBay seller and get your money back and purchase a known working device.
Does it connect to WiFi?
1. If any post helps you please click the below the post(s) that helped you.
2. Please resolve your thread by marking the post "Solution?" which solved it for you!
3. Install free BlackBerry Protect today for backups of contacts and data.
4. Guide to Unlocking your BlackBerry & Unlock Codes
Join our BBM Channels (Beta)
BlackBerry Support Forums Channel
PIN: C0001B7B4 Display/Scan Bar Code
Knowledge Base Updates
PIN: C0005A9AA Display/Scan Bar Code -
Internal Order for AUC Asset not getting created Automatically
As per SAP Standard , when I create an AUC Internal Order (KO01), and save , AUC asset is gets created automatically ted via AS01 and stores the AUC Asset in Internal Order settlement rule.
However when tried with the client Im not able to create, AUC is not getting automatically created and stored in Int Order Settlement rule.
In config I have added investment profile to Ord Type and in OAOA ( AUC Asset class setting , Investment profile is also checked)
Kindly let me have your inputs to fix the issue
Advance Thanks
SanjaiHi,
In order to create AUC asset automatically by the system, you need to create an investment profile in OITA.
Then assign this investment profile in the Internal order master data created through KO01 in the Investments tab.
There is no option of assigning the Investment profile in the Order type.
And in OAOA that is Asset class, select the radio button investment measure.
You can default the Asset class of AUC in the investment profile or leave it blank so that same can be filled when system prompts for AUC creation.
You cant see the AUC asset in the settlement rule once Investment order is created, but only after settlement of the balances to the AUC u can see.
Thanks & Regards,
Ravi Kumar -
How can I get an automatic connection to wifi on startup?
We lost internet connection during snow/ice storm. I have to manually connect to wifi now. How can I get an automatic connection to wifi?
An 'uninterruptible power supply' that automatically steps in and takes your computer
off the grid momentarily, will work in cases of brown-out (under-power) & surge (spike)
and it does so at a fast rate. Most of these also offer a way to customize sensitivity to
a certain degree, depending on model and should there be a valid reason to do so.
An old-school surge protector, even if it has a few fancy LEDs, is no protection. And
for less than a replacement logic board or an hour of authorized Apple repair, the UPS
is a fairly good investment. Backup battery is user-replaceable in the better made units.
Most of them offer extra ports that do not use the battery-backup power feature. If you
need to have more items run when the power switches up/down or out, you'd need to
consider a larger capacity backup power unit. In some instances, the makers of these
(for a time, perhaps even now) did caution users to not install more than one UPS per
room when the same leg may have inadequate grounding, since these can dump the
excess surge power from several different UPS units and overload the ground.
That said, the gamble is yours. I've found to have and use these is some protection
and when away from the computer. Most settings for controlling them appear in OS X.
No additional software is required. Other settings may be on the UPS front panel.
Good luck & happy computing! -
Hello guys. I'm on the fence of buying a new Haswell MacBook Pro Retina. I'm a student so i plan to get it with the student's discount. I want to ask you guys whether is it possible to use debit card to purchase anything from apple online store? Im using CIMBclicks debit card. Thank you.
Call the online store and ask them! We are just users like yourself. Besides, you will get a much faster answer directly from the horses mouth and it will be correct!
-
I keep getting a "new network interface has been detected. Hoping to stop getting this automatic message I configured it, or thought I did. I'm still getting the message. How do I stop it?
I thought the same too, looks like its not just me having this issue, hope Apple do something soon. Thanks for your help
-
Purchase order output type NEU is not get assigned automatically
Dear All,
when i am creting purchase order the output type NEU is not get assigned automatically.
I have maintained message condn record for NEU and for specific PO doc type NB.
same problame i was facing for the inventory docuemnts but i was resolved by running one SAP std program so please guide me if any such program is available for Purchasing documents also or any other setting i am missing to make.
Pl suggest
Regards,
VimleshHi
Please check the following in customization.Dont check in NACE you may miss something like fine tune control
1) Check the Message determination procedure is having the NEU output type
2) Check the std Message determination procedure is assigned to PO
3) Check the output type for the Access sequence, default data for transmission medium and partner function VN, Language & Form assigned to it
4) Check the Access sequence for the condition tables
5) Check the condition record in MN04/MN05
6) Check the purchasing group has printer assignement
7) Check the fine tuen control for operation 1 & 2 for message type.
Hope your problem now solved.
Thanks /karthik
Edited by: Karthik on Aug 13, 2009 5:29 PM
Maybe you are looking for
-
How do I print in black and white with HP Deskjet 5740?
I have just updated from Snow Leopard to Mountain Lion. With Snow Leopard, and an HP Deskjet 5740 printer, I could choose to print in draft or best quality, black and white only or in full colour, and had various other options. Now I am not offered t
-
Reusing a page as a region in other pages
Hi All, I have a requirement. I want to reuse a page as a show hide region in other pages. Please suggest a way to do the same. Version: Oracle Apex 4.2 Thanks and regards, Abhishek Arora
-
Hi, I am facing one issue while working in Adobe forms. My requriement is as follows. Two Drop down lists are there. Say Z1 and Z2. Z1 will contain three values.( A1, A2, A3). Assume for A1, the corresponding values in Z2 are (1,2,3,4,5,6,8,10). Ass
-
hello guys ..when i try to update any applecation..it puts the first user a ccount and it ask the password which i dont know it cause im not the first user of this i pad ,,,,so how can i changebit to update apps dute to my account name and password??
-
MuVo TX FM display and power prob
hello to all! good evening...i've been the owner of a creative MuVo TX FM for a little over a year now and im extremely satisfied with it. it was extremely reliable and handy and was a worthy competitor against the shuffle...it never gave me any prob