Solman CHARM: adding multiple clients for quality/Production systems in Solar_project_admin

Dear Colleagues
We are using Solution manager 7.3. When we setup system landscape under a solution manager implementation project, we can only select one development and one quality/testing system.
Our scenario is that,
Development System:
D40 - 010 : (both workbench and customizing changes being done in same client)
Quality System:
Q40 - 010 : for customizing changes
Q40 - 000 : for work bench imports
So the querry is that, how we can add these two separate rows in Solar_project_admin and under tab systems:
ie D40-010 --> Q40-010   and D40-010 --> Q40-000.
Regards
Renjith

Hi Renjith
Please check below
Change Request Management scenario: Usual questions and known errors
Question no. 2 is more relevant for you
hope this answer ur query
Regards
Prakhar

Similar Messages

  • Is it possbile to have multiple clients on our Production instance

    We have our Production system with client 101
    Our abapers want me to create another client 500 (config only - not easy to accomplish)  to be used for our Mexican users.
    I told them to create another company code for Mexico, but they do not know how to do this.
    DO I have any other options, of yes
    Pros and cons of having multiple clients in same production instance.
    I know that any independent code is going to effect all clients.
    THanks
    Joe

    Hi Jo,
    you CAN create a new client, but mostly this is not done, because the effort to maintain multiple clients is mostly higher than just different company codes. Yes, ABAPs are client indpendent and therefore valid for all clients.
    So, the argument, to "not know" how to create different company codes is not valid to me !
    Regards
    Volker Gueldenpfennig, consolut international ag
    http://www.consolut.de - http://www.4soi.de - http://www.easymarketplace.de

  • Multiple batches for a production order and mapping with components

    Hello Gurus,
    Our business requires to create multiple batches for one production order + they want to trace which component in the production order has been issued to the main equipment.
    For example, I am creating production order for 'A' equipment for 4 qty. Business wants to create 4 different batches for these equipment
    Lets say now 4 batches are created A001, A002, A003 and A004.
    Now lets assume 2 nos of 'B' component are required for 1no of 'A' component. So the requirement of B component is 8.
    Lets say 8 batches are generated B001, B002 ......B008
    Now lets say batch B001 and B002 are issued for A001 and packed together. How do we map this?
    I understand we can do some enhancement for creating the multiple batches but I still dont know how to map them with each other.
    Please help

    Hi Ethan
    There is a functionality called WIP batches, that allows you keep the batch traceability within an order.
    With WIO batches you can track which batch of component was used to produce each batch of finished product.
    See this link for more details:
    Work-in-Process (WIP) Batch - SAP Library
    BR
    Caetano

  • Setting up a Quality/Production System-- Pl suggest

    Dera All,
    We are on SRM 7.0 and ERP-EHP4. We have a development Server and have configured the  SRM and ECC for the Extended Classic. What is the best approach to create a Quality/Production System?. I Have gone through the document System Transport and Copy too and have a couple of questions.
    1.  Do We need to perform a client copy with SAP_Cust from Development  to Quality and Quality to Production? and then do the necessary settings for Product Categories/Products/Business Partners and Org Model Transport etc...?
    2. Is System copy a good option?. ( The document suggests not to go for System Copy for setting up Quality/Production Systems from Development Server)
    Pl suggest.
    Thanks and Regards
    velu

    Dear All,
    Any suggestions. Can you pl share how this is being handled in your current projects?.
    Thanks in advance
    regds
    velu

  • Chart of account conversion SLO tool,method for a Production system

    Hi All
    We have a requirement like we want to use Chart of account conversion tool for a production system where transactional data are present.
    We have used this COA conversion tool for best practice solution not in a production system.
    we want to know the difference between these two methods like production and non production system.
    Provide me some process document on the SLO service tool for the same
    Mrinal dey
    9836265158

    Hi Mrinal
    I'm wondering the same? How to go on in productive system after to use the conversion toll?
    How did you manage?
    Regards
    Angels

  • Multiple clients with role production

    Dear SAP experts,
    Is it possible to assign the client role "production"  (in scc4) to multiple clients in 1 instance. If the answer is yes then how can it be done because if I try to do it via ssc4 i get an error that there already is a production client..
    I have searched the forum, SAPNET  and googled but I could not find a definitive answer.
    Thanks for your patience and answers.
    Regards
    Dirk Visser

    Hi all,
    I discovered that it can be done. Just set the role to production and ignore the warning.

  • XI, SLD & multiple clients for DEV & QA

    <i>Ref: Re: 3rd party tech systems for multiple business systems...</i>
    I have a question regarding the avoidance of duplicated Configuration (Collaboration Profiles, Logical Routing & Collaboration Agreements) for different clients in the DEV/QA landscape.
    As we know: many projects have multiple clients in DEV and QA. Here is an example landscape:
    SXD_100 - Dev XI server
    SED_100 - config dev
    SED_200 - ABAP dev
    SED_300 - unit test
    SED_400 - sandbox
    <b>[ 1 technical system : 3 business systems ! ]</b>
    LDEV Legacy system
    <b>[ 1 technical system : 1 business system ]</b>
    SXQ_100 - QA XI server
    SEQ_100 - clean config QA
    SEQ_200 - ABAP QA
    SEQ_300 - data migration prep
    SEQ_nnn - yada, yada...
    <b>[ 1 technical system : nnn business systems ! ]</b>
    LQA Legacy system
    <b>[ 1 technical system : 1 business system ]</b>
    <b>The problem:</b>
    SED_400->LDEV is used for prototyping integration
    SED_100->LDEV is used for config development
    SED_200->LDEV is used for ABAP development
    SED_300->LDEV is used for unit tests
    Receiver Determination is able to look into the message for a <b>dynamic receiver</b>, but we are not able to have a <b>sender</b> like "SED*"
    <b>The question:</b>
    Do we really need multiple sets of configuration in the Integration Directory? Is there a way to re-use the configuration for SED_100->LDEV for the other development efforts?
    Any feedback would be greatly appreciated.
    Rgds,
    Derek

    Hi Derek,
    Since there can only one business system in SLD per client in SAP R/3.
    e.g
    SED_100   will have lets say BS_100_Dev
    SED_200  and BS_200_Dev
    In QA
    SEQ_100 -> BS_100_QA
    SEQ_200 -> BS_200_QA
    It is not possible to configure the single scenario catering the Dynamic (multiple) sender agreement to Reciever.
    But for QA you can use set transport target in SLD to reflect the BS_100_Dev -> BS_100_QA, where ever used.
    This doesnot solve the problem of  having dynamic sender service, it is just for information.
    We also faced the same problem of testing a scenario from different clients of SAP :(.
    Cheers,
    Satish

  • RMI: multiple clients for one RMI server?

    Hi,
    We're thinking of making a RMI Server.
    However, can multiple clients access the same RMI Server at the same moment?
    So, if one client is connected to the RMI Server, what will happen with the other clients that want to work to do the same thing at the same moment ?

    all over the same port?
    so for example, 100 clients can work simultaneously on this simple server?
    import java.rmi.Remote;
    import java.rmi.RemoteException;
    public interface OkServer extends Remote {
        public String getOk() throws RemoteException;
    import java.rmi.server.UnicastRemoteObject;
    import java.rmi.RMISecurityManager;
    import java.rmi.RemoteException;
    import java.rmi.Naming;
    public class OkServerImpl extends UnicastRemoteObject implements OkServer {
        public OkServerImpl() throws RemoteException {
        public String getOk() {
         return "ok";
        public static void main (String args[]) throws Exception {
              System.setSecurityManager(new RMISecurityManager());
              OkServerImpl OkSvr = new OkServerImpl();
              Naming.bind("OkServer", OkSvr);
    }

  • Multiple tool for same product.

    Dear All,
                   please guide me for my scenario given below:
    how work center is to be decided whether machine wise or tool wise.because one macine can be load by four different tool at a time.
    Regards
    Deepak Sharma

    Hi Deepak sharma.
    since u have Number of workcenters for same product, create routing for each work center, and create prod versions equal  number of workcenters.
    u can select the prodution version manually, while cerating production order manaully.
    There should be a capacity planning  for your work center.
    Have i tried to understand ur problem,if not please come back with some examples.
    Regards
    pradeep

  • How to define an export system for a production system?

    Hello:
    I remember there is a way to define an export system for a PRD.
    However I cannot recall exactly what to do: in transport  profile or instance profile?
    Could any expert help find out this?
    Thanks with points!
    Regards!

    Hi,
    Are you trying to configure CHARM? In that case, try setting the domain controller as the production system and keep CTC=1.
    This should help.
    Thanks,
    Rinkal

  • EWA for non-productive Systems

    Hi all,
    is there a possibility to get Early Watch Alerts for Systems in a Solution, which are not marked as productive.
    I don't want to create many solutions.
    The same problem i have with the monitoring, I only see the productive in the monitoring overview.
    Regards
    Tobias

    >
    Schlosser Tobias wrote:
    > I have added Systems to the Solution XY. The Leading Role of this solution is "productive Systems"
    >
    > I have add System PR1 (Productive) and System DE1 (Development).  But I can only see the EWA for the Productive.
    > If I want to see the EWA for the Development I have to delete the log. components and switch the leading role to "Development Systems".
    >
    > That's very inconvenient.
    >
    > I wan't one Solution with all my Systems, and EWAs for every System in it. Is this possible?
    Yes, it's possible to have all systems (Prod, Dev, QA, ...) within one solution and to have EWA activated.
    You need to choose "Put in Solution" from the context menu. See screen shots attached.
    Regards,
    Ruediger

  • Same logical system name for two productive systems - BW, PI issues

    Dear all,
    we have a productive system which serves two companies (different company codes). This system is connected both to BW and PI for both companies.
    There is a requirement that these two companies must use their own system, so the whole landscape (dev,qa,prd) will be copied to different systems (different server with different system id).
    As a result of the above procedure we wll have two different productive systems, as required, but we wll have the same logical system name for the two productive systems, which must be both connect to bw and PI.
    However as far as I know:
    - we cannot connect systems with same logical system name to BW,PI
    - we cannot convert logical system name of the one of the two productive systems as they are productive and so this is not supported.
    How can we overcome the problem?
    Please advice.

    > However as far as I know:
    > - we cannot connect systems with same logical system name to BW,PI
    > - we cannot convert logical system name of the one of the two productive systems as they are productive and so this is not supported.
    Right.
    > How can we overcome the problem?
    Since you split up systems (or plan to) I highly recommend booking an SLO service (http://service.sap.com/slo). Those people have to the tools and the knowlege to help you. I would not do this on my own.
    Markus

  • Disaster Recovery scenario for MSCS Production system.

    Hi
    Our production system is on win2008/sql2008 MSCS. We decided to install a disaster recovery system. We will use a database replication software. If we have a standalone production system, not a MSCS system, i know that i can install Disaster Recory system with same SID and hostname and i don't need any homogeneous system copy procedure to switch to DR system. But in our scenario, we have many hostname (sap cluster group, sql cluster group, hostnames of nodes... etc.).
    How can i install my DR system (which hostname.. etc.) to make our DR scenario easy?
    Best Regards...

    You May have trouble with RFC connections:
    So, one possible solution is, your new server name(Host name) should be your message server name to minimise the trouble and you have to maintain this for all RFC connections (to Prod ECC system) to virtual host which could be message server.
    If I could think if any other possible issues, I will update.
    Krishna

  • SAP GRC 10 : Can we connect GRC to multiple clients within the same system

    We are having this requirement to connect SAP GRC to two different clients within the QA System.
    Just wondering whether this is possible to connect at the same time. We have created connectors in both the clients in ECC  and in GRC we have connectors for both ECC Cllients. When I try to add the connector for second client in SPRO , it is not even showing up entry for that
    Please confirm whether we can do this

    Hi Anil
    If you have two ECC clients you would create two connectors to GRC. You would need two SM59 RFC connections (one for each client) to map them through.You can map them to the same logical group though.
    What is not working for you? Did you define both clients as their own connectors?
    Regards
    Colleen

  • PP : Need to find Multiple Batches for different production Orders

    Hi Experts,
    I have a requirement that, user wants to see the  "Single batch assigned for multiple production orders and different materials"
    Which its a off case, it cannot be done , but i have gone with 1. So user wants to know all the Orders which has same batch but for different  materials & Orders.
    Please help me in this regard.
    Br,
    SandeepCH

    Hi Shri,
    Please find the attachment  for your better understanding.
    Yes, as you said one material can have multiple batches, But that same batch cannot be linked with other material. This was my requirement.
    So now i want to know all the  batches which came in double for different materials.
    Br,
    SandeepCH

Maybe you are looking for

  • Asa 5505 inside to outside ping ?

    Hello, for some reason I cannot ping from a host on my inside network to my outside network interface i.e. ping from 192.168.0.100 to 192.168.200.2 Also vice versa, when I ping from the asa5505's outside interface to any inside network address it doe

  • View for Oracle Payroll Module

    I am working on a drilldown Report where by I need to generate ALL detailed transaction for a particular period. I found some views useful for some modules like XLA_AR_INV_AEL_GL_V,XLA_AR_INV_AEL_GL_V a,XLA_AR_REC_AEL_SL_V etc . I am not able to loca

  • Crossing Out Old Calendar Events in iCal

    Hey Guys! I'm a big time list guy, and love crossing things off once they're done. I would love to find a way to cross off (in full month view) previous days on iCal. I don't want to delete events, because I often go back and look at previous dates f

  • Short Dump while executing ALV Grid.

    Hi All, I m getting a short dump while trying to execute an ALV. The dump exception is of type CX_SY_DYN_CALL_ILLEGAL_TYPE class. The message displayed is :  " Call to form 'GI_FIELDCAT' is incorrect .The actual parameter in PERFORM is different data

  • DVD sound but no video

    A135 S4666 Vista Basic When I try to watch a DVD Movie all I get is sound no picture.  I can read/write CD's. I have tried several movies I know work on DVD player but will not now work on my laptop.  I use Win Media Player to view movies and it was