Solution for no mms/sms with iPhone 4s?

Just got my iPhone 4s and realized I am only able to send iMessage. SMS looks like it goes thru but they never get it. MMS won't send at all.
I see others have this same issue, but I haven't seen one post saying they found a resolution other than a few who said it mysteriously started working a few hours later again.
Anyone have suggestions? I already restored the phone, checked all my settings, etc. Tomorrow I'll go into the Apple store, but I'd love to fix it before then. Thanks!

Mine is a 16GB white iPhone and I have the same issue. I'm able to send MMS but can not receive them.
Tried my sim in a black iPhone 4s and I can receive them.
The issue is with my iPhone and not with the sim/carrier.
All the settings were the same on the black version as it is on my white. I've even restored to a factory vanilla version of the software to rule out anything I may have installed/set/unset, but still no joy.

Similar Messages

  • HT1476 My iPhone 4S will charge on a laptop but not from a wall plug. I have tried different boxes and different USB cords from the wall but none work. These boxes and USB cords work for other family members with iPhones. I'm stumped :/

    My iPhone 4S will charge on a laptop but not from a wall plug. I have tried different boxes and different USB cords from the wall but none work. These boxes and USB cords work for other family members with iPhones and a USB cord that works from the laptop won't work from 3 or 4 different wall boxes that work for others. I'm stumped :/

    Update: It seems as though the phone will charge if I plug it in and then turn it off.  It will not charge while the phone is on.  Also iTunes will not recognize it, so I can't sync or anything.  I read somewhere that it could be a fuse somewhere?? Or maybe the dock connector. Where is the best place to get this repaired?

  • SAP Solution for Mini steel plant with DRI Process

    Dear all,
    I am a metallurgist who spent couple of years in steel and process Industry and then moved to IT Consulting as SAP consultant / business analyst mainly working in the area of solution designing.
    Here i will like to describe SAP solution for Mini steel plant with DRI proces.
    u201CManufacture Productsu201D Description
    The series of operations performed upon material to convert it from the raw material or a semifinished state to a state of further completion. This includes the establishment and maintenance of a CAPEX plan, the planning, scheduling and execution of production activities, the dispositioning of produced goods, the maintenance of production data, the monitoring of production performance and the implementation of engineering changes.
    u201CManufacture Productsu201D Objectives
    M-010
    Compile 3-year CAPEX Budget     Establish the overall manufacturing goals and metrics that the organization will use to measure performance and progress towards objectives. These goals should be consistent with overall organizational strategy/value propositions. Develop long-term goals for production capabilities and manufacturing. These goals should align with the overall goals and objectives of the organization.
    M-050
    Perform Long Range Production Planning     u201CBudgetingu201D. Long range planning of production quantities based on planned available capacities and known or estimated customer demands. This process may include planning for different capacity and/or demand scenarios. Approved capital expenditures from the 3-year CAPEX budget may influence the budget. Range and frequency for budgeting is yearly.
    M-060
    Perform Medium Range Production Planning     Medium range planning of production quantities based on planned available capacities and known or estimated customer demands. This process may include planning for different capacity and/or demand scenarios.  Range and frequency for planning is quarterly.
    M-070
    Perform Short Range Production Planning     Short term planning of production quantities based on capacities and demands as previously planned in the longer terms, actual customer demand and actual capacities. The result from short range production planning will run into the operational plan for the current and following days.  Range and frequency for planning is monthly.
    M-080
    Schedule Production     This sub-process enables detailed scheduling by resources over the planning horizon. Planned orders that fulfill demands (Stock Transfer Requisitions, Sales Forecasts and Customer Orders defined by due-dates and due-quantities) come from the short range plan. This results in a feasible schedule, optimizing utilization of the production resources. It is based on production process constraints as well as labor resources in order to minimize production costs and also taking into account constraining raw materials availability.
    M-090
    Execute MRP     The purpose of this sub-process is to generate a Materials Requirements Plan (MRP) for all materials, which are produced or purchased. The MRP process involves looking at current material inventory, planned inbound material deliveries, requirements, lead times and stock levels to generate a detailed plan for future material requirements. The materials requirements will be generated with respect to the three planning horizons, short-term, medium-term, and long term. If an over stock of raw materials occurs as a result of a planning change production and marketing personnel will be informed. This would allow for the cancellations of any unneeded shipments.
    M-100
    Perform Setup / Changeover     Perform set-up and changeover activities on production equipment as necessary, to prepare for the production of specific materials/grades. Set-up and changeover activities will enable the production equipment to perform operations on materials, as per the specifications called out on the production order. Ensure time is allocated for first off inspection requirements after changeover.
    M-110
    Execute Production     Insure that the production plan is met by converting raw materials and component supplies into finished and semi-finished products. Batch/lot documentation will be created for individual production orders to provide traceability throughout the process. Each step of the production process is continuously monitored to identify mechanical, quality, and productivity issues and suggest solutions when problems arise. Data collection for performance and financial reporting enables management to take immediate action on manufacturing processes as well as conduct historical analysis.
    M-120
    Perform Quality Management     Quality management refers to the entire supply chain process. Process activities are related to the evaluation and inspection of key characteristics of semi-finished and finished materials. These evaluations are recorded and acted on based on the results. Report/manage internal quality problems or issues. Install and manage quality control systems to insure product quality. For supplier or subcontractor based issues this data should be used as a performance measure during the vendor evaluation process.
    M-130
    Manage Product Disposition     This process ensures those semi-finished and finished products that do not meet quality requirements, are prevented from being used and distributed in good finished product to customer, or released for the next step of the production process. A semi finished product is any material that needs to have another operation on line before being shipped to the customer. Finished goods are defined as any material that can be shipped to a customer; in house produced finished goods, subcontracted materials and trading goods. The information required to make decisions regarding disposition comes from the Quality Management system of each production facility. The first step ensures that raw material and returnable goods are dealt with in another subprocess. The reason for the goods not meeting quality standards is recorded along with the results of any investigation to find the cause of the fault. Information is sent to all other parties who need to know: order fulfillment, inventory management and shipping. The process ensures that the most appropriate action is taken to either dispose of, or rework the goods. Disposal or rework may be either through the original materials supplier or subcontractor, or Mittal Steel Point Lisas.
    M-140
    Maintain Product Related Data     u201CMaterial Master Maintenanceu201D. The Sub-Process 'Maintain Product Related Data' is the list of activities that identify the steps and decision points related to the request for and performance of additions, changes, and deletions to the Material Master file or files. This sub-process begins when a need to create, change or delete a material is identified and ends when the request is either actioned or refused. The sub-process is intended to cover all material types, including finished goods, raw materials, bills of materials, equipment and service, POS, Sundry Items etc. In fact, any product which the company wishes to inventory or purchase. A number of key strategic decisions, including a clear definition of when we issue a new material, will affect this sub-process.
    M-150
    Maintain Production Related Data     u201CMaster Data Maintenanceu201D. This subprocess identifies the activities related to requesting changes or additions to production related master data. Once a need for master data maintenance is identified, a request is submitted for approval. Data defining production capacities and performance standards (e.g. line efficiencies, material yields, etc.) require Corporate level approval prior to maintenance. Other data that is more specific to internal planning functions are maintained at the plant level. Maintenance requests are returned to the originator whether the request is approved or not to improve communication throughout the system. This subprocess may be triggered by: annual operations budgeting process process/production equipment upgrade or replacement change in facility work schedule (i.e. planned hours or days) change in personnel required to operate process/production equipment new products, formulations, or packaging.
    M-160
    Operations Execution Reporting     Gather manufacturing information at various points in the production process. Prepare management reports both at the detailed level for plant management and summary level for senior operations management. Reports will be available on-demand and will include - volume, efficiencies (mechanical, line, and labor), yields, downtime, asset utilization, environmental, safety, quality, and financial data. A major goal of this sub-process is to define a consistent method of calculating operations metrics. Some plants will use line information systems and PCSs to collect information. Not all plants are equipped with these systems and the where they do exist, the level of sophistication varies.
    M-170
    Manage Process Reliability     Optimize capacity by reducing process downtime and ensuring compliance to quality expectations by the reduction of rejects. Install tracking systems to measure line time utilization, quality results, process settings. Conduct root cause analysis, and use the data to develop and implement improved operating procedures.

    Thank you for your prompt response. I'm assuming you are still proposing to use Sales order -> purchase order -> invoice verification -> Customer billing process flow. Is that correct?

  • Is there a fix for the connectivity problems with iPhone 5S and ISO 7.0.2?

    Is there a fix for the bluetooth connectivity problems with iPhone 5S and ISO 7.0.4?
    I am having problems connecting the BT Audio and the handsfree phone connectyion is unreliable in 2012 Mitsubishi Lancer XL.
    All worked OK with ISO 6.

    Hello CraigNicholson
    You would need to sync with iTunes to get that process to work for you. Check out the article below for more information on how to resolve that issue to get the proper token to use Push Notifications again.
    iPad and iPod touch: Unable to use YouTube or Push notifications
    http://support.apple.com/kb/ts3305
    Regards,
    -Norm G.

  • How can I change the ringtone for text messages (sms) at iPhone 4?

    With iPhone 3G it is not possible to change the ringtone with own sounds.
    Can I do it with iPhone 4?

    Yes, you can :-)
    Look at my homepage for ringtone!

  • Using iMessage with iPods/iPads and SMS with iPhones

    I prefer using SMSs to text other people with iPhones but I still want to use iMessage to chat with people who own an iPad and an iPod. What do I do? I don't want to desactivate iMessage.

    The only way I know to do what you want is to disable/enable your iMessage account as needed.
    Of course, every time you disable and then re-enable iMessage in message settings, you may have a "pause" while it re-activates your iMessage account.
    Out of curiosity, why do you even want to do this?  The integration of iMessage is intended to be seemless - if the devices at each end can use, it will be used, but if not a regular SMS is sent.  You can force it as you wish, but it will be a pain in the rear to do, if you ask me.

  • Full mesh VPN solution for on MPLS network with PE and CPEs

    Hi,
    We are trying to evaluate some best solution for Hub-Spoke mesh vpn solution in a MPLS network. The VPN hub router will be in PE router and all the VPN spoke will be in CPE.
    Can someone please let us know what will be the best vpn solution, we understands that there will be some technical limitations going with GETVPN but still we did counld find any documenation for possiblity of using DMVPN.
    How about the recent flexvpn, can fex-vpn work on this requirement, where can i get a design/configuration document.?
    thanks in advance.

    Hello,
    GetVPN is intended for (ANY-to-ANY) type of VPN communication, over an MPLS network with Hub and Spoke Topology, your best Option is to look for Cisco (DMVPN) implementation where this type of VPN is primarily designed for Hub & Spoke.
    Regards,
    Mohamed

  • Is it possible to create a shortcut for current time / date with iPhone native apps?

    is it possible to create a shortcut to insert the current time / date in a text such as a Note with iPhone (IOS 6) native apps (not a 3rd. party app)?
    By "shortcut" I mean a combination of characters, the same as under settings/general/keyboards/shortcuts.
    thanks.

    Code that does it is here:
    http://forum.java.sun.com/thread.jsp?forum=48&thread=453846&tstart=0&trange=15
    MOD

  • Cannot send SMS with iPhone 5

    Hi I have purchased a iPhone 5 from Hong Kong and I am using it in china. All works well except that I cannot send SMS (still can receive them)... I have contacted the apple support but I have no solution till now. I also asked China Unicom for help but they cannot find the problem... More over the activation of message and FaceTime doesn't : I can use iMessage and FaceTime but on settings the activation doesn't work. Did anyone have similar problem and was anyone able to find the good solution ?

    Hello, I also have the same problem. My iPhone 5 is a from Hong Kong too! My iMessage doesn't work as well as FaceTime also. It keeps saying waiting for activation. I use china unicom too, tried contacting them but they couldn't solve the issue. But it many cases when I change my SIM card or insert mine to another phone , it suddenly activates. This is really frustrating because I can't check my credit balance at all or send urgent messages to people.
    Anyone with a good suggestion?

  • Airport worked for years. Now with iphone, it doesn't. Any ideas?

    Recently bought iphone and hooked it up (configured with home's wireless network). Worked for a week or two and now NOTHING works wirelessly.
    ISP said to call Apple. "Sounds like their router (Airport Express) crapped out".
    I called Apple Care and they would not do anything for me if I didn't agree to pay $19. (Very nice of them, don't you agree?).
    Does anyone have a simple, or any, advice/solution? (Of course I tried rebooting, disconnecting/recoonecting, etc. The usual no-brainer stuff).
    Thanks.

    You might try resetting your Airport http://support.apple.com/kb/ht3728

  • Solution toiCal crashes after syncing with iPhone?

    Since the 1.1.1 iPhone update (at least it seems related to this), iCal crashes when I start it on my Mac Pro (10.4.10) after syncing my iPhone. I can fix this by opening iSync, going to preferences and choosing to reset sync history. After that, iCal runs fine (although it adds a new calendar (with a blank label on it). I can open it, close it, etc. But as soon as I sync my iPhone again, it crashes and I have to open iSync again and reset the sync history. Any ideas on how to solve this issue?
    Thanks

    Thanks for posting this - I am having the exact same problem right now! I tried your solution and I can reopen iCal, but not sure what happens if I sync my data again...has anyone found a solution to this??

  • Known MMS issue with iPhone 4?

    I recently upgraded my wife's phone from the original iPhone to the iPhone 4, however she cannot send MMS. Text messages work fine. I called AT&T and after about 40 minutes on the phone with them they didn't have an answer, they stated they reset the carrier settings and had me reset network and all settings. I restored the phone as new, and still nothing worked. The lovely folks at AT&T did give us a follow up call back on 12/27/10 stating the this is a known issue on Apple's end with people who have upgraded to iPhone 4 ios 4.2.1.
    So, do you know about this? Any suggestions?
    MMS is on, Data is on...

    Hello,
    I am in the same boat. On phone with AT&T for over an hour, transferred to tech. support. Mms on, reset settings, 3G and cellular on. I also upgraded from original iPhone to iPhone 4. Finally tech told me that it's because it shows I still have the original iPhone and that someone has to manually go in and change the setting. She couldn't do it, her supervisor did not have access. She said that ticket was issued and it can take up to 32 hours, it's been close to 48 hours and nada. She is suppose to call me back today. The only thing I did not try is to set up phone as new. The rep said that it's on AT&T's end.
    Please let me know if you get your wife's fixed.

  • MMS issue with iPhone 4?

    So luckily I have not had any of the issues that a lot of people seem to be having and I'm loving my new phone, but something happened last night and I'm not sure if it's an apple issue or an AT&T issue.
    I took a picture and tried to send it via MMS to two friends of mine (that I MMS quite frequently).  Both of them received the following error message:  
    "One or more of the message components have been deleted by MMS Adaptation. Either the message was too large or the components were unsuitable for your terminal."
    I tried to resending several times but they keep getting that message.  One of them has an iPhone 3G and one a Blackberry of some sort.
    Any ideas what may be going on?   

    Last night was the first time I had attempted to send a picture via MMS on my new Iphone4. I took a picture with the phone and attempted to send it but kept getting a red exclamation point indicating failure. It would load to about 98% and then fail. I tried rebooting etc but nothing helped. This morning I did two things and finally got it to successfully send a picture.
    1. I turned on location services for the camera
    2. I cleared all history/cookies/cache (setting>safari>clear history/cookies/cache
    I took a new picture with the iphone4 and sent it successfully. I turned off the location services for the camera and tried to send a previously failed picture and again it failed. I turned the location services back on for the camera and the previously failed picture went through successfully.
    Either there is an intermittent problem causing the issue or the location services has to be "ON" for camera in order to send a picture via MMS. Give it a try and see what happens.

  • Need solution for using Symbol LRT3840 with Apps 10.7 and/or 11i?

    Any suggestions for using Symbol's scanner/terminal with Oracle 10.7 and/or 11i? The symbol unit runs a telnet session (with a 1/4 viewable area). I'm looking for some alternate screen templates and/or a software solution that will allow me to remap the existing full screen forms so all critical information is displayed on the symbol unit in the allowable viewing area. I understand that version 11i of Oracle Apps does not support character-based telnet sessions, so I'm also interested in a fix that will be transparent to my material handlers when we upgrade from 10.7 to 11i. Any help would be greatly appreciated.

    Hi
    We are developing solutions in that area.
    If we can know more of the exisitng solution you have implemented or PDA and how it is integrated with Oracle Application(whether it is a third party tool?)
    then we can discuss about arriving at a solution.
    My mail-id is [email protected]
    Thanks and Regards,
    Bibs

  • Has anyone found a solution for the screen freeze on iPhone 6 plus?

    I have an iPhone 6 plus on t mobile. Since buying the phone, there has been difficulty with the screen randomly freezing. I was wondering if this was a software fix or do I need to have the hardware looked at.

    Have you tried these basic troubleshooting steps?
    Restart / Reset
    http://support.apple.com/en-us/HT201559
    Restore from backup
    Restore as new
    http://support.apple.com/en-us/HT201252
    If no joy, make an appointment with the Apple genius bar for an evaluation.

Maybe you are looking for