Solution Manager Certification -- Change Control Management

I am planning to do the certification test on "Application Management Expert - Change Control Management" , C_E2E200_08.
I am looking for sample questions or any study tips.

Hello Tathagata,
Please do the following checks.
1) Check if the satellite system TMS is configured with three system landscape.
2) Check both to and back RFCs to the systems. Especially check if the users are not locked. Even if the users are locked, the RFC check may give you green.
3) Go to central configuration(/TMWFLOW/cmsconf) in Solution Manager system and check if the system are shown green.. If not there will be a check list to make the systems green. For example no changes should be permitted in the production system.
Regards
Farzan

Similar Messages

  • E2E 200 change control management training (Run SAP ) FAQ

    Hi to all,
    I have attended E2E 200 change control management training . Now I want to go for certification but I want the sample questions for this exam.  Please forward the questions.
    Thanks,
    Amit

    Hi ,
    I am willing to attend   E2E100 and E2E200 ( RCA and Change management) at Banglore SAP training.
    I would like to know how is the training, is 5 days sufficient for each one of it.
    I am also planning to write certification for this.

  • SAP IDM on Solution Manager with Change Request Management

    Hi Experts,
    I'm facing a question. Does SAP Identity Management manage association between user in Solution Manager and links in PPOMA_CRM tree for Ticket validation on Change Request Management project ?
    It seems that it could be done using Compliant User Provisioning from GRC Access Control application.
    Thanks for your help,
    Ben

    Hello Ben,
    as far as I know currently there is no "business level" integration between IdM 7.1 and SAP Solution Manager. You only can create SU01 user data as for any other SAP ABAP system.
    I have heard that it is planned for the future to integrate the Solution Manager also in the business suite integration options the IdM product already provides for applications such as CRM, SRM and others.
    Nevertheless you could create your own implementation for your requirements.
    Regards,
    René Feister
    SAP Consulting Germany

  • Using TFS and SSDT to manage the change control for the Database

     Hi,
    I am managing my Database version control using SSDT tool on TFS, when I have created database project I got  file extension as Database.sqlproj.
     I am trying to open this solution in the SSMS but its failing as its looking for the .ssmssln. My target is to provide the facility to developer that they can open any of
    the data base object from ssms using project and when the alter it will get checked out on tfs and also altered on the database.
    Regards Vikas Pathak

    Hi Vikas, the projects used inside SSMS are not compatible with those in Visual Studio. So unfortunately you cannot open and manage them inside SSMS.
    The best practices we recommend are that you do your development inside Visual Studio and then publish the .dacpac file created on project build to your database - you can do this using VS, SSMS or SqlPackage.exe from the command line.
    If you do not want to use project-based development but do want TFS support for version changes, plenty of developers use SSMS for day-to-day changes and then use Schema Compare inside Visual Studio to sync those updates to a project and check these in.
    This gives you some level of change management and backup support. 
    Hope this helps,
    Kevin

  • Transfer live VMs from one Manager to Grid Control Manager?

    I've installed EM 10.2.0.5 with the Virtual Server extensions. I've got my current VMs (V2.1.2) attached to a standalone VM Manager (V2.1.2).
    Can the VMs be moved to the EM manager while live and in production? What is the best procedure?
    When I tried to create them in the EM manager, I was informed that they were already attached to another VM Manager.
    Thanks for any help...
    Eric Raskin

    Didi you check MOS Note: How to Enable Oracle VM Management Pack in EM Grid Control 10.2.0.5 [ID 1125013.1] ?
    Regards
    Rob
    http://oemgc.wordpress.com

  • Change Request Management for Implementation Project

    Hello gurus!
    I have a problem with execution change request in implementation project.
    I have created Implementation project and task list for him."Change request management" is active for this project.
    I can create document Change Request, but I can not to create Correction linked with Task plan...
    Dmitry.

    HI,
    Have you verified if your project definition is setup correctly ? Please verify with some of the steps available in the blogs
    First steps to work with Change Request Management scenario
    /people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    Change Request Management scenario: Usual questions
    https://weblogs.sdn.sap.com/cs/junior/view/wlg/15116
    Change Request Management scenario: Working examples
    /people/dolores.correa/blog/2009/07/23/change-request-management-scenario-working-examples
    Hope this helps.
    Cheers
    Sh

  • Virtual systems in SMSY? (Change Control Mgmt. & Change Request Mgmt.)

    Dear all,
    We plan to implement Change Control Management (CCM) and Change Request Management (Charm).
    At the current stage of the project, we do not have all satellite systems ready (e.g. production system is missing, Dev and QA are setup).
    Nevertheless we want to start setup of Charm and CCM.
    We understand that we have to "register" the missing systems in the STMS as virtual systems.
    But how do we do that in the SMSY?
    Do we enter the data manually? or can we "load" the data out of the STMS?
    And what are the typical traps and errors we can make (i.e. hopefully avoid making). Anyone to share his/her experience?
    Thanks and Regards,
    Jan
    Edited by: Jan Krüger on Jun 30, 2009 9:34 PM

    Hi Jan
    please see:
    http://help.sap.com/saphelp_smehp1/helpdata/en/9c/efa9068cce4149a40d7991ad2113f3/content.htm
    Goto SMSY
    Systems
    Select your SAP XXX (like SAP ERP or SAP Netweaver)
    Click on your SID
    On the right hand side you go to the tab "Header Data"
    Here you can aktivate planned or production
    If you are unable to see the planned button that this is because your setting for data source is not set to manual.
    Than please click on the button "Other object" (SHift + F5), for System enter your SID and click on the lock "Set Datasource to Manual input CTRL+F9)
    This will set your SID-System to manual adjustment - just confirm.
    Than you can mark your system as planned
    You will be able to add clients manually yes.
    regards
    Nesimi

  • Notification to Manager on creation of an Urgent Change Control

    Trying to set up a notification subscription so that when someone creates an Urgent Change Control, the Manager of that person gets notified. Looking in the subscription, under Recipients not sure what to put there. Since it could be anyone that creates
    the CC, how do you direct the notification to just that persons Manager?
    I am sure it has something to do with the Template that is used and the Activity tab but not sure what. Can someone get me started in the right direction or is this even possible?

    Alternatively, If you need the line manager to approve, you might try adding a review activity to the process and setting the "Line Manager must approve" checkbox on that activity. if you have set up standard review activity notifications,
    then the manager of whoever created the request will get a notice.
    if the user only needs to be notified, then you might set the approval method on that activity to "automatic" so the notification is sent, then the RA is automatically approved and the process can continue.
     

  • Configuration Management/Change Control/Build Management contract help needed in Missouri*** *** **

    Configuration Management/Change Control/Build Management
    Needs to have instituted a config management process before.
    web development history
    Tools/Skills:
    CVS
    ANT
    Unit Testing
    Unix
    BEA Weblogic
    John D Allen
    CEO/President.
    Leveridge Systems INC.
    v1 (480) 899 9341
    mailto:[email protected]
    http://www.leveridgesystems.com

    Could you post an example of your problem ?
    CC
    Chilly Charly    (aka CC)
             E-List Master - Kudos glutton - Press the yellow button on the left...        

  • Solution Manager 3.2 SP 8- Change Request Management Configuration Problem

    Hi friends,
    We are in process of implementing SOLMAN 3.2 SP8 in our landscape.I am facing  problem in configuring change request management.
    When the developer is working on an urgent correction document we are facing a problem.The steps we are following are here under provided.
    Step 1 :
    Selected Action "In development" - > it created the transport request in the dev system.
    Step 2:
    Action "Log into System" -> made correction attached to the transport request manually and released the task.
    Step 3:
    Action "Release transport requests" -> The transport request in the development was released.
    Step 4:
    Went for action "Pass to correction" -> I am facing exceptions which conveys
    Status was reset by system
    A condition is not satisfied because of an exceptional situation
    Not all transport requests yet released
    And we would be thankful if you provide the authorization required for the different roles in the change request management.I have followed the help file of SOLMAN 3.2 and create the users as under
    User - Role
    SOCM_RQSTR - ZSAP_SOCM_REQUESTER
    (Derrived from SAP_SOCM_REQUESTER)
    SOCM_DVLPR - ZSAP_SOCM_DEVELOPER
    (Derrived from SAP_SOCM_DEVELOPER)
    SOCM_CHNGNGR - ZSAP_SOCM_CHANGE_MANAGER
    (Derrived from SAP_SOCM_CHANGE_MANAGER)
    SOCM_CHNGNGR - ZSAP_SOCM_IT_OPERATOR
    (Derrived from SAP_SOCM_IT_OPERATOR)
    Even then I am facing problems while developer creating transport requests and while logging into development system.
    I tried adding S_RFC,S_RFCACL auth objects to their roles but did not help.
    Pl. suggest.
    Thanks & Regards
    Mrutyunjay
    Message was edited by: Mrutyunjay Rao Dora

    Hi all,
    We are trying to implement the Change Request Management piece in Solution Manager 3.2. 
    We are facing the following issues which I think relate to the same reason:
    1)We have created a Maintenance Project in SOLAR_PROJECT_ADMIN and assigned it a logical component, which consists of our two system landscape (namely DEVàQAS). We have also created the IMG project in the DEV system and have distributed that IMG project to both the Solution manager system and the DEV system. Now we have to make the maintenance cycle and task list for that maintenance project, but as we select the project and click on “create project cycle” it shows the message "The project is not released. Hence cycle can not be created". It is showing the status of project as locked .How can we open or unlock the project to remove the error?
    2) Also after selecting the SMI project when we click on the button “CTS status switches” or “project specific Transport route” it responds with the error "Project landscape not configured; set the project status to "open" first ".
    3)When we click on “synchronize single project” it prompts for the login of connected system (Development System) and after login, it gives an error "Warning, problems during synchronization of the system Landscape".
    For Error resolution, we have checked the system landscape and it does not give us any errors. We have done that, both from the solution manager by going to the transaction SOLAR_PROJECT_ADMIN -->  >system landscape tab>selecting our logical component and doing a check by clicking the "Check system Landscape" button. It returns with "no Errors". We also did a check on the TMS configuration by logging directly on to the TMS domain controller system and checking the Transport routes. We have checked the RFC connections without any errors.
    Any help would be greatly appreciated.
    Thanks
    Abhi

  • Document for Change request Management in Solution Manager

    Hi,
    We are setting up Solution Manager. I know service desk configuration. But I need a document on how to configure change request management in Solution Manager.
    Also I need a steps or a document for monitoring of EP 6.0 from Solution Manager.
    Thanks a ton for help in advance.

    Hi,
    Check out these links
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/media/uuid/b4406827-0a01-0010-3da2-f56b36d88510
    BI and Portals 2006 [original link is broken]
    very good collection of eclasses. for making use of solution manager.
    Feel free to revert back.
    --ragu

  • Need help in Solution Manager certification

    Hi All,
    I am appearing for Solution Manager certification in Dec'2007. Please send me some documentation regarding solution Manager.  Please email to the following :  [email protected]
    Appreciate all your help.
    Thanks in Advance.
    Harish.

    Hi Harish,
    The documents are not available as a free download. You must join the SAP education to obtain the training & material.
    Kind regards,
    Sundar

  • Change Request Managment setup for Solution Manager 4.0

    Hi guys! Can someone help me on how to setup the Change Request Management in Solution Manager 4.0? I have already have checked the SAP Marketplace for any documentation about this topic but found none. I am configuring the two test servers (1 prod and 1 dev) in tcode SMSY. I have also configured the system role for each server. When I try executing /TMWFLOW/CMSCONF in SE38, no clients appear in the CRITICAL OBJECTS pane. Did I miss a required step in the implementation? I hope you guys can help me. Thanks in advance...
    Regards,
    Ronald Navarro

    Hello Ronald,
    Following the spro configuration will setup the Change Request Management scenario, each spro point has associated the corresponding documentation.
    Also in service.sap.com/rkt-solman>solman 4.0>CCC profile you will find valuable information about how to use this scenario.
    Hope this helps,
    Dolores

  • Regarding Configuration of Change Request Management in solution manager4.0

    HI Techies,
    I have configured the change request in solman 4.0 but the transactions SDCR,SDMN,SDMI,SDAD,SDDV,SDTM,SLFN,SDHFare not working for activating this i have executed the BC sets as mentioned in Note :903527 ,is there any BC sets available for this ,can anyone suggest me with the solutions.
    Thanks in Advance solutions awarded for sure !
    regards,
    ESRkumar

    Hi Tripti,
    I have already done it .i dono where iam lagging can u please send me the docs regarding the Change Request Management in solution manager 4.0 with sp12 .Still iam facing the same
    thanks in advance!!
    ESRkumar
    Edited by: esr kumar on Feb 26, 2008 11:10 AM
    Edited by: esr kumar on Feb 27, 2008 5:47 AM
    Edited by: esr kumar on Feb 28, 2008 10:10 AM
    Edited by: esr kumar on Feb 29, 2008 9:28 AM
    Edited by: esr kumar on Mar 13, 2008 6:10 AM

  • Solution Manager Certification , Wily Introspective and Topaz FAQs

    Hi All,
    I am preparin for certification exam on Solution Manager Certification , Wily Introspective and Topaz. Could you please send me FAQs and certification questions on those topics.
    Please fored to my email.
    I appreciate your help and award points.
    Thank you
    Maruti CR
    [email protected]

    Can u please share with me
    [email protected]

Maybe you are looking for

  • Voice memos got deleted while synchronising

    Hello everyone I have a small (big) problem. For the past 8 weeks, I've been recording my lectures with my iPhone 5s. Now that it's vacation, I wanted to re-listen to them all. My cat however knocked over soda all over my laptop (a HP), it couldn't b

  • My google calender is no longer showing up on ipad

    I've been using a shared google calender which I've set up on my Mac as a delegate. It's been working fine, with my iphone and ipad syncing this information without problems. However this week, both devices suddenly stopped syncing this information.

  • InD CS5 Crash alluva sudden

    Have a fairly large (24pp), 8.5x11 doc, many pix, much justification going on, etc. Started crashing regularly only today when either exporting to PDF in entirety or just a few random pages. Also crashes when trying to export to INML. What to do? Loo

  • Error KB976932

    I have a windows 7 professional edition, hp pavilion elite HPE with 64 bit.  I am on automatic updates.  This particular update continues to fail and says " failure configuring service pack, reverting changes" upon starting the computer.  Error numbe

  • HT4967 How to add a new calendar to Calendar

    I have used iCal for years, I recently upgraded from 10.6 to 10.8 and now I can't seem to add a calendar to my Calendar without going to iCloud. Right now I don't want to spend the time learning how to integrate existing calendars into iCloud. Please