SOP - Flexible Planning u2013 Demand Management.

Hello Gurus
Can any one guide me  SOP - Long term plannng  / Flexible Planning  - Transfer to demand managment Process
Thanks
JJ
Edited by: JJ_SAP_S on Jul 28, 2008 12:24 AM

Hi,
Transferring SOP  to Demand Management :
Use:
You can pass on data planned in Flexible Planning or Standard SOP to Demand Management.
Demand Management determines the requirement dates and requirement quantities for important assemblies and specifies the strategies for planning and producing/procuring finished products. The result of Demand Management is the demand program. The demand program differentiates planned independent requirements and customer independent requirements. It gives the information needed in MPS and MRP for planning at SKU level. The placing of sales orders eventually consumes planned requirements and triggers updating to the Sales Information System. This actual data can then be used as input for future sales planning. For more information, see PP Demand Management.
Prerequisites:
The system distributes the data to the appropriate plants in Demand Management on the basis of the quotas you set in Customizing (in Define proportional distribution across plants). You can also make these settings in the Flexible Planning or Standard SOP menu by choosing Settings ® Plant distribution. Plant distribution works as follows:
If a plant or plants can be found for the material in the planning hierarchy, data is transferred to Demand Management for these plants.
If no plant can be found in the planning hierarchy, the system checks to see which plants have been maintained for the material in the material master record. It then checks to see whether distribution quotas have been maintained for the material. If quotas have been maintained, the transfer to Demand Management is based on these quotas.
If no distribution quotas are found for the material, the system checks to see whether you have set generic distribution quotas; that is, distribution quotas that apply to all materials. If so, the transfer to Demand Management is based on these quotas. If generic quotas exist for some but not all plants maintained in the material master record, the system assumes that the distribution quotas of plants without generic quotas are 0.
If no distribution quotas are found at allu2014neither material-specific nor generic onesu2014, the system splits the data equally among all the plants in the material master record.
See also:
Plant Distribution Quotas
Features
Independent requirements are created in Demand Management for all materials whose data has been transferred. These independent requirements are created in the base unit of measure of the material. The base unit of measure of the material is not necessarily the same as the base unit of measure of the information structure or the unit in which you planned the material. See also Switching Units in the Planning Table.
You can transfer SOP data to Demand Management in the following ways:
Transferring Online, Synchronously and Automatically:
You set the following information structure parameters in Customizing for Sales & Operations Planning (in Set parameters of info structures and key figures).
Field name of the key figure whose values are to be transferred
Planning version from which the data is to be transferred
Demand version to which the data is to be transferred
The system creates or overwrites independent requirements in Demand Management every time you save this planning version of the information structure in Flexible Planning.
Transferring Online, Asynchronously and Manually
You choose between the following options:
Transfer of the planning data of all members of a single-level product group from standard SOP (a single-level product group is a product group whose members are materials)
Transfer of the planning data created for one material from standard SOP
Transfer of key figure values from an information structure
You make the following general settings:
The material or product group whose data you want to be transferred
The plant of this material or product group
The planning version of the information structure in which the data is stored
The dates for which you want the data to be transferred
Whether you want to check what the data looks like as independent requirements before you transfer it
The requirements type
If you do not make an entry, the system sets the requirements type via the MRP group which is maintained in the material master record.
The version of the demand program to which you want the data to be transferred
Whether this version of the demand program is active and therefore relevant to MRP
Depending on the option you chose in step 1, you set one of the following strategies.
Transferring Planning Data from a Single-Level Product Group:
You transfer the sales plans of the materials direct.
You transfer the sales plans of the materials as proportions of their owner product group (using the proportional factors defined in the product group master record).
You transfer the production plans of the materials direct.
You transfer the production plans of the materials as proportions of their owner product group (using the proportional factors defined in the product group master record).
Transferring Planning Data of One Material from Standard SOP:
You transfer the sales plan of the material direct
You transfer the sales plan of the material as a proportion of the product group of which it is a member (using the proportional factor defined in the product group master record)
You transfer the production plan of the material direct
You transfer the production plan of the material as a proportion of the product group of which it is a member (using the proportional factor defined in the product group master record)
Transferring Key Figure Data of One Material from Flexible Planning
The information structure from which you want the key figure data to be transferred
The key figure whose values you want to be transferred
This key figure must be a quantity key figure.
For more details go to the following link :
http://help.sap.com/erp2005_ehp_03/helpdata/EN/a5/63238b43a211d189410000e829fbbd/frameset.htm
Hope this helps.
Reward if useful.
Regards,
Tejas
Hope this helps.

Similar Messages

  • SOP flexible planning  transfer to  demand managemnt

    hi guys,
    very good morning...
    any one plz light on SOP flexible planning  transfer to demand management  from inactive version to active version with flow,
    thanks in advance,
    mohan m

    Hi,
    In flexible planning the nomal flow is as follows
    1. MC21
    2. MC7F
    3. MC8A
    4. MC61
    5. MC93
    6. MC8V/MC8Q
    7. MC90
    In MC90 u transfer the requirements from SOP to demand management.Here u give the requirements type and the planning version from which it is to be transferred.
    Manisha

  • Sales Planning  vs Demand management

    Can any body explain how to process the sales planning vs Demand management !

    Hi,
    Demand Management  : The function of Demand Management is to determine requirement quantities and delivery dates for finished products assemblies. Customer requirements are created in sales order management. To create a demand program, Demand Management uses planned independent requirements and customer requirements.
    To create the demand program, you must define the planning strategy for a product. Planning strategies represent the methods of production for planning and manufacturing or procuring a product.
    Using these strategies, you can decide if production is triggered by sales orders (make-to-order production), or if it is not triggered by sales orders (make-to-stock production).You can have sales orders and stock orders in the demand program. If the production time is long in relation to the standard market delivery time, you can produce the product or certain assemblies before there are sales orders. In this case, sales quantities are planned, for example, with the aid of a sales forecast.
    Sales & Operations Planning (SOP) is a flexible forecasting and planning tool with which sales, production, and other supply chain targets can be set on the basis of historical, existing, and estimated future data. Rough-cut planning can also be carried out to determine the amounts of the capacities and other resources required to meet these targets.
    Use SOP to streamline and consolidate your company’s sales and production operations.
    SOP is particularly suitable for long- and medium-term planning
    SOP constitutes the planning functionality of the LIS information systems.
    You pass on SOP plans to Demand Management (PP-MP-DEM) in the form of independent requirements. In turn, this data is fed to Master Production Scheduling (PP-MP-MPS) and Material Requirements Planning (PP-MRP).
    An interface with Profitability Analysis (CO-PA) allows you to use CO-PA data as the basis for sales planning in SOP.
    You can also pass on the results of SOP to Profitability Analysis (CO-PA), Cost Center Accounting (CO-OM-CCA), and Activity-Based Costing (CO-OM-CCA).
    Application Link Enabling (CA-BFA-ALE) supports the distribution of data to different operating units in your enterprise
    I hope this information will help you.
    kiran.

  • Error in Data Transfer : From CO-PA to SOP Flexible Planning

    Hi Friends
    I am working on a Scenario of Transferring CO-PA data to Flexible Planning, I am encountering few problems, I have done the followig steps, request you to check and get back to me..
    The following configuration steps are done with Example;
    Characteristic assignment
    u2022 Sales Organization
    u2022 Region
    u2022 Plant
    u2022 Material Number
    u2022 Material Group
    Key figure(s) assignment
    u2022 Sales Quantity
    Assignment: Information structure - operating concern
    S555 u2013 Z001
    Define activities Z1
    Mass Processing Job : ZSO-PA
    We are able to transfer data from CO-PA to standard SOP, But we tried for transfer to Flexible Planning SOP by creating Mass Processing Job setting as below configuration path.
    Production -> Sales & Operations Planning (SOP) ->Functions -> Mass Processing -> Transfer LIS / CO-PA
    After executing Job MC8G - Schedule, we checked in Tcode - MC8I u2013 Check, Status: Processed with errors, And also data are not displayed in Tcode : MC95 for Material & active version.
    We couldnu2019t find log for error status.
    What is the method / Procedure for transfer data to Flexible Planning SOP?
    Please get back to me.

    Dear,
    Status:            Processed with errors ok
    Activities checked:? what is the error message here like
       COPY
           Planning type in activity and job not identical
           Planning type of job:  SOPKAPAM
           Plng. type of activity:Z004PLAN
    When checking a mass processing job in SOP/flexible planning (Transaction MC8I), in the log error message "Activity and COPA profile have different planning versions?
    Or planned/actual indicator in the COPA profile?
    Version should be        A00
    Please check the MC8S. Then an Avtivity in MC8T
    after you create the job in MC8D with the acitivity you have defined for your info structure.
    After that check in MD62 for plan value.
    Regards,
    R.Brahmankar

  • Creating infostructure - SOP flexible planning

    Hi
    Can anybody explain the procedure creating the infostructure in flexible planning (sop).
    When i am choosing application as 41 in MC21 and tab Choose characterstics it is displaying an error message Table PFAM is not in the Dictionary - i am testing in ides server.
    Regards
    Mohan

    Hi Siva,
    Thank u very much for the perfect gudie that u had given.
    Please can u guide me for sop flexible planning any doc any help will be welcome.
    Regards
    Mohan

  • How requirements from SOP are transferred to Demand Management

    How requirements from SOP are transferred to Demand Management? what is transaction code for it ?
    Madan S. Rode

    Hi,
    In mc82 view, after checking the capacity situation(By choosing view, capacity situation, show) you can check the load for that particular resource. Once the load is 100 %. You can save it.
    Use mc78, copy the inactive version no to active no. (a00).
    Then in mc82 view, go to Extras,
    transfer to demand management,
    Choose the strategy as LSF/VSF... according to your scenario & then click transfer.
    Regards,
    Senthilkumar SD

  • SOP flexible planning calender

    Hi Experts,
    Plz light on the issue, we are going with SOP flexible planning -
    client want planning result for only 6 days/week but we maintained calendar for work center for 7 days,
    How assign 6 days calendar for only for SOP planning purpose,
    Thanks in advance
    Mohan M

    Dear,
    You can define the Factory Calender  for Info structure in  Tcode: MC7F asign 6 days work calender here.
    Regards,
    R.Brahmankar

  • SOP-Flexible Planning

    Dear all,
    I am doing SOP Flexible Planning but it is not getting me, can any body  Send me screen shorts/user Manuals of SOP flexible planning.
    Regards,
    Ravi

    Hi,
    check this SAP help:
    http://help.sap.com/saphelp_40b/helpdata/en/a5/632f3b43a211d189410000e829fbbd/frameset.htm
    Major steps is:
    Your business needs to define characterristics and key figures.
    1.Create a info structure for flexible planning.
    2.Create planning heirrachy
    3.Create planning type/macros
    4.Plan using MC94 planning table.

  • SOP and transfer to Demand management for MTO material

    Hi all,
    I have the following situation:
    I have a material, a finished goods product with planning strategy 20 Make to order defined in the material master. I enter a sales forecast for the material in SOP in SAPECC (transaction MC87), works fine.
    But when I try to release the forecast to Demand Management (MC74), I get the following error message: "No requirements type exists for material 110100 1 in plant 2". I can see that planning strategy 20 MTO does not have any requirement type defined.
    But what is the best practice then to forecast on MTO materials (with strategy 20 MTO)?
    What I want to do is to bring down the requirements of the MTO material to Long term planning to get a BOM explosion for the components. I realize that I should not start a production plan for the MTO material, but I want to plan the requirements for components several months ahead.
    What is the best practice? Should I use a different production strategy? Am I missing config or any fundamental thinking here?
    I need to have the material as a MTO strategy, but I want to plan the components.
    Please, give me input on this if you have any solution.
    Regards,
    Lars

    Hi Lars,
    Here's what you need to do:
    1. Instead of pure 20, customize a strategy group that has in it 20 and 10, and attach this strategy group to your material.
    2. In MC74 specify requirements type LSF, demand management version, and make sure to uncheck the "active" box (otherwise you will get requirements in the operative system, and not only in LTP).
    3. Do the transfer, and include the version in a LTP scenario.
    Regards,
    Mario

  • Transfer plan to demand management

    Dear All
    i have maintained an active sales plan in mc93 for 30 materials.Now i can transfer plan of one material
    to demend management by mc 90. But i want to transfer whole version to demend management i mean plan of all materials instead of one by one. so is it possible to transfer whole version in which so many materials are planned to demend management

    Hi ahmad
    with ref to your query i want to add few points which will clarify your issue upto certain extent
    if youwant to transfer all 30 materials to demand management you may work with product group scenario  instead of material(one)
    you maycreate rough cut plan for product group save it against version make it active
    you may trnasfer to demand management by using t code  mc74 with respect ot active versionas well as defined version
    which creatingrough mc35 you have to select w r to sales or production plan
    once the sales plan or production plan trnasfer to demand management you can view the results in md62 for results
    i hope it will clarify your issue for a certain extent
    thanks
    shaik

  • Reg SOP and flexible planning

    Dear all,
    Please explain what is the difference between SOP and flexible planning, similarly in an industry when do use Longterm planning, when we will use SOP and when we use Flexible planning, when we should use MRP planning
    Please advice
    regards
    venkat

    Dear,
    Standard SOP:-
    Standard SOP, you work with one organizational unit, the product group hierarchy, and plan predefined key figures in a planning table with a set layout. All plans in Standard SOP are based on the standard information structure S076.
    If there are more regions for an organization, planning can not be done at different region or different sales organization level using Standard SOP.
    Flexible Planning:-
    Flexible Planning, on the other hand, can be based on any information structure of your choice, either a self-defined information structure or a standard information structure.
    If there are more regions for an organization, planning can be done at different region or different sales organization level using Flexible planning
    Please refer my reply from this thread,
    [SOP - Flexible Planning |SOP - Flexible Planning u2013 Demand Management.]
    Regards,
    R.Brahmankar

  • Transfer SOP plan to Demand Mgmt

    Dear friends,
       I  have created SOp through MC88. And i wants to transfer SOP plan to demand management through t.code MC74.
    While filling the data in the fields, i do not know what to enter in the field "Version" either "00" or "GP".
    Please guide me what data to be entered in the "version" field?
    Thanks
    Shri

    If i understand clear on your querry you want to transfer the SOP plan to the demand management.
    1.In such case you can use any version.
    2.But the version needs to be active .
    version in Demand Management:
    1. these are used to just manage the diff types of demand in the demand table just for recognising them
    2. If they are active then they will be included int he MRP ELSE no.
    let me know if you need more answers
    reg
    DSK

  • Sope of planning /qouta Arrangement

    Hi PP expert.
    i want to under stand scope of planning. there are two finish material type,one MTO and another is MTS.and have 4 production plant.
    now for the MTS  i want run one  MRP  for 4 plant. can i do from Scope of planning or Quota Arrangement.
    kindly  Guide  me step be step of both scope of planning and quota Arrangement.what is difference in both.and which process  is easy. and how i will send Demand managment to all  4 plant for MRP run.in both case.
    Now for MTO.same there are 4 plant and want run only one MRP.can i do from scope of planning or Quota Arrangement.
    kindly guide me for both MTO and MTS.only one MRP run for 4 plant
    Regards
    Aqueel

    Aqueel,
    You have asked about many topics.  It is not clear what exact business objective you are trying to accomplish.
    Quota arrangements has to do with the determination of  sources of supply.  It is not the same as running MRP in multiple plants.
    MRP in ECC normally runs plant-by-plant.  You can create a scope of planning, in which you specify the order of plants that MRP runs against.  In this case, you execute MRP once, and in the background, MRP looks at the list of plants you have created, and then runs against the first plant, the second plant, the third plant, and so on.  During the MRP job with Scope of Planning, the MRP processing programs do not run against multiple plants simultaneously, they complete one plant, and then move onto the next, and so on, until the end of the scope of planning list.  You can configure scope of planning in OM0E.
    Now you ask about two types of planning methods for materials, one is MTO and one is MTS.  I guess you want to run MRP for the MTS only, against the 4 plants.  You could define the MTS materials as MPS relevant, (change MRP type to M*) and then run an MPS job instead of an MRP job.  In this case, MPS (MD40 et al), which is very similar to MRP, runs only against the MPS parts.  If this workaround is not satisfactory, then you can use the standard MRP selection userexit (M61X0001) to define a specific suite of parts to run MRP against (such as "all MTS parts").  If you combine either of these solutions (MPS or userexit) with scope of planning, you can then run only the MTS parts against the 4 plants in your scope of planning, all in one job.  You didn't speak of when/how you want to run the MTO parts, but you could do the same thing for these parts as well.
    If, however, you wish to run both MTS and MTO parts in a single MRP run, against 4 plants, then just use scope of planning.
    Demand management is not directly related to MRP.  You can create Planned independent requirements for any combination of parts that you desire.  These requirements, once activated, will cause MRP to run net requirements calculations, and produce procurement proposals (PurchReqs or PlndOrds or PurchScheds).
    Rgds,
    DB49

  • Transfer to demand management - Flexible Planning

    Hi everyone,
    I was wondering whether someone has carried out the next process in the following scenario. I am working with flexible planning in SOP (level-by-level planning and dual level planning type, since I am working with product groups).
    Now I would like to transfer to demand management some data stored in a ratio associated to one field (disaggregated value) in my planning table.
    I tried to do it using the online mode but I just could transfer aggregated level values. I also tried to do it with batch processing (by creating a trannfer profile, then an activity, then a job and finally scheduling and executing the job) but there was an error message that looks like "No dual planning requirements allowed".
    I would be very grateful if someone could give some useful information about how to solve my problem. I guess that someone in this forum has faced this challenge formerly.
    Thanks in advance and best regards.
    Ben.

    Hi,
    Yes, dual level was specified in the MC8A.
    Thanks.

  • Tranfser from demand management to SOP

    Hello All,
    is it possible to send  data from demand management (eg.MD61) to SOP - standard information structure S076 or flexible planning ?
    The idea is to put values directly to MD61 and use them later in flexible planning
    thanks a lot
    KS

    Dear,
    It is not possible. In sap, the planning cycle will be SOP -> Demand management -> MRP
    SOPu2019 is a forecasting tool enabling you to set up sales, production, and other supply chain targets based on existing, future, or historical data. SOP is most suitable for planning finished goods. SOP plans are passed on to Demand Management in the form of independent requirements (MD61), which in turn is fed in to MRP (Material Requirements Planning).
    Hope it clear your doubt
    Regards / US

Maybe you are looking for

  • Java 2 runtime Environment setup failed with a return code of -1

    Hi! I have tried to install sdk 1_3_1_01 on Windows 2000 with ServicePack 2 and the error "Java 2 runtime Environment setup failed with a return code of -1" occured. As I saw, a lot of people has the problem but couldn't find a solution on this page!

  • My dashboard no longer works, can anyone help?

    I dont have a clue what ive done but my dashboard no longer works. it will open, i.e screen goes greyish colour, but there are no widgets on the screen and even when i try to put them on it closes automatically. ive had a look in the forums and some

  • Reporting Services Add-In for SharePoint Products

    Hi, Can I use the SSRS Web part installed by the add-in to see local mode reports just by instaling the add-in or do I also need to install the "Reporting Services - Sharepoint" on SS Shared Features setup wizard? Thanks, DD

  • How to schedule reporting

    Hello everyone, I use OBI version 10.1.3.4 Standard Edition One. Is it possible to schedule the execution of reports or dashboards without using Delivery and without creating an iBot or Publisher? thanks Sara

  • How do we create custom flags to show/hide navigation menus?

    Hi, I need to set a custom flag which allows me to hide/show navigation menus to users. These flags are declared in dynamicdata MenuItemFlagDefinitions and are used in dynamicdata CoreMenuItemsFlags, but I do not know were they are defined.. For inst