Sope of planning /qouta Arrangement

Hi PP expert.
i want to under stand scope of planning. there are two finish material type,one MTO and another is MTS.and have 4 production plant.
now for the MTS  i want run one  MRP  for 4 plant. can i do from Scope of planning or Quota Arrangement.
kindly  Guide  me step be step of both scope of planning and quota Arrangement.what is difference in both.and which process  is easy. and how i will send Demand managment to all  4 plant for MRP run.in both case.
Now for MTO.same there are 4 plant and want run only one MRP.can i do from scope of planning or Quota Arrangement.
kindly guide me for both MTO and MTS.only one MRP run for 4 plant
Regards
Aqueel

Aqueel,
You have asked about many topics.  It is not clear what exact business objective you are trying to accomplish.
Quota arrangements has to do with the determination of  sources of supply.  It is not the same as running MRP in multiple plants.
MRP in ECC normally runs plant-by-plant.  You can create a scope of planning, in which you specify the order of plants that MRP runs against.  In this case, you execute MRP once, and in the background, MRP looks at the list of plants you have created, and then runs against the first plant, the second plant, the third plant, and so on.  During the MRP job with Scope of Planning, the MRP processing programs do not run against multiple plants simultaneously, they complete one plant, and then move onto the next, and so on, until the end of the scope of planning list.  You can configure scope of planning in OM0E.
Now you ask about two types of planning methods for materials, one is MTO and one is MTS.  I guess you want to run MRP for the MTS only, against the 4 plants.  You could define the MTS materials as MPS relevant, (change MRP type to M*) and then run an MPS job instead of an MRP job.  In this case, MPS (MD40 et al), which is very similar to MRP, runs only against the MPS parts.  If this workaround is not satisfactory, then you can use the standard MRP selection userexit (M61X0001) to define a specific suite of parts to run MRP against (such as "all MTS parts").  If you combine either of these solutions (MPS or userexit) with scope of planning, you can then run only the MTS parts against the 4 plants in your scope of planning, all in one job.  You didn't speak of when/how you want to run the MTO parts, but you could do the same thing for these parts as well.
If, however, you wish to run both MTS and MTO parts in a single MRP run, against 4 plants, then just use scope of planning.
Demand management is not directly related to MRP.  You can create Planned independent requirements for any combination of parts that you desire.  These requirements, once activated, will cause MRP to run net requirements calculations, and produce procurement proposals (PurchReqs or PlndOrds or PurchScheds).
Rgds,
DB49

Similar Messages

  • Qouta Arrangement not splitting the requirement

    Hello All
              Am facing a problem with quota arrangement, AI have maintained qouta for SF X2 which is a component for X. Material X is maintained in plant 1400 & as well as SF X2. I have maintained qouta arrangement for X2 in plant 1400 with procurement type F & special procurement type U, I have maintined this setting for plant 1200 & 1500 with the ratio as 70:30 respectively. In material master if X2 in plant 1400 I have maintained Quota arrangement usage as 4. When am giving a requirement of 100 EA and after the MRP run of material X the requirement of X2 is passed on to 1200 totally with 100 EA, the system is not splitting requirement to both the plants 1200 & 1500. I have also maintained splitting in SPRO for lot size key EX which I am using for X2. After maintaining this data i shall get the requirement of X2 to be splitted between plant 1200 & 1500 which is not happening in this case. Kindly suggest where is the gap in maintainng the appropriate setting for Quota arrangement. I shall be looking forward to your valuable inputs & guidance.
    Regards
    J K Tharwani

    Dear Jitendar Kumar,
    check with these inputs,
    1.Maintain the Info-Records for the vendor + material combination in ME11.
    2.Maintain the source List for the vendor + material combination in ME01 and for source List usage in Materials Planning select
    value 1.
    3.Maintain splitting allowed for Quota for the Lot size in OMI4.
    4.Maintain Quota arrangement usage 4 in the material master for the material for which the quota's has been maintained.
    5.Maintain the quota arrangement details in MEQ1.
    After MRP Run,check whether you are gettinsg the exact results.
    Regards
    Mangalraj.S

  • Error in Data Transfer : From CO-PA to SOP Flexible Planning

    Hi Friends
    I am working on a Scenario of Transferring CO-PA data to Flexible Planning, I am encountering few problems, I have done the followig steps, request you to check and get back to me..
    The following configuration steps are done with Example;
    Characteristic assignment
    u2022 Sales Organization
    u2022 Region
    u2022 Plant
    u2022 Material Number
    u2022 Material Group
    Key figure(s) assignment
    u2022 Sales Quantity
    Assignment: Information structure - operating concern
    S555 u2013 Z001
    Define activities Z1
    Mass Processing Job : ZSO-PA
    We are able to transfer data from CO-PA to standard SOP, But we tried for transfer to Flexible Planning SOP by creating Mass Processing Job setting as below configuration path.
    Production -> Sales & Operations Planning (SOP) ->Functions -> Mass Processing -> Transfer LIS / CO-PA
    After executing Job MC8G - Schedule, we checked in Tcode - MC8I u2013 Check, Status: Processed with errors, And also data are not displayed in Tcode : MC95 for Material & active version.
    We couldnu2019t find log for error status.
    What is the method / Procedure for transfer data to Flexible Planning SOP?
    Please get back to me.

    Dear,
    Status:            Processed with errors ok
    Activities checked:? what is the error message here like
       COPY
           Planning type in activity and job not identical
           Planning type of job:  SOPKAPAM
           Plng. type of activity:Z004PLAN
    When checking a mass processing job in SOP/flexible planning (Transaction MC8I), in the log error message "Activity and COPA profile have different planning versions?
    Or planned/actual indicator in the COPA profile?
    Version should be        A00
    Please check the MC8S. Then an Avtivity in MC8T
    after you create the job in MC8D with the acitivity you have defined for your info structure.
    After that check in MD62 for plan value.
    Regards,
    R.Brahmankar

  • Creating infostructure - SOP flexible planning

    Hi
    Can anybody explain the procedure creating the infostructure in flexible planning (sop).
    When i am choosing application as 41 in MC21 and tab Choose characterstics it is displaying an error message Table PFAM is not in the Dictionary - i am testing in ides server.
    Regards
    Mohan

    Hi Siva,
    Thank u very much for the perfect gudie that u had given.
    Please can u guide me for sop flexible planning any doc any help will be welcome.
    Regards
    Mohan

  • SOP flexible planning  transfer to  demand managemnt

    hi guys,
    very good morning...
    any one plz light on SOP flexible planning  transfer to demand management  from inactive version to active version with flow,
    thanks in advance,
    mohan m

    Hi,
    In flexible planning the nomal flow is as follows
    1. MC21
    2. MC7F
    3. MC8A
    4. MC61
    5. MC93
    6. MC8V/MC8Q
    7. MC90
    In MC90 u transfer the requirements from SOP to demand management.Here u give the requirements type and the planning version from which it is to be transferred.
    Manisha

  • SOP flexible planning calender

    Hi Experts,
    Plz light on the issue, we are going with SOP flexible planning -
    client want planning result for only 6 days/week but we maintained calendar for work center for 7 days,
    How assign 6 days calendar for only for SOP planning purpose,
    Thanks in advance
    Mohan M

    Dear,
    You can define the Factory Calender  for Info structure in  Tcode: MC7F asign 6 days work calender here.
    Regards,
    R.Brahmankar

  • SOP-Flexible Planning

    Dear all,
    I am doing SOP Flexible Planning but it is not getting me, can any body  Send me screen shorts/user Manuals of SOP flexible planning.
    Regards,
    Ravi

    Hi,
    check this SAP help:
    http://help.sap.com/saphelp_40b/helpdata/en/a5/632f3b43a211d189410000e829fbbd/frameset.htm
    Major steps is:
    Your business needs to define characterristics and key figures.
    1.Create a info structure for flexible planning.
    2.Create planning heirrachy
    3.Create planning type/macros
    4.Plan using MC94 planning table.

  • SOP - Flexible Planning u2013 Demand Management.

    Hello Gurus
    Can any one guide me  SOP - Long term plannng  / Flexible Planning  - Transfer to demand managment Process
    Thanks
    JJ
    Edited by: JJ_SAP_S on Jul 28, 2008 12:24 AM

    Hi,
    Transferring SOP  to Demand Management :
    Use:
    You can pass on data planned in Flexible Planning or Standard SOP to Demand Management.
    Demand Management determines the requirement dates and requirement quantities for important assemblies and specifies the strategies for planning and producing/procuring finished products. The result of Demand Management is the demand program. The demand program differentiates planned independent requirements and customer independent requirements. It gives the information needed in MPS and MRP for planning at SKU level. The placing of sales orders eventually consumes planned requirements and triggers updating to the Sales Information System. This actual data can then be used as input for future sales planning. For more information, see PP Demand Management.
    Prerequisites:
    The system distributes the data to the appropriate plants in Demand Management on the basis of the quotas you set in Customizing (in Define proportional distribution across plants). You can also make these settings in the Flexible Planning or Standard SOP menu by choosing Settings ® Plant distribution. Plant distribution works as follows:
    If a plant or plants can be found for the material in the planning hierarchy, data is transferred to Demand Management for these plants.
    If no plant can be found in the planning hierarchy, the system checks to see which plants have been maintained for the material in the material master record. It then checks to see whether distribution quotas have been maintained for the material. If quotas have been maintained, the transfer to Demand Management is based on these quotas.
    If no distribution quotas are found for the material, the system checks to see whether you have set generic distribution quotas; that is, distribution quotas that apply to all materials. If so, the transfer to Demand Management is based on these quotas. If generic quotas exist for some but not all plants maintained in the material master record, the system assumes that the distribution quotas of plants without generic quotas are 0.
    If no distribution quotas are found at allu2014neither material-specific nor generic onesu2014, the system splits the data equally among all the plants in the material master record.
    See also:
    Plant Distribution Quotas
    Features
    Independent requirements are created in Demand Management for all materials whose data has been transferred. These independent requirements are created in the base unit of measure of the material. The base unit of measure of the material is not necessarily the same as the base unit of measure of the information structure or the unit in which you planned the material. See also Switching Units in the Planning Table.
    You can transfer SOP data to Demand Management in the following ways:
    Transferring Online, Synchronously and Automatically:
    You set the following information structure parameters in Customizing for Sales & Operations Planning (in Set parameters of info structures and key figures).
    Field name of the key figure whose values are to be transferred
    Planning version from which the data is to be transferred
    Demand version to which the data is to be transferred
    The system creates or overwrites independent requirements in Demand Management every time you save this planning version of the information structure in Flexible Planning.
    Transferring Online, Asynchronously and Manually
    You choose between the following options:
    Transfer of the planning data of all members of a single-level product group from standard SOP (a single-level product group is a product group whose members are materials)
    Transfer of the planning data created for one material from standard SOP
    Transfer of key figure values from an information structure
    You make the following general settings:
    The material or product group whose data you want to be transferred
    The plant of this material or product group
    The planning version of the information structure in which the data is stored
    The dates for which you want the data to be transferred
    Whether you want to check what the data looks like as independent requirements before you transfer it
    The requirements type
    If you do not make an entry, the system sets the requirements type via the MRP group which is maintained in the material master record.
    The version of the demand program to which you want the data to be transferred
    Whether this version of the demand program is active and therefore relevant to MRP
    Depending on the option you chose in step 1, you set one of the following strategies.
    Transferring Planning Data from a Single-Level Product Group:
    You transfer the sales plans of the materials direct.
    You transfer the sales plans of the materials as proportions of their owner product group (using the proportional factors defined in the product group master record).
    You transfer the production plans of the materials direct.
    You transfer the production plans of the materials as proportions of their owner product group (using the proportional factors defined in the product group master record).
    Transferring Planning Data of One Material from Standard SOP:
    You transfer the sales plan of the material direct
    You transfer the sales plan of the material as a proportion of the product group of which it is a member (using the proportional factor defined in the product group master record)
    You transfer the production plan of the material direct
    You transfer the production plan of the material as a proportion of the product group of which it is a member (using the proportional factor defined in the product group master record)
    Transferring Key Figure Data of One Material from Flexible Planning
    The information structure from which you want the key figure data to be transferred
    The key figure whose values you want to be transferred
    This key figure must be a quantity key figure.
    For more details go to the following link :
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/a5/63238b43a211d189410000e829fbbd/frameset.htm
    Hope this helps.
    Reward if useful.
    Regards,
    Tejas
    Hope this helps.

  • Sop consistent planning

    dear gurus,
                    can any body explains the concept of consistent planning in sap
                        it will be useful for all
                                                                                    thanks in advance
                                                   gide

    FOR CONSISTANCE PLANNING
    The application allows planning at any level of aggregation: for example, high-level planning of planning hierarchies and/or product groups or detailed planning of finished products.
    Not only can users create sales and production plans, they can also plan other items of information such as key figures from an information structure.
    Moreover, resource leveling can be performed for work center capacities, materials, production resources/tools, and costs to ensure that resources are sufficient to meet targets.
    Planning is carried out in an easy-to-use planning table like a spreadsheet, in which macros and events can be defined and actual data compared with planned data.
    sop flow
    create sales order t.c VA01
    create prod order from sales order MANNUAL
    disaggregate plnning valves
    T.C: MC87 PLANN TO MATLS
    T.C: MC74 VERSION MANAGEMENT
    T.C : MC87 CHANGE IN PLAN
    tranfer the planned reqmt to demand mag T.C : MC74
    mrp run T.C: MD02 , MD04

  • If I'm between jobs and soon unable to pay for my current service plan, what arrangements can be made?

    For whatever reason, I'm only going to get $123 a week in unemployment benefits. I could just budget what I receive, but then I wouldn't have a lot left for things like putting gas in my car. I went to my local Verizon Wireless and they said they could suspend devices that I had, but that  I really wouldn't be getting much back in terms of savings. I was also told that VW Customer Service could provide more tools to help, so here I am. (BTW, I would have preferred to talk about this issue through secure e-mails instead of an online forum. However, no email option could be found at the Support page)

    Hello NAStrahl!
    I'm so sorry to learn of the circumstances that led to your post. We understand that situations like yours can come up, and we have a Financial Services team that can make arrangements with you. Please contact them directly at 866-266-1445.
    ChristinaB_VZW
    Follow us on Twitter @VZWSupport
    If my response answered your question please click the �Correct Answer� button under my response. This ensures others can benefit from our conversation. Thanks in advance for your help with this!!

  • SOP- Production Plan

    Hi,Sales plan is prepared for every 3 months (month wise demand). based on that we need to generate weekly wise production plan forindividual months.pls advise how to do that?

    Dear,
    Create the production plan from sales plan in MC87 for three months.
    Then split it in to week just go to header menu EditPeriod splittingTotal Week. than transfer to demand managment ExtraTransfer to Demand managment.
    Else you can also split in MD62 in schedule line tap.
    Then run the MRP you you will get weekly requirement.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Transferring Plans from SOP to CO-PA

    Dear Friends
    I am working on the integration of SOP and CO-PA, can you plz let me know the configuration relating to the transfer of SOP(Flexible planning) plans to CO-PA an Vice versa, if possible also the steps(transactions with codes) for transferring data.
    Please get back to me, I read few old threads but nothing had the whole information, get back to me on the above at the earliest.
    Jade

    Jade,
    Find detailed preocedure at below sap help link:
    Go to transferring sop data to other r/e applications->Trsafer to Profitabilty analysis.

  • Reg SOP and flexible planning

    Dear all,
    Please explain what is the difference between SOP and flexible planning, similarly in an industry when do use Longterm planning, when we will use SOP and when we use Flexible planning, when we should use MRP planning
    Please advice
    regards
    venkat

    Dear,
    Standard SOP:-
    Standard SOP, you work with one organizational unit, the product group hierarchy, and plan predefined key figures in a planning table with a set layout. All plans in Standard SOP are based on the standard information structure S076.
    If there are more regions for an organization, planning can not be done at different region or different sales organization level using Standard SOP.
    Flexible Planning:-
    Flexible Planning, on the other hand, can be based on any information structure of your choice, either a self-defined information structure or a standard information structure.
    If there are more regions for an organization, planning can be done at different region or different sales organization level using Flexible planning
    Please refer my reply from this thread,
    [SOP - Flexible Planning |SOP - Flexible Planning u2013 Demand Management.]
    Regards,
    R.Brahmankar

  • Open Order Quantity - SOP "0" column

    Dear Grurs/Friends
    In the SOP Flexible Planning for my scenario, one of the Key figure is Open Order Quanity.
    This is std sap field
    I want to maintain this automatially from the system in "0" column during the every month opening
    ie) for the month columns are June08, July08,Aug08
    the "0" column should have the open order qty at the end of May08
    I read the Library, i need more clarity of Mapping the same
    Prabakaran K

    closed

  • How to activate planning version

    hi,
    sap gurus,
    in which t.code we will create planing version for product allocation.
    please explain how to activate planning version in product allocation.  when we go T.CODE MC93
    there the planning version 'A00' showing active instead of '000' which works as a updation when ever requried.
    regards

    Dear,
    A00 is active version
    What we need to do is create inactive version say 001 or 010 anything and forcast sales plan or production plan
    Creat sales plan in MC87 and then goto MC88 make this inactive plan to active plan which system automatically takes to A00
    Logistics u2192 Production u2192 SOP u2192 Planning u2192 Version Managementu2192 MC78 Copy
    So here in the Source Version Provide the SOP version that you have created,
    In the Target Version give Version A00
    Hope clear to you.
    Regards,
    R.Brahmankar

Maybe you are looking for

  • It won't let me get adobe or flash.

    I have an old MacBook and because of that it has a lot of problems with adobe and java. How do I get it fixed? I tryed twice, but it didn't work out. And it's killing me that i can't use so many programs and websites. Please, someone must be out ther

  • Failed session with Java Thread error message

    Hi: We are using Oracle Forms 10g (application server 10.1.2.0.2). One of our users sessions just went unresponsive and when we took a look at the Java Console we captured the following: Exception in thread "AWT-EventQueue-2" java.lang.IllegalStateEx

  • Posting to One time Vendor with SPL GL indicator

    Hi Experts, I want to post to a one time vendor using a special GL indicator. Standard SAP does not allow this. Is this possible through some round about way  without a very big z development. if not then is there any other way out. Regards,

  • 3D Stem Graph String-based Axes

    When using 3D Stem Plots and real-world data, I successfully generate a 3D Graph. However, I was wondering if it is possible to customize the X and Y axis values with strings rather than numbers. I still want the Z-Axis to be a numerical intensity, b

  • Billing Relevance A & M in Item Category.......

    Hi Could anyone explain the difference between the billing relevance A & M in item cat definition..... Thanks in advance..... S.Kumar