Sorting projects by date (e.g earliest)

I have my library organized like so (for example):
*Short trips* [folder]
Daytrip to Isaberg [project]
Weekend at Marie's summer house [project]
Vacations [folder]
Driving through France [project]
Blue Summer scouting camp [project]
Can I arrange the projects in each folder by e.g. date of first picture?
The "Keep arranged by" (on rifgt-click on folder) only shows "name" and "kind" as options.
I'd very much like to avoid renaming every project to [yyyy mm dd], as space on sidebar is limited, and I'd much rather have a descriptive title bee the first thing to meet my eye.

Afaik, not directly. (It would be very processor intensive with Smart Folders.)
You could manually arrange your Projects as you wish to see them in the Library tab of the Inspector. Aperture will remember the sort order when you return it to "Manual".
Have you tried using Projects view for seeing Projects grouped by Folder sorted by date? Select "Projects" at the top of the Library tab of the Inspector, then set the sort order of the Browser to "Date", and then click the button to group your Projects by Folder. You can drill down through nested Folders by clicking the Folder titles.
Play around with it -- I've found it useful -- and see if it meets your needs.

Similar Messages

  • Sorting projects by date for syncing

    I'm a new Aperture user and have recently imported a few years worth of iPhoto pictures. Everything went smoothly and I am really enjoying Aperture. I do, however, have one concern - syncing with iTunes. With iPhoto I could have the last 12 months events synced with my iPad and iPhone. This automatically changed as time passed so I always had the last 12 months of photos with me. But with Aperture if I select all projects from the last year, or month for that matter, ALL projects are selected. I assume this is because Aperture sees the projects as all newly created because of the recent import. But when I check the project properties the correct range of dates is listed.
    Is there any way, other than manually sorting, to have Aperture sync projects like iPhoto did albums?
    Thanks!
    Kevin

    I've experienced the exact same issue when I moved from iPhoto to Aperture last month. Here are the steps to recreate:
    1. Import your iPhoto library to Aperture, copying the photos into Aperture itself
    2. Open iTunes and attach your iOS device
    3. Go to your iOS device in iTunes and click on the "Photos" tab
    4. Check "Selected projects, albums and faces", and select "projects from the last 6 months"
    What should be included are projects with photos from the last 6 months. However, since the Aperture import created all new projects for each Event it imported from iPhoto, iTunes sees all projects as being from the last 6 months.
    I've rebuilt the Aperture library by holding Option+Command when opening Aperture, that didn't work. I even wrote a script to manually fix the project dates in ApertureData.xml using the dates from iPhoto. While that works temporarily, opening Aperture eventually overwrites the project dates with the incorrect recent ones.
    There is no way inside Aperture that I can find to change a project's creation date. The only thing close is right clicking on a project and clicking "Project Info". If I do that, they show the correct dates (i.e. photos from 1972 have a project date of 1972).
    This problem is seriously annoying and makes syncing photos to my iPhone essentially impossible without manually selecting albums. Apple, any input here is appreciated!

  • In V_V2 the role of Sort Item by date of creation and Sort by delivery date of earliest schedule line for the Sales Orders when Material is out of Stock.

    Hi All,
    Good Morning,
    I am working on once Incident for Re-Scheduling Program V_V2 where the user has requested us to change the criteria for determining the priority of Sales Document based on Sort Item by date of creation. Currently they are using the Sort by delivery date of earliest schedule line in the Variant.
    I would like to know the role these both options play in the Re-Scheduling program V_V2. I would like to know the impact of both of them and the kind of testing I need to perform to study the behaviour of Sales Orders especially when the material is out of stock?
    Please explain with help of examples.
    Thanks
    Farhan.

    This is not that simple that an example would explain how this transaction works but I'll give you some examples.
    Material A has SO1 and SO2 of 10KG each, stock is 20KG so both quantities are confirmed at today. A stock recount determines a reduction to 5KG. This program would change confirmed quantity of SO1 to 5KG and SO2 to 0KG if:
    Creation date of SO1 is older then SO2 in strategy 1
    1st delivery date of SO1 is smaller then SO2 in strategy 2
    Material B has SO1 and SO2 with 10KG each but no quantity confirmed, stock is 0KG. A prodution adds 15KG to stock. The program would change confirmed quantities of SO1 to 10KG and SO2 to 5KG if:
    Creation date of SO1 is older then SO2 in strategy 1
    1st delivery date of SO1 is smaller then SO2 in strategy 2
    I'm assuming a specific configuration, there are many other scenarios possible.
    regards,
    Edgar

  • How sort projects by given number serie (ie. date)

    Hi,
    Right or wrong my 35 000 photos are in the library put in folders by year. Within each year there are projects (approx 30 -70 per year) with project names such as "20100725 closeups of a moose". When i add new projects as days go by and name them by the date series I use, they do not automatically drop into a slot as they would if sorted by the number.
    How do I sort projects by their name (ie number series)?
    please advice,
    regards pyry.

    Hi
    Right click or control click on a year folder, go down to Keep Arranged By, choose Kind, Name or Manual
    gary

  • How Can I put an Artists Live Albums in a separate folder, so they sort by "Concert Date" in iTunes and do not "intermingle" so to speak with Studio Albums?  Is this possible?

    How Can I put an Artists Live Albums in a separate folder, so they sort by "Concert Date" in iTunes and do not "intermingle" so to speak with Studio Albums?  Is this possible?
    That is about the best way I can phrase my question.
    I put year/month/date at the beginning of a show, hoping for them to sort by date and I get mixed results.
    Would creating a Folder within the Artists' existing folder  that said "Pearl Jam Live", inside the "Pearl Jam" folder in iTunes Media help this "Date Sorting Issue"?
    Thank you.

    Or is there a way to go through aperture to make a new reference library that I can move the masters into later?
    you do not move the masters into a references library - you turn your current library into a referenced library.  As Terence Devlin said:
    File -> Relocate Masters
    What you should set up:
    Select a folder, where you want to store your referenced files - probably on an external drive.
    Decide on a hierarchical folder structure inside this folder - that is completely up to you.
    Select a project from your library and use the command "File -> Relocate Masters/Originals" to move the original image files to the folder where you want to go them to. Only take care not to send two projects to the same folder.
    Alternatively, if you do not care about the folder structure Aperture will use, select all images at once from the "Photos" view and let Aperture decide how to assing the folders - in the "Relocate Originals" dialoge you can specify a subfolder format.
    Regards
    Léonie

  • For 0PS_C02  cube  Project System - Dates update rules not activated!!

    Hi All,
    When we are trying to install update rules from the BI content for PS module  for the cube "0PS_C02  Project System - Dates",  the
    update rules are not activating. under the cube when BI content activation. What is the issue in activating the update rules from BI content. From BI content the available version objects only will be activated i think. Please rectify and resolve the same at the earliest friends.
    thanks,
    Sakali

    Hi,
    Try to activate through program RSAU_UPDR_REACTIVATE_ALL.

  • Sorting projects by name

    I try to sort my projekcts by name but I didn´t find a way. As far as notice the projects are sorted by the change date; even I put them in folder I am not able to sort them.
    Is there any possibibility to sort projects by name?
    thanx

    Welcome to the forum.
    At the very top of the Library pane, just under the name of your Library, click on 'Projects'. This will take you into the All Projects view where you can quickly scan through the contents of Projects by mousing over the thumbnail for a Project.
    The buttons you're talking about are at the top of this view.
    Ian

  • Scheduling as per given project finish date

    I need to know if it is possible to arrange the project structure to do below described scheduling.
    Urgent reply will be highly appricated..
    thanks,
    he.
    I would like to give the "project finish date " ;
    I would like p6v7 would schedule such that ;
    - project finish date would be the date that I gave,
    - all activity dates would be defined accordingly even if they should have been start and/or finish before project start date.
    I should say that there is not any resource / cost assignment. Just activities/ original durations/ and relationships have been entered.

    user9166529,
    By you saying "project finish date" I have to assume that you have some sort of mandatory completion date such as a contract deadline.
    Or do you mean that you want to add a date constraint to the project finish date such as "must finish on or before" your date of completion?
    If needed, you could even apply a "mandatory finish" date constraint (not highly recommended).
    On the other hand, by building your initial schedule you will be able to determine your planned finish date by tracing your longest path. If this completion date does not meet your needs you then would need to adjust your scheduled activities (durations) to fit within your planned finish date.
    After settling on your initial schedule, save it as a baseline (copy) in order to perform periodic comparisons between your original (baseline) and the current (real time) schedules. The result of performing these comparisons will produce your schedule variance data.
    Hope this helps,

  • How can I sort lines of data (alphabetically) in the new pages 5.0?

    How can I sort lines of data (alphabetically) in the new pages 5.0?
    It was very simple to do in the previou version of pages.

    I'm not sure why people are torturing themselves with Pages 5 given the nearly universal outcry on this forum and the incredibly negative reviews elswhere, such as the App Store.
    Pages 4.3 should still be in an iWorks folder within your Applications folder.  Just use that.
    Please remember to tell Apple what we need from them at:
    http://www.apple.com/feedback/pages.html

  • Project & WBS data

    Hi All,
    I have project & WBS data in my Datasource. I have checked using RSA3 for a Datasource, and i c that the Project and Wbs data appear exactly as the Table Data like
    For Ex: Refer this Record values for WBS and Project respectuvely.
    (WBS)P000254A1 and P000254(Project).
    But when i replicate this Datasource in BW,,these above said values change to (WBS)1463 and 316(Project)
    Y is this change involved when the Datasource in R.3 shows correct Data but while In BW it shows Something Else,,
    Please Help on this Issue.
    Thanks
    Point Are Assured..

    Hi Jr,
    Sorry for the delay In reply!!
    Im Checking the data in BI at PSA level.I just replicated the datasource then scheduled the infopak to DS to see it.
    The DS is a Zdatasource which is made thru a Ztable. The table & ZDS in R//3 contains correct P******(WBS) and P****(project) data's,,but y is it wrong in BI??
    Is there any conversion exits!!,,,Bcoz,project number starts vth P****** but earlier in my Ztable it was showing the same numerics which is as of now in BI,,So i checked on the SEttingsUserparameterthen Check on conversion exit Box,Then finally the Data gt changed to P********.So is there any technique like this in BI??
    Please help

  • Error in Loading Project master Data into BW from R3

    Hi Experts,
    Actually I am trying to load Project Master Data from R3 to BW through a BW Process chain, Its a daily activity which we are performing since long time.
    But since last 2 days loading is getting failed with an error in ST22 in source system (R3):
    Runtime Errors         OBJECTS_OBJREF_NOT_ASSIGNED
    Exception              CX_SY_REF_IS_INITIAL
    Date and Time          27.09.2011 01:47:15
    Short text
         Access via 'NULL' object reference not possible.
    What happened?
         Error in the ABAP Application Program
         The current ABAP program "CL_CGPL_TASK==================CP" had to be
          terminated because it has
         come across a statement that unfortunately cannot be executed.
    Error analysis
        An exception occurred that is explained in detail below.
        The exception, which is assigned to class 'CX_SY_REF_IS_INITIAL', was not
         caught in
        procedure "PREPARE_FOR_RELOAD" "(METHOD)", nor was it propagated by a RAISING
         clause.
        Since the caller of the procedure could not have anticipated that the
        exception would occur, the current program is terminated.
        The reason for the exception is:
        You attempted to use a 'NULL' object reference (points to 'nothing')
        access a component (variable: "ME->OUTLINE_PARENT").
        An object reference must point to an object (an instance of a class)
        before it can be used to access components.
        Either the reference was never set or it was set to 'NULL' using the
        CLEAR statement.
    I tried to reload the data but no help, I am not sure how to reolve this issue, I also contacted to BASIS even they are not aware of this error.
    I am seeking help from you guys.
    Please help to overcome this problem...!
    Thanks.

    it seems basis issue
    howver check below links
    http://sap.ittoolbox.com/groups/technical-functional/sap-dev/objects_objref_not_assigned-1793688
    OBJECTS_OBJREF_NOT_ASSIGNED error in a background execution
    thanks
    pathak

  • How do I delete duplicate songs in my iTunes? I have hundreds and I don't want to delete them one by one. They were all added on the same date, so sorting by the date won't help.

    How do I delete duplicate songs in my iTunes? I have hundreds and I don't want to delete them one by one. They were all added on the same date, so sorting by the date won't help.

    Hi, if this is in regards to your library simply open up itunes and do the following steps:
    Click File
    Scroll down to "show duplicates"
    A list will then appear of your duplicate song titles.
    Be sure to CAREFULLY review each song to make sure it is a duplicate ( as I have some music that is the same song but live, acoustic etc...)
    Proceed to manually delete each song from the list and leave alone any song that you wish to keep.
    Best of luck,
    Cait

  • Some photos are not sorted correctly by date

    I just imported some photos from my friends camera who were on the same trip. However, I noticed that a couple (not all) of his photos are not sorted correctly by date in the Event. A photo from day 3 somehow comes before the photos from day 2. I checked the extended information and the dates on the photo are correct. Has anyone had this problem and know of a solution? Thanks.

    It might be of some help to delete the photo cache. Please see this link - http://support.apple.com/kb/TS1314

  • How to use XmlModify to sort the XML Data?

    Hello,
    I saw some examples explain how to use XmlModify in BDB XML package. I want to sort the XML data by several elements but my Java program could not work correctly.
    <CustomerData>
    <Transaction>
    <DLSFIELDS>
    <ADR_PST_CD>12345</ADR_PST_CD>
    <CLT_IRD_NBR>002</CLT_IRD_NBR>
    </DLSFIELDS>
    </Transaction>
    <Transaction>
    <DLSFIELDS>
    <ADR_PST_CD>12345</ADR_PST_CD>
    <CLT_IRD_NBR>102</CLT_IRD_NBR>
    </DLSFIELDS>
    </Transaction>
    // many nodes like transaction ...
    </CustomerData>
    My XQuery script was executed successfully in the shell. The script looks as follows:
    "for $i in collection('sample.dbxml')/CustomerData/Transaction order by xs:decimal($i//ADR_PST_CD), xs:decimal($i//CLT_IRD_NBR) return $i".
    The Java code :
    // create XmlManager
    XmlManager manager = // ...;
    // open XmlContainer
    XmlContainer container = // ...;
    XmlQueryContext context = manager.createQueryContext(XmlQueryContext.LiveValues, XmlQueryContext.Eager);
    XmlQueryExpression expression = manager.prepare("for $i in collection('sample.dbxml')/CustomerData/Transaction order by xs:decimal($i//ADR_PST_CD),xs:decimal($i//CLT_IRD_NBR) return $i", context);
    XmlModify modify = manager.createModify();
    XmlUpdateContext uc = manager.createUpdateContext();
    XmlDocument xmldoc = container.getDocument("sample.xml");
    XmlValue value = new XmlValue(xmldoc);
    long numMod = modify.execute(value, context, uc);
    System.out.println("Peformed " + numMod     + " modification operations");
    Could you point out the errors above or offer some suggestion?
    Thanks.

    I have other question of the sorting issue. Here are a large XML need to sort so I have to split it to multiple small XML files. After importing these files, I will use the XmlModify and XQuery to sort them. I'm not clear on the multiple XML files processing.
    1. Can the BDB XML ensure that all these XML files were sorted or how to update all documents with same logic.
    2. If I want export all these sorted documents, how can I ensure these files processed in sequence? Which document needs process first?
    The export method:
    public void export(String outputfile)throws Exception{
    final int BLOCK_SIZE = 5 * 1024 * 1024; // 5Mb
    try{
    File theFile = new File(outputfile);
    FileOutputStream fos = new FileOutputStream(theFile);
    byte[] buff= new byte[BLOCK_SIZE];                         
    XmlResults rs = container.getAllDocuments(new XmlDocumentConfig());               
    while(rs.hasNext()){
         XmlDocument xmlDoc = rs.next().asDocument();
         XmlInputStream inputStream = xmlDoc.getContentAsXmlInputStream();                    
         long read=0;
         while(true){
         read = inputStream.readBytes(buff, BLOCK_SIZE);
    fos.write(buff,0,(int)read);                    
         if(read < BLOCK_SIZE) break;
    inputStream.delete();
    xmlDoc.delete();
    rs.delete();
    //MUST CLOSE!
    fos.close();               
    catch(Exception e){
    System.err.println("Error exporting file from container " + container);
    System.err.println(" Message: " + e.getMessage());
    Thanks.

  • Sort by Creation Date and TIME!

    I need to sort hundreds of images taken by three photographers and on six different cameras. I sort by Image Date, but it keeps each photographers images together, seems to sort by DATE only, then by file name.
    I have used iView Media Pro to sort this way and it is a GREAT way to organize this type of work. Is there a way to refine how Aperture 1.5.1 does this type of sort?
    At this point, my option appears to be to export my final picks, then resort and rename them in iView Media Pro.

    In the browser section, I clicked on the list view (control-L is the shortcut) and then clicked on the "Image Date" header, and saw all my images sorted by date AND time. Is this what you're looking for? If all the photographers shot on the same date and time, then they'd be intermingled I suppose, but if the times were separated, this should work. Give it a shot anyway.
    Mark

Maybe you are looking for

  • Dynamic pages / parameter and navigation links

    hi all! my goal is to develop a portal page , with a naviagtion region on the left side (this is a dynamic page in which links are defined) and on the right side there should be the main region (also a dynamic page , with parameter input). Now, it sh

  • Upload by others to my creative cloud

    I'd like to let members of my camera club download an image, process it and then upload it back to me. I think I can accomplish the allow download on ACC, but can they send the changed file back to me? Chances are they won't have a subscription to AC

  • Logic on Period From and Period To

    Hi Experts, Can any one please provide sample logic on Period from and Period To. I have Period From and Period To dates in the selection screen. I need to write logic using Loop. For Example:- Loop/do loop for u2018period fromu2019 to u2018period to

  • System.out not found

    I tried to compile a simple program but the following compiler error is returned: >>>> cls01.java:5: <identifier> expected System.out.println( "d = " ); ^ cls01.java:5: cannot resolve symbol symbol : class out location: class java.lang.System System.

  • Set auto shut down for iPod touch after period of inactivity

    I keep falling asleep with my iPod on. My old MP3 player had a setting where it automatically shutdown after a specified period of inactivity. Is there a download or setting of some sort that will make the ipod touch do the same?