Source inspection lot

I made a settings in job planning for source inspection to create inspection lot.
But when PO is released, it is creating 4 inspection lots for the same PO., please advice what i went wrong.

How about schedule delivery?
Delivery split into 4 times?

Similar Messages

  • How to prevent MIGO when source inspection lot is either open or rejected.

    Hi
    How to prevent doiMIGO when source inspection lot for the vendor/material is open or the source inspection lot is rejected.

    Hi Sudhar,
    Please find the process steps for your question : 
    How to prevent MIGO when source inspection lot is rejected
    Go to Q-info record (QI02) for that particular material, vendor and Plant combination.
    1.Use Inspection Type 0130 for source inspection.
    2.Number of days ahead of lot to be created.
    3.Through transaction code QI07 run the manual program to create a lot.This source Inspection may be rejected as in your case.
    4.Control key contains the control on GR in the QM view of MM.
    In the spro>QM>QM in Procurement-->Define Control Key and assign it to MM.
    We can define here under Source Inspection Control that in case of GR for rejection-->GR not allowed.
    This will prevent MIGO if in case Source Inspection Lot is rejected.
    Thanks,
    Ravi.

  • Source inspection lot after PO release

    This is regarding source inspection, i think in standard sap, source inspection lot can be trigger as soon as P.O. is created.
    But in our scenario, every P.O. will be released by Purchase manager and sometimes he may not release.
    My requirement is like inspection lot should trigger only when P.O. is releases.
    Is this possible please advice.

    The creation of the source inspection lots are based on the expected delivery date.  They are not created when the PO is created or released.
    See this SAP help for manually creating the source inspection.  This same program is usually set up in most clients to run as a batch job on a regular basis.  The parameters given the program determine how far in advance the source inspection lots are created.  (QI07, QA51,QA52) QM>Quality Inspection>Worklist>Inspection Lot Creation>Source inspection
    http://help.sap.com/saphelp_46c/helpdata/en/0f/adfab1354d11d4b2ea0050da4ceab0/content.htm
    You may need to create several variants for the batch job and run multiple steps to the job.  This allows you to set up certain materials and/or vendors with different opening periods and delivery dates dependent on the specific material.
    It sounds like whom ever set your batch job up for this set the job up with very wide open parameters so virtually every PO created gets the source inspection lot created almost right away.  You might improve your problem by just adjusting the parameters used in the batch job.
    It would also probably not be hard to copy this program and have a programmer modifiy it so that only PO's with a release status are considered.
    Of course it would probably be better to train the purchasing agents/manager to actually delete the PO's in a timely fashion when they don't intend to use them.  It would keep the system cleaner and help out MRP.
    FF

  • Settings for source inspection lot

    Hi,
    Can any one explain how do you set source Inspection?
    Regards
    vikram raghuwanshi

    Hi,
    Do following settings:-
    Go to Q-info record (QI02)
    1. source inspection type 010
    2. Number of days ahead of lot to be created.
    3. Tick the check box u201Csource Inspection No GRu201D in the quality info record.
    4. Through transaction code QI07 run the manual program to create a lot.
    5. Control key contains the control on GR if source inspection lot is rejected.
    Regards
    Nikhilesh Ray

  • Source Inspection lot cancellation

    Hi,
    I wanted to know, whether existing source inspection lot (with status Qualification Model) can be cancelled (LTCA) by carrying out reversal of the GRN (movement type 102) ?
    Background : Material is having both inspection type (01 and 0101) active in materail master. Q-info record exists with profile 0001 (Supplier Relationship).
    Thanks

    Source Inspection lot is created after PO is released.So canceling original GRN will not cancel the source Inspection lot...
    Can you explain what is exact requirement ??

  • Scenario with reference to source inspection and MIGO

    Hi all,
    My scenario as follows:
    1.Source Inspection lot should get generated as per the lead time given in Q-Info while creating PO.
    2.MIGO should not be allowed when source inspection lot is open(Means UD is not taken).
    3.Inspection lot should be generated while doing GR in MIGO when source inspection lot is accepted.
    These all three points are with reference to one raw material.
    Kindly throw some light on the above said scenarios.
    Thanks in advance
    Sudhar

    Dear Sudhar
    1) For generating inspection lot automaticaly please use QA51. here you can shedule the program as in Qi07 and can be sheduled in a defined frequency
    2) You may have to go for user exit if you need to stop GR when the source inspection is open. You may use MB_CF001. Please check the exact exits as there is no option in standard for the same
    3) just check - in config maintain GR for Rejection -  GR not allowed and in quality info record maintain No GR inspection for source inspection
    Please let me know the issues
    Regards
    Gajesh

  • Stock posting in block stock after grn for source inspection

    Hi All,
    I have following scenario
    I am doing source inspection at vendor site i have maintained control key 0005 in material master & necessary certificate with certificate check required at GRN & UD stage
    i am creating a source inspection lot for a release po through t.code qi07 & then processing that lot before GRN
    Now when i am doing GRN for same PO it is giving me the following message  stage
    <b>A category ZC01(user sp. category) inspected certificate is required</b>
    Message no. QA312
    Diagnosis
    An inspected certificate must exist at the first goods receipt for a purchase order item.
    Procedure
    Check whether a suitable certificate exists for the purchase order and delivery, and create a certificate record with the status "Certificate checked and stored".
    If there is no certificate or no suitable certificate, this does not comply with the requirements in the material master record. If there is no inspection lot for this goods movement, the system posts the quantity to blocked stock or does not post the goods receipt.
    If you have created an inspection lot, the system marks the certificate check with the status "In lot". You must confirm the availability of an inspected certificate by the time you make the usage decision.
    after doing the GRN stock is being posted to block stock
    if i do not process the source inspection lot then the stock is posted to quality stock but this does fulfill the requirement of source inspection
    plz suggest soultion
    It's urgent
    Regards
    Ashutosh Shende
    9860681314

    Hello Ashutosh,
    In the material master you have defined certificate type with the customizing setting indicator for  'Enhanced Certificate Processing' active.
    If you set this indicator, extended certificate processing is active for
    this certificate type. You can then manage the inbox for quality        
    certificates independent of the goods receipt.                          
    The electronic inbox of certificates for the purchase order is only     
    possible if this indicator is set.                                                                               
    This means you have to create a certificate in QM (Transaction QC51),   
    before you can update your PO with cert. enclosed.  
    If you do not want the enhanced certificate processing you have change  
    the indicator into inactive.    
    Another problem known here is if you have activated the 05 Inspection type in the material master, that it is not activated in all plants relevant although QM in Procurement is set in all plants.                                        
    I hope that this resolves the described issue.
    Regards,
    Isabelle

  • Source inspection before 365 days of delivery date of purchase order

    Hi Experts,
    Business wants to create source inspection lot well in advance before 365 days of delivery date of purchase order. this lot is required to record results.
    In SAP, transaction code QA51 allows only two digit characters for 'number of days for opening period' so system is not creating inspection lot for more than 99 days delivery date from current date.
    Please advise.

    Hi Patel, I really got interested on this particular issue because we have been using source inspection in our company for a while. After some investigation on ABAP code of report I will share with you my fact findings:
    1) System calculates the start date of source inspection (delivery date from PO - Leadtime from q-info record). For example, in my test case it was 14.08.2015 - 0 days. So field g_datum below will be 14.08.2015:
    2) System then checks if you are running the report in background (highlighted in yellow above). If so then it will check if the start date of inspection (g_datum) falls on opening horizon (g_datum_eroff). The opening horizon is calculated as per formula below (system login date + opening period). As an example: 14.08.2014 + 30 days = 13.09.2014.
    Default opening period (p_eroff) is 30 days:
    3) So all-in-all, when you are running QI07 online you´ll get a yellow traffic light on the long leadtime PO but you will be able to process it (on-line). However if you run the report in background (job scheduling) system will only create inspection lot to the relevant POs if the PO's delivery date falls on the 30 days window based upon the current date.

  • Source inspection configuration

    dear all,
    what is source inspection and vendor evaluation, please give me details of configuration steps for it.
    thanks in advance

    *What is Source Inspection* 
    What is source inspection and what are the setup required to do in system to implement successfully?
    A source inspection is a quality inspection in which Buyer required the quality check before the material received. So that he performed the quality inspection at the vendoru2019s Location.
    To setup source inspection, you should define inspection type (01 and 0101) in material master QM View. (MM01)
    When requesting source inspection, include the following information:
    a)  Purchase order number
    b)  Item number
    c)  Part number
    d)  Quantity of parts to be inspected
    e)  Date source inspection is required
    f)   Types of inspection  required
         - In Process
         - Final
         - Interim
         - First Article Inspection (FAI)
    g)  Contact name and phone number
    Go to transaction QI07 and give the material code, vendor, plant and opening period. When you execute the transaction you would find open purchase orders for the given input data. Select the Purchase Order you wish to perform Source Inspection and choose Create Inspection Lot. These inspection lot triggers for inspection type 0101. Against this inspection Lot perform result recording QE01 & QA11.
    When finally you received Goods at your premises, then inspection lot will triggered automatically (01) and perform result recording QE01 & QA11 
            How to do Source Inspection in QM
    Can any one guide how to do Source Inspection in QM. What are the settings required to be done and can the lot for source inspection be trigerred manually or automatically. 
    The Q-Info Record is used to trigger a source inspection lot for a material/vendor and plant. Under the tab key Inspection Control in Q-Info Record, you would find vendor source Inspection and under that select the inspection type desired for source inspection (say 01,0101) and give the lead time required to perform the  inspection in days (say 10 days).  If you do not want to trigger an inspection lot @ GR for a source Inspection lot then check the box (Source Insp. No Gr).
    Ensure that the inspection type selected @ source inspection is activated in the Material Master Record for the chosen material in the Quality Management View.
    To trigger the lot manually you need to have some open purchase orders for the material/plant/vendor. Go to transaction QI07 and give the material code,vendor,plant and opening period. When you execute the transaction you would find open purchase orders for the given input data. Select the Purchase Order you wish to perform S.I and choose Create Inspection Lot. 
    This would trigger the lot and then it is QE01 & QA11.
    Vendor Evaluation for Purchasing
    Define the weighting keys in SM30 - V_T147J.
    Weighting keys 01 and 02 are defined in the standard system. You combine the following
    weighting shares for the standard main criteria:
    Main criterion     Key 01 Key 02
    Price                   1      5
    Quality                 1      5
    Delivery                1      2
    Gen. service/support    1      1
    Ext. service provision  1      2
    Define the criteria in SM30 - V_T147G - Double click on the line items
    In this step, you define the criteria by which the system computes scores for vendors and
    specify whether the scores for the subcriteria are computed manually, semi-automatically, or
    automatically.
    You can also store your own methods of computation for the scores for subcriteria in the
    form of user exits. The enhancement MM06L001 is available for this purpose.
    Define the scope of list in SM30 - V_T147M - Double click on the line items
    Define Purchasing Organization data for vendor evaluations in transaction OMGL.
    An example :-
    How the system calculates the score for the automatic subcriteria
    "On-Time Delivery Performance"?
    The system uses the statistics-relevant delivery date in the purchase order
    (Items -> Delivery Schedule) and the goods receipt date to calculate date variances.
    You use the statistics-relevant delivery date, for example, if you know that the vendor
    will not deliver the material as scheduled on September 15 but on September 30. Enter the
    delivery date as September 30, but enter the statistics-relevant delivery date as
    September 15.
    In calculating the score for on-time delivery performance, the system will then not use
    the actual delivery date, but the statistics-relevant delivery date. This has a negative
    effect on the score for this goods receipt.
    However, materials planning and control uses the realistic delivery date (September 30)
    which the vendor will actually adhere to.
    The system considers only goods receipts against purchase orders and scheduling agreements
    into stores and the release of GR blocked stock into stores. In the standard system, these
    are the movement types 101 and 105.
    Minimum Delivery Percentage - OMGL in the On-time delivery section
    If you do not want a vendor to receive a very good score if he delivered the goods on time,
    but did not deliver the required quantity, you can maintain a minimum delivery percentage
    in Customizing.
    Assume you set the Min. del. perc. parameter to 60% and the vendor delivers the goods on
    time, but only 55% of the ordered quantity. Although the goods receipt is punctual, it is
    not included in the calculation of the vendoru2019s score for on-time delivery performance. So
    that the non-scoring of the on-time delivery performance criterion in this case does not
    bring an unfair advantage in comparison with a poor score, the vendor is awarded a low score
    for quantity reliability. On-time delivery performance is thus always to be seen in
    conjunction with quantity reliability.
    Standardizing Delivery Date Variance  - OMGL in the On-time delivery section
    To rate delivery date variances in days, maintain the Std.del.time var. parameter.
    If you assign a lower standard value, this means that relatively low date variances produce
    high percentage variances. If you set a higher standard value, this results in a relatively
    low percentage variance:
    The Std.del.time var. parameter has the value 20. The goods receipt took place on Nov. 27;
    the statistical delivery date was Nov. 15. There is thus a difference of 12 days.
    The system calculates the percentage variance as follows:
    12 / 20 x 100 = 60
    If the Std.del.time var. parameter had the value 60, the variance would be 20%
    (12 / 60 x 100 = 20).
    If you do not maintain this parameter, the system calculates the delivery time variance via
    the firm zone in the case of scheduling agreements, and via the order date and the
    statistics-relevant delivery date in the case of purchase orders.

  • Block GR through source inspection

    Hi,
    We want to block the GR if the material is under test or else is rejected by QC. For this we have select source inspection functionality but the system is not blocking GR for under test material or rejected material. Please confirm what setting are missing. However I have made the following setting:
    mm02 ---> 0101 insection type and control key as 0007 (Configration -----Good receipt not allowed for rejection)
    qp01 -----> 51 Good receipt model
    qi01 ------> Inspection control tab -----> Vendor source inspection----> 0101
            ------> tick not selected ------------ Source inspection- No GR
    Regards,

    Hi Shailendra,
    We are not allowing user to do GR, but there should be system control to restrict the user to do GR if the source inspection lot has not been created yet or inspection lot is created but user decision is pending.
    Here the system is allowing to do the GR if the inspection lot has not been created in qi07 and also it is allowing GR if the inspection lot is created and is pending for user decision.
    Our requirement is that system should allow for GR in the following case.
    1. If user decision is pending
    2. If inspection lot creation through qi07 is pending
    3. If the material is rejected --------- This is happening properly.
    Regards,
    sun

  • Can not create source inspection to to material with mpn optional

    HELLO,
    Our materials are divided to two groups:
    1. materials that their manufacturer part profile is mandatory (mark : 'MPN MANDATORY" CHANGE IN MPN and QM PROCESSING FOR MPN)
    2. materials that their manufacturer part profile is optional (mark: CHANGE I MPN).
    We use source inspection to all materials .
    No problem create source inspection to the first group (mandatory mpn) I created q-infor-ecord to vendor vs mpn-material, in the purchase order header the mpn material is added and by using trns qi07 I get source inspection lot with our firm material
    The problem is that I can not create a source inspection to material that was defined as mpn optional and in the purchase order header the mpn-material is filled.
    regards in advance
    Eyal rosenfeld

    HELLO,
    Our materials are divided to two groups:
    1. materials that their manufacturer part profile is mandatory (mark : 'MPN MANDATORY" CHANGE IN MPN and QM PROCESSING FOR MPN)
    2. materials that their manufacturer part profile is optional (mark: CHANGE I MPN).
    We use source inspection to all materials .
    No problem create source inspection to the first group (mandatory mpn) I created q-infor-ecord to vendor vs mpn-material, in the purchase order header the mpn material is added and by using trns qi07 I get source inspection lot with our firm material
    The problem is that I can not create a source inspection to material that was defined as mpn optional and in the purchase order header the mpn-material is filled.
    regards in advance
    Eyal rosenfeld

  • Source inspection- partially accept

    Dear all,
    How to partially accept the source inspection lot.  For example: my source inspection lot size 10 kg I want to accept only 5 kg.
    Otherwise how to give the link to GR.(like  5 KG accepted qty)
    Thanks and Regards,
    Vairavan

    Hi Vairavan,
    Please make a note that Source inspection is non stock relevant. It has no control over the stock posting. Moreover you'll do the inspection at Vendor premises.
    Rather what you can do is accept only 5 kg out of 10 kg in the results recording screen and take UD (like accepted partially) and at the same time change the PO quantity to 5 kg, which will satify your requirement.
    Regards,
    Keerthi.

  • Source inspection - inspection lot skip for certified vendor

    Hii,
    I have a requirement in which during source inspection, the inspection lot should not be created if the Vendor is certifed. I have made the following settings:-
    1. In Vendor Master, maintained the Actual QM system in control-reference data.(QM system marked for skip in customizing)
    2. In Material Master-
        - Activated QM Proc- QM control Key -Delivery release
        - Target QM system
        - Inspection type for source inspection activated in inspection set up
    3.In Quality Info Record for Vendor,Material,Plant combination-in Inspection Control tab-
        - Maintained the existing QM system & validity
        - Selected 'No Inspection' in Insp. control
        In Vendor source inspection tab maintained the inspection type & lead time.
    Inspite of the above settings, I can see this PO (for vendor,material,plant) in the source inspection worklist(QI07).
    Please suggest as to which setting I might be missing.
    Thanks!!!
    Regards,
    SV

    Hi,,
    You have to go T code QI07
    where give input Vendor ,Material plant,
    Delivery dateopening peroid
    Then execute the transaction .
    Select line item click oninsp lot & save.
    Where you have trigger lot for the same then only lot will get genarated.
    Regards
    SANIL
    This confugaration required if you have option if lots get rejected.
    Quality management-QM logistics-QM procurement -Control key
    Define control key;
    GR/Source inspection control;
    GR for rejection; three option is available
    1.source inspection has no effect on goods receipt
    2.Creation of new inspection  lot
    3.Goods receipt not allowed
    Regards
    SANIL
    Edited by: Sanil Vadke on Mar 12, 2010 7:29 AM

  • Block goods receipt if open inspection lot for source inspection (SAP QM)

    hello!
    i would like to block the goods receipt for a purchase order item, if there is an open inspection lot for source inspection. i know how to block, if it rejected, but not what to do in this case.
    thanks!
    matthias

    Hi matthias,
    can you tell me how to block GR if inspection is rejected in source inspection??? as you said u know. please let me know.
    Thanks!!
    vinay

  • UD  Insp. Lot for Vendor Source Inspection

    Experts,
    I set up Vendor Source Inspection for some of our parts. Customizing setting for Rejected is "Create New Lot".
    So in case of a "rejected" UD  before GR I get a second insp. lot after GR. Both insp. lots are refering to the same PO, but I see no reference regarding the insp. lot number 1 in the insp. lot nubmber 2.
    Same happens if I generate a QN refering to Insp. Lot before GR, QN Information will not be copied in the insp. lot after GR.
    So my question is, is such a reference in between the inspection lots available ?
    -Jörg

    Thanks for your reply...
    But it doesnt work....
    I have mentioned a material with the Check box "Documentation reqd" ticked as "Construction type material of the object" in the Equipment in the Structure tab.
    And tried the lot....But not able to get the long Text while UD...

Maybe you are looking for

  • Why does Safari quit unexpectedly while using the GLRendererFloat plug-in.

    Hi I did a usual prompt for install updates and after, I get this error message: Safari quit unexpectedly while using the GLRendererFloat plug-in. Problems faced after update 1. Not able to click open my files on the desktop 2. Not able to enlarge my

  • Events in a JSPX page

    Hi, I have this problem now.. I don't know if its a very simple one, but I couldn't find a way through it yet. I have a text box (af:inputText) inside a .JSPX page.. I want to capture the "onKeyPress" or "onKeyUp" event from this text box. For exampl

  • How to export alv into excel sheet without using toolbar button

    hi, i have developed ALV using FM methord on that i have created one button when user will click on that button hole ALV should export in to excel as it is and that ALV is Heaving top of page contain also i want that shuld also copy please help me fo

  • Going back to earlier screen (navigation) in ALV interactive screen

    Hi all, I have requirement of going to 4th alv screen on clicking back on screen 5.(all 5 screens are ALV).But it comes out to selection screen instea going to screen 4(ALV).Please guide me for the same. Thank you. Edited by: sanu debu on Mar 29, 200

  • Where is the drop down for bookmarks toolbar?

    On old version I could hit a drop down to access complete toolbar list for bookmarks. Now drop down has everything but the extended toolbar file. How do I get it back?