Source of supply is not updating in me53n from fiori App order from Requisition
Hi,
I am using Order from Requisition APP, to create a PO from Approved PRs.
while doing this, there is a step assign Supplier, i am assigning the supplier and created the PO Successfully.
But in backend, when i checked in t-code ME53N for Source of supply tab for a particular PR item. that tab is not updated with vendor details.
when i checked in created PO it gets updated there.
Purchase REquisiton
PO CREATed with above PR
Is there any workaround to update the source of supply in backend.
Thanks,
Venu
Tags edited by: Michael Appleby
Hi,
We are using classic scenario in SRM 5.0.
We are using desired vendor in the purchase requisition, whenever the Purchase requisition is moving into the SRM Sourcing cockpit. We are unable to see the source of supply.
Source of supply is missing in sourcing cockpit (SOCO).
desired vendor number which is not updating, instead it is showing empty.
I have found some BADI like BBP_SOS_BADI and BBP_SOS_BADI_ICC, this BADI will trigger when a shopping cart has contract GUID, but we donu2019t have contract for this purchase requisition.
Could you please tell me the BADI or user EXIT name, by using this BADI I can populate the populate the source of supply and vendor in SOCO.
Similar Messages
-
hi - my Mu was "buggy" and would not update - so i threw the APP in the trash - but now CC will not allow me to Re-Install because it thinks i already have the APP - any advice?
restore your app from the trash and then properly uninstall.
if that fails, CC desktop lists applications as "Up to Date" when not installed -
Assign Source of supply is not working for contract with material group
Dear Experts,
I have searched all the threads and gone through before posting my query. So i would ask moderators to go through the thread properly before rejecting this.
We have value contracts with respect to a particular material group without material and with item category W in the contract item, Please note that for the materials with this material group, the source determination is not set and source list is also not maintained.
When we create PR for the material with this contract, and when we click on assign source of supply contracts used to get popped up, but recently from few days, when we click on assign source of supply we are getting an error " no source found for this item ".
Can anybody help on this.
Regards@ Biju,
As mentioned earlier, we are not creating PR with reference to contract.
first we are creating contract with item category W (material group), without material and plant details.
we create PR with or without material with account assignment K and with the material group in the transaction ME51N, and after inputting all the fields, we click on assign source of supply, it was proposing the existing contracts with respect to material group earlier, but it is not happening for particular material group(it is working for all other material groups)
Hope it is clear.
@ Dev Patra,
we are using DIEN-Service material types and we assign that particular material group to only service material type.
we have not ticked, source list in the material master, we donot have any source list for the materials under that material group.( please check the note 457110- question number 14.)
Regards -
Status for the transferred Suppliers is not updated in ROS client!
Hi all,
We are running on SRM 5.0(Sp6).After i transfer the propects from ROS to EBP and when i convert them to VENDOR in EBP,then the status of the suppliers become "RELEASED" in EBP but the status is not updated in ROS client.
What is to be done so that once the prospect is saved as a VENDOR in EBP,its status should be updated /set as RELEASED in ROS client too?
Any help is appreciated...Points will be rewarded.
BR,
Disha.Deepti / Ramakrishna,
As per Rama's comments, the BP status is released only when we use SUS and the information is passed via XI. However in our case we have ROS (without SUS) and EBP in same client. In this scenario XI is not required to transfer the Business partner status as per OSS note 1134978.
So any idea how do we change the status from ACCEPTED to RELEASED?
Deepti - in one of the thread you did mention about a workaround to update the status? Did you manage to crack it?
Do you recommend having separate client for ROS, so that system automatically trigger XML message by standard?
Regards,
Sandeep Parab -
Supplier information not updated in SC
Hi,
Kindly clarify the below points,
Once
the SC reached SOCO, the Supplier is assigned in the SOCO Screen for that SC
and the Follow-on-document is created.
When I check the BBP_PD transaction after that
to see the detail, the supplier information in the partner table is not seen or
updated.
Is this a standard functionality ? Yes, then I
could I fetch the supplier if I needed.(i.e Technically get the supplier information).
Is this a standard behaviour, and the changed at Date information is also not updated.
Kindly help me on this.
Thanks in advance.Hi Tamil,
you should call META_PO_GETDETAIL on SRM site.
System will choose the right rfc function module for backend according to its version.
It's so called driver approach in SRM.
Regards
Konstantin -
GR Cost not updating as Target Cost for process orders
Dear SAPians,
We are facing an issue in Target Vs Actual cost reporting for process orders. We are creating a process order after cost estimate of that material and doing the confirmations for activity cost. After that, GR has been done for the finished goods of that process order. That GR entry is updating the Actuals values but not updating the Target cost. When I am checking the standard report KKBC_ORD, I am getting the following figures.
Cost Elemnt Text | Target Cost | Actual Cost | Target Vs Act
Inventory Chnge FG | 0 | 1,472,205.60- | 1,472,205.60-
Packing Matrl Cons. | 1,148,142.37 | 1,252,752.68 | 104,610.31
Raw Material Cons. | 60,463.91 | 50,688.29 | 224.38
Semi-Fin Matrl Cns. | 181,934.68 | 367,959.56 | 186,024.88
Labour Cost Activity | 39,735.36 | 39,862.80 | 127.44
Machine Cst Activty | 41,611.75 | 43,153.01 | 1,541.26
That 'Inventory Change FG' entry is showing the GR posting updating actuals and not target cost. This is causing huge difference in target vs actual cost that will affect the profit and loss figures ultimately.
What am I missing here? What should I do to update the GR amount in Target cost as well.
ShiraziDear,
Target Cost on Production Order or Process Order is shown only when Variance is Calculated.
So please calculate the Variance, system will show the Total Target Cost.
Br,Vivek -
Can not update -'Error -36' I REMOVED Music folder FROM IPod!!!!!!
Hello!
I accidentely removed whole folder (directory for music) from iPod several days ago.
As a result my ipod is just empty- no music inside and I can not update that- because iTunes can't find the way.
It says : ' unknown error -36 '
Please tell me how I can resolve the issue?
Windows XP
pc Windows XPHi zen-an
Welcome to Apple Discussions
Does this link help?
-36 or "Disk cannot be read from or written to" error syncing iPod in iTunes
Regards,
Colin R. -
I have made quite a few shared photo streams and love the idea of sharing easily with a variety of friends and family. The problem in having is that any modifications made to the shared photostream (adding/deleting pictures) are not updated in the URL I have sent to my family and friends. Is anyone else experiencing this? Does anyone have any ideas or solutions?
Disable Photo Stream in the System/iCloud preference pane
and in iPhoto's Photo Share preference pane.
Reboot and reenable both respectively. That should jump start Photo Stream on your Mac.
Happy Holidays -
Business area is not updating when allocating stock to sales order
Dear Experts,
When ever we allocating/dislocating stock in MB1B with 412E and 411E movement type,business area is not updating in the
accounting documents.but we assigned business area to plant in the customization.its happening to our Depot,for remaing plants its working.
Regards,
Varunplease suggest me right forum to post the issue.
Regards,
Varun -
Credit management not updated for the first credit blocked order only
Hi experts,
Pls help to solve. Thx.
Case: The first sales order is created against credit block because the credit limit is exceeded. In FD33, no credit data related to the first order indicates, i.e. credit limit used shows zero as well as sales value, credit exposure. In VKM1, the blocked order can be captured.
As long as the second order is created, the credit management can be updated. But, it still does not capture the data from the first order.
The sales orders I test have the same delivery date.
Questions:
1. Is the standard behavior for the dynamic credit check?
2. If not, how to make credit management consider the first order data?
PS. In OVA8, update 000012 is applied while horizon is 4 months.Hello Jonathan,
After testing, I found credit management can consider the first order data if using 000018 only. Why 000012 cannot consider it?
I have checked the explanation for those two update groups by F4. I feel obscure about the explanation of sales order between them (see below).
000012:
Sales order
Increases open order value from delivery-relevant schedule lines
000018:
Sales order
Increases open delivery value
By the way, my testing data as below:
1. were the two sales orders of the same document type? Answer: yes. Same document type, same customer, same delivery date, etc.
2. were the item categories the same? if not, was one not relevant for credit check? Answer: Yes, the same.
3. did the documents have the same value? if the second order had a lower value and was not blocked for credit, the exposure will be updated. Answer: yes, credit management can consider the second order data ONLY. It seems the first order have not been created if checking credit management. -
Update was terminated while creating purchase order from ME21N
Hi Experts,
We are getting this dump when try to create purchase order from ME21N;
Our system ECC 6.0 and IS-AFS (Apparel & Footwear Solution) V600 component has installed,
How can we prevent this error,
Regards
Here is the dump and sm21 log,
Runtime Errors LOAD_PROGRAM_NOT_FOUND
Exception CX_SY_PROGRAM_NOT_FOUND
Date and Time 10.10.2008 10:22:03
Short text
Program "RMCMS431 " not found.
What happened?
There are several possibilities:
Error in the ABAP Application Program
The current ABAP program "SAPLMCS4" had to be terminated because it has
come across a statement that unfortunately cannot be executed.
or
Error in the SAP kernel.
The current ABAP "SAPLMCS4" program had to be terminated because the
ABAP processor detected an internal system error.
What can you do?
Note down which actions and inputs caused the error.
To process the problem further, contact you SAP system
administrator.
Using Transaction ST22 for ABAP Dump Analysis, you can look
at and manage termination messages, and you can also
keep them for a long time.
Error analysis
An exception occurred that is explained in detail below.
The exception, which is assigned to class 'CX_SY_PROGRAM_NOT_FOUND', was not
caught in
procedure "TMC2F_FROUT_CALL" "(FORM)", nor was it propagated by a RAISING
clause.
Since the caller of the procedure could not have anticipated that the
exception would occur, the current program is terminated.
The reason for the exception is:
On account of a branch in the program
(CALL FUNCTION/DIALOG, external PERFORM, SUBMIT)
or a transaction call, another ABAP/4 program
is to be loaded, namely "RMCMS431 ".
However, program "RMCMS431 " does not exist in the library.
Possible reasons:
a) Wrong program name specified in an external PERFORM or
SUBMIT or, when defining a new transaction, a new
dialog module or a new function module.
b) Transport error
How to correct the error
Check the last transports to the R/3 System.
Are changes currently being made to the program "SAPLMCS4"?
Has the correct program been entered in table TSTC for Transaction "ME21N "?
If the error occures in a non-modified SAP program, you may be able to
find an interim solution in an SAP Note.
If you have access to SAP Notes, carry out a search with the following
keywords:
"LOAD_PROGRAM_NOT_FOUND" "CX_SY_PROGRAM_NOT_FOUND"
"SAPLMCS4" or "LMCS4F10"
"TMC2F_FROUT_CALL"
If you cannot solve the problem yourself and want to send an error
notification to SAP, include the following information:
1. The description of the current problem (short dump)
To save the description, choose "System->List->Save->Local File
(Unconverted)".
2. Corresponding system log
Display the system log by calling transaction SM21.
Restrict the time interval to 10 minutes before and five minutes
after the short dump. Then choose "System->List->Save->Local File
(Unconverted)".
3. If the problem occurs in a problem of your own or a modified SAP
program: The source code of the program
In the editor, choose "Utilities->More
Utilities->Upload/Download->Download".
4. Details about the conditions under which the error occurred or which
actions and input led to the error.
The exception must either be prevented, caught within proedure
"TMC2F_FROUT_CALL" "(FORM)", or its possible occurrence must be declared in the
RAISING clause of the procedure.
To prevent the exception, note the following:
sm21 log ;
Transaction Canceled 00 671 ( LOAD_PROGRAM_NOT_FOUND 20081010102203saptest_TET_00 EYUCE 100
Update terminated
> Update key: F39796DD5421F1509233001E0BD601E0
> Update module: MCE_STATISTICS_UPD_V2
Run-time error "LOAD_PROGRAM_NOT_FOUND" occurredPlease follow the oss note 800335
V2 Update terminations in Purchasing transactions after upgrading or installing AFS 5.0 release.
Other terms
AFS, LIS, MIGO, ME22N, OLI3, S433, S431
Reason and Prerequisites
AFS Purchasing infostructure S431 is no longer used. S433 is the valid infostructure for the release AFS 5.0.
Solution
Please do the following.
For customers upgrading to AFS 5.0 only:
> Rebuild Infostructure S433.
- Goto transaction: OLI3 (Statistical Set up of Infostructures)
- Info structure to be compile: S433
- Specify the 'Name of run'.
- Execute.
> Please also follow the instructions given below.
For both Upgrade and Non-upgrade Customers:
> Create the report 'ZDELS431'.
- Transaction: SE38
- Give Program name as ZDELS431.
- Create (F5).
- Title : 'Program to delete S431'.
- Type : 1 (Executable Program).
- Status: T (Test Program).
> Copy the program text from the note and paste in the program.
> Save and activate the program.
> Execute the report for all clients in Update mode.
(Two check-boxes will appear: P_ALL_CL, P_UPDATE.
Please check both of them).
This report will delete all the references to infostructure S431. -
IPad 2 will not send email from any app except from my actual email app
IPad 2 will not send email from any app (eg camara, pdf edit apps, evernote ect.) except from my actual email app. It will send email from my email account in the mail app or online. Pls help :-/
I had this problem
I hit the power button and the round button at the same time and held it until it rebooted
You get the black screen and the apple logo
When that was done I want to the app and update screen and I was able to update my apps
I suggest when you update stay on that screen until they all update
I find it sometimes get stuck updating when I leave the screen as they are updating and do other things, but I could be wrong. It just seems to me that is when it happens.
The reboot works and don't worry you don't lose anything when u reboot it's like shutting down a computer and powering it back up. Everything you had before will still be there. -
nobody wants to help me! why???
Order from 20.02.2014 (alt storniert am 03.04.2014)
Bestellnummer: (new order)
i want preffered support after you were not able to take my money from the first orders credit card, i had to order again!
<Personal Information Edited by Host>You are not addressing Apple here. We are all just users like yourself. Call Apple in your country
-
Supplier Directory not updated with Released status after the trasnfer
Hello Experts,
I need your help to resolve an issue.
We are implementing SRM 5.0 with ROS Client and EBP Client in place to manage Supplier Self REgistration and EBP.
When I trasnfer an accepted Supplier from ROS Client to EBP Client via OPI to create a Bidder in EBP and then extend the transferred supplier to Vendor status, I am able to see the ROS relationship established in the Vendor tab. But the Supplier still exist in Supplier directory. According to documentation, the status of supplier in ROS client will be automatically set to released and based in the status in EBP, the supplier status will be updated in the ROS - supplier directory.
Also I tried to convert the supplier to Vendor(instead of Bidder) and maintained all the appropriate fields. But still the problem exists.
Please let me know
1. Do I need to initiate any workflow for this?
2. Is the any notes to correct the issue?
3. Is there any config related to this?
Regards.
VijayHi Vijay
ROS BP status is set to 'Released' only when you use SUS.
1) When you create vendor in EBP from ROS, check PORTAL Vendor
2) You should have mapped relevant XI mappings to transfer vendor from EBP to SUS.
When a Portal vendor is ticked and BP is saved in EBP, a XML message is generated and sent to SUS to create BP .
This XML message also updates the status in ROS to 'Released'.
Best regards
Ramki -
Custom fields in Source of Supply screen - not getting saved
Hello Experts,
There is a requirement to create 2 customizing fields on Souce of Supply (SOS) screen of Shopping Cart in SRM7.0 and has to be updated in the Backend system (PR,PO etc).
I have created CUST1 and CUST2 in the standard include - INCL_EEW_PD_PARTNER_CSF (Customer Enhancements to Partner in Doc.) which is being used in the structure /SAPSRM/S_CLL_WD_SUPPLIER (CLL structure for SOS).
But while creating Shopping cart, these customizing fields are not getting saved and not transfered to backend.
NOTE:
1. I refered SAP Note - 672960 , but it has no information abt SOS enhancement.
2. I have enhanced the backed system accordingly to show these 2 customizing fields in PR and PO.
3. Webdynpro component for SOS screen is - /SAPSRM/WDC_DODC_SC_I_SOS, and the structure used is /SAPSRM/S_CLL_WD_SUPPLIER.
Awaiting the correct answer from you all
Thanks and Regards,
PrabhuHello All,
I'm facing exact same problem.
Steps followed:
1. Configuration from SPRO
Supplier Relationship Management -> SRM Server -> Cross-Application Basic Settings -> Extension and Field Control -> Configure Customer Fields -> Define Customer fields on item Level -> Append for Customer Fields on Shopping Cart Item
2. Add new fields in Webdynpro: /SAPSRM/WDC_DODC_SC_I_SOS
View:V_DODC_SC_I_VENDOR
Still i'm not able to get proper results.
Please help.
Thanks in advance.
Yogesh
Maybe you are looking for
-
Line 390 Under the (Insert into SALES_TRADEIN Table) I need to insert (TradeIn_1_VIN) Values If there is no values in (TradeIn_1_VIN) then i have to insert (TradeIn_2_VIN) values to the (SALES_TRADEIN) Table. After i run then below script only (Trade
-
JS CS3: ScriptUI - window and panel loses focus on Mac
Hi, Have made a script to export selected textframes as text files. When the script runs on a PC the script window stays in front of the document as intended. Much to my surprise this is not the case on Mac, On Mac the script loses focus and goes beh
-
Hi, Is it possible to group sort on ALV? it seems we are able to merge together several rows via sort but only on its field level. is it possible to be a group field level? example if i sort PO number first and vendor second it will have individual
-
Hi, I'm generating WebHelp from RH 9.1. I'm on Windows xp. When I attempt to open the webhelp, I get the following error in the browser screen: Your browser does not support frames. We recommend that you update your browser to a version that supports
-
I am new to Dreamweaver and web design, and I must be missing something on how CSS positioning works. I am using DW8 and in design view the text is positioned at L 200px, T 200px, but when I preview in browser for IE 6.0, it is positioned at L 0px, T