Source System Creation in BI to load data from ECC 6.0

Our ECC 6.0 and BI 7.0 is one server. I would like to load data from ECC 6.0 to BI. How to create source system? I have source system for flat file and Data Mart (Myself source system) but don't know how to create source system to laod data from ECC 6.0. Please provide step by step guide.
Thanks.

Check here:
https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/c0751ba5-b7a8-2b10-6d97-e91e85c0fafa
https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/0087780d-81b0-2a10-eb82-86e1062f1a2d
http://www.saptechies.com/connectivity-file-system-in-sap-bi/
http://help.sap.com/bp_biv370/html/index.htm
Thanks...
Shambhu

Similar Messages

  • Error while loading data from ECC to BI

    Hi BW Experts,
    while loading data from ECC 6.0 to BI  i got error in details tab of the infopackage as datapackage 1  arrived in bw processing not yet finished.
    Could any one help me out?
    Thanks

    Amar,
       please check the source system job status. If its successfully completed then we can expect data load sucess in BW side.
    to check source system status: RSMO> select related load>in Menu Environment-->Job overview in source system.
    once this over check the TRFC or IDocs struck
    if TRFC, chk in TCode-SM58 or from environment select TRFC from source/data warhouse.
    if you are finding TRFcs are in stuck just select and run manually to complete.
    M

  • BPC 7.5 : Is it possible to load data from ECC to BPC

    Hi,
    Is it possible to load data from ECC to BPC in BPC 7.5 Netweaver version.
    Thanks
    Prasad Bobburu

    Option 1 -
    ECC -> BW -> BPC NW (Standard, or recommended for NW)
    Option 2
    ECC -> BW -> Openhub / Flat file -> BPC MS
    This is more common for SAP customers, who are using BW, but running MS version
    Option 3
    ECC -> ABAP Extractor Program (generated flat file) -> BPC
    Again a more common for SAP customers using BPC MS
    -Kiran Malineni

  • CIF STEPS to load data from ECC to APO from Process chain

    Hi,
    i try to create on ECC system a process chain in order to execute the CIF program for updating APO Material/Plant Master data on DELTA mode .
    I am not sure that the procedure is correct, at the moment i put on a chain:
    - Step 1 Program RIMODGEN with a specific variant
    -Step 2 Program RIMODACT2 with a specific variant.
    Is necessary a third step with RIMODACT2 in order to deactivate the integration model?
    On APO we have to insert other standard step in order to complete the delta update?
    Any experience on similar situation?
    Thanks,
    Veronica

    Veronica
    You do not need a third step. You do not need to deactivate the model. In fact, it is not recommended to do so. You do not need any step in APO.
    If your CIF setup is correct, the first two steps should be enough.
    If by 'Delta', you mean field value changes to material/ plants in an existing integration model, you dont even need to do CFM1/ CFM2 if you have setup transaction CFC9 for BTE (online transfer).
    Rishi Menon

  • Loading of data from ECC to BW initially takes time

    Hi,
    I am loading data from ECC to BW System.
    But I find that this process initially takes some time to start say for 15 minutes or so.
    I have no clue as to why this is happening.
    Could anyone help me out here.
    Regards,
    Sushanth Hulkod

    No, I found that there were no BGD's available in SM50 Transaction.
    But initially, the loading of data does not start for some time.
    After that all the data is loaded at once.
    I am uanble to understand this weird behaviour.
    - Sushanth Hulkod

  • Master/Transaction data from ECC to APO-BW

    Hi All,
         Normally we come across scenarios where Master/Transaction data is pulled from ECC to BW and then pulled into APO-BW. What are the pros and cons of CIF (direct connection between ECC and APo-BW) rather than pulling data from ECC to stand-alone BW and then into APO-BW?
    Regards,
    Joy

    Hi Santhana,
    If you want to add data of ECC to APO BW & Then in to DP, then follow the following Steps.
    1. Create Generic Data Source in ECC for thet Sales Order table.
    2. Replicate that data Source in to APO BW with Source System.
    3. Create whole data flow process by using created Data Source.
        Data Flow Process: 1. Info Package
                                      2. Info Source
                                      3. Info Cube
                                      4. Transformation between DS & IS, Then IS & IC
                                      5. Data Transfer Process.
    4. Load data from ECC to APO BW
    5. Use transaction /n/sapapo/tscube, for copy Info Cube data to Planning Area.
    Hope this will help you.
    Regards
    Sujay

  • Fetching data from ECC to APO

    Hi,
    I have fetch to data from ECC custom table to APO and create data, can anyone let me know the procedure.
    Thanks in advance

    Hi Santhana,
    If you want to add data of ECC to APO BW & Then in to DP, then follow the following Steps.
    1. Create Generic Data Source in ECC for thet Sales Order table.
    2. Replicate that data Source in to APO BW with Source System.
    3. Create whole data flow process by using created Data Source.
        Data Flow Process: 1. Info Package
                                      2. Info Source
                                      3. Info Cube
                                      4. Transformation between DS & IS, Then IS & IC
                                      5. Data Transfer Process.
    4. Load data from ECC to APO BW
    5. Use transaction /n/sapapo/tscube, for copy Info Cube data to Planning Area.
    Hope this will help you.
    Regards
    Sujay

  • Transaction data from ECC to APO DP

    Dear All,
    Can you tell me if i can directly load transaction data directly from ECC to APO BW Infocube.
    For example i want to load say sales orders from ECC.
    Can i directly load from ECC --> APO BW Infocube --> DP Keyfigures.
    Or any staging is required inbetween ECC and APO BW
    Thanks
    Santhana.

    Hi Santhana,
    If you want to add data of ECC to APO BW & Then in to DP, then follow the following Steps.
    1. Create Generic Data Source in ECC for thet Sales Order table.
    2. Replicate that data Source in to APO BW with Source System.
    3. Create whole data flow process by using created Data Source.
        Data Flow Process: 1. Info Package
                                      2. Info Source
                                      3. Info Cube
                                      4. Transformation between DS & IS, Then IS & IC
                                      5. Data Transfer Process.
    4. Load data from ECC to APO BW
    5. Use transaction /n/sapapo/tscube, for copy Info Cube data to Planning Area.
    Hope this will help you.
    Regards
    Sujay

  • While loading data from r/3 to bw error 8 /error in source system is coming

    while loading data from r/3 to bw error 8 /error in source system is coming . how can i solve this problem .

    Check source system connectivity.
    Tcode RSA1 --> Source System RClick --> 'Check'

  • Error in code page mapping for Source system whil loading the data from ECC

    HI Gurus,
    I am working in a implementation project, Recently our BI sand box is up, when i am doing my load from 0comp_code_attr it is throwing an error "Error in code page mapping for source system"(This is my first load from ECC).
    In details tab it is showing as the data is sent from the source system but the data is not reaching to the PSA.
    Please let me know if there are any settings needs to be made.
    Many thanks in Advance
    Jagadeesh

    HI V,
    Thanks for your quick response. I did it but it didn't resolve the issue. since the system id which i am having is 3 digits(LEC) but there it is taking only 2 digits, so i clicked on the button called Propose system ids, it has praposed LE, but the issue is stil there.
    Do we need to do any settings in LBWE??
    Thanks and Regards
    Jagadeesh

  • Source system creation

    hi experts,
    this is the first time i am creating source system
    i am have requirement to load data one bw system to another bi system,
    so, to do that i defined and created logical system in bw for bi system and
    i created same for bw in bi system also and everything is ok.
    i guess my next step is to create source system(my self) for bw in bi .
    when i am trying to create it is showing that it is already exists.and here what type of source system i need to choose. i am not founding any my self bw data mart
    status symbol under  source system creation node and what type of the source system i need to choose and whether it is manually or automatically.if i choose automatically it is asking create new destination ,create back ground user and connection of source system to bw (it is asking to fill all fields),for manual system creation only logical system and rfc destination. is it required to creat source system or not because my self bw data mart symbol is present in bw system and bi system also.please correct me if anything wrong
    thanks
    venu

    hi chandra shekhar &chitrat,
    thanks for your quick reply,when i choose sap business information symbol
    it is asking to fill all the entries like crate new destination under this i provided
    target computer in this i provided ip address of bi system( i am creating in bw system),system id & system number,and  back groung user in source system and
    password ,connection to the source system ,target system for back ground user
    and connection to the source system what i need to provide
    thanks
    venu

  • To load data from a cube in SCM(APO) system to a cube in BI system.

    Experts,
         Please let me know whether it is possible to load data from a cube in SCM(APO) system to a cube in BI system.If so explain the steps to perform.
    Thanks,
    Meera

    Hi,
    Think in this way,
    To load the data fro any source we need datasource Ok. You can genare Export data source for Cube in APO,  then use that datasource for BW extraction, try like this. I think it will work, in my case I'm directly loading data from APO to BW using the DataSource sthat are genaraed on Planning Area.
    Why you need to take data from APO cube?. Is there any condition for that?. If it is not mandatory, you can use the dame datasource and load the data to BW, if they have any conditions while loading the data from APO to APO cube, they you try check wherther it is possible in BW or not. If possible then you use DataSource and do the same calculation in BW directly.
    Thanks
    Reddy

  • Error in Source System while running the Full Load

    HI Experts,
    We are using 0CRM_UT_SRV_CONT_I datasource from CRM to extract data.
    It is giving error while running the full load as 'Error Occured in Source system' with messaage Number : RSM340.
    I  want to mention certain points here:
    1) In RSA3 its running fine.
    2) Connection between BW and CRM system is OK.
    3) We have replicated datasource and send active veriosn from Dev system.
    4) When I run Init without data, Init set sucessful with entry in RSA7 in CRM.
    5) Delta run fine with green status.
    6) As source system is static client, hence do data for delta.
    The Main issue happens when we run either the Full load or Init With Data transfer.
    Kindly suggest.
    Thanks
    Mayank

    Hi Mayank,
    see in source system (CRM) with transaction SM21 and ST22 the error log and and then you let us know.
    Charly

  • Source System creation in BI 7.0 for SQL Server using DB Connect

    Hi
    My requirement  is to extract data from SQL Server 2005 to BI 7.0 using DB Connect.
    I need to create a SOURCE SYSTEM for that purpose,As i am new to BW i don't know how to start to create a  SOURCE SYSTEM.
    What are the parameters i require either from Basis team to install or for DB team User ID in SQL (What type of user).
    Questions:
    1)  create a db user with authorization to read this views.......as i created views on tables...do i need authorisation to read table or views
    "On BW Server side (If BW server isn't based on SQL Server):
    (1) Install SQL Server client and test connection to SQL Server DB.
    (2) Install DBSL of SQL server (download lib_dbsl_<num>.sar file from service market and sapcar to BW kernel)"
    How can i know on which server our BW System is Based and HOW Install SQL Server client and test connection to SQL Server DB and
    Install DBSL of SQL server (download lib_dbsl_<num>.sar file from service market and sapcar to BW kernel
    and
    how to create Source System to SQL Server on BW
    Please update me in details i this is my first Source System Creation in BW
    Thanks in advance

    go through the link this may be helpful                  http://msdn.microsoft.com/en-us/library/dd299430.aspx

  • Error while source system creation/Source system transport

    Hi,
         In our BW implementation, the system landscape is only 2 servers. One is BW Dev, another is BW Prd. All configurations are done in BW Dev and I extracted the data from QAS for this BW Dev system.
         Since we can’t create the source systems in the BW Production system, I tried to create the source system for the SAP R3 Production system in BW Dev and trying to transport this to BW Production Instance.
         I have two queries.
    1.  Is this way is correct for creating the Source System for BW Production system?
    2. When I tried to activate the source system I am getting the following error messages. (I tested the RFC Destinations. There is no problem, I also done the configurations for logical system creation and client assignment in both the systems).
    Error in source system GWPCLNT900
         Message no. RSAR502
    Diagnosis
         With Remote Function Call to system GWPCLNT900 error connection closed
         (no data)  ccurred.
    Procedure
         Remove the cause of the error.
    When tried again I got the following error message
    Basic type ZSBB030 doesn’t exist. EA 447
    Result of the destination check: Timeout RSAR 375.
    Could anyone throw some light on these errors?
    Thanks in advance.
    Krishna

    Hi,
    you need to maintain the logical systems on both R/3 and BW. You also need to set up the RFC connection with users that can log in to the other system. The R/3 system must be open for customizing in scc4.
    In transaction se03 the system change options for 'Business Information Warehouse: SAP Namespace' and 'Business Information Warehouse: Customer Namespace' may need to be modifiable. I am not completely sure about this.
    The last thing I will mention is that I have seen source system creation fail when the RFC-users are system users, and the source system creation worked if the RFC-users was display user while creating the source system. The RFC-users must be changed back to system user later...
    Please look at best practice documents on a more step-by-step guide...
    Best regards,
    Christian Frier

Maybe you are looking for

  • Info about Tax on sales/purchase from a business perspective

    Hello everybody, Where could I find information about tax on sales/purchase? I am especially looking for info from a business perspective. The questions I try to answer are, for example, the followings: - What are the main business issues regarding V

  • Managing Query Suggestions through CSOM (C#) or PowerShell for Sharepoint Online.

    Hello everybody. I am currently working with Sharepoint Online search and am trying to find information about managing Query suggestions (CRUD operations). Would anybody have any information as to how I could do this in CSOM or PowerShell ? I truely

  • Getting response in fault tag ?

    Hi All, My BPEL process contains an operation which has Input,Output and Fault parameters. When I initiate the process, Its completing successfully.. but my response is wrapped up in <env:Fault > Following is the response I am getting <env:Envelope x

  • Language change to my Trial Download

    Change language to English ( North American ) from German

  • Moving CF8 Standard Server License

    Hi all, I'm really nervous about this, because this is a production server.  I'm wanting to know if there are problems or issues that I should be aware of. Current Server: Windows 2003 Standard 32-bit Coldfusion 8.01 32-bit standard 1 or 2 proc licen