Dear Experts,
Normally we do developments in Development server,so we create source system connection to R3 Development server (say 120) and create DataSources, DTP and process chains based on the Source system 120.
Now my Doubt is when we transport the developments to QAS, how will i get the data from R3 Quality Server 500 (because my developments -DataSources, DTP,Infopackages and process chains are connected to R3 dev 120).
how should i do this?
Please give me your valuable inputs.
Regards
BI Learner

Hi Friend,
In general this connections done by Basis people.
So in your case automatically mapped quality r/3 to bw quality, but first replicate changes from r/3 quality to bw quality before moving changes from bw dev to bw quality.
this scenerio is normal wherever you go either in production perspective also.
SAP BW(Dev)---->SAP BW(Quality) and simaltaneously mapped SAP R/3(120)--->SAP BW(Dev),SAP R/3(500)---->SAP BW(Quality)
llly mapped production also, this is general landscape.
I try to give scenerio and hope it should helps out.
Thanks-RK

Similar Messages

  • SAP TAO,What is the purpose of Development,Quality,Production environment?

    Hi All,
    What is the significance of Development,Quality,Production environment under license tab of configuration in SAP TAO.
    Which environment has to be selected for better operatability of SAP TAO functions.
    Thanks and Regards,
    Ujwal Kandimalla

    Hi,
    As TAO deals with the testing aspect, a 3 system landscape is recommended:
    DEV : For unit testing
    QA:    For system testing and integrated testing
    PRD:   Has to be available for production usage
    You could also have a Pre-Prod for load and UAT.
    Regards,
    Srikishan

  • Creating source system PC Files on productive system

    Hi,
    I have a problem, i need to create source system PC Files on productive system.
    I tried to do it in RSA1 - source systems.
    I could not create any source system - error message :
    "No entry for BW_USER in table RSADMIN available"
    Where should be problem?
    Thanks for help
       Radka

    Hi Radka,
    You have two options to do that:
    1. Write an ABAP program or use an Infohub to download the data on to your Prod Application server.
    2. Download the data to your PC and then FTP to your Prod App server. You can speak to your BASIS on this.
    Bye
    Dinesh

  • Patches difference in development, quality & production

    Hi,
    Our Development & Quality environment is on patchlevel
    SAP_ABA 700 0018
    SAP_BASIS 700 0018
    PI_BASIS 2005_1_700 0018
    SAP_BW 700 0020
    Our Production server is on
    SAP_ABA 700 0019
    SAP_BASIS 700 0019
    PI_BASIS 2005_1_700 0019
    SAP_BW 700 0021
    Golive is next week. already developments and configuration are moved to quality and testing is going on.
    Now i want to upgrade the patches in dev & quality to production level.
    After that only i ll move the transports to production.
    Please suggest us whether any problems will come in developments & configurations when the transports are moved to production.
    Regards,
    Raj

    It's difficult to commnet on.
    Best is building a Sandbox by copying production system , moving all those transports there and test. Then if everything is fine, upgrade quality and devlopment.
    But in any case , do you want to downgrade production patch level if any problem occurs after moving the transports to PRD?
    If the answer is NO, then you can upgrade quality first and test new patch level. If you find any problem try to solve that ( may be by applying some notes or rasing a message with SAP)
    I can make sure at least PI_BASIS 2005_1_700 0018 upgrade will not pose any problem.
    Regards
    Anindya

  • Source System inactive in Quality

    Hi Experts,
    I need to load the data from flat file to ods but my source system is inactive in Quality server when i double click on source system it is not showing any active button in quality server, but the same source system is active in development server.
    Please can any one solve my problem.
    Many Thanks in advance
    David

    Hi Srinivas,
    Thanks for your answer, and one of my source system is still inactive for this i follow the below steps,
    1) Run the program in se 38 RS_TRANSTRU_ACTIVATE_ALL
    2) RSA1- source system_ right click on source system - activate..
    but still my source system is inactive so how can i solve my problem... please give me solution.
    Daivd

  • MII Development - Quality - Production promotion

    Hi
    Does anyone has experience in promotion of MII projects from Development to Production via SAP standard transporation?.
    What we currently doing is transfer (export imports) of MII projects from one server to another server (i.e Development server to Test server and then to Production Server). I know there is CTS. Is CTS onyl available for ABAP or also available for MII?
    Issues that we face during the transfer (import and exports) are
    - The System connections and Data Servers' names have to be rename to have exact name as in the current system.
    - The SQL code , has to be rename to match for each system. Especially if you work with Schema (writing schema names in the SQL code).
    - This means the development has a lot of dependency for each current systems.
    How do you deal with that???
    Edited by: Seng Kiang Hoe on Dec 14, 2010 10:32 AM

    Hi,
    Your current promotion or transport process is common for MII 12.0 customers. New in 12.1 is the ability to use content management within the workbench for your MII objects. It uses [NWDI|http://help.sap.com/saphelp_mii121/helpdata/en/48/cfd8b4c1d310b4e10000000a421138/content.htm] to do this. You may want to research it further.
    The [MII 12.x best practice |http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/f08d7ae2-6f56-2c10-50b4-8a3bb1d43502]guide talks about naming your data servers so that you don't have to change them when you transport. You should look into it and make some changes.
    Regards,
    Kevin

  • Source System conversion for several production SAP

    Hello all,
    What kind of customizing in table RSLOGSYSMAP i have to do ?
    We have 1 DEV and 9 production system P01, P02,  .... P09.
    In the table i must insert 9 lines, one for each production system ?
    DEV -> P01
    DEV -> P02
    DEV -> P09
    Or i insert only one line
    DEV -> P0X
    and i change the table before each of the nine transport ???
    I have to transport the same order 9 times ?
    Thanks for your precious help.
    Christophe

    Cristophe,
    I think this must be done on the target system where you will mention the source and target fields .
    You do not have to manually enter the values into the table - you can find this under source system conversion defined in the transport connection .
    I think the source system just gives it current logical systems and then the target system will do the conversion and hence it will not be 9 entries in your DEV environment but 1 entry each in your productive environment.
    Also you cannot have two entries for the same logical source system in this table.
    Arun

  • Delta loading master data errors in source system Message RSM340 quality

    Hi,
    I'm trying to load with delta  master data for standard data sources.
    In dev, everything seems fine.
    I' ve transported the same elements to QA. I've done init, it is ok. I do delta, I get red status: Errors in source system, message no. RSM340. I've tried to put my delta on green, I've remade my init, I've reloading with delta, and I get the same problem.
    I have this problem for all master data loading.
    Should I install some infoobject from Bi Content?
    Thanks a lot !

    Hi,
    Check following threads
    [3003 + R3299 + RSM340] error messages loading an ODS
    Extraction failed with error Message no. RSM340
    BW Data Loading - Delta Processes
    Thanks and regards
    Kiran

  • Source System as R/3 production for the BI Development?

    Hai..
    My client asked me to get the data available in production for testing  the loading and the calculations done in BI 7.0. I want to know whether it is possible to get the data from production.
    In my undersatanding the landscape b/w BI and R/3 is
    R/3 Dev  -
    >  BI Dev
    R/3 Qual -
    >  BI Dev
    R/3 Prod -
    > BI Dev
    R/3 Qual -
    >  BI Qual
    R/3 Prod -
    > BI Qual
    R/3 Prod -
    > BI Prod
    Can someone guide me regarding the RFc connection b/w BI 7.0 development and R/3 production.

    You are welcome,
    If your dev or quality server is copy of production try through test in dev or quality .
    Yes, its not impossible to extract data from R/3 production to Bi development server only your RFC connection should be in place.
    Secondly after your testing you need to remove you RFC connection ( R/3 to BW dev) & check you R3 Prod and Bi prod are in place.
    Hope you are testing data through full load, not delta.
    If you are testing delta you have to do all the steps again for init while you extract for prod after testing is done.
    Hope this helps.

  • SPDD and SPAU Request from Multiple Source System (Dev and Quality) ??

    Hi all,
    We have one query related with SPDD and SPAU automatic adjustment during Upgrade.
    We done SPDD in our Development systems and same is taken by SAPup during Quality Sytem PREPARE step from umauto.lst file.
    But we adjusted some object in Quality System as the SPDD request from Develpopment does not able to adjust all the request. We created one request for the Same in Quality System and the that also got added to umauto.lst file.
    Now during our during Mock run Upgrade, PREPARE ask to take only one system for SPDD request with following options
    1. missing systems
    2. Development (DEV)
    3. Quality         (QAS)
    4. None
    But we need both transport of  SPDD from DEV and QAN to be imported to Mock run Systems till Production.
    any suggestion to fix this ?

    Hi,
    Give the DEV requests for SPDD, and proceed. During DDIC_700 you will come across the DD objects which need to be corrected as you have done in QAS. here you need to open the system and correct them manually. Then only you should proceed. Be very carefull during this activity, as you may loose data if not done correctly.
    Regards,
    Suhas

  • Development, Quality , Production server

    Dear Experts,
    I am new to SAP HR , Can some one help to understand the following terms.
    1. Development server , where it has more clients. I am not able to understand it , like why it is being used.
    2. Quality server - What is the purpose of it ?
    3. Production server - what is the purpose of it ?
    As a SAP HCM Functional consultant, what is our role in this 3 server ? If we need to make some changes where we need to do the configuration ?
    4. Also please let me know what is Transport request ?
    Waiting for the valuable reply from you experts.
    Regards
    Bala

    Hi Bala,
    In the Development system the SAP ERP is being configured: Customizations are done by the different processes consultants, developments are done by the programmers, etc.
    The main system is the Production system - this is the system where the end-users work.
    The end-user are required to perform checks and quality-assurance processes before the different programs and table are transported to the production system - these checks are performed on the Quality Assurance (QA) system.
    Each system may have several clients, E.G., the Development system has the main client (usually its 100) - in which the consultants and developer perform the configurations, and another client (e.g. 110 or 120) - in which they can test the configuration.
    Each system usually sits on different server. This is the call of the organizational IT department and the BASIS system. They will tell you how to logon to each system.
    The transport request, his name suits him, is being used to transport customizations and developments from client to client and from system to system.
    Regards,
    Liran

  • RFC destination in FM for development, quality & production server

    Hi all,
    I have a doubt in RFC enabled FMs..
    The RFC destination wil be different for dev, quality & prodn.
    Whn we do dev, we wil use RFC for Dev in Code & execute.
    Do we need to change the code whn we move to quality & thn again whn moving to prdn?
    How is this handled?? Is there any std. table where we can maintain this?
    Need help on this…
    Thanks,
    Sivagami

    hi,
       no need to chage this this means that that particular FM can be called from any other system as its RFC enabled.if one FM is not RFC enable then it can be execuetd on that parent server only we cant call if frm  outside.
    reward if helpful
    ravi

  • BI Production as a source system on BI Development

    We have a requirement to make the Production BI environment as a source system on the Development BI environment. This is required with a view to make greater live data available in a particular cube on the Development box to aid in future enhancements
    The same Production BI environment is again reaquired as a source system on the Quality BI environment. This is required with a view to make greater live data available in a particular cube on the Quality box to help in testing/UAT activity
    My question is that corresponding to the source system BI PROD on BI DEV and source system BI PROD on BI QA.  What can I keep as a source on BI PROD itself. Can/should BI PROD itself be the corresponding source system on BI PROD ? Is it technically feasible. What are the pros and cos/risks of such a design design

    Hello,
    You can add the BW production system as a source system in the DEV and QA system without any problem. I don't believe there is any need to attache the production system as a source to itself, this connection alrady exists (the so called myself connection), if you goto RSA1 and under source system you will find a source system connection for production that points to it self, this is used for all internal datamart loads that might occur in the production system itself. Therefore there is no need to add the system again with a connection to itself.
    Best Regards,
    Des

  • Source system assignement in production

    Hi all
    Before importing any requests which are related to infosource , cubes and update rules into production, do we need to make any source system assignment in production system?
    I have directly imported into production but there were no source system / data source assignments to these infosource.
    can you please suggest what to do for these souce system assignments in production.
    thanks in advance
    AN

    Hi,
    you have to assign the production source system to your BW system. After replication of the DataSources, you can import your development from the BW development system.
    Important is the conversion in the SPRO Transaction - Change source system name after transport. In this view you have to type in the source system name of the source system linked to your development system and the name of the source system linked to your production system. During import to production system, BW will automatically change the source system names.
    regards
    Juergen

  • Transfer Rules for two Source System in Production

    Hi All,
    I have a question.
    I have source system ECDCLNT230 (ECC Devlopment) which is connected to BIDCLNT200(BID Devlopment) I have two production source system ECPCLNT410 (ECP Pre Production Client) & ECPCLNT400 (ECP Production Client) which i want to connect with BIPCLNT400. when i transport my content from ECDCLNT230 to ECPCLNT410 and ECPCLNT400 , it works fine. i created 2 source system in BIPCLNT400 and replicated data source in to BIPCLNT400 so all data source has replicated.
    Now when i transport the request from BIDCLNT200 to BIPCLNT400, i need two transfer rules, two transformation one for each source system. for that what kind of settings are required.
    Thanks is advance.
    Regards,
    Komik Shah

    Hi,
    If I understand correctly, in your BW Production system, you want to connect / load data from your ECC Pre Production and Production system.
    In this case, to automate the transport needed for changes of transfer rules for both source system, you will need to have two tranfer rules in your BW Dev. You can either create two source system in Dev pointing to the same ECC Dev system, or one to ECC Dev and the second to ECC QA. Use different name for this two source system.
    In BW Production, you then then maintain the source system conversion of both source system.
    Thanks.