Your question is too general. You have to be little more specific about your reqirement.
Iam going to assume you are talking about sourcing to a single destination branch from multiple vendors using quotas. It is simple you have to create inbound quotas to branch from the vendors using tcode /n/sapapo/scc_tq1. Make sure the quotas are active and valid as of the current date. Then run heuristics and you will see the quotas taking effect .
thanks
aparna
Edited by: Aparna.Ranganathan on Feb 3, 2011 6:43 PM

Similar Messages

  • Source determination,Quota Arrangement Process

    Hi,
    Plz tell me how to maintain Source determination,Quota Arrangement.step by step

    Dear,
    QUOTA ARRANGEMENTS
    If a quota arrangement exists for a material, it has the highest priority during source determination. Like source list, the quota arrangement facilitates the administration of sources of supply at plant level.
    If you procure a material from different suppliers, you can assign a quota to each individual supplier. A quota arrangement applies to a certain period and specifies how the receipts should be distributed among each source of supply.
    If a quota arrangement exists, this does not mean that the quantity of a single manually created purchase requisition is automatically apportioned among different sources. In such case, the entire quantity of the requisition is assigned to one source u2013 the source that is next in line receive the relevant order.
    Before you can maintain a quota arrangement item with the procurement type external procurement, a source of supply (info record and / or outline agreement) must exists.
    Create quota arrangement:
    LOGISTICS u2013MATERIAL MANAGEMENT u2013 PURCHASING u2013 MASTER DATA u2013 QUOTA ARRANGEMNET u2013 MAINTAIN.
    Specify number ranges for quota arrangement:
    SAP IMG u2013 MATERIAL MANAGEMENT u2013 PURCHASING u2013 QUOTA ARRANGEMENT u2013 DEFINE NUMBER RANGES.
    You must specify the business application for which quotation arrangement will be used, for example: in material planning or in purchase requisitions. You make this specification in QUOTA ARRANGEMENT USAGE filed, which is to be found in the plant-specific purchasing/materials planning data of the material master record.
    Set quota arrangement usage indicator:
    SAP IMG u2013 MATERIALS MANAGEMENT u2013 PURCHASING u2013 QUOTA ARRANGEMENT u2013 DEFINE QUOTA ARRANGEMENT USAGE.
    System assign quota rating to each source by calculation as u2013 Quota rating = (quota allocated quantity + quota base quantity / quota).
    ADDITIONAL ASPECTS OF SUPPLY SOURCE DETERMINATION
    Quota arrangements also can be source of supply.
    Quota arrangements for material requirements arising over a certain period divided up among different sources on basis of quota. Quota arrangements determine which source of supply is automatically assigned to a purchase requisition.
    SOURCE DETERMINATION
    The purpose of the source determination process is to automatically assign a source of supply to a purchase requisition, if source determination indicator set in the requisition header, the system searches for possible sources of supply for all the items of the requisition. Quota arrangements also can be source of supply.
    In source list specify a preferred source as fixed for a certain period, the system suggest just only this source, even if other potential sources exists.
    Quota arrangements for material requirements arising over a certain period divided up among different sources on basis of quota. Quota arrangements determine which source of supply is automatically assigned to a purchase requisition.
    Source list record consists of the following:
    1.Validity period u2013 Period of validity
    2.Key source data u2013 Number of vendor and responsible purchasing organization or number and item of outline agreement.
    3.Fixed source u2013 Within a validity period not more than one source should be flagged as fixed.
    4.Procurement plant u2013 if the materials can be procured from a plant or another point within your firm, enter the plant number in PPl field and leave the field for the vendor number empty.
    5.Blocked source u2013 To block a source. If you set Blocked indicator and enter only one validity period, the material is excluded from external procurement; that is, it cannot be ordered during this period.
    6.Material requirements planning  - You use MRP indicator to determine whether an automatic source determination process is carried out during the requirements planning run. The appropriate source is then automatically assigned to a purchase requisition, or scheduling agreement delivery schedule lines can be generated directly via planning run.
    If an attempt is made to order a material subject to a source list requirement from a source that is not included in the source list, the standard system issues an error message with the text: Source not included in list despite source list requirement. You can change this to warning message.
    If source list requirement defined for a plant, all materials in the plant level must be maintained with source list before procurement.
    Analyze source list:
    LOGISTICS u2013 MATERIAL MANAGEMNET u2013 PURCHASING u2013 MASTER DATA u2013 SOURCE LIST u2013 FOLLOW ON FUNCTIONS u2013 ANALYSE.
    Define source list requirement at plant level:
    SAP IMG u2013 MM u2013 PURCHSING u2013 SOURCE LIST u2013 DEFINE SOURCE LIST AT PLANT LEVEL.
    Source lists can be created:
    -Manually.
    -Create from within an outline agreement u2013 on outline agreement overview screen, select an item for which you wish to enter source list record and choose ITEM u2013 MAINTAIN SOURCE LIST.
    -Creation from with an info record u2013 you can enter vendor in the source list when creating or changing a purchasing info record. Choose EXTRAS u2013 SOURCE LIST. If the info record valid for entire purchase organization, you can create the source list for all plants of the organization in question. Choose the plant via GOTO u2013 PLANT.
    -Automatic u2013 can generate by system automatically.
    Create source list manually:
    LOGISTICS u2013 MATERIAL MANAGEMENT u2013 PURCHASING u2013 MASTER DATA u2013 SOURCE LIST u2013 MAINTAIN/DISPLAY.
    Generate source list automatically:
    LOGISTICS u2013 MATERIAL MANAGEMENT u2013 PURCHASING u2013 MASTER DATA u2013 SOURCE LIST u2013 FOLOW ON FUNCTIONS u2013 GENERATE.
    Regards,
    Syed Hussain

  • How to know if a MRP run element is using Quota Arrangement and lot size?

    Hi all,
    Two questions:
    A) How to determine if a source is actually pulled from Quota Arrangement?
    I am wondering if there is anyway from ABAP table or from Transaction (i.e. Purchasing Order) in which the source is pulled from a Quota Arrangement?
    We use scheduling agreement, PIR and source list, and as well as Quota Arrangement for our purchasing.
    I just want to know how, from system (table and transaction), to find out the source is from quota, not from PIR or others.
    B) Quota Arrangement still can work properly if lot-size procedure's splitting quota indicator not Checked?
    If my the lot-size procedure which I am using for a material does not activate the splitting quota indicator, it means split quota will not work during MRP run.
    But does this also mean that quota arrangement will not be working for this particular material even if I have create a a quota arrangement object (via MEQ1) for this material?
    Thanks
    Daniel

    Tomek,
    If I want to use the split quota, it seems there is some pre-requisite.
    If you go to MEQ1 and press F1's on the "Minimum qty split" column, and you will notice the following message.
    Allocation by quota using splitting quotas is only carried out via a requirement planning run, subject to the following preconditions:
    Through the appropriate entry in the field Quota arrangement usage (on the MRP data screen 2 or Purchasing screen) it must have been specified that a quota arrangement is to be applied in the planning run.
    The indicator for the splitting quota must be set for the the lot-sizing procedure used for materials planning purposes in Customizing.
    Hence, the quota arrangmeent still workable even if the lot-size does not have the spliting quota box checked?
    Indicator: Splitting quota in short-term horizon
    The indicator for splitting is used to determine that in the case of the selected lot size, the quota arrangement is to be applied using the splitting logic.
    Use
    If this indicator has been set, the lot is split up in the planning run according to the following formula:
                                quota for source X
    Quantity for source  X = --------------------- * requirement
                               sum of all quotas

  • Source list & quota arrangement

    At which level the source list is maintained:
    Client Level
    Plant Level
    Purchasing Org. level
    When source determination takes place, does the quota arrangement takes precedence over a fixed vendor?

    Hi Vishal,
    At which level the source list is maintained?
    Plant level.
    When source determination takes place, does the quota arrangement takes precedence over a fixed vendor?
    Yes, it does.
    The system determines the source of supply of a requested material on the basis of the following factors (in the order shown):
    1. Quota arrangement
    The system first determines whether a quota arrangement within whose validity period the delivery date in the requisition falls exists for the material.
    If a quota arrangement exists, the system determines the vendor from whom the material is to be procured according to the quotas assigned to the vendors and then suggests the source.
    If no source can be determined this way, the system checks the source list.
    2. Source list
    The system determines whether an entry in the source list within whose validity period the delivery date of the requisition falls exists for the material. The source in question may be a fixed vendor or an outline agreement (contract or scheduling agreement).
    If the source list contains a unique source, the requisition is assigned to that source.
    If several sources are found, a box appears for selection purposes.
    If no source could be determined, the existing outline agreements and info records are examined.
    3. Outline agreement and info record
    The system searches for contracts, scheduling agreements, and info records for the material and suggests these.
    (If info records with more than one purchasing organization exist, all info records of the purchasing organization(s) that is/are responsible for procurement for the requesting plant are also suggested.)
    If several outline agreements and perhaps info records exist, all possible sources are offered for selection in a box.
    When an info record is found, the following two additional checks are carried out:
    - Check of supply region
    The system checks whether a certain supply region is specified in the associated vendor master record. If so, the system checks whether the plant in the purchase requisition belongs to this region. If not, the info record is discarded as a possible source.
    - Check of regular vendor
    The system checks whether a regular vendor has been specified for the material (that is, a vendor valid for the entire corporate group, or client). If this is the case, and it has been specified in Customizing that the regular vendor takes precedence, the info record for this vendor will be preferred as the source.
    Hope this will help.
    Regards,
    Ferry Lianto
    Please reward points if helpful.

  • Allocation quantity using quota arrangement

    Hi folks.
    please let me know what I need to do in order to allocate the schedule lines according the quota defined. I mean.. if I have a demand for 100 PC for each weak and a quota arrangement with 60% for vendor A and 40% for vendor B how can I get for each weak a schedule line with 60 PCs to vendor A and 40PCs to vendor B?
    tks

    Tks Baweja. But actually what is happening is that the system is allocating quantity only to a one vendor and not distributing the quantities for both. 
    week    qty    vendor
    1           60       A
    1           40       B
    2           60       A
    2           40       B
    3           60       A
    3           40       B
    4           60       A
    4           40       B
    5           60       A
    5           40       B
    What I found out was that to split the quota we have to set up it in the lot size procedure.
    spro->production->materials requirements planning->planning->lot size calculation->check lot-size procedure->mrp lot size

  • Assign Source of Supply User Exit with Quota Arrangements in ME57 and ME56

    Hi there,
    We are using Quota Arrangements to define Vendor rebate levels and we have enabled User Exit EXIT_SAPLMEQR_001 to provide a more informative popup to replace standard Source of Supply popup as need to display current allocation quantities and % allocation fulfiled.
    This User Exit is invoked during Assign Source of Supply during PReq processing (More precisely during Assign Source of Supply in ME51n and Automatic Source of Supply in ME57 and ME56) which all works fine.
    When used in ME51n and Source of Supply Assigned and PReq saved, the allocated quantity against the valid Quota Arrangement (EQUK-QUMNG) is successfully updated with the relevant amount
    When using ME56 or ME57 to Automatically Assign source of Supply via the PReq list, the User Exit is invoked correctly and on selecting Vendor and saving the PReq is update correctly, however the allocated quantity against the valid Quota Arrangement (EQUK-QUMNG) is NOT updated with the relevant amount
    I have searched SAP Notes and debuged with limited success but cannot find evidence as to why this difference is happening - I assume that it has something to do with User Exit but any advice gratefully received if anyone else has experienced this issue?
    Ben

    Hello Jerry,
    source will be determine based on the following points:
    Outline Agreement
    Info record
    Quota Arrangement
    Source List
    For more information, <a href="http://help.sap.com/saphelp_47x200/helpdata/en/75/ee11b255c811d189900000e8322d00/content.htm">Click here</a>
    Hope this helps.
    Regards
    Arif Mansuri

  • KANBAN with Quota arrangement

    Dear Guru,
    Ist possible to use Quota arrangement in KANBAN external Procurement (Scheduling Agreement)?
    If so, please advice me how to do it... i am new to KANBAN.
    Regards,
    Senthil

    Hi Kumara,
    As per my knowledge Quota Arrangement is not possible to use in KANBAN with Schedulling Agreement.
    However pls find below the process steps for KANBAN WITH SCHEDULING AGREEMENT:
    You can carry out KANBAN with Replenishment Strategy- External Procurement in following two ways :
    1.     External procurement from Vendor to Main Stores:
    Basic rules and Prerequisites:
    u2022     MRP type should be u2018NDu2019 in MRP1 view of material master.
    u2022     Availability check should be u201CKPu201D in MRP3 view of material master.
    u2022     Material received from vendor is directly posted to unrestricted stock. Inspection at vendors place or vendoru2019s process control to ensure rejection free material. Inspection set up in Material master should be inactive.
    u2022     Backflush is not required and Material is issued against a Pick List for Production Order.
    Process steps:
    1.     Create supply area for Main stores. TC: PK05
    2.     If required, extend the material to main storage location. TC: MMSC
    3.     Make the necessary changes in the material master as explained above.
    4.     Create scheduling agreement. Put kanban indicator (X) in the additional data of item.
    5.     Create Kanban control cycle. TC:PKMC
    6.     Print the barcode. TC:PK17
    7.     Set the kanban status to EMPTY by scanning the barcode. TC: PKBC. A Schedule line will be generated for the supply of material to main stores.
    8.     View the demand source view. TC: PK13n
    9.     When the material is received at Gate, perform goods receipt into blocked stock (movement type 103). TC: MIGO
    10.     Once the material reaches Main stores scan the barcode to FULL. TC: PKBC (At the background GR with 105 movement will happen).
    2.     External procurement from Vendor directly to shop:
    Basic rules and Prerequisites:
    u2022     MRP type should be u2018NDu2019 in MRP1 view of material master.
    u2022     Availability check should be u201CKPu201D in MRP3 view of material master.
    u2022     Backflush indicator is must. It can be defined in the routing or in the material master itself. If Backflush indicator is set in the material master, then the material will be backflushed through out the plant (Material issue not required against production order). However if you want the material to be backflushed only when it is used for certain products, then Backflush indicator should be set in the routing ( in the component allocation against operations).
    u2022     Confirmation should be done for each operation in the production order either individually (CO11n) or collectively (CO15). Confirmation posts goods issue of components (relevant to confirmed operation/s) to production order
    u2022     Maintain KN01 storage location in the field - production storage location of MRP2 view in the material master. Back flushing will take place from this location. Field - Storage location for external procurement should be KN01 in the material master.
    u2022     Material received from vendor is directly posted to unrestricted stock. Inspection at vendors place or vendoru2019s process control to ensure rejection free material. Inspection set up in Material master should be inactive.
    Process steps:
    1.     Create supply area for kanban stores (KN01). TC: PK05
    2.     Extend the material to Kanban storage location. TC: MMSC
    3.     Make the necessary changes in the material master as explained above.
    4.     Create scheduling agreement. Put kanban indicator (X) in the additional data of item.
    5.     Create Kanban control cycle. TC:PKMC
    6.     Print the barcode. TC:PK17
    7.     Set the kanban status to EMPTY by scanning the barcode. TC: PKBC. A Schedule line will be generated for the supply of material to kanban store.
    8.     View the demand source view. TC: PK13n
    9.     When the material is received at Gate, perform goods receipt into blocked stock (movement type 103). TC: MIGO
    10.     Once the material reaches shop, scan the barcode to FULL. TC: PKBC (At the background GR with 105 movement will happen).
    Hope this helps.
    Revert if any doubt and reward points if useful.
    Regards,
    Tejas

  • Quota Arrangement in MRP Planning

    Dear All,
    I am facing problem in foll Scenario:
    I am trying to use Quota arrangement in MRP Planning.
    I have maintained foll values:
    Quota Usage in Material Master.
    Quota for the material against 3 vendors in Percentages.
    I have not maintained any Lot size procedures cause we are not using any batch management or Lot sizing in our company.
    MRP Type is reorder type planning.
    PIR is maintained for all the 3 vendors against the material being used.
    No source List is maintained.
    But during MRP Run only 1 PR is getting generated against a single Vendor - which is appearing 1st in the Quota arrangement.
    Kindly please suggest me why is this happening... and whether there is some note of configuration missing.
    Regards,
    Jyotsna Loomba

    Hi,
    It is easier to use an example.
    Lets say we have two vendors that we want equally used and they have been set up in a quota arrangement for a long time. The quota base qty will show how many have been ordered from each. So lets say that at the moment we have the two vendors both set up with a quota of 1 (to keep them equal) and the quota base qty is the same for each (lets say 10,000).
    We now want to add a third vendor and they too should get an equal share of the orders. If we just add them the system will see that vendors A and B have each had orders for 10,000 and the new vendor has had 0 and so the system will give every order to the new vendor until they too have a total of 10,000.
    By manually entering 10,000 to the quota base qty of the new vendor we are tricking the system into thinking that the new vendor has had the same number of orders as the existing vendors and so from now onwards they WILL all get an equal share.
    I hope this helps with the clarification of the use of quota base qty?
    As for the data you have just provided, the system would give the next few orders to Vendor V2.
    the reason is that the other two vendors get a quota rate of 1 each and V2 has a quota rate of 8 and so V2 should get 8 times the qty of V1 and V3. The quota base qty of 80 against V2 and 20 against each of V1 and V3 means that V2 will get the next orders until their qty reaches 160 (at the proportion of 1, 8, 1).
    So if V1 is getting all of the orders at the moment then there is something wrong with the set up of the quota arrangement. This could only really happen if you have set some maximumquantities or lot sizes etc. If you have not done this then I would check that V2 and V3 have valid info records etc.
    Steve B

  • How to Disregard Quota arrangement in LTP run

    Is it possible to disregard any quota arrangement usage set on the Material Master MRP2, when running Long Term Planning MS01/02

    Hello....
    Note 206684 has the following information:
    o  When you use quota arrangement, the special procurement key of
       the quota arrangement item must correspond to the special
       procurement key for the source list entry (recognizable, for
       example, in table EORD). If, for example, the special procurement
       in the material master is changed, when the source list entry
       already exists, not corresponding special procurement keys can
       occur and a new source list entry must be created.
    Check if it helps you to solve.
    Bye
    Gabriel

  • If 100% quota arrangement - no PR getting generate through MRP

    Dear All :
    I have maintained
    lot size ES , quota arrangement = 3 , source list tick in mm master.
    Also maintained source list , quota arrangement.
    Where ever more than one vendor , system generating PR but for those quota arrangement maintained 100% for single vendor , there system not generating PR.
    I know source list is enough for same but i want to give 100 business for some items vendors.
    Please resolve my query at early as possible.
    Vijay

    Hi
    In T.code OMI4, which is to define a lot size, you see a small check box for split quota. It will be there for short term planning and long term plannng. You need to tick both or atleast one for your lotsize which you use in material master
    Then only it will work.
    Regards
    Antony

  • Subcon Quota Arrangement behavior during MRP

    Dear Gurus,
    Currently, we have a scenario wherein during subcon process there can be 3 Vendors active. During MRP, we would like to have an output as per below:
    Requirement: 1500
    Vendor A: capacity 500 - priority 1
    Vendor B: capacity 700 - priority 2
    Vencor C: capacity 500 - priority 3
    If I run MRP, I would like system to have PR's Vendor A with 500 then as the Vendors capacity is only 500 the remaining requirement should be passed on the succeding vendors. So from my example, Vendor B should have 700 and Vendor C should have 300.
    Is this possible using Quota Arrangement. I was trying to test but I cannot get my desired result.
    Please note that the settings in the material master is already set to Quota usage 4 and the lotsize is weekly with splitting quota activated.
    Thanks,
    Raymond
    Edited by: Raymond on Oct 10, 2011 11:17 AM

    Hi,
    Yes I have maintained below in MEQ1 just for testing but I cannot get the desired result:
                      Quota Percentage        Maximum Lot size      Priority
    Vendor A:   100                                 500                           1
    Vendor B:    100                                 700                          2
    Vendor C:                                           500                          3
    Set-up Weekly lotsize with splitting quota and quota usage 4.
    But during MRP execution, I think the system splits the requirement quantity into 2 and distribute to Vendor A and Vendor B then if it reached maximum lotsize it proposed to vendor C.
    our requirement is first to consider Vendor A then Vendor B then Vendor C according to maximum lot size and priority.
    Any idea if this is possible?
    Thanks,
    Raymond

  • Source determination with referance to quota arrangement

    Dear all
    I had created quota for vendor A & Vendor B for a material M100, I had also defined quota arrangement usage in SPRO ( 3),
    While creation of PR for this material M100, I had selected the tick for source determination, But still system is not determining the source.
    Here one more observation is if I create the info record the source is determined from info record & the details are updated in quota.
    Can some one help me which other things I need to check, so that the source is automatically determined by system from quota arrangement.
    Thanks in advance
    Regards
    Pravin

    HI,
    If MIGO is done for the P.O all the datas are updated in the Purchase order history.
    When you are doing MIRO , it will take what you have entered in  the MIGO only.
    Please try
    G.Ganesh Kumar

  • Uploading of Quota arrangement using LSMW

    Dear Members,
    I want to upload Quota arrangement using LSMW.
    Pl advise.
    Thanks & Regards,
    Sanjay Kohli

    I am trying to upload quota arrangement using IDOC method, since there is no Standard/Batch Input Method as well as Bussiness object method available for it.
    I am not using Batch input recording method since no of vendors will varies depending on the plant & material comination.
    I am unable to load it using IDOC as I not able to identify process code for I DOC message Type LIPEQU.
    I slhall be thakful in case you can provide the same or alternative method to upload Quota arrangement in addition to Batch Input recording.
    Regards,
    Sanjay Kohli

  • How to calculate the quota base quantity in quota arrangement?

    Hi all,
    As we all know, when a new supplier is added in the quota arrangment, we take the help of quota base qunatity so that the new supplier does not get any unfair advantage over the existing suppliers. Would you please help me on how to calculate the quota base quantity or on what basis the quota base quantity is calculated?*
    Regards,
    Ranjan

    Dear,
    Quota arrangement divides the total requirements generated over a period of time among the sources of supplied by assigning a quota.
    Quota u2013 quota is equal to a number and its represents the proportionate of requirements. Total quota of all the vendors is equal to 100% of requirements.
    This quota arrangement is also specific to material and plant level.
    Quota rating = quota allocate quantity + quota base quantity / quota.
    Quota based quantity used only when a new vendor introduced.
    In the as on date situation, the minimum quota ratings will considered as preferred vendor.
    The 2 vendors has 2 same quota rating, the vendor who is having the highest quota will considered first.
    In the running quota, a new source of supply is included. (In situation of short supply) including a new source not means to reduce the quota for existing.
    Regards,
    Syed Hussain.

  • Process Quota Arrangement

    In SAP SRM 210 training material, page 334 (under main topic Unit 8: Sourcing), it is clearly stated that every requirement fitting a quota arrangement is sourced automatically by the system. But that did not happen in our system implementation (assuming standard SAP is used and no configuration needed). The picture captured in the training material SRM210, page 334 showed that, in Process Quota Arrangement, at Quota Arrangement item level, there are 3 columns in which values are updated. The value will be updated in the 3 columns after Purchase Order created with refer to quota based vendor selection. The 3 columns are Release Quantity, Current Percentage and Target Percentage. After PO created, system gives current release quantity and current percentage in the quota arrangement. However, in the real implementation, I did not see the column available for automatically update except the target percentage column. We want to see if the Quota Arrangement updates the column Release Quantity and Current Percentage but both columns are not updated. We use standard SAP-SRM7.0, but the result is not as the same in the SAP SRM210 training material, provided by SAP.
    Anyone know the solution?

    In SAP SRM 210 training material, page 334 (under main topic Unit 8: Sourcing), it is clearly stated that every requirement fitting a quota arrangement is sourced automatically by the system. But that did not happen in our system implementation (assuming standard SAP is used and no configuration needed). The picture captured in the training material SRM210, page 334 showed that, in Process Quota Arrangement, at Quota Arrangement item level, there are 3 columns in which values are updated. The value will be updated in the 3 columns after Purchase Order created with refer to quota based vendor selection. The 3 columns are Release Quantity, Current Percentage and Target Percentage. After PO created, system gives current release quantity and current percentage in the quota arrangement. However, in the real implementation, I did not see the column available for automatically update except the target percentage column. We want to see if the Quota Arrangement updates the column Release Quantity and Current Percentage but both columns are not updated. We use standard SAP-SRM7.0, but the result is not as the same in the SAP SRM210 training material, provided by SAP.
    Anyone know the solution?

Maybe you are looking for