Special Period NOT in consideration for FAGLB03 ? ? ? ?

Hi     
All Experts ,
I am facing such strange problem that , for all the General account FAGLB03 is not considering 13
( special period ) period  postings with profit center. When I am double clicking on 13 period balance
column it is showing the balance of period 12 only and it is for all GL executed in FAGLB03.
Please experts tell me is this SAP system problem or Human being error posting problem.
Your help is highly appreciable for this critical issue.    
Regards,
Pankaj.
Edited by: pankaj_ab on Jun 25, 2009 1:30 PM    
Edited by: pankaj_ab on Jun 25, 2009 1:53 PM
Edited by: pankaj_ab on Jun 25, 2009 3:15 PM
Edited by: pankaj_ab on Jun 26, 2009 8:26 AM

Hi,
Raj.
I gone through and explored the all your said options but m facing that problem in only FAGLB03.
All other places are still intact and showing balances exact I am confused that is it human error or
system error ?
Can you pleas put some focus.
Regards,
Pankaj.
Edited by: pankaj_ab on Jun 26, 2009 8:59 AM
Edited by: pankaj_ab on Jun 26, 2009 9:16 AM

Similar Messages

  • Special Periods

    Hi Guys,
    I could not understand the following. Can anyone elaborate with example-
    " If you do not need 12 posting periods, you can use the posting periods that are not required as special periods. If you use these additional closing periods, you must specify the number you require in the field No. special periods. when defining the fiscal year variants."

    Hi Vinod,
    Normally A maximum of twelve posting periods and four special periods make up a fiscal year.
    Special periods represent an extension of the last normal posting period. When the posting date falls within the last normal posting period, then during document entry you can specify that the transaction figures be updated separately in one of the special periods.
    In OB29 your need to specify the Normal period and special period.  Special period are the part for the last period in that fiscal year.
    regards
    Atul

  • Include Special Periods into 12th period for Virtual InfoCube(0FIGL_VC1)

    Dear SDN,
    The following update routine is perfectly working for 0FIGL_C01 InfoCube...
    But some reports developed with 0FIGL_VC1 InfoCube....Still Special Periods are coming....
    The update routine could look like the following if it is 0FISCPER:
    IF COMM_STRUCTURE-FISCPER+5(2) > '12'.
      CONCATENATE COMM_STRUCTURE-FISCPER(4) '012' INTO RESULT.
    ELSE.
      RESULT = COMM_STRUCTURE-FISCPER.
    ENDIF.
    I want to eliminate special periods problem in 0FIGL_VC1 InfoCube also...
    All Special Periods should be in the 12 th Period..
    I have included code in the Update rules level ...
    But similarly how to do in the Virtual InfoCube, Which does not have update rules...
    Help will be greatly appreciated with points...
    Thanks in advance...

    Hi,
    Thanks for your quick reply,
    But here i am getting Special Periods for Virtual InfoCube...Whereas 0FIGL_C01--- Special Period problem resolved....
    I am also not understanding how come in 0FIGL_VC1 -- Special periods problem still existing..
    Pls provide a solution
    Thanks

  • Running GR55 reports for special periods

    When running GR55 reports, the selection field for "Period" only lists periods 1 to 12. We are using the standard K4 FI year variant.
    Can someone tell me how to get the 4 special periods displayed for selection?
    Thank you,
    Hakiza

    The drop down in the "To" field only lists periods 001 to 012, but it lets you manually enter other periods such as 14 or 16.
    So you are not limited by the periods displayed in the drop down box.
    I hope this solves your problem. Thanks,
    Hakiza

  • Special Period for every quarter

    Hi,
    My client wish to have special periods for every quarter.
    For Example:
    I posted document number 1 to 100 for 1st quarter. Now document number for 2nd quarter should start from document number 151.
    The remaining document number 101 to 150 must be for any adjustments made in 2nd quarter regarding 1st quarter on the basis of auditor's requirement.
    Is it possible ?

    No.
    It is not possible
    You cannot have document number ranges per quarter
    You can have document number ranges per company code and fiscal year.
    Regards,
    Ravi

  • Special consideration for BRF rules related to configuration managment

    Hello All.
    I am looking for a document or oss note that discribes if there are any special consideration for BRF rules related to configuration management and transport control?  I just learned how to spell BRF so, I would appriciate if you could direct me to the information requested above.
    Regards,
    k

    Hello All.
    I am looking for a document or oss note that discribes if there are any special consideration for BRF rules related to configuration management and transport control?  I just learned how to spell BRF so, I would appriciate if you could direct me to the information requested above.
    Regards,
    k

  • Special period for commitement

    hello,
    we want to size prices for a third period 2006 in the transaction kp26.
    we cant and we have the following message:
    Period 13 is not allowed for the planning period.
    I already customize 12 normal periods and 1 special in ob29 and for the analytical perimeter.
    for real costs i have 13 periods but still 12  for commitment.
    could you help me?
    thank you

    You can do  planning only in the normal periods as you have defined in the T/code:ob29.You cant do planning in the special period.But in special periods you can post the actuals.[The year end adjustment entries etc are all done in the special period.].
    The concept of planning itself is to have a projected figure for comparison and control.you have determined [ in  ob 29] that your working calender will have 12 periods;as such you can plan for these periods only.
    Special period is not a part/ a period of the fiscal year.It is the area in which your auditors,etc can work and post the adjustment entries.Please note that the entries in the special period itself should pertain to these [ normal ]12 periods.In other words you can not construe the special period as an extended fiscal year.
    If you want to post/plan for the 13 th period,change your fiscal year variant to have 13 normal periods.Also note that you can have only one fiscal year variant for a company code.
    Hope this will help you.
    Regards,
    Ramesh

  • Account 'Special reserves balance' could not be found for area 03

    Hi Experts,
    I had an error message from fixed asset depreciation transaction (AFAB) like below.
    Account 'Special reserves balance' could not be found for area 03
    Message no. AU133
    Our depreciation areas are like following.
    1 : Book Area
    2 : Tax Area
    3 : Book Area - Tax Area
    51 : Investment Support Area
    The depreciation area information is like above, then I got an above error message.
    Please tell me where I have to assign above account at AO90 transaction.
    Thanks.
    BR,
    Chris Kim

    Hello Julie,
    Thanks for your reply.
    The depreciation area "03" is a derived area.
    I think the issue has been solved.
    Thanks again.
    BR,
    Chris

  • AUTOMATIC CLEARING FOR RECEIPTS실행시 PERIOD NOT OPEN ERROR

    제품 : FIN_AR
    작성날짜 : 2004-05-19
    AUTOMATIC CLEARING FOR RECEIPTS실행시 PERIOD NOT OPEN ERROR
    ========================================================
    Problem Description
    AR에서 Receipt이 "Remitted" 상태임에도
    "Automatic Clearing for Receipts"프로그램 실행시 아래와 같은
    Error가 발생하면서 처리되지 않음
    ARZACS module: Automatic Clearing for Receipts
    MSG MSG-01000: DEBUG: Before_Report_Procs.Check_GL_Date.
    MSG MSG-05000: DEBUG: GL_Date not within open period.
    ERR REP-1401: 'beforereport': Fatal PL/SQL error occurred.
    ORA-00000: normal, successful completion
    Solution Description
    Period가 open되어 있지 않아 발생하는 것으로,아래의 실제 Test과정을
    참조.
    Automatic Clearing Test step.
    1. Trx 입력
    GL_DATE 09-JAN-2004
    2. Receipt입력
    GL_DATE 09-JAN-2004
    Maturity DATE 15-JAN-2004
    (Payment Method는 Clearance Method가 "by Automatic Clearing"을 가진
    Receipt Class를 입력)
    3. Remittance 실행
    Receipts -> Remittances 에서 Auto Create
    4. Clearing실행
    Receipts -> Clear/Risk Eliminate에서
    "Automatic Clearing for Receipts" 실행
    Parameter중 Clear Date 11-JAN-2004로 입력
    5. 해당 Receipt이 Clearing안됨.
    6. 다시 Clearing실행
    "Automatic Clearing for Receipts" 실행시
    Parameter중 Clear Date 16-JAN-2004로 입력
    7. 해당 Receipt이 Clearing됨.
    위의 Test결과에서 알 수 있듯이,
    Clear Date는 Maturity Date보다 이후여야 함을 알 수 있다.
    또한, Maturity Date가 같은 Period내가 아닌 그 다음 Period, 예를들어 2월15일이라고
    해도 Clear Date를 2월 15일 이후로 입력해야만 해당 Receipt이 Clearing되었다.

    hi,
    pl go to OB52 and open the FI posting period for account type S.
    you will find either 1000 or 0001 as the field status variant for which you can select the acccoutn type S. You need to know what is the field status variant for your comp code. You find out by going to OBY6 ( Comp code global settings ).
    at OB52 you can maintain this way.
    1000 S zzzzzzzzz 1 2008 12  2008 13 2008 16 2008.
    regards
    sadhu kishore

  • Programs which are not being executed for a specific period

    Hi,
    We are planning to do the application upgrade in few months,with respect to that we would like to find out what all programs/transactions(standard or custom) which are not being executed for a specific period.What is the way to find this?
    Regards,
    Sam

    Hi Sam,
    You can use st03 and defice theprograme name and period to sotp the activity.
    Regards,
    Anil

  • SO will not be taken into consideration for MRP until it is released for delivery.

    Dear Sir,
    We are following sales order basis planning (MTO basis planning strategy 50 is being used ).
    When sales order are created by default it is blocked for delivery. In our present system,  we have a scheduled total MRP procedure on daily basis. Hence, when sales are entered in the system it is taken into consideration for MRP RUN automatically.
    But our new proposed system we want , until the sales order is blocked for delivery, it will not be considered for MRP RUN. It will only be taken into consideration for MRP RUN when sales order will be released for delivery.
    Is it Possible ? If Yes, Please let me know the procedure.
    Regards,
    Amit Biswas

    Hi Krishnendu ,
    Then we are deviating from my requirement ,
    My requirement >>
    We are using  MTO planning  (Planning Strategy using 50),
    1. Sales order are created for material requirement planning .
    2.  under MD04 list sales order will be shown under FERT material .
    3. There is release procedure of Sales order.
    4. Daily scheduled MRP RUN has been introduced on total planning.
    5. MRP RUN only consider released sales order . If there is any sales order which is not released , that will not be consider for MRP RUN.
    6. Under FERT material , there may be number of sales order both released and not released sales order.
    Please let me know the process , sales order which are not released , this will not be under the scope of MRP RUN .
    Regards,
    Amit Biswas

  • TS1559 Wifi will NOT turn on for the past several days except for a brief period of approximately 2 days.

    My wifi stays greyed out and dim and will not turn on.  For a little bit it did turn on but would NOT recognize the wifi in our home, although all other devices did without an issue.  I've tried all the solutions I've found on here and nothing is working to solve my problem.  (i.e., restarted my phone, my modem, reset my network settings, backed up my phone and restored it and still nothing!)  Very frustrated!!!  Apple support says it must be a hardware issue and I will have to take it in for a repair which since I'm just past my one year mark, will cost $199.00.
    How can it be a hardware issue if for a brief period the wifi worked for about two days before it again went dim and won't work???  Any help or suggestions would be extremely appreciated as I'm not a very techy person and I'm baffled!
    Thanks to all!
    P.S.  My phone is an iphone 4 and is updated to the current version.

    Your iPhone doesn't require as much power to charge as your iPad needs so there is a possibility that the charge could have a problem even though you were able to charge the phone. If you can try a different power adapter and still have no luck, then the only thing left - IMO - is to contact Apple support and see what they advise.
    BTW  ....   Copied from your first post ...
    i then decided to do a reset or restore by pressing and holding the home button and the sleep/wake button down.
    I'm not trying to be a nitpicker - but what you described is a hard reset and your post gave no indication that you tried a software restore - which I referenced in my post. That's why I suggested the restore.
    Many times restoring the iPad to factory settings can help "revive" the device. If you have tried restoring according to the two support articles that I directed you to and still have no success, you are probably out of luck getting any further help on this site. That's all that you can try at this point at least AFAIK.

  • Fund Managment: Posting period not opened for value type 66

    Hi,
    I have already opened all the posting periods FM  thru' TC: FMIR  from period  0 to 16  for all account assignments.
    While posting through thru' a customised program (i.e customised program is using  FB01) I am getting error 'Period 002/fiscal year 2010  not open for FM posting in value type 66', please let me know why this error inspite of opening all the periods and for all account assignment.
    Thanks,
    Suresh

    hi suresh,
    Check this link
    FMIR - For fiscal yr based encumbrance, the whole fiscal will be open
    Hope it will resolve your question.
    Thanks and regards
    Praveen.J

  • Project Considerations for Team Development not work

    Dear All
    how can tell the responsible of this site "Oracle ADF Insider" about any link is not working ?
    http://www.oracle.com/technetwork/developer-tools/adf/learnmore/adfinsider-093342.html
    i try many times to see this sample but it not work
         Project Considerations for Team Development April 2011
    regards

    you can mail [email protected] regarding this.
    who has created this video.
    Edited by: Nikhil Gokhale on Apr 29, 2011 7:45 PM

  • KEU5: Allocating special period costs for receivers in 12th period only

    Dear All,
    Every year I'm facing a problem with allocating costs of special periods (13-16) to receivers that were posted in 12th period.
    By senders I mean cost centers.
    By receivers I mean sales documents from december (F-type documents)
    I don't want to use cumulative allocation method since it will use receivers from all months.
    Best regards,
    Mark

    Dear Mark,
    What is the problem that you are facing... Can you elaborate more...
    Regards
    Srikanth Munnaluri

Maybe you are looking for

  • Ni-DAQ single-point analog sample latency.

    I am maybe in my own little world here in wanting to do software-triggered analog sampling and wanting to do it fast. Having bought a PCI-6014 which is capable of 4 microsecond analog sampling I found a simple AI_Read took 95usec. I was somewhat disa

  • HT201210 My iPhone 4s kept re-starting every few minutes.

    My iPhone 4s kept re-starting every few minutes which made it virtually impossible to use. I had looked online for various solutions to solve this problem that I am having. I have manually turned the phone on and off multiple times but had no luck th

  • No Sound During DVD Playback

    I have a new HP elitebook 8460p and there is no sound during DVD playback. Is there a setting I may be able to change? Here is a list of things I've tried and pertinent information: - Confirmed all system mute settings are off (e.g., not muted) - Con

  • OSB Dynamic Routing Downstream Error Handling.

    Hi I've written several services which implement dynamic routing proxys which route to other proxys who then talk to business services. My problem is that when the downstream service encounters an error the router seems to throw away that error messa

  • Problem in HttpDispatcher , Please help ...

    HttpDispatcher Hi all, I installed edge server 10.1.3 and tested EdgeSimulator sample from tutorial. I used HttpDispatcher and Edge Simulator Driver. After I builded jsp application from tutorial(Connecting the Oracle Sensor Edge Server to a Simple A