Special procurement Key in APO

How do I define in APO the special procurement key relationships between plants within the company or consignment/ subcontracting, just want to maintain the same relationship as in R/3. I know you answered about special procurement type U: stock transfer which I got it, could you please explain how I maintain the above Sp. procurement keys in APO.
Thanks Mono
Harish's reply:
As far as i know you cant maintain Spl procurement keys in APO. This is used as an indicator in the material master for CIF and for creation of Transportation lanes in APO. So if you create manually more transportation lanes in APO to other source locations it will all be considered as sources of supply unlike in R3.

Hi Mono
Are you planning to run MRP in R3 and also plan in APO for the same materials. Depending on the sequence one of the runs is wasted
you normally plan selected materials in APO  and the rest in R3
You can use the X0 in product master for APO relevant indicator and CIF only these materials to APO and plan it here
as for the spl procurement keys
If you have a special producrement key in R3 the Transportation lanes are created automatically with the  correct source of supply or you can ensure you manually create this(and block or delete the others) so the planning  will be the same as it would be in  R3

Similar Messages

  • Transportation lane for special procurement key is flagged for deletion

    we are on SCM 7.0 and ECC 5.0 and transportation lane records are automatically created for items with special procurement keys (SPK). When we change an SPK, the old record is automatically being locked and flagged for deletion. This is causing planned orders in the old lane to not be replanned. it is therefore incorrectly indicating that a requiremnt is being met by the old planned receipt.
    The documentation indicates that the lane should be locked (not locked and flagged for deletion). When it is locked, the orders are deleted and replanned in the new lane as expected.  Can someone tell me if the correct behavior is for it to just be locked or to set to flagged for deletion? if it is supposed to be flagged for deletion, how do we delete the planned orders in the old lane without switching the record back to locked only?

    Hello,
    Please follow on the SAP Help library:
    Automatic Creation of Transportation Lanes
    http://help.sap.com/saphelp_scm50/helpdata/EN/d4/56ef1a5572544081619 a5f87f4055e/content.htm
    Change of Supplying Plant in the Special Procurement Type
    In the SAP R/3 system, if you have changed the supplying plant in the special procurement type, the SAP APO system creates a new transportation lane for the new supplying plant (from special procurement type) and material/plant combination. The already existing transportation lane and now invalid combination between supplying plant and receiving plant in the R/3 system is locked for orders in the SAP APO system. This can be recognized by the lock indicator X that is set by the system.
    Removal of Special Procurement Type from the Material Master Record
    If you have removed the special procurement type from the material master record in the SAP R/3 system, the SAP APO system locks the already created transportation lane so that it cannot be used in orders.
    Hope it helps in this matter.
    The best regards,
    Michel Bohn

  • Cross company code Stock transfer - Special procurement Key

    Hi,
    Please clear my following doubts...
    1. We have two company codes, Company code: A1 having a Plant: AP1, Company code B1- Pant BP1,
    Finished goods sold from the plant AP1 are purchased from the plant BP1, so is there is any possibility to create a special procurement key having BP1 as the delivering plant and assign the key in AP1 materials.
    2. Can i combine the two plants AP1 and BP1 for total online planning (MD01) by creating a scope of planning indicator? and run a single MRP run for both plants at a time...
    Please clarify...
    Thanks,
    JK

    JK,
    I dont think Scope Planning is problem. You can create Scope of planning combining multiple plants, use transaction OM0E.
    I doubt on Special procurement key option for STO across cross company codes, as the special setting needed in that case would be that Plant as to be created as Vendor / Customer. I would suggest to post this to MM forum for further response on this.
    Regards,
    Prasobh

  • Special procurement key 65 in MRP view.

    Hi gurus,
    I have two plants A & B.
    A = manufaturing plant.
    B = planning plant.
    In plant A, we have maintained special procurement key as 65(withdrawl from alt.plant B)
    In plant B, we have maintained special procurement key as 55 (production in another plant A)
    My question is that mandatory to maintain 65 in the plant A. What might be the effort if you not maintain.
    Please explain.
    thanks in advance.

    Alapati,
    You cant define special procurement key in both plants for the same material as defined by you. If Plant A is manufacturing you can have special procurement key assigned to the material in Plant B as "Production in Alternate Plant".
    Regards,
    Prasobh

  • Special procurement keys

    Hi experts,
    what are the special procurement keys for MRP related consignments and MRP related sub-contarcting
    rgds
    Lakshmi Reddy

    HI
    Special procurement key for subcontracting:-30
    Special procurement key for consignment:---10
    These can be found in MRP2 view of material master record
    Hope this will help you
    Reward if useful
    Thanks and Regards
    SHYAM.R

  • SPECIAL PROCUREMENT KEY CUSTOMISATION (OMD9)

    Any one can explain the various scenario where in we need to configure special procurement keys in customisation.
    1. When we need to create keys without "As BOM component" indicators?
    2. When we have to use the above indicators?
    Pl. explain with business scenario.

    One option is create new item category for stock transfer and assign that item category to the special procurement key in MRP and assign that tiem category in the purchasing document tyoe config so it will allow this only
    OR the simple solotuion without config is
    Create the screen variant using SHD0 transaction for the doc type ZIC and assing transaction code e.g
    ZINTRA and give the user so whenever they will enter this code, system will defulat the ZIC doc type for STO.

  • MB21 - Reservation in reference to a BOM - Special procurement key

    Hello,
    I want to create a manual material reservation against a WBS element in reference to a BOM which uses a special procurement key at component level. This special procurement 70 uses the following configuration points:
    -  Procurement type: External procurement
    -  Withdrawn alternate plant indicator: checked
    -  Issuing plant: 0410
    When creating the reservation with MB21, the BOM referenced is created in plant 0100. I was expecting component reservations created from plant 0410 but not. All reservations created are from plant 0100. Any ideas why the special procurement key is NOT taken into account in this scenario using MB21?
    On the other hand, I successfully tested this procurement key within a PM order; all component reservations created are from plant 0410, as expected. 
    Thanks for your help.
    Christian

    Hi Christian,
    Happy to see your posting. Good that your work is going ahead.
    But, I think your initial post was not checking "How to..." but was "Why it is not possible in manual MB21 when possible with PM order linked scenario?". Right? For "How to.." the SAP feedback is OK to make use of user exit which one can anyway decide (without SAP involvement) to carry out his/her work.
    May I know specific--Has SAP suggested a SAP Note wherein use of User Exit is recommended? or a simple reply to your SOS message as a recommended option?
    The reason behind making this point is How it can be considered as standard behaviour when on one side - BOM explosion wrt special proc key and creating reservation/requisition through PM order scenario goes successful and on the other hand not possible through manual MB21?
    Bye..

  • Costing run for materials with special procurement key

    Hello,
    Since moving to ECC6, the costing run for materials with special procurement keys is not pulling the marked price from the materials the special procurement keys point to. Only the released prices are pulled.
    Example:
    Material A, plant A has a future price (costing 2 tab) of 100 and a current price of 99
    Material A, plant B has special procurement key Z1 (costing 1 tab) which pulls the costing from Material A, plant A
    In our old system (46c) the costing run for Material A, plant B would pull 100.
    In ECC6, the costing run for Material A, plant B pulls 99
    Anyone that can push me in the right direction?

    Hi,
    Based on the info provided thus far, the result that you notice in ECC 6.0 is right as it is picking the current standard price based on your setup.
    Now why it is picking the future price in 4.6c, well for that you will have to do a detail check as in which variant is being used etc. I would suggest you to work with your CO personnel on this. Do a costing run for this particular material via CK11n using the variant which you mentioned & see the results.
    Or if you can upload the screenshots (picasaweb or some other portal) of the valuation variant you're using in 4.6c, along with Acctng view 1 & 2, costing view 1 & 2 details of the material it would help to have a better understanding.
    Regards,
    Vivek

  • Query related to Stock Transfer special procurement key.

    Hi PP Gurus,
    One conflict I got regarding to Special Procurement Key 40 (Stock transfer). Here in one plant material XYZ is getting produced in-house as well as procured from Alternate plant also.
    Initially I configured Spcl Prct key 40 taking XYZ (for example) in Demanding plant (say 1003) as externally procured through material master with spcl prct key 40 and Supplying plant (say 1001) In-house produced through material master.
    Now the requirement is to produce material XYZ In-house in Demanding plant (1003) as well as Stock transfer through Supplying plant (1001).
    As per my information for material handled through STO in Material master procurement type=F with splcl prct key=40 should be maintained in Demanding plant (1003)
    And
    In Supplying plant (1001) through Material master Procurement type= E without Spcl prct key= 40.
    If we change Procurement type from F to X in Demanding plant material master, does it support special procurement key and STO? Is it possible through some other solution? What could be the impact in Std. cost estimate and Product Cost Collector?
    Thanks & Regards,
    Abu Arbab

    Hi Alex,
    Thanks for valuable reply. SAP doesn't support Special procurement key for stock transfer with Procurement Type=X. I think two options one of the following options are suitable for such scenarios.
    1. Reply from SAP
    2. Quota Arrangement
    3. Creation if New material code and new production version for Semi-finished product in plant 1003. That is some what tedious. There is a valuable reply from Rajesha Vittal in this context to one of my last threads subjected [        Special Procurement Key- Withdrawl from alternate plant (40)|https://www.sdn.sap.com/irj/scn/forums]
    I let decision on Client whatever the way he wants will map the process through one of above options
    Here is the reply from SAP
    Normally for a material which is to be produced internally(inhouse production) and also procured externally the material type 'X' is used in the material master.
    Typically, If the material is sometimes produced in house and sometimes completly procured externally depending upon your capacity availability then the procurement type 'X' could ensure that you always have a
    planned order created in the planning(MRP run).Then you would have to decide later whether the material has to be produced in house or procured externally. If it has to be produced inhouse you could convert
    the planned order to Production/process order in MD04 else if the material is to be procured externally you could rater convert the planned order to a purchase requisition and then later could be
    converted to a purchase order.
    However kindly note that the special procurement type of stock transfer can not work with 'X' in standard, so even if you set the procument key to X in the material master it will not be read as the system will only
    look at the procument key of the special procurement type. This is also apparent in the warning message that you recieve when you set 'X' and 40in the material master: Message no. M3 675 ::The procurement type of the special procurement type is F.
    Unfortunately there is not a setting for X for the special procurement in the transaction OPPQ. To achieve this you will need to implement a modification. Please be aware that modifications are not supported by
    the support department of SAP.
    Workaround:
    Typically, if you have such a scenario I would think that you would set this key for the majority of the transactions, ie, 90% of the time this material is truly stock transferred. However if you have to decide laterwhether the material has to be produced in house or stock transfer you could plan it as type 'X' without the special procurement key and later in MD04 convert the planned order and change the material master back again.
    Or you may set procurement type 'E' and create PO manually for stock
    transfer.
    Best Regards,
    Abu Arbab
    Edited by: abu arbaba on Dec 2, 2008 10:06 AM

  • Special procurement key 10 for sales plant

    Hi Expert,
    We have one sales plant which normally used for trading activities but besides, sometimes we also have consignment process happen under this plant. Currently we don't maintain any value under sales procument key > MRP 2 view. My question is, can we maintain value 10=consignment as special procurement key? Is there any dependens config or data maintainance that we have to look into if this value maintained?
    Thanks/Regards,

    HI,
    You can maintain the special procurement key as10 based on which system will create a consignment PR when you execute a MRP.
    Thanks & Regards,

  • Production planning - special procurment key

    Hi
    what is special procurement key in material master and how it works.
    Thanks
    Mahesh

    Hi Mahesh,
    We use special procurement when we want to be able to override the procurement type in the material master or define the procurement type more precisely.
    If the procurement type is in-house, you can force the system to ignore the BOM and routing, and process the material as if it were externally procured, by specifying the special procurement as external.
    Example
    If you procure a material externally, you may want to choose the special procurement type Consignment. If you produce the material in-house, it may be appropriate to choose Production in other plant.
    Hope this might be useful.
    Narendra

  • Creation of Special Procurement keys

    Hi Gurus,
    I am about to create new procurement keys. Honestly, I am new into this task. I have to create new procurement keys with the requirement below.
    Material 1234 produced in plant A is now stored in plant B. From this new location (plant B) the materials need to be delivered to the customer (Plant C).
    The requirement of customer plant C is not created in plant B but it is created in plant A. So it must be created within Material Requirements Planning.
    As the material need to be shipped from Plant B, I need to create a requirement on this plant using SAP standard functionality. For this the special procurement key have to be maintained for Plant C.
    I really do not know how start with this one.
    Please help me.
    Thank you.
    Edited by: Mark Primus on Jul 16, 2010 11:04 AM
    Edited by: Mark Primus on Jul 16, 2010 11:05 AM

    Mark,
    It is not often that I hear of a plant being referred to as a 'customer'.
    I will assume that all material that is moved into plant B must be produced in plant A.
    You set two sp keys.  For plant C, create a key similar to SAP std 40, pointing to plant B
    For plant B, create a key similar to SAP std 40, pointing to plant A.
    Plant C has a shortage.  MRP runs in plant C.  It produces a Stock Transport Purchase req, pointing to plant B.  If stock exists in B, the STPurRq is converted to a Stock Transport order and the material is moved to C.
    Now, if Plant B has no stock or available inbound elements, then there is a shortage, since the STPurReq creates a requirement in B.  MRP runs in plant B.  It produces a Stock Transport Purchase req, pointing to plant A.  If stock exists in A, the STPurRq (A to B) is converted to a Stock Transport order and the material is moved to B.  The existing PurReq (B to C) is converted to a STO and the material is moved to C.
    If Plant A has no stock or available inbound elements, then there is a shortage.  MRP runs in plant A.  It produces a planned order or purchase req to a vendor. The material is obtained and placed into stock.  The STPurRq (A to B) is converted to a Stock Transport order and the material is moved to B.  The existing PurReq (B to C) is converted to a STO and the material is moved to C.
    MRP should be run in the proper sequence:  First C, then B, then A.  This can be automated by creating a 'Scope of Planning" (OM0E)
    Rgds,
    DB49

  • Special procurement type is APO relevent?

    Hi,
    I change the special procurement type for a material in MM02 MRP2 view. CIF models are running fine. But APO PDS is not getting updated.
    What could the issue here?
    regards,
    shan

    Thanks..
    There are no CIF queues..
    I have made special procurement type "BLANK". BOM is still not updated. CIF models are fine.
    regards,
    shan

  • Which table in APO has the SPECIAL PROCUREMENT TYPE field?

    Hi All,
    I have to enhance the CIF by creating two additional T-Lane on the basis of Special procurement type of the product. For which table in APO can i get this field.
    Also Is there any table in APO containing the value of material type in ECC
    Please Help.
    Thanks and Regards,

    Hi Gaurav ,
    When you have special procurment key settings in R/3  for a material such that location B gets stock from location A (A---> B) , when you CIF the material to APO ,  a transportation lane gets created with source location = A and destination location = B.  This source - destination combination is stored in table /sapapo/TR . If you want to get all products that are available in a particular transportaion lane you have to query table /sapapo/trprod.  Means of transport is stored in table /sapapo/trm.
    Also i dont think material type is available in APO (not very sure ).  Material group is available and it is stored in table /sapapo/matkey.
    Thanks
    Saradha

  • Special procurement

    We have the next case
    A supplier is had with which the subcontracting figure is had; it is to
    say the company facilitates part to him of the required components to
    make the product.
    On the other hand, the negotiation with the supplier is of purchase in
    consignment, therefore the payment to the supplier is made solely when
    the product is consumed
    We have the following problem: When making the entrance of the product
    (101) to the inventory is not possible to leave it in consigment. That
    we can do?
    Exists some form to both have cases of special procurement in one
    single one?

    Hi Yasir,
    You can do that. I think you want to produce semi2 in X plant and after production you want transfer it to Y plant, So material semi2 in material master of Y plant maitain special procurement key=40  or 80 ( i.e., production in alternative(y) plant) then maintain BOM also in Y plant.
    And create same material semi2 in plant X by using procurement key=E (in house production) and maintain same BOM . Then in this plant create work center, routing..etc as master data. Create requirement n run mrp n display stock/requirement list ( here system will display the planned order for perticular qty in one column n in last column system will show you the name of another plant) n create production order. After confirmation n all , MB1B and trasfer the semi2 material to plant Y.
    Hope I cleared you , eventhough lets wait what other experts will reply you.
    Regards,
    Imran Shaikh

Maybe you are looking for