Speeding up Rendering during production

We are using FCP to produce a product called www.GloryScapes.com. Our problem is the rendering time. We are creating overlaid text in Motion and importing it into FCP and we have to wait for these words to render with the video footage an inordinate period of time. We have tried setting FCP to "draft quality" in the "Render Control" so this will move along faster during the production process, then we can change it to "best" once we have completed the program. Any other suggestions to speed up the rendering?

That was a great suggestion. Yes, the settings match that of FCP. We are working with DVCPRO HD 1080i60 (1280x1080) 16:9. We'd be welcome to any other suggestions. Thanks.

Similar Messages

  • Error during OIM schema upgrade during product ugprade from 9.1.0.2 to 11g

    Hi All,
    We have received following error during product upgrade from 9.1.0.2 to 11g.
    Error occurred during fourth step ( Task 4: Use Upgrade Assistant to Upgrade the Oracle Identity Manager Schema)
    On the screen while running upgrade assistance (ua.bat)
    Following message came on screen.
    Schema Version registry >> succeeded
    Oracle Identity Manager Schema Upgrade >> Failed
    I could see only following error in the log file.
    \middleware_home\Oracle_IDM1/server/db/oim/oracle/Upgrade/Oracle_upg_91_92_x2ell_92.sql
    [2012-06-28T09:34:51.147-06:00] [FrameworkMR] [NOTIFICATION] [] [upgrade.FrameworkMR] [tid: 14] [ecid: 0000JWnikOB6qIvyKWYBSQ1Fv7Zd000005,0] finalize() instance 1 of 2
    [2012-06-28T09:35:00.863-06:00] [OIM] [INCIDENT_ERROR] [] [upgrade.OIM] [tid: 13] [ecid: 0000JWnijRj6qIvyKWYBSQ1Fv7Zd000004,0] UPGCMP-00924: SQL error [{0}]
    [2012-06-28T09:35:00.863-06:00] [OIM] [INCIDENT_ERROR] [] [upgrade.OIM] [tid: 13] [ecid: 0000JWnijRj6qIvyKWYBSQ1Fv7Zd000004,0] [[
    java.sql.SQLSyntaxErrorException: ORA-00955: name is already used by an existing object
    ORA-06512: at line 31
         at oracle.jdbc.driver.T4CTTIoer.processError(T4CTTIoer.java:457)
         at oracle.jdbc.driver.T4CTTIoer.processError(T4CTTIoer.java:405)
         at oracle.jdbc.driver.T4C8Oall.processError(T4C8Oall.java:889)
         at oracle.jdbc.driver.T4CTTIfun.receive(T4CTTIfun.java:476)
         at oracle.jdbc.driver.T4CTTIfun.doRPC(T4CTTIfun.java:204)
         at oracle.jdbc.driver.T4C8Oall.doOALL(T4C8Oall.java:540)
         at oracle.jdbc.driver.T4CStatement.doOall8(T4CStatement.java:202)
         at oracle.jdbc.driver.T4CStatement.executeForRows(T4CStatement.java:1074)
         at oracle.jdbc.driver.OracleStatement.doExecuteWithTimeout(OracleStatement.java:1466)
         at oracle.jdbc.driver.OracleStatement.executeUpdateInternal(OracleStatement.java:2123)
         at oracle.jdbc.driver.OracleStatement.executeUpdate(OracleStatement.java:2067)
         at oracle.jdbc.driver.OracleStatementWrapper.executeUpdate(OracleStatementWrapper.java:306)
         at oracle.ias.mrua.plugin.oim.SchemaUpgrader.loadScript(SchemaUpgrader.java:303)
         at oracle.ias.mrua.plugin.oim.SchemaUpgrader.doUpgrade(SchemaUpgrader.java:139)
         at oracle.ias.mrua.plugin.oim.OIMSchemaUpgradePlugin.doUpgrade(OIMSchemaUpgradePlugin.java:302)
         at oracle.ias.mrua.MRUA.executePlugins(MRUA.java:3672)
         at oracle.ias.mrua.MRUA.internal_driver(MRUA.java:2448)
         at oracle.ias.mrua.MRUA.driver(MRUA.java:1710)
         at oracle.ias.upgrade.gui.UAUpgradeThread.run(UAUpgradeThread.java:390)
    Any Idea ?
    Ritu

    Hi All,
    We are also trying to upgrade OIM 9.1.0.2 which is present in our environment to OIM11g. Request your help.
    Now how do we achieve the upgrade? Should my source of OIM9i software  and target of OIM 11g software  be installed on the same server?
    I did install OIM11g and OIM9i on the same server  and tried to do schema upgrade based on the link:
    Upgrading Oracle Identity Manager Environment
    But during examine phase I get error the below error
    UPGAST 00091- ERROR DURING EXAMINE OF COMPONENETS
    UPGAST 01004- UPGRADE IS UNABLE TO DYNAMICALLY LOAD COMPONENET SPECIFIC SOFTWARE MODULES.
    When i check in the log in internet it says :
    Cause: Repository upgrade framework was unable to dynamically load the Java classes of its component-specific software modules. mrua.xml file might have been corrupted.
    Action: This is an internal error. Verify that the Java classpath has been correctly set, the mrua.xml file is correct, and that the .jar files for all component-specific software modules are present in the jlib directory. Contact Oracle Support Services for assistance
    What is the javaclasspath to be set?how to check if mrua.xml and jar files are fine
    Pls help.Any help is much appreciated.

  • Change Work Center during production order confirmation

    Dear All,
    I must to modeling this situation:
    I created an production order. In routing I used an work center A.
    After I confirmed a half of quantity, the work center A was damaged and I must to change it, with the work center B.
    The system allow this change, but when I checked the costing, the situation isn't real. The system counted the costs just for the work center A, and no for work center B.
    My question is: it's possible to change the work center, during production order confirmation and the costs updated with new cost?
    Thank you for your answer!
    Regards,
    Marian

    once a Order is released, the Process order detaisl for that order is frozen.
    however if you want to do it, change the order status to CRTD after reversing the Movements done.
    Do READ MAster data , this will copy the new Work center , redo the previously done Moevements.
    if the change is long term.
    or
    Just manually add the new work center and do the processing. if the change is temporary.

  • Restrict Authorization at Material level during production confirmation

    Hi SAP Gurus,
    I would like to ask if its possible to restrict authorization at Material Level during production confirmation.
    Our scenario is we have SFG and FG which are handled by different group of people but it has the same Order Type. Now we want to restrict authorization such as one department can only confirm SFG and the other department can confirm FG only.
    Is it possible to set authorization at material type or production scheduler level. IF not possible, is there other way except creation of new Order Type?
    Thanks,
    Raymond

    Hi Raymond,
    DO you mean I should create a customized table for this?
    Yes
    Are there no standard way?
    As per my knowledge, you can control through production order type, so you need to create seprate order type for this
    Thanks,
    Sankaran

  • QM inspection at various quality gates during production

    Hi All,
    We need clarification on how to plan inspection during production at various stages.
    1. How to trigger and use inspection point planning at various inspection stages??
    2. How will the characteristic be activated, processed and closed at various inspection stages??
    3. How to define different characteristic at different inspection stages?
    4. Will a single inspection lot be generated for entire production of a machine or separate lot will be generated at all the inspection stages??
    If possible, please provide the process flow.
    Thanks & Regards,
    Ritesh

    First questions
    1. How to trigger and use inspection point planning at various inspection stages??
    .. QCC0 > Quality Planning > Inspection Planning > General > Define Identifier for Inspection Points
    2. How will the characteristic be activated, processed and closed at various inspection stages??
    .. When user define new inspection point at result recording, system activates the characteristics automatically based on inspection plan.
    3. How to define different characteristic at different inspection stages?
    .. Not possible with inspection point function in SAP standard
    .. You have to define all characteristics at inspection plan or use add characteristic function at result recording.
    4. Will a single inspection lot be generated for entire production of a machine or separate lot will be generated at all the inspection stages??
    .. It depends on production order process because inspection lot for production is generated based on production order.
    Second questions
    1. How can we define partial inspection points within production processes?
    .. QCC0 > Quality Planning > Inspection Planning > General > Define Identifier for Inspection Points
    2. Process to activate and process characteristics at every inspection points?
    .. Yes
    3. Is it possible to allot score against those characteristics during inspection?
    .. Allocation is not possible, only add is possible.
    4. How is partial check points processed and closed?
    .. You can define it in operation header detail of inspection plan.
    5. Is defect recording done at every inspection point or at the end?
    .. Every inspection point
    5. How to summarize the result and close the inspection lot finally??
    .. System summarize the result automatically when you execute usage decision transaction.
    Regards, DoWook Kim.

  • Accounting entries during production cycle

    Hi
    Can someone tell me what are the accounting entries that take place during production from one process to another? Where is the accounts configured?
    Thanks

    Anyone?

  • Error during Production Order Confirmation

    I get a real wierd error during production Order confirmation.  The error message is
    "Additional items are not allowed
    Message no. ZOAL010"
    Can anyone throw some light on this?
    Regards
    Raj

    it is not std SAP message.
    you can check the user exit for confirmation.
    check in transaction code CMOD/SMOD for CONF*

  • Co products and by products during production process

    hi,
    I have a production scenario where in both co products as well
    by products exists during production process.
    We can maintain co products by choosing the indicator in material master and in BOM but how should i maintain the by products?
    And also, co products and by products produced will undergo further production process with different operations, in this scenario how I can include these operations and products in my production planning? and how the costs are calculated?
    Can any one please help in this regard.
    Thanks and Regards,
    Pavan

    Hi
    For Co-product just by choosing the indicator in material master and in BOM.
    So when ever u confirm the production order co- product GR done automatically through 101 movement type.
    For By-product
    1) u have to enter the byproduct code in the BOM with -ve sign if ur by-product is fixed qty.
    2) If ur by-product is varying qty then u have to post the by product qty through MIGO 531 movement type against the production order.

  • Inspection during production

    Hi All,
    Please clarify  my doubt on Quality inspection during production.
    We are using inspection type - "04 - Goods receipt inspection from production" for inspection during production.
    Once after inspection if we reject a sub assembly for rework and move the part to block stock, we raise a notification to the concern department.
    Now after production does a rework, how can we receive the sub assembly back to unrestricted used through Quality route and reflect the same in my notification.
    If there is some other standard process of inspection during production and rework then please throw some light on it.
    Thanks & Regds,
    Ritesh

    QM>Qualty Notif.>Notif. processing>Additional notif. Functions>Define Action Box
    In the next pop-up screen select Define functions for the Action box
    To research this I would look at notification Q1.  Select Q1.  Double Click on Activities.
    Double click on 0035 - post goods movement.
    you will see this action uses FM QM06_FM_TASK_GOODS_MOVEMENT_2.  It is configured to run a second module upon saving called QM06_FM_TASK_GOODS_MOVEMENT_STEP2.
    Click on the blue information button to read more about these FM's.
    Copy these FM's and have an APAB'er modify them for your use.  Add an action to your particular notification using these the new Z FM's.
    FF

  • Batch no assigning during production order creation

    Sir,
    We are manitaining the batch management for inut raw materials. During production order creation it is mandatory to assign the batch no for raw materials then only production order releasing is possible.In our case due to batch assignement to production order while order creation,we are facing the lot of problems like batch no not assign for full req qty and also if unavailabilty of stock for particular batch no it will come to COGI.hereby i need experts help for,
    1.I want to determine the batch no during confirmation instead of order creation and also allow to release the production order even batch should be in blank.
    Kindly help
    Regards,
    PS

    Hi
    For Rawmaterials why cant'n you assign Batch nos buring GR of purchase order.
    Then you can do automatic batch determination during confirmation of order for mvrmt type ;261...
    This is  easy  to handle.
    Please check and come back
    Regards,
    srihari

  • Component Availabity Check during production order creation

    Hi All,
    During production creation, I donu2019t want to include/ check the reserved stock of component (stock which has been assigned for other prod order)
    Where I required to make the changes in config.
    Regards,
    Shailendra

    Hi,
    Deactivate Include Reservation in T.Code OPJJ. But make it sure you are doing it for correct Checking Rule which you have maintain in your checking Control OPJK for Order Type and Plant Combination.
    Regards,
    Dhaval

  • Can i hack gtx 560 ti speed up rendering in premiere pro using mercucy engine ??*

    I'm going to buy this card soon, msi gtx 560 ti oc version, i wonder if i can "hack" it to use mercucy to speed up rendering and playback ??? please tell me ??

    As Harm stated, yes, you can. However, there are currently two different MSI GTX 560 Ti OC cards on the market (the Twin Frozr II and the Twin Frozr III, the former being based on the regular 560 Ti with only 384 CUDA cores and 256-bit graphics memory bus, the latter with 448 CUDA cores and a 320-bit graphics memory bus). Between the two, go for the Twin Frozr III as the lesser Twin Frozr II (being based on the "regular" 560 Ti) can only achieve a score of 90 to 100 seconds (versus 60 to 70 seconds for the Twin Frozr III/GTX 560 Ti 448) in the MPEG-2 DVD portion of the PPBM5 benchmark even on a system with a heavily overclocked CPU. (This assumes that you're going to use the card in a system with an overclocked i7-2600K or higher CPU. If on the other hand you're going to use the new card in a system with only a limited-overclockable i5 CPU or an i7 CPU that's stuck at or near stock speed, then the regular Twin Frozr II would be sufficient as the Twin Frozr III's performance would not have been sufficiently faster in such a limited system to justify the higher price.)
    Remember, performance is affected not only by the number of CUDA cores, but also by the memory throughput. The latter is the very reason why the GTX 550 Ti is slightly slower than the GTX 260 despite both GPUs having the exact same number of CUDA cores (192, in this case) because 192-bit DDR5 memory (as used on the GTX 550 Ti) has slightly less total memory throughput than the GTX 260's 448-bit DDR3 memory.

  • Serial nos entry during production order confirmation in CO15 - User Exits

    Hi all,
    Is there any user exit existing for a serial nos screen pop-up during production order confirmation.
    Regards,
    Sravan Kumar V

    Hi,
    For serial numbers at the time of goods receipt, u have to activate sr. no. mgt for that particular finished product. This can be done by assigning sr. no. profile in the material master record of that material in work scheduling view. once this is done , system will automatically prompt for sr. nos at the time of goods receipt. I am not aware about any user exit.
    Thanks & Regards,
    Vijay Patil

  • Component / Semi Finshed rejection during Production

    How can we configure the following Business Scenerios :
    1. Material is Transfer to production floor with reference to BOM /  Production Order from main store
    2. During production - Some material is rejected because found faulty
    3. Rejected Material is sent to Quality for inspection ( the same material is inspected by the Quality at the time of GR ,but may be found faulty in production floor)
    4. Quality Department do the inspection and found some quantity may be used after some rework and remaining quantity is rejected and send to Main stores to return to Supplier
    Pl let us know the steps how this can be configure into the system.
    thanks
    harish

    Hi
    1. Material is Transfer to production floor with reference to BOM / Production Order from main store
    2. During production - Some material is rejected because found faulty
    Solution:Here for the rejected material take back that material through reversal movement type.
    3. Rejected Material is sent to Quality for inspection ( the same material is inspected by the Quality at the time of GR ,but may be found faulty in production floor)
    Issue this material to quality through transfer posting (from unrestricted to quality inspection) using movement type 322.
    4. Quality Department do the inspection and found some quantity may be used after some rework and remaining quantity is rejected and send to Main stores to return to Supplier
    Once it's cleared from quality department here create inspection lot & thorugh usage decision clear that stock as unrestricted stock & again issue that material to production.
    Regards
    Ravi Shankar.

  • Equipment as PRT's during Production Order Confirmation

    Hi Gurus,
    During Production Order confirmation I cannot see whether I have consumed equipments as PRT which are attached to operation.
    The operation is showing CNF status as well the Order.
    How can I see whether which Equipment was used for each operation since there can be more than one equipment as a PRT's for a single operation.
    Regards
    Nilesh

    I use Production Order confirmation hence saw it in CO14 and checked that PRT's are in PRT REL status..I guess this is what you mean to say right??
    Thank you so much for your response.
    Regards
    Nilesh

Maybe you are looking for