Split Allocation Date in production order

Hi,
I need to get the value of the field Date for capacity splits in production order but I don't know how to do it. I haven't found the sap table where this value is recorded.
¿Can you help me?
Thanks a lot.
Regards.

Ocr Cs,
Did you check KBED table if not found any can you please let us know data element name by clicking on F1 on same field?
BR
KK

Similar Messages

  • How to change operation dates in Production Order /Capacity Leveling

    Dear Experts ,
    We are using ECC 5.0 .In production order , scheduling happing as Backward  based on the Sales Order Delivery Date .I am doing the following :
    1.Demand as Sales Order with Delievery date : 20.03.2010
    2.Running MRP with Lead Time Scheduling -2  in md02 and converting the Planned Order to Production Order .
    4.Production Order have following dates :
             Basic Finsish Date : 21.03.2010
             Basic Start : the day Pl.Or--Pr.Ord
             Schedule Start : 15.03.2010
             Schedule Finsish : 17.03.2010
            Schedule Release : 13.03.2010
    5.In schedueling margin key :  Float Before Production : 3    , FAP : 3 , Release Period : 2
    6.In material master : Work Scheduling View : Setup : 3 days , Processing : 4 ,Interoperation : 2 for one Base Qty 1
    7.In operation : Op1  : Start Date  : 15.03.2010    Finish Date: 15.03.2010
                             Op2 : Start Date : 16.03.2010      Finish Date : 17.03.2010
                             Op2 : Start Date : 17.03.2010      FD : 17.03.2010
    Question :
    1.How to change the Operation dates  in Production Order Operation over view screen ? Today,  operation over view screen , Start date and Finsih Date  of individual operation are not changable with in Production Basic Start /BF date  or beyond .It is only changing based on the Standard Value : Labor
    2.How to change/re-schedule operation dates d in CM21 (Graphical view -Work Center Capacity load as per   Production Order and Operation combination ) based on capacity availale in advance dates? I am using  Time Profile : SAPSFCZ002 -SFC Graph midterm-3 motnhs and Planning  ,
    How to solve this above issue in scheduling operation and capacity distribution .
    Regards
    JH

    Closing the thread

  • How to get change date in Production Order ?

    Dear Friends,
    I want to know it, how to get change date in Production Order "Administration-TAB".
    F1-Help, It is displayed with "Change date for Order Master". and Structure table "CAUFVD".
    But, CAUFVD is not Transp. Table.
    Which table should I read ?
    Thanks in advance
    Yamazaki-H

    Dear Friend
    Thank you for an answer.
    It was settled.
    Best regards.

  • Batch Split during GR for Production Order Confirmation

    Hi All,
    We need to do batch splitting during GR for Production Order Confirmation.We are using CO11N for confirming the Production Order and in the PP settings auto GR is activated once the Confirmation is done.
    Currently it is generating only single batch number for the complete quantity, but our requirement is that we need that system should create separate batch for each piece.
    For ex.: Production Order is for 100 pce, when we do Production Order confirmation, system is automatically doing the GR by 101 movement type and it is creating one single batch for full 100 pce. But we want the batch number should be generated for 1 pce i.e. we want to split the 100 pce into 100 batches with 1 pce each.
    Please let me know what can be done for this requirement.
    Regards,
    Ankit

    Dear,
    In OPK0 you need to active the screen Mill: Goods Receipt (8485) for confirmation profile for the single-screen entry.
    Best way is use BAdI /SAPMP/SPLIT_CO11N for the Enter Time Ticket for Production Order transaction (CO11N)
    you must activate BAdI implementation /SAPMP/SPLIT_POPUP and/or /SAPMP/SPLIT_CO11N for this BAdI
    I have use the same BADI it will ask you number of split according to that it will split the GR line item.
    Please refer this link,
    http://help.sap.com/saphelp_dimp50/helpdata/EN/4e/1796374b088e5ce10000009b38f8cf/frameset.htm
    Regards,
    R.Brahmankar

  • How to collective read PP master data in Production order?

    Hi: Guys
    Please tell me how to collective read PP master data in production orders. in COHV, I can find out some collective functions but read PP master data.
    Thanks
    Henry

    Read PP master data is only to update routing and BOM in production order if it is already created to effect the changesmade in routing and BOM.    I think in that collective option is not possible.  
    Regards
    KrishnamurthyDSS

  • Bapi for update Master Data in Production order

    Dear All ,
        I am working in a car manufacturing company here production order is made month wise planning qty , but every day its Bom is get changed by Autocad/PLM interface and all changes are being recorded through ECN .
       I have to  generate daily reservation for assemblies for a perticular finish vehical ,so I need to update the Masterdata in production order no through the PLM( VB platform) interface .
      So please suggest me any BAPI so that I can update the master data regular basis in monthly production order  or if you have any better way to map this process into SAP please suggest .
    Thanks in advance .
    regards ,
    Pralay ..

    Not sure what master data in production order you want to change. Anyway if it is at header level, then evaluate BAPI - BAPI_PRODORD_CHANGE.
    Alternatively evaluate the usage of Order Change Management if it is feasible in your solution. Do a search in this forum you will find many threads on it, also read SAP help & do a test a test in your sandbox. If you face a specific issue then do revert

  • Splitting the cost of Production Order

    Hello Sapians,
    We have a situation where a purchase order has all of its costs going to one production order but the services provided
    on the purchase order were actual for three production orders. What is the process for adjusting this amount for the
    production order costing?
    For example, PO number is 10001 and this is currently all being charged to production order 60003. I would like
    15000 USD be moved to both production orders 60001 and 60002.
    Do we have any process of splitting the amount to two different Production Orders in SAP?
    Thank you,
    -Harter.

    Hi Ajay,
    I checked the Order and there are some actions after the Production Order is settled.
    For example: The Order got settled twice in 12/10/2010 and 01/31/2011. And the Variance was there when settling the Order second time and it was also settled on 01/31/2011.
    There are some operations that are on the Production Order before and after the second settlement dates. Even after 01/31/2011 month's settlement I can see some charges on the Production Order from the operations (Subcontracting, Overhead PRD, Personnel Hr)
    My questions and doubts are
    1. Do I need to reverse both the months settlements?
    2. What are the impacts of the reversing the settlements on the other operations that were executed before and after the Order is settled? (Operations are Subcontracting, Overhead PRD, Personnel Hr).
    Thank you,
    -Harter.

  • Retstriction of confirmation dates in past dates in production order

    Hi All,
    I have a issue with dates
    In our system production orders are created in advance at once in mass...suppose a production order is having start date and end date as 01.08.2014 and 07.08.2014. Now user taking this production order and proceeding with manufacturing execution in today's date say from 23.06.2014 to 30.06.2014 without  changing the production order planned dates ( basic dates  and scheduled dates ).. after completion of production they are confirming with actual dates as explained from 23.06.2014 to 30.06.2014...
    Now situation is like this...Now this is very difficult to explain to auditors..is there any way to prevent this through customization.
    Thanks
    Kumar

    Kumar,
    The user exit CONFPP04 can be helpful to check the details during order confirmation.
    Also implement OSS note 1523641 first (http://service.sap.com/sap/support/notes/1523641) if you go for this enhancement.
    Best Regards,
    Rajen

  • Change Mrp Element Data of Production Order in MD04

    Dear guru ,
    In the mrp element data of the stock/requirement list for the production order I see the
    Production order number , the order type , and the system add /RE if production order is released or
    /PD if production  order is partial delivered. No other information about others production order status.
    How can I change mrp element data using Customizing or ABAP in order to recognize in MD04 if production order is confirmed or partial confirmed ?
    Thanks.

    Dear Cris ,
    I am not sure if CNF/PCNF will show up in the MRP Element data in MD04.I have checked PO which are also CNF/PCNF and i looked the same order in md04.It is not showing .U may need some ABAP help .
    But if you really intersted to see the list PO status together , then go to COOIS and give plant , order type .It will give you all the order under that plant irrespective of material and also Status.U ave lot of option to filter the PO status under Status Profile or System status ok.
    Hope this will fullfill your requirement
    Reward point if useful
    Regars
    Jia

  • How to get the finished date of production order

    hi guys
    now i want to get the finished date of production date.  when i search in the table afko , i found the field GLTRI is '0000.00.00'.
    BUT IN the production order display view , the confirm date is '2007.1.1'. so how can i get the confirm date with the production order number? thanks.

    For costing report, you have to read the following tables: based on material Qty/value/ Machine rate and machine posting date , machine rate ( T-code kp26)  and also types of material Raw, finished and semi finished ..
    AFRU ,AFPO,AFKO,AFVV,AFVC,CAUFV FOR PRODUCTION ORDER.
    For material calculation MARA, MSEG and MKPF as well as MAKT...
    Hope this’ll help you .
    Thanks

  • User Exit: Saving data in Production Order Header Long Text

    Hi PP Gurus,
    Can any one let me know which user exit can be used to save some data in the Long Text of Production Order Header.
    We try PPCO0007, it works well on ECC, but my client's system version is 4.7, it does not work.
    In 4.7 version, is there any other User Exit or BADI can be used to comply with this requirement?
    It's quite common requirement, hope someone can help me. Thanks.
    Best regards,
    Sun Qiang

    Hi All,
    Thank for your reply.
    After saving the text using 'SAVE_TEXT' function module and commiting it you need to update the 'ltext' field in AUFK table.
    SELECT SINGLE * INTO wa_aufk FROM aufk WHERE aufnr EQ '000012345678'.
    wa_aufk-ltext = 'D'.
    MODIFY aufk FROM wa_aufk.
    It works in Enhancement PPCO0007.
    This call can be closed. Thanks.
    BR
    Qiang

  • Actual Finish date in production order

    Hi All
    Iam using AFKO-GLTRI  ( ACTUAL FINISH DATE) field in some Z-report.
    Iam having only one operation in production order which does not have AUTOGR key.
    Iam using serial number and doing GR through migo.
    Date in AFKO-GLTRI  field does not get populated when i do partial or final confirmation with full yeild. -- WHICH Standard SAP and right
    After final confirmation when i do goods receipt then i can able to see Actual finish  date in CO03  screen but it is not available in AFKO-GLTRI.
    If i do partial confirmation With or without any hours after  GR then   Date gets populated in AFKO-GLTRI.
    Please can you guide why date is not appearing in AFKO-GLTRI when I do GR --  iam missing any config ?

    you probably can use the AFRU-IEDD (Confirmed date for execution finish).
    the logic could be - look at all confirmations(or just one) and get the last one.

  • Batch processing function to read PP data for production orders

    Hi,
      As we know, If BOMs changed we can use T-code: CO02, then follow the menu "Function --> read PP master data" to get up-to-date BOM. But If there're many production orders need to be read PP master data again, I have to do it one by one.
       My question is, If I have a list of production orders, could I do it in batches? and What's the transaction for it?
    Please kindly Advise.
    Best Regards.

    Hi,
      As we know, If BOMs changed we can use T-code: CO02, then follow the menu "Function --> read PP master data" to get up-to-date BOM. But If there're many production orders need to be read PP master data again, I have to do it one by one.
       My question is, If I have a list of production orders, could I do it in batches? and What's the transaction for it?
    Please kindly Advise.
    Best Regards.

  • Data for production order

    hi all,
    We want to get the classification(configuration)  data from the production order.
    We are presently using VC_I_GET_CONFIGURATION and passing the instance as CUOBJ from AFPO. But the data we get is from the sales order.
    Require help as to waht instance to pass to get the data from Prod Order and not from sales order.
    any pointers???

    I make a sales order first -
    XYZ
    Then i make a prod order with reference to sales order -
    ABC
    The CUOBJ -
    LMN is same for both the orders in AFPO and VBAP
    I go to VC_I_GET_CONFIGURATION and pass LMN and I get the charac values.
    Now i change the sales order. I get a information message that a prod order is already available, but the system allows me to change the configuartion values
    Now, the config values are different in sales order and prod order
    I want the details from the prod order, but since the CUOBJ is same- when i run the FM, i get the changed values from the sales order
    I need the previous unchanged data from the prod order and not from the sales order

  • Update of Sales Order Delivery Dates from Production Order Date Changes

    I work at a discrete made-to-order manufacturer. 
    When our factories maintain their production orders, they will often have to change their order dates.  Is there a way so that these changes can automatically update our sales orders so we can re-send sales order confirmations?

    hi,
    this comes under development part.
    please check the feasibility with your abaper because you will have to change standard code.
    regars,
    balajia

Maybe you are looking for

  • Open production orders and its costs migration

    Hi All, We are migrating open production orders from legacy to SAP. We have some standard cost production orders are open in legacy and like to migrate a open production orders to SAP? May I know how can I do from controlling point of view? I have on

  • Adding Address to Fios Availabili​ty

    I know for a fact that Fios is available in Huntington Beach, CA where I live. I have talked to a couple of neighbors who have it installed and have even talked to techs I have seen on site at my neighbors place. I have called Verizon a long time ago

  • Visual Composer Control - Dropdownlist

    Hi SDN, <b>Iam trying to display details from an RFC(R3 System) in a dropdownlist in the output form of Visual Composer. I don see this dropdown control other than buttons, text and time controls. How to achieve such functionality in VC? Thanx & Rega

  • C2 223 A valid bill of material could not be found for material 5089

    Hi Experts I have Production orders that use a phantom material 63955 with Std costing control.  This material uses three materials (5089,5233 & 5235) of moving average control. Material 63955 is a HALB and uses all the numbers 5089,5233 and 5235 whi

  • Where to get Ora 8 for redhat 6.2?

    Hi I am a beginner for linux and now having redhat 6.2 installed on my PC. Does anyone know where to get the download of Oracle 8 for redhat 6.2? Thank you for your help! Rick