Split Single Server Installation into two servers...

Hello everyone,
We are using OCS 10.1.2.3, SO Linux RHEL 3. We have the infra and apps in a single box installation. All in one and we are using all Collaboration Suite services except Wireless.
We are having a huge performance problem in there. After we start to use Content Services, our Infra Database is growing 10 Gb per month and the app tier is consuming all RAM memory from the server.
So, we are trying to separate the Infra tier from the App tier, in two servers, but we can't find anything, any docs, any articles, any metalink notes, nothing at all!
So, my question is:
* Anyone has been through the same situation?
* Is actually possible to separate the tiers after one year running both tiers on the same server?
Thanks in advance,
Paulo.

We have moved our database to new hardware - so I know that portion is possible. We had the two databases for our ocs install in the same RAC environment. We had 3 sets of servers for our install 2 OCS App nodes, 2 IdM nodes, and 2-node RAC DB (holding 2 databases). We moved the IdM databases to a new RAC environment to allow IdM nodes to be up when we need to perform maintenance on OCS App/RAC nodes.
Moving the database required only an update of TNS and OID information that pointed which hosts held the database.

Similar Messages

  • SharePoint Server 2013 single server installation licenses and system requirements

    We are thinking of setting up a SharePoint Server 2013 for the following features to be accessed by our test team (<100 users)
    Our requirements are as follows - 
    Total user access <100 users(starts with 50 and may be go upto 100)
    Mainly Access to TeamSite(Document library), WiKi, BI reports view(SSRS Reports integration)
    We have a Visual Studio Ultimate license that covers SQL Server 2012 and Share Point server 2013.
    We have also got a Amazon EC2 machine access to create a Xlarge box with Microsoft recommended Cores, Memory, storage for SINGLE INSTALLATION of SharePoint Server 2013 and SQL server database on Windows Server 2012 
    My queries are as follows
    Are the licenses above sufficient to go ahead with setting up the SP Server? or do i need any other licenses ?
    I would like to create local LDAP in amazon without connecting to the company active directory. Would this be possible? We have users from other locations(different countries) providing services to our company and we would like them to access this portal
    to share and access docuemnts without any network issue etc..
    Are there any known firewall issues with EC2 machines for share point deployment
    System requirements for single server installation (with or without BI reports)
    Please note this implementation is only for internal use by the test team and is not critical. Not a production implementation. 
    Is there any better solution?
    Much appreciate your help 
    Thanks
    Vara

    MSDN subscription licenses for SharePoint aren't, as far as i know, for use as production devices. This means that whilst you can use it for testing and development you can't use that license for the SharePoint server that you'll all be using.
    As such I think you will need to buy a SharePoint 2013 server license. The same goes for SQL, Windows etc.
    There is also the question of user licenses, ie. CALs. I don't remember if those come included as part of an MSDN subscription.
    2) Possibly. As long as Amazon can host a domain for you it should be possible.
    3) Pass. Microsoft prefer you to use Azure and most of my training and experience is with that.
    4) High. 4 cores, 24GB of RAM minimum.
    http://technet.microsoft.com/en-us/library/cc262485.aspx#hwforwebserver
    You'll either need a 2XLarge or a memory orientated box, in which case you won't have much storage space.
    Internal team infrastructure is still important. If you're using it enough to make it worth having then you need it there and running.
    Have you considered using Office 365?

  • Split one salesorder item into two items in delivery

    We want to split one salesorder item into two different items in the same delivery.
    This is because we will pick the material from two different storage locations.
    Any user-exit to use for solving this?
    Best regards,
    Terje

    Hi,
    We are not using batch management.
    I have looked into the foreign trade/customs standard functionality in SAP, but I can not see that them difference in stock in SAP what is duty paid or not.
    We need to have documentation in the system for the custom goverement for what stock is duty paid and not.
    For the same material we can have stock which are duty paid and not duty paid. This is decided when we do the goods receipt.
    For stock coming from Asia, it is profitable to have this on not duty paid stock since we are exporting it back to Europe and Asia later.
    We will send import and export EDI messages to a third party custom application handling all the papers with the custom goverement.
    The only we need to make track on in SAP is the stock for what is duty paid and not.
    In some situations we need to take stock from both duty paid stock and not duty paid stock when we deliver the same material to a customer. Therefor I asked the question of splitting one delivery item into two items.
    Best regards,
    Terje

  • Split single line entry into mutliple table entries using BODS.

    Hi All,
    I have a question on how to resolve splitting a single entry input into mutliple line entries using BODS.
    Example we have Column 1, Column 2, Column 3 and the output will have 3 lines with Line 1 value from Column 1, Line 2 value from Column 2 and Line 3 value from Column 3?
    Is there a loop that can be utilized inside a Data Flow?
    What I had thought of is current using a CASE and a MERGE to resolve this.
    Are there a better solution to this?
    Thanks,
    Tim

    Hi Maurice,
    Thanks for the reply. It's more based on a condition so say if column 1 has a value, then you get row 1 created, if column 2 has a value then only row 2 gets created. Also, the source table contains multiple columns and not all will be pivoted into rows, just a certain particular columns.
    Anyway, i had resolved this at the moment via CASE to split single row input into individual Queries and MERGE them back creating multiple rows.
    Would like to know if anyone has a better 'performance wise' solution.

  • How to Split Single Outbound Idoc into Multiples

    Hi guys
    Hope you all are doing good.
    Can you please let me know , How to Split Single Outbound IDOC into multiples.
    I am looking for some sought of configuration in IDOC/from SHIPMENT Configuration level.  Because this needs to be implemented for Shipment IDOCS.  Please let me know if this can be done through configurations apart from implementing  User exit or copying the outbound shipment function module.
    Awaiting for your valuable replies.
    Best Regards
    Shiva

    Hello,
    1. Routes
    2. Packaging used
    3. Shipment Type
    Regards
    Waza

  • ZENworks Single Server installation error

    Hi.
    I have a problem during the single server installation.
    Let me tell you server status.
    Server OS: MS Window server 2003 Enterprise
    SQL: MS-SQL 2005 Enterprise edition.
    with IIS and Active Directory.
    Error message show like this
    "Couldn't replace ~DSDATAFOLDER~ with "E:\Program Files\Microsoft SQL
    Server\MSSQL.1\MSSQL\DATA" in file Scripts\SQL_PSTOKEN.sql(error code -2)
    Would you let me know if you know how to figure out this?

    Originally Posted by lanoxox
    I have changed the installation procedure that was "distributed setup" in the CD.
    There was error during the "Policy Distribution Service". the message is
    "The Database STDSDB exists,but the password you entered for user account "DS_STDSDB_USER" is incorrect ,Try another passwor?"
    I could not go forward after this. and there was no account for "DS_STDSDB_USER"
    in the SQL Server. I think it could not create this account.
    Hi, how did you solve this? the TID doesn't solve this error.
    Regards.

  • How do I split up a project into two or more projects?

    How do I split up a project into two or more projects?

    Select the Images you want to put in the new Project and then run "File➞New➞Project" and check "Move selected items to new project".

  • Splitting my Adobe ID into two accounts / transfering registrations

    How can I split my Adobe ID into two accounts, and transfer registrations from one to another?
    Background: our company has split into two companies.

    You'll need to contact web chat:
    Adobe ID, sign in, and account help

  • HFM and Database single server installation

    Hi Everyone
    I am trying to install HFM, FDM, HFR and database on single server (64bit 2008 R2 OS), I started with installation of 64 bit database(v11g Release2) which I have installed in my D drive rest everything remains at default path. Installation completes successfully, also I am able to login into the database through SQLPLUS.
    Then I start my installation for clients which I am installing in c drive, installation of 32 bit client is successful and when I try to login through that client I am not able to login(TNS Protocol error).
    Moving ahead with the installation of 64bit client, I am not able to install since it throws me an architecture error "Actual Value 32bit and Expected Value 64bit" if I install 64 bit first and then the 32 bit everything goes fine but I am only able to connect through 64 bit client and not with 32 bit.
    Now I have few questions here..
    1) Can I install database, HFM, FDM, HFR on single server (11gR2 and v_11.1.2.1) if yes what is the correct way???? Installing database first and then clients and then 11.1.2.1??? or what????
    2) Why does it throw me an architecture error while it recommended to install 32 bit first and then 64 bit??????
    3) If I install 64bit client first and then 32 bit I am able to make connectivity to database only from 64 bit so in that case after installing the suite I should run HFM atleast but I am only able to run it once the moment I take a restart of server everything goes down with "Apache bridge error" and then the 404 forbidden error.
    If any one can guide me with proper steps for database installation and clients that would be great!!!!!
    I am installing foundation services first then HFM followed by FDM and HFR.
    Regards
    Vikalp

    The following blog post might help you:
    http://blogs.technet.com/b/dpm/archive/2014/09/29/support-tip-dpm-2012-r2-ur3-agent-install-fails-with-error-0x80070643.aspx
    Regards, Trinadh [MSFT] This posting is provided AS IS with no warranties, and confers no rights. If you found the reply helpful, please MARK IT AS ANSWER. Looking for source of information for DPM? http://blogs.technet.com/b/dpm/ http://technet.microsoft.com/en-in/library/hh758173.aspx

  • SLT - Splitting one source table into two tables in the destination

    Hi,
    I am wondering if we can split content of one source table into two different tables in the destination (HANA DB in my case) with SLT based on the codified mapping rules?
    We have the VBAK table in ERP which has the header information about various business objects (quote, sales order, invoice, outbound delivery to name a few). I want this to be replicated into tables specific to business object (like VBAK_QUOT, VBAK_SO, VBAK_INV, etc) based on document type column.
    There is one way to do it as far as i know - have multiple configurations and replicate to different schema. But we might have to be content with 4 different config at the max.
    Any help here will be highly appreciated
    Regards,
    Sesh

    Please take a look at these links related to your query.
    http://stackoverflow.com/questions/5145637/querying-data-by-joining-two-tables-in-two-database-on-different-servers
    http://stackoverflow.com/questions/7037228/joining-two-tables-together-in-one-database

  • How to split a PE1 project into two smaller projects?

    I have a 1hr 36 min. project in PE1.  I want to split it into two different projects of about 48 min. each and burn two DVDs.  My intent is to get a better MPEG resolution for these smaller projects.
    Can I select half of the timeline, cut it and paste it into a new project?  Would the effects be preserved?  I have a week of work invested in this project and I don’t want to screw it up!
    Thanks
    Fred J.

    FredJ,
    Welcome to the forum.
    I agree with both Neale and Steve, though it might at first appear that they are saying two different things.
    The bit-rate in the Transcoding to MPEG-2 will be determined by the Duration of the Timeline and the capacity of the blank media, whether DVD-5, or DVD-9. In most versions of PrE, this bit-rate will be a function of the Quality Slider, but the ultimate bit-rate for the combined video and audio is set in the DVD-specs. One cannot exceed about 8 b/s.
    Now, with your Duration, there might be a very slight increase in the bit-rate, were you to take Neale's advice and break your Project into two parts, however, I think that his advice to study the result of your entire Timeline is good, as I doubt that one could tell the differences, unless you have a great deal of fast motion, of either the camera, or the subject, and then it's likely that the quality would appear to be the same to the human eye.
    Steve is correct in that the result will have to be within the DVD-specs, and will only be 720x480, at up to that max. bit-rate. That is as good as it gets.
    For the ultimate test, I would take Neale's suggestion on Burning to Folder one step further. Once that is done, you can first test your Project with a DVD software program on your computer. BUT, be aware that you are viewing on a higher-rez, progressive computer monitor, and its rez will exceed that of a TV and that of a DVD-Video disc. Thus, it is not a perfect test. To get an idea of how the DVD will look on a set-top player, hooked to a TV, you can either, also burn to a DVD RW (rewritable disc) to test on a set-top player, or you can use the free burning utility, ImgBurn, to burn to a DVD RW and test. The reason for the Rewritable media is so that you can reuse it for testing. You will NOT be using this disc for delivery, but just for testing. Now, if you feel that very slight decrease in bit-rate is noticed, you can go back to his suggestion on how to split the Project, and then produce a multi-disc. set for the Project.
    Also, the ultimate quality and also playability of the DVD-Video will be enhanced if you use quality blank media. I strongly recommend Verbatim, or Taiyo Yuden blank media. Brands like Memorex, TDK, recent Ritek and ALL "store-brands," are to be avoided. One is also best served by buying slower speed media, as PrE will measure the speed of the media and the speed of the drive and try to get you the fastest possible burn. It does not allow you to set the speed of the burn manually. Most people feel that stepping down from a max. burn speed produces a better DVD. I routinely will drop the burn speed (in other software) to about 1/2 of the max., and have had thousands of perfect DVD's. One can set the burn speed in the above mentioned ImgBurn utility.
    To distill the above: try it and see if your Project isn't perfect now, and if not, then break it apart into two segments. I doubt that you could tell the difference.
    Good luck,
    Hunt

  • How do I split one Apple account into two accounts?

    I have 2 iphones using one Apple ID.  The apps are completely different on the 2 phones (wife's stuff, my stuff).  I would like to split them into two Apple ID's so I can keep them completely separate.  Any ideas?

    Sorry, but there is no way to "move" an app from one iTunes Store account to another.
    Regards.

  • How to split the AP invoice into two invoices

    Dear All..,
    Can you tell how can i split the AP vendor invoice which i was posted erlier..i want spil the invoice into two invoices to pay the partial payment to some amount..
    For ex : i have poste one invoice with 50000/- rs..and now i want to split this doc into two like 30000 and 20000, and i want to made the payment for through APP for 30000..
    Can you tell me the step how to do this..
    Advanced thanks
    Bhargav

    If you reverse the original vendor invoice ( credit memo), you can create a new vendor invoice by splitting the amounts with different payment methods. This way APP will pick up only required amount.
    Amount split in vendor invoice can be done by activating "Enable amount split" in OBY6 configuration. This will give you an additional tab "Amount split" in vendor invoice.
    Hope this helps
    Thanks,
    Kalyan

  • Split one column value into two columns using t-sql

    Hi All,
    I have one varchar column in a table.
    Col1
    ABC-12C4
    BC-A345
    CD
    XYZ
    How to split this into two columns like this using t-sql
    Col1   Col2
    ABC    12C4
    BC      A345
    CD     
    XYZ
    Thanks,
    RH
    sql

    assuming a static delimiter, and the split will end up with a max of 2 columns, something like this would work.  basically you just need to determine where the delimiter is, and then use the left and right functions to find the 2 pieces.
    declare @t table(value varchar(10))
    insert into @t(value)
    values
    ('ABC-12C4'), ('BC-A345'), ('CD'), ('XYZ')
    select
    case
    when charindex('-', value) != 0 then left(value, charindex('-', value) - 1)
    else value
    end as col1,
    case
    when charindex('-', value) != 0 then right(value, len(value) - charindex('-', value))
    else ''
    end as col2
    from @t

  • Split ALV Column heading into two

    Hello All,
    I have a ALV Column Header - ALV LIST - SAP 46C.
    Material   |  Info Type |  Quantity |  Price etc..
    Due to space contraints and other reason client needs to split the Info type column into two.
    Material   |  Info  |  Quantity |  Price etc..
               | Type   |
    The data records should not have any additional blank lines.
    How to achieve this?
    Thanks,

    You have to assign X to layout property no_colhead.
    Then write your heading using write statements.
    Here is the exact example you are looking for [Create Multiple Lines Header In ALV List Report|http://www.freesaptutorial.com/create-multiple-lines-header-in-alv-list-report/]

Maybe you are looking for

  • How do you use forward and back button on mouse and use "zoom" in web browser.

    Ok so apparently this forum is ruled with an iron fist or something my very honest and truthful problems with these issues seem to have been instantly deleted in my last discussion? I'll try this once more. 1) How do you use the forward and back butt

  • Getting [Microsoft][ODBC SQL Server Driver] Optional feature not implemented

    I am using below mentioned code to insert values in MSAccess 2000 which having table structure as mentioned below:- Field Name Data Type TodaysDate Date/Time Cart ID Number Client Name Text Campaign Text Team & Segment Text Duration Number Tape ID Te

  • New MacBook bought. Auto upgrade to Maverick when released?

    I bought my MacBook Air 3 days ago and it is running mountain lion. I have heard Apple provide a copy of the new OS if they are released shortly after the MacBook is purchased. Will I get a copy of mavericks when it is released?

  • Problems with using whiteboard in flex 4.

    I recently ported my app to flex 4 using spark components. The SharedWhiteboard has stopped working correctly. There are 3 specific problems:      1) I'm unable to change the color of a line or shape. It throws an exception in the debugger. It looks

  • What's all this then?

    Recently, I decided to empty the Trash and found 501 folders which contained files such as:- annex_aux annex.db filetoken.db FondResourceCache fonts.db Local.fcache qdfams.db System.fcache and User.fcache I'm new to computing and don't know what they