Split the material cost into labor and overhead costs

Hello Experts,
We get Finished Goods from another plant and that plant is not on SAP. So we load these materials as Finished Goods and enter the price in the costing tab and we do run cost estimates. In the cost estimate we see this price as material cost. How can we split this material cost into material + labor + over head costs? Is there anywhere we can enter the percentages that would split the total price into material and labor and overhead prices? I appreciate your time and response.
Thanks In Advance

HI Venkat,
You can only split material cost using origin groups and not into material, labour & OH as you may know the cost components are grouping of cost elements (with an option to use origin groups).
If this is too important for you to maintain that cost component split, then I see the only way is to consider maintaining quantity structure in SAP for the finished product, so that cost roll up happens with cost components.
Hope this helps.

Similar Messages

  • How the Material costs and Overheads flow from Logistics to COPA

    Hi,
    I know that Revenue will flow to COPA from SD Condition types which we assigned to value fields in KE4I.
    But i am not clear how the Material cost will flow to COPA?
    How the Overheads will flow to COPA?
    Kindly help me in understanding the flow...
    Thanks
    KB
    Moderator: Please, read available SAP material for basic questions

    Hi,
    check this link:
    http://help.sap.com/saphelp_erp60/helpdata/en/7a/4c48c64a0111d1894c0000e829fbbd/frameset.htm
    Go to: "Flows of actual values" to get the big picture of CO-PA value flow.
    best regards, Christian

  • Mock costing run not updating with recipe changes to labor and overhead

    We have made changes to the labor and overhead values assigned to a master recipe.  We are trying to determine what the new standard cost will be when we do our costing run at the end of the the month.  However,  when we do our mock costing run using CK40N it does not reflect the changes we made to the labor and overhead it still pulls in the old values.  We have tried this in our test system on several other products and it has worked for some materials but not others.  I don't think it matters but the material we are costing is a semi finished good.  Any ideas?

    Problem has been resolved.  Thank you!

  • Split Valuation Material Cost Estimate into COPA

    Hi all,
    Is there any way how we can transfer the split valuation material cost estimate into COPA?
    I checked the actual line items, there is no "valuation type / batch" characteristics there.
    Is this the main cause?
    Please kindly suggest on the best way to solve this issue
    Thank you very much
    Regards, Erwin

    Hi, Ajay
    Does this mean that, even though i manage to create the valuation type as characteristic in COPA, i won't be able to get 2 different cost estimate based on valuation type into COPA?
    Hm, then, are there any solutions which can be done to solve this issue?
    The client needs a COPA report which can show the breakdown of the sold materials cost estimates
    As usual, thank you very much for your help
    Regards, Erwin

  • How to add the purchasing overhead costs to the material costs

    Hi,
    I have a requirement to add the purchasing overhead costs like transportation costs to the material costs so that the costs is added to the material costs and update my material price accordingly.
    Can u tell me how to do it for both standard price and MAP price?

    Hi,
    Please attach a accrual key in customization (Pricing procedure) to the overhead condition type you use.

  • Excise Duties should be added to the material cost

    Hi all,
    Here my Client place comes under excise exception.  Here they are not going to avail excise credit. Also there is no utilization.  If the material is procured from outside then the vendor will charge the excise amount as he comes under excisable place.  So in this case my client wants to track the excise duties paid on the materials and they want the register updation also. Meanwhile they want the excise duties to be added on the Material cost. So I have maintained J1ID settings for the materials & vendors also I have maintained FV11. Here in this case the excise duties are not adding up to material cost.
    For Ex: I am procuring a Material ABC from a Vendor. My PO price will be 100.
    Qty=1EA
    PO Price=100
    BED=16
    Ecess=0.32
    SEcess=0.16
    In Normal case my Inventory cost of the material will be 100.
    In this case my client wants to be 116.48 should be the material price and at the same time the 16,0.32&0.16 should post to the respective CENVAT Clearing account at the time of MIGO & MIRO.
    Can anyone please suggest me how to handle this issue?

    hi Manju
    As i understood that your plant is in the area which is under Tax exempted. See you have two option from excise point of view.
    1. Either mantain the conditions through FV11 and call the same in your PO through Tax code and country combination.
    Mantain the J1ID and manatain material chapter id combination material type and the no of gr and credit allowed it will hit your excise register in migo while you do GR as per the material type mantained in J1ID. But here you cant add the duty amount to be get added on Material Value.
    2. You mantain the condtion in the FV11 go for key combination tax code and country, inventorised condition type for   eg JMIP inv BED condtion mantain the desirable rate their which would be 14% from now. Create PO with the suitable tax code and mantain J1ID AND DO THE GR IT WILL GET ADDED TO YOUR MATERIAL VALUE.
    Also if you cant avail the credit on the output material you cant accumalate credit in your register also accumulated credit can't be carry forward in the next financial year.
    Reward if usefull
    Regards
    Sujoy

  • Freight not to be loaded on the Material Cost in Purchase Order

    Hi,
    For Purchase Order, we want to configure a scenario where in we want the freight not to be loaded on the Material Cost.
    Where need to change in the configuration do achieve the same.
    Please guide.
    Regards,
    PK

    HI PK,
    1. New condition type to be created by copying the standard condition type FRA1/FRB1/FRC1
          New condition type ZFR1 created by copying FRA1 - M/06.Accrual flagged in this condition type same as FRA1 and Condition category of the new condition type should be Blank and maintain X-Negative value in the plus/minus field. Accrual must be flagged.
    2.New account key ZR1 created
    OLME -- >conditions -- >Define pricing Determination process -- >Define Transaction/Event keys
    3.Assign this condition type to pricing procedure - M/08 .Also assign transaction key ZR1 .
    80     1     FRA1     Freight %     70             X                              FR1
    80     2     ZRA1     Freight  in spl GL     70             X                         FRE     ZR1
    4.GL account maintained in OBYC for this new account key -ZR1
    Maintain same conditions for FRA1 and ZFR1.
    5. Goods receipt debits freight amount to separate account
    Inventory Acct -  100 Dr
    GR/IR - 100 Cr
    Frght Clr Acct - 20 Cr
    Frieght payable - 20 Dr
    6. At the time of MIRO
    Vendor - 120 cr
    GR/IR - 100 Dr
    Frght Clr actt - 20 Dr
    Hope Help U !
    Regards,
    Pardeep Malik

  • Stock Transfer Order - Post freight cost in diff. G/L of the material cost

    Hi Friends,
    I created PO (stock transfer Plant to plant). In condition I added
    standard price and Freight cost. When I received material in
    receiving plant the freight cost was added in total stock valuation of
    receiving plant.
    In Plant to Plant transfer I want to see only stock value without
    freight cost in receiving plant. We want freight cost in other G/L different of the material cost.
    Best Regards,
    Edgardo Delgado

    Hi
    Futher to Imdarpan statement, normally we will have different pricing procedure for STO's for the reason you are mentioning with this procedure for freight you can define acct key & accrual if reqed seperately & while posting respective documents it will not go to material cost it will get accounted in different G/L account.
    If you are not maintaining accural tick in condition it will get added to material cost, just maintain this in freight condition.
    Regards

  • Post freight cost in diff. G/L of the material cost Accnt Cat. E

    Hi MM experts,
    I created a PO in reference to Sales Order (account assignment E-Trading materials)
    In condition I added a custom condizion for freight (SPRO Cond.category B, flag on accruals).
    When I received material the freight cost was added in total stock valuation.
    Account    Account short text             Amount Trs
    174020     STOCK M  VENT DIR                 576,03     BSX
    319500     FACT/REC                                 476,03-    WRX
    171090     Cte pass.stock march               476,03     EIN
    171090     Cte pass.stock march               576,03-    EKG
    422000     TRANSPORT                             100,00-    Z03
    319500     FACT/REC                          100,00     ZMA
    I want to see only stock value without freight cost in G/L account. I want freight cost in other G/L different of the material cost.
    I expect that the result is as follows:
    174020     STOCK M VENT DIR                  476,03     BSX
    319500     FACT/REC                                 476,03-    WRX
    422000     TRANSPORT                             100,00-    Z03
    319500     FACT/REC                                 100,00     ZMA
    Is there any other way to avoid this problem?
    Thank you very much.
    Regards,
    Michela

    Hi Michela,
    This is possible by adding one more condition type with blank condition category and negative value in plus/minus field.
    please refer the following wiki which gives step by step configuration.
    Appreciate if it is useful
    http://wiki.sdn.sap.com/wiki/display/ERPLO/PostingplanneddeliverycosttoNon-inventoryaccount
    Edited by: Raja Ramasamy on Apr 14, 2010 7:20 PM

  • How to the *material costing* after below steps

    Hi sapgurus
    please help us,
    How to the material costing after below steps
    1.     Actual costing /material ledger
    2.     Material update
    3.     Actual costing
    4.     Production start up
    5.     Customizing setting in OBYC
    please sent to any documents.
    Thanks & Regards
    Sri

    Dear Friend
    A sales order is created say order no 10000 and for material X say 10 units this order is delivered and PGIed and invoiced and the payment too has come
    That means the order 10000 is closed
    Case 1
    Now an user goes to VA02 t code and put this order no 10000 and changes the material X qty from 10 to 12 and opens up the whole order once again
    This can be controlled by using t code OVAH choosing message class the V4 message no 083 and change from warning to error
    Case2
    But to avoid the user to add material Y to the existing order say 10000 then i think we have to go for user exit
    Because the system doesnot even throw a warning message too in case 2 (according to my knowledge) and allows another line item to be added in the same order
    But you can test it if it throws any warning message we can try to convert that error
    But in case 2 it is not happening(even warning is not there)
    Regards
    Raja

  • Charge the material cost to another activity

    Hi all,
    How it is possible to charge the material cost to another activity?
    The material has GR for the activity A but we require the cost in the activity B (Activities are in same network)
    Is it possible to charge the material to this activity (Without PR creation).
    Regards, Madhusudan Patil

    hi,
    txn kb15n select the scrn var as wbselement/network and enter the sender wbse,network,activity no,costelement and amount.
    enter the data for receiver also. with this you can transfer the material cost from one activity to other.
    regards,

  • KSII - Trying to split the activity price in fix and var

    Hi gurus,
    does anibody know if is possible calculating the actual activity price split in fix and var?
    I know the percentage in which i'd like to split the price, for example 75% and 25% for Cost Center Group XXX; 60% and 40% for Cost Center Group YYY and so on...
    Is it possible to do something in the system in order to obtain the price split?
    As it is now, the price is all fix.
    Thanks,
    Enrico

    Hi Enrico
    It is possilbe... For that you need to plan costs in KP06 like that.... i.e. You need to do activity dependant planning in KP06 so that you will be able to enter Plan values - Both Fixed and variable
    You would agree that Act Price is Plan Cost / Plan Qty... So, the Numerator i.e. Plan Cost has to be planned as such in order to get the output as fixed and variable price
    Thats the only possible way and no other option exists
    Regards
    Ajay M

  • Splitting the single record into multiple records based on validity

    Hi Guru's,
    basically i am an BI consultant with less knowledge on ABAP, can i request your help on the ABAP task.
    I am working on HR module which is integrated with SAP BI,  the reports will be executed based on calendar month the requirement is i should split the single record into a multiple records based on validity of the record.  basically the HR data would be in data from and date to. 
    below is the logic
    Check whether the start and end date of the record are in the same month and year.
    If yes  nothing changes
    If no  create multiple records
    1st record  original start date of the record u2018till end of that month
    Following record  1st of the next month  u2018till last day of the month
    u2026
    Last record  1st of the month u2018till original end date.
    All fields will have the same values, only the datefrom and dateto fields change.
    Can any one please provide me the same code to proceed on my task.
    Thanks and Regards,
    Venkat

    Hi,
    Using Rule group we can split it.
    Using Rule Group in SAP-BI  Part - 1
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/business-intelligence/s-u/using%20rule%20group%20in%20sap-bi%20%20part%20-%201.pdf
    Thanks
    Reddy

  • I removed my battery in an attempt to insert a SIM card, obviously without knowing how to insert the SIM card. I put the battery back into place and it was already charged 100%, but it's stuck in recovery mode. I've already restored it, but it won't boot.

    I was trying to insert a SIM card into my iPhone 4 without actually knowing how to do so. I assumed that I was to remove the back of the phone and find a slot for it near the battery. I removed the battery in an attempt to find a SIM slot, and was obviously unsuccessful. I put the battery back into place and screwed the phone back plate back on. Note: the battery was fully charged and the iPhone was working perfectly fine before. After screwing the iPhone back into place properly, I thought, I attempted to cut the phone on and it would not do so. I put it back on the charger, and the screen came up that says "Connect to iTunes". I obviously couldn't do so if its plugged into the wall. I plugged into the computer, connected it to iTunes, went through the Recovery mode process, and it still won't turn on. The computer says that the iPhone is in Recovery mode, but iTunes can't do anything because it has already been restored. When I disconnect it from the computer, I hold all buttons in all possible combinations, but it won't turn on at all. When I plug it into the wall, it again says to connect to iTunes. I don't know if I damaged the battery or any part within the iPhone, but I was sensitive in my approach to removing the battery and putting it back in, and there is no visible damage whatsoever. I am extremely frustrated and in desperate need of Apple-Pro help.

    do you have a cdma iphone 4? becauase cdma iphones dont have a sim card slot... the providers that use cdma technology here in the us would be verizion, sprint, criket, ect... if you want to use your iphone 4 on att or tmobile (gsm carriers). then you would need a gsm iphone 4 (has sim card slot). a gsm iphone 4 is different than a cdma iphone 4 (they have different radio chips). maby you missed the sim card slot? sim card slot would be on the side of the phone.. never inside (unless it has a removable back cover like the galaxy s3 or s4), if you dont see a sim card slot on the side of the phone than you have a cmda iphone 4. can you tell me what carrier you are trying to use?

  • I have iMovie 8.0.6 and an iPhone 4S.  I took hours of videos on vacation (Australia and New Zealand) and want to make a movie.  I've imported the first batch into iMovie and started the project.  I just realized that I shot both horizontally and vertical

    I have iMovie 8.0.6 and an iPhone 4S.  I took hours of videos on vacation (Australia and New Zealand) and want to make a movie.  I've imported the first batch into iMovie and started the project.  I just realized that I shot both horizontally and vertically and when I preview (on full-screen) what I've combined, first it's wide-screen, then it's tall, narrow with wide black sides. 
    The film looks choppy, no flow, since it alternates horizontally and vertically.
    I can import the vertical clips two ways:  "Full-Original Size", or "Large 960x540."  But the vertical clips have very short, fat people.
    This didn't happen with my Flip HD; the movies are smooth and terrific.  My heart is breaking.....please, how can I make the videos match?

    Yes, I'd like to use all the video I shot, put it together with music, titles, etc. and make it consistant.  when it goes from full screen to this vertical, narrow clip, it's very awkward.....and it's so narrow, it's hard to see what I'm looking at; my eyes don't make the adjustment quickly.

Maybe you are looking for

  • How do I close all apps at once

    The shutdown procedures in Lion are broken (IMHO). Shutdown should mean shutdown, not sleep/standby. This is a powerful computer, not some cheap portable toy. Multiple apps is not a bolt on but a norm. In another thread there seems to be no apparent

  • How to get total number of pages from .doc file without using Office interop?

    Hi, Kindly help me in getting the total number of pages from a .doc file not .docx file using C#. I know how to get by using Office interop but I do not want to use Office interop. So, without office automation in C# let me know how to get the total

  • Need Help with scrollbars

    hu.. i have this JFrane that has a table which has scrollbars... i have included in my code setResizable(false) so the user will not be able to maximize the page.. i have a function AdScroll()[that adds scrollbars] that will be called every time i ad

  • Sent messages not dated and timed.

    My son has given me his old nokia model 1600 phone and I note that when I send messages they are not dated and timed. they do not display as sent only pending. can u help please. Thanks Margaret

  • Enable Safe Search in Group Policy

    We ran across an issue where if a Student typed xxx in the Google Search and then click images, they are submitted to more than an eye full of inappropriate images.  We have the "Safe Search" enabled on our Sonic Wall, but that still does not stop th