Split valuation - Header Material - Price det. 3 - Matl. ledger active
Hi,
We have split valuation along with Material ledger and Actual costing active.
My client wants to keep price determination 3 / V for Header Material as it defaults 3 / S while creating subbordinate materials i.e., by valuation types.
Per SAP, the requirement is Price determination 2 and Price control is V for Header Material.
My client questions, what is wrong in keeping 3 in Header level?
Do you have any input for this? as I have only answer, as it's the standard configuration and impact unknown.
Ashok
Hi Ashok ,
The materials with split valuation are there in the MM valuation tables MBEW, EBEW, QBEW with the field 'valuation type' BWTAR filled . The header segment (with field valuation type blank) is only for intermal use of the system .
For such materials with valuation type blank (the header segment of material with split valuation) in Material Ledger only the table CKMLPR contains information, the rest of the tables are empty .
The header segment has always price control V. However, the price of the header segment is NOT a moving average price. It is the weighted average price of all valuation types.
Therefore with a Split valuation scenario the materials are recorded in the system with the field BWTAR not blank and with its own price control independently of the header segment
Hence , i think its immaterial of what ever Price Determination you put in Material Master for header material and hence SAP has recommended "2" for the same . Having Price Determination "3" will not have any impact.. i believe...
Regards
Sarada
Edited by: Sarada Sankar Sil on Nov 16, 2010 9:48 AM
Similar Messages
-
Split valuation for material with two different price indicator S and V
Hello Gurus,
Is it possible to maintain split valuation for same material with two different price indicator S and V.
For Ex. Material A is manufactured can be manufactured in house , procured from outside vendor and can be purchased from subcontracting vendor by providing raw material.
We want to keep Price control V for same material " A" which is procured from outside vendor.
And price control S for inhouse produced same material " A".
Besically this material is semifinished and having BOM for subcontracting.
Please advice.Hi
When the material is split valuated, you maintain the accounting view for the material 1st with valuation category, here the price control should be V.
When you will extend the material to valuation type "Inhouse mfgd" maintain the price control as S, for valuation type "Procured form outside vendor" maintain it as V.
Regards
Prasad -
Split valuation in material master
Hi all,
I am using val category B. After I create the parent material with val cat B, I am extending it to val type (inhouse prod and externaL proc). But in MM01 >> ORG LEVELS >> VALUATION TYPE, when I do F4, I am getting message 'NO VALUES FOUND' even after I have created it.
Please let me know what would be the possible error ?
Regards,
YogeshHi
For splitting the valuation of material ypu have to maintain first the valuation category H and price control V in Accounting 1 and then split valuated it with the price control S for SFG and FG
These are SPRO setting for Split valuation
1.SPRO> MM>VALN AND ACC ASSIGNMENT> SPLIT VALUATION> Activate Split Valuation
2.SPRO> MM>VALN AND ACC ASSIGNMENT> SPLIT VALUATION> Configure Split Valuation
check and revert
Regards
Anupam Sharma -
Split Valuation For Material Having No Open PO & Stock
Hi Experts,
Will somebody throw light on split valuation where there is no any open PR, PO & Stock for that material but system does not allow to make material split valuated.
System shows error meassge giving old PO nos list.
(Logically all these POS whole business transcations/cycle is completed )
I want split valaution to be done to the material whose stock is nil also there is no any open PR,PO for that plant in the system.
But I dont prefer to delete line items of the old PO for doing the split valuation.
Please suggest solution
Thanks in advance.
Ramesh
Edited by: RameshChandra Soni on May 17, 2008 11:46 AMHi,
You can find severaé threads about this on this forum.
Some hints:
1. In MM02 try to set the split valuation > Save > SAP will give error message > Push the appearing 'Display errors' button > SAP will say what hinders you from being able to set the split valuation.
2. As I remember stock has to be zero in current and previous period. (You can set your stock to zero in the previous period using MB1A201posting date in the past; after having set split valuation you can reset your stock level via MB1A+202).
3. IMPORTANT: you have to archive all existing batch records.
4. etc
BR
Csaba -
Dear all,
I'm facing issue when trying to assign "Valuation category" to Material in Material master Accounting view.
Purpose of doing this is to achieve split valuation. But system is blocking me to do that due to PO created for the material before.
Refer below that steps happen for the scenario:
1. Material 123 created without split valuation.
2. Create PO 999 for the material 123, follow by full GR of qty 10 and eventually "delivery completed" marked for the material.
3. Using MIGO movement 261 to perform GI qty 10 for production usage.
4. Now Production order has been finished, and wish to bring back the qty 10 to Non-valuated stock.
5. Goto MM02 change Material 123 to assign "Valuation category" in Accounting view. Error returned by system " Purchase order 999 item 00010 already exist".
For the case, do you know how to get rid of the error in order for me to assign "Valuation category" after PO has been created for the Material?
Please comment.Hi,
Have you activated Split valuation ???? Before using valuation category.
the process you followed is correct. Now the stock is 0.
You need to configure Split Valuation :
1.To use split valuation, you have to activate it using TCode 'OMW0'.
2.To select split valuation ('OMWC'), proceed as follows:
2.1. Determine the valuation categories and valuation types that are allowed for all valuation areas:
- global valuation categories via menu "Goto --> Global Categories"
- global valuation types via menu "Goto --> Global Types"
2.2. Allocate the valuation types to the valuation categories.
a) Select "Goto --> Global Categories".
b) Position the cursor on a valuation category and select
"Goto --> Global Categories --> Assignments --> 'Types->Category'".
c) Activate the valuation types you want.
2.3. Determine the local valuation categories for each valuation area.
a) Select "Goto --> Local definitions".
b) Position the cursor on a valuation area and select
"Goto --> Local Definitions --> Allocate Categoires->Org.units (button Cats->(OU)".
You obtain a list of the global valuation categories.
c) Activate the categories to be used in this valuation area.
The system creates the local valuation types based on the allocations under point 2.2.
Now you assign the Valuation Category in Material MAster Accouinting View.
Hope this is useful for you.
Regards,
Smitha -
Stock Out to Enable Split Valuation on Material
We need to activate split valuation on a particular material on one specific plant, in order to do so we must stock out from all st. locations and cancel all opened documents.
We did it !
In Stock report it shows zero stocks in the following plants and Storage locations.
we also checked MBEW and MARD Tables and the values are zero their.
However it still display errors:
Stocks already exist at plant level.
Material Plnt SLoc
236670030 D920 M920
236670030 D920 M921
We checked Plant stock and Storage Location in MM03:
There it shows the Following:
Plant Stock in previous Period:
Unrestr.-use stock 45,836
How can settle the above.
Please advise!
MASKHi There
Check in Stock in transit or Stock in transfer or Reservation for a material in a plant,,
Once you confirmed everything Zero, again check the Stock and try
Based on your below post, i am doubting of transfer or Transit or reservation open qty
236670030 D920 M920
236670030 D920 M921
Hope it helps
Thanks
Senthil P -
Remove Split Valuation in Material Master
Hi,
We need to remove the Batch Management & Split Valuation Type from Material Masters. I already got notes to guide me in the removal of Batch Management, but i can't seem to find any for removal or split valuation. How do I do this?
Thanks,
JogradHi,
What1s your problem exactly?
If your goods have no history you can change your settings in MM02 / MM17(?).
If your goods have history mass change is questionable...since the goods have to meet certain conditions to be able to change their settings. I think in this case you have to 'repair' them on-by-one...
e.g.
- you have to eliminate their stock in previous and current period (MB1A201posting date in the past > after change use MB1A+202 to reset their stock levels)
- eliminate opem transactional data
- archive batch master records
/In MM02 please change the setting > you will get error message > 'Display errors' button will appear > click on it.../
BR
Csaba -
Activating split valuation in material master (autom. batch valuation cat.)
I want to activate the split valuation (automatic batch) in several materials. These materials have purchase orders, schedule agreements or production orders, etc...
Is there any way to activate the split valluation without deleting all the related documents?Hi,
You want to activate batch management on materials that have stock and
transactional data like PO's production orders etc.
Refer note - 533276 , which makes a mention of report -
RVBCONVMAT2BM.
This report can activate batch management without the necessity of
manual preliminary works such as the posting of the stocks or the
completion of open documents.
If this report does not exist on your system then SAP will provide the report as a different tool and will charge for it.
Hope wil help u.
Deepak -
Only price control "V" is possible for split valuation'
Hi
For semi finished items price control has been assigned as 'V'.when i am trying to change the same to S' I got the error message is"Only price control "V" is possible for split valuation''.Even i checked and corrected the MRP views in Material master.
Can any one help me to sort out this issue
Regards,
P.SelvakumarHi,
I guess that you are getting the error message M3 185 ('Only price control "V" is
possible for split valuation'). This message is correct.
ONLY materials with Moving Average Price can use the split valuation
function.
The reason is the following one:
If there are 2 valuation types, named X and Y.
There is an equality:
Material pricetotal quantity = Price Xquantity X + Price Y*quantity Y
In order to balance,
When X and Y is 'V', the header material should use 'V'.
When X is 'V', Y is 'S', the header material should use 'V'.
When X and Y is 'S', the header material should use 'V'.
So only price control V is possible for split valuation.
In accordance with the text of the message M3185, split valuation
requires the price code 'V' (moving average price) for the header
record.
Please, refer to the SAP Library (http://help.sap.com) documentation
under the menu path (for your current release level, 470):
MM - Material Price Change (MM-IV-MP)
-> Split Valuation
-> Creating Material Subject to Split Valuation
"Creating Material Subject to Split Valuation:
1. First create a valuation header record for this material. This is
where the individual stocks of a material are managed cumulatively.
To do this, fill in the Valuation category field on the accounting
screen when you create the material master record and leave the
Valuation type field blank. In the Price control field, enter V
(moving average price), since a moving average price is constructed
in the valuation header record from the values and quantities of the
individual stocks. When you save, the system creates the valuation
header record.
2. Then create the material for a valuation type.
To do this, call up the material in creation mode again. Due to the
fact that a valuation header record exists, the system requires you
to enter a valuation type for the valuation category.
3. Repeat step two for every valuation type planned."
In order for the system to take into account the different values of
the substocks, the material at the header level must necessarily have
a 'moving average price' (V) control.
Regards,
MLM -
Split valuation- material identification
Hi, letus say we maintained grade1 price and grade 2 price thru split valuation for material x, say shaft. here material number and description is same for both grade materials. How to know which grade should be manufactured when the order comes from sales/ customer? Basically how to identify the material incases of issue to shop floor, receiving from shop floor or from vendor or to customer?
When you activate spilt valuation for material then for posting inventory movement system will ask you to select the valuation type.
If material is going to be procured from outside(Vendor) then while creating Purchase order you need to select the valuation type. Same will be considered at GR posting.
At Issued stage also you need to select the stock from valuation type.
Regards,
Ajay Nikte. -
Activating split valuation for existing material code
All SAP Gurus,
We have certain material codes in ROH and HALB material types in a plant.
We are doing external procurement as well as inter-company stock transfer (STO) of the same materials.
We want to keep the separate accounting of the material which is procured from out side and which has been received through STO.
As the material codes are same, in my view only solution is to have split valuation for these materials.
Now, as the materials are already in use since very long, will it be possible to actvate split valuation for these materials?
If yes then how?
Is there any alternate way to tackle with the problem?
Regards,Hi,
Better you go with Split Valuation. But Before u go to split valution u have u clear all Pending Documents for that material.
U must not have stock in for that particular material.
In Split valuation, use material Valutaion type STO or External procurements.
Donot make any of the Valuation Type as Default....it will create problem in Future.
Hope Help u !
REgards,
Pardeep Malik -
Material type ROh,ERSA & HIBE to be configured as per split valuation
Material type ROh,ERSA & HIBE to be configured as per split valuation
you can very well do Split valuation for material types ROH,ERSA & HIBE . Follow Txn OMWC and proceed for the configuration for Global types/valuation categories , in Global category assign the Account category reference as required separately for each material type.
Regards -
Different Valuations for material under a Plant
Dear experts,
I have created the a plant & assigned different storage locations under the plant. Is it possible to have MAP (Valuation) at storage location level?
Is it possible to have split valuation at a plant level or is it at the Company code level?
If it is possible can you send the configuration to my ID vskrishna#gmail.com
Useful answers shall be duly rewarded.
Useful answers duly rewardedHi,
It is not possible to have split valuation activated at storage location level. But yes, it is possible to activate it at plant level.
In Material Master Table, at the time of creation of master data, there is a field in Accounting-1 view. The field name is "Valuation Category".
OMWC & OMW0 are t-codes for configuring & activating split valuation.
Specify the valuation category (u can create user defined category also as per your requirement) when creating material at plant level and goto organizational level tab. Select valuation type created through above t-codes to split valuation of material.
Also please note and ensure that if you want to have split valuation of a particular material then it has to have price indicator "V" at header level. And only at split level you can have indicator "S". Bocs if you put indicator "S" at header level you can not have split valuation activated.
please revert in case of any doubt. -
I am trying to set up split valuation. I have activated it in OMW0. OMWC appears active too. When I try to create a material in mm01 the Valuation Category field is gray and won't allow entry. price control is V. Material ledger is active. How do I allow to choose a Valuation Category.
Split Valuation for material is declared at material master level using material master important fields i.e accounting views 1 &2
1. Valuation category
2. Valuation type
1. The valuation category specifies what the criterion of dividing and splitting stocks into different type .
In standard SAP, following are the valuation category provided.
B (Procurement type): The stock is divided up based on whether the material is manufactured in-house or procured externally.
H (Origin of Material): The stock is divided up according to place from where it was originated
X: There is no specific valuation types assigned to this category.
Step
GOTO SPR0
Material Management > Valuation and Account assignment > Split Valuation> Activate Split valuation
THEN
Material Management > Valuation and Account assignment > Split Valuation> Configure Split valuation
A. Define u201CValuation typesu201D (Global Types-applicable to company)
B. Define u201CValuation categories (Global Categories-applicable to company)
C. Assign u201C Valuation types to Valuation categoriesu201D (Global)
D. Define Local Valuation types (applicable to plant)
E. Define Local Valuation category ((applicable to plant)
F. Assign u201C Valuation types to Valuation categoriesu201D (Local)
Material price change with Split Valuation
Let us take an example to see how
Material : sachin0911, Plant: 9999, Valuation Category: H, Valuation area: 0009, Total Stock: 100 PC
Criterion for split valuation Origin of Material: GERMANY Origin of Material: MEXICO
Valuation type GERMANY MAEXIC0
Stock 50 50
Moving average price $ 5$ 6$
Stock value 250 300
THEN U R TOTAL STCK VALUE 250+300=550 $
AND AVG STOCK VALUE IS 550/100=5.5$
HOPE U CLEARED SIR
Edited by: sachin_jadhav140906 on Sep 9, 2011 11:43 AM -
Hello SAP Experts,
What is split valuation and whats is the use of split valuation .
Also can we use split valuation at Material Code level.As we have some material codes that has already been created and which we pocured Localy and import as well.
Also what are the configuration required and once activated how do the system identify that material is local or imported material , while posting any goods movement (101 and others etc.).
Also while creating the new material with split valuation what are the steps to be followed.
Best Regards,
MMHi gollu,
Please find process for Split valuation
Valuation category is used if you want to have a split valuation i.e. you have an option of differentiating partial stocks of material according to particular criteria & handling them differently regarding valuation within a plant.
Why Required? : 1)Your valuation of in-house & external procurement may be different
2) Distinguish based on Quality so value
3)Different batches have different value
Valuation category could be In House/External , Indian / Imported
Following configuration reqd.
1)In global setting we have to define Valuation category( Say P-Procurement) & Valuation type( Int. / Ext)
2) Active split valuation in MM
3) Assign valuation type to category in customizing
5) In Material Master enter valuation category in accounting view & choose price control V
6) Extend Material Master view for both valuation type
7) valuation category to be active /assign for plant
8) In local definition Define Valuation category to Valuation area.
Then for every transaction (Valuation relevant) may be GR, GI, and Phy. Inventory you must mention valuation type during transaction to get your material valuated separately.
This is all about split valuation configuration.
create a valuation category as orgin H
In our case you can create two valuation class
1.LOCAL
2.IMPORT
Maybe you are looking for
-
ADC to DVI and DVI to VGA on my G5
I have a G5 with an ATI 9600 video card that has both DVI and ADC outputs. I cannot find am ADC to VGA adapter, but I was wondering if I could use and ADC to DVI adapter and then connect that to a DVI to VGA adapter and use a 2nd VGA monitor on my M
-
Home Directories when installing on multiple partitions
I have a macpro setup with two partitions. Originally one partition assigned to Snow Leopard. I log in using a network user (using OSX server) and that user has local Admin rights. All is well. I setup a new instance of Snow Leopard on the seconda
-
RESTful Authentication to Service Bus for Windows Server - Multiple Scopes?
We currently have a three-node farm set up and have tested authentication and sending/receiving messages to each node individually, with which we've had no issues. However, we use NetScaler as a network load balancer, and once we configured NetScale
-
Help with Boot Camp Assisant install
I am trying to install windows 8 on my macbook pro I bought Saturday (2/28). I get past the first 3 steps but when it restarts my computer the first thing it does is boot to the usb drive called windows where it tells me there is no boot disk availab
-
Message mapping when using BPM?
We are doing a test to see if you can do a split of a string using standard functions, UDF or BPM. We discovered that standard function has some of the functionality but if you are going to solve the problem that way the solution will be very complex