Split valuation-Price control with valuation category

Hi,
While creating halb material with valuation catergory Y,System select price control V,
I wish,it should be S, as after cost run value updated with standard price.
Regards,
Devendra

Hi,
I am not sure about moving thread to other forum since I don't find any such option in our purview. You can check the option to contact moderator who has right to do the same.
Also you can try with creating new thread in MM forum and close this thread here in PP forum thereby you can avoid duplication.
Regards,
Tejas

Similar Messages

  • MR21 for split valuation & price control "V"

    hi all,
    Case: Split valuation is activated but parent has price control "V" and child i.e. diff valuation types have "S". We want to make std prices of all valuation types "0". It is done but the parent still shows value in MAP.
    a. How do we make MAP of parent as "0" (price control "V"), will it allow?
    b. Will it impact and how e.g. MB5L
    c. Is it ok if we ignore the valuation of parent
    d. All valuation types under parent are made "0"
    Thx
    Bhushan

    Hi
    The price control at the plant level will always be V,where at the valuation type level either V or S can be maintianed.It is not recommeneded to ignore the valuation class at the plalnt level in case of split valuation because if you are going for costing run then this needs to be maintained.becoz cost of a material procured needs to be determined at plant level
    Regards
    Sandeep
    Edited by: sandeep13 on Feb 8, 2010 12:49 PM

  • MTO Sales order controlling with valuated stock

    Hi,
    In SAP MTO with sales order controlling (sales order is cost object) with valuated stock, how to make settlement rule set to sales order so that costs will flow from production order to sales order .
    Can anybody advise me in this.
    Regards
    Rajesh A

    Hi Rajesh,
    I'm new to Engineer To Order (ETO) and Make To Order (MTO) Product Costing and my client like to implement ETO and MTO product costing with Project Systems(PS) integration.
    If you worked on these proccess? please can you guide me how to design the process or could you please forward me design and configuration documents....my client is discrete manufacturing industry.
    Thanks,
    Rau

  • Split valuation and price control

    Dear all,
    Case :the price control for mat'l type MAIN is defined as S in IMG,
    mat'l no.A with mat'l type MAIN,
    test 1:
    In plant 01, A with price control S
    In plant 02, A with price control V, valuation category X, problem is when I create a PO in plant 02 with mat'l A,when goods receipt,  the accounting docs is wrong(D:price difference, C:GR/IR), the debit should be inventory account, it should not hv price diff with price control V under this situation,
    test 2,
    In plant 02, A with price control V, without valuation category,the acounting document when goods receipt is correct.
    test 3,
    changed the price control for mat'l type MAIN to V in IMG,
    In plant 02, A with price control V, valuation category X, when goods receipt , the accounting document is correct also.
    I doubt why this happen, do the split valuation or valuation category X effect?or there's any priority abt price control?
    Urgent, can anyone instruct me? thanks in advance, will assign points, thanks.
    kathy

    Hi, Kathy:
    The price control in master data of material have the priority.
    Besides, I guess the error happened is due to the incorrect valuation area configuration. If your valuation area is set to company code level, the system will use the same valuation method within a company code.
    In this case, you need to set the valuation area as plant level to differentiate the valuation methods between different plants.
    Hope it's helpful for you!

  • Batch valuation with different price control

    Hi experts,
    Our requirement is to combine batch valuation and split valuation for the same material. We want to have valuation by batch (1 price for each batch). However, we need to classify the material into 2 types because of price control.
    Example:
    We classify batches into 2 types.
    - in-house production (Price control S)
    - purchasing (Price control V)
    Make use of user exit, we may have batches starting with:
    - PRD000001, PRD000002, PRD000003...
    - PUR000001, PUR000002, PUR000003...
    Our question is:
    How can we achieve the requirement where sometimes we want S and sometimes we want V at batch level?
    We understand that we can change the price control in material master after the batch is generated. But is it possible to change price control at the same time when batch is generated?
    Please feel free to give any idea. Thanks a lot.

    It is possible to have batch specific valuation by using valuation category X. This way, you will have a valuation type for each batch.
    If the batches are created in advance (and not during material movements), then it is possible to have a separate price control and valuation class depending on batch number.
    In your case, since the batch nomenclature for inhouse produced and purchased are different, it can be done without confusion.
    Regards,
    Aroop

  • Valuation Price issue in PR Approval form

    Hi,
    We have a PR with multiple line items and different valuation price.
    But in the PR approval form, the valuation price is showing  only  the line item 1's valuation price, not
    total valuation price of the all items.
    Can any one help me how to show the valuation price as sum of the all line items values.
    Thanks in advance
    Rajeev

    Dear Rajeev,
    Please check in spro whether system is configured for Item level or Header  level release.
    check the tick sign at Release group.
    For item level release system considers the value of line item and for header level release system takes the total value of line items.
    please go through this link
    https://www.sdn.sap.com/irj/scn/wiki?path=/display/erplo/releaseprocedureforPurchaseRequisitioninMM
    Release procedure for Purchase Requisition in MM
    Best regards,
    Maverick
    Edited by: Maverick 331 on Jun 16, 2009 7:34 PM

  • Split valuation - material with price control V

    Hi,
    I have created material with split valuation ,ie val category as Z (auto batch).. and i did gr. and in mm03 i have maintained the pr control as V .. and later po and gr .  when i checked in MM60 its showing the parent material and the child mat ie valu types/ batch materials are also in V... it suppost to have with S.. is there any customization need to have S price control for the child/ val type materials?? pls suggest

    Hi UJ ,
    Different price control are possible for different valuation types based on Valuation category , but this doesn't hold good for Valuation Category X- Auto Batch as there are no valutaion types linked to it in Config.
    Therefore system proposes the same price control as that of parent material incase of Valuation Category(X)- Auto Batch
    Regards
    Ramesh Ch

  • Split valuation for  material with two different price indicator S and V

    Hello Gurus,
    Is it possible to maintain split valuation for same material with two different price indicator S and V.
    For Ex. Material A is manufactured can be manufactured in house ,  procured from outside vendor and can be purchased from subcontracting vendor by providing raw material.
    We want to keep  Price control V for same material " A"  which is procured from outside vendor.
    And price control S for inhouse produced same material " A".
    Besically this material is semifinished and having BOM for subcontracting.
    Please advice.

    Hi
    When the material is split valuated, you maintain the accounting view for the material 1st with valuation category, here the price control should be V.
    When you will extend the material to valuation type "Inhouse mfgd" maintain the price control as S, for valuation type "Procured form outside vendor" maintain it as V.
    Regards
    Prasad

  • Only price control "V" is possible for split valuation'

    Hi
    For  semi finished items price control has been assigned as 'V'.when i am trying to change the same to S' I got the error message is"Only price control "V" is possible for split valuation''.Even i checked and corrected the MRP views in Material master.
    Can any one help me to sort out this issue
    Regards,
    P.Selvakumar

    Hi,
    I guess that you are getting the error message M3 185  ('Only price control "V" is            
    possible for split valuation').   This message is correct.                                                                               
    ONLY materials with Moving Average Price can use the split valuation          
    function.                                                                               
    The reason is the following one:                                                                               
    If there are 2 valuation types, named X and Y.                                                                               
    There is an equality:                                                                               
    Material pricetotal quantity = Price Xquantity X + Price Y*quantity Y                                                                               
    In order to balance,                                                                               
    When X and Y is 'V', the header material should use 'V'.                      
    When X is 'V', Y is 'S', the header material should use 'V'.                  
    When X and Y is 'S', the header material should use 'V'.                                                                               
    So only price control V is possible for split valuation.                                                                               
    In accordance with the text of the message M3185, split valuation             
    requires the price code 'V' (moving average price) for the header             
    record.                                                                               
    Please, refer to the SAP Library (http://help.sap.com) documentation          
    under the menu path (for your current release level, 470):                                                                               
    MM - Material Price Change (MM-IV-MP)                                         
    -> Split Valuation                                                            
       -> Creating Material Subject to Split Valuation                                                                               
    "Creating Material Subject to Split Valuation:                                                                               
    1. First create a valuation header record for this material. This is            
       where the individual stocks of a material are managed cumulatively.                                                                               
    To do this, fill in the Valuation category field on the accounting           
       screen when you create the material master record and leave the              
       Valuation type field blank. In the Price control field, enter V              
       (moving average price), since a moving average price is constructed          
       in the valuation header record from the values and quantities of the         
       individual stocks. When you save, the system creates the valuation           
       header record.                                                                               
    2. Then create the material for a valuation type.                               
       To do this, call up the material in creation mode again. Due to the          
       fact that a valuation header record exists, the system requires you          
       to enter a valuation type for the valuation category.                                                                               
    3. Repeat step two for every valuation type planned."                                                                               
    In order for the system to take into account the different values of            
    the substocks, the material at the header level must necessarily have           
    a 'moving average price' (V) control.                                           
    Regards,
    MLM

  • *How to change the Valuation Category & Price control in material master*

    Hello SAP Gurus,
    I have a requirement to change the valuation category from 'X' to '  ' in accounting view of material master.
    -> I have cancelled all the open PO's & SO's for the material
    -> I have ensured that there is no stock for the material in that valuation area.
    But still I get an error message that batch already exists for the material. When I check entries in MCHB I find that there are previous entires in MCHB with zero stock.
    I have gone through the SAP note 155874 which recomends the archiving the effected objects.
    Please let me know is there any work around to change the valuation category from 'X' to '  ' & price control 'V' to 'S'. I also need to change from '  '  to 'X' for a few materials.
    Thanks for your advise.
    Best Regards,
    Narayan.

    Note 155874 cleary describes what has to be done to be able to change.
    There is no workaround, and if you change anything in the tables directly, then this will cause inconsitencies, as described in this note as well.

  • Does moving average price work with multiple valuations?

    Dear All,
    I have activated multiple valuations: Legal, group and profit center.
    I have activated ML/Actual costing for this multiple valuations too.
    Now I have 3 price fields in material master.
    Could I use moving average price for some materials types in multiple valuations?
    Thank you,
    With best regards,
    Kamila.

    Hi Kamila,
    yes, ML is always activated for all materials in a plant. To use MAP you have to set the price determination of a material to '2':
    This is the F1 help of the field price determination:
    Material Price Determination: Control
    Specifies how the material price determination should procede.
    You have the following options:
    With price control V in activity-based material price determination (indicator2 in the material master), the moving average price is calculated. With price control S, the material is valuated with the standard price and the moving average price is calculated for information purposes.
    In single-/multi-level material price determination(indicator 3 in the material master), the valuation price (standard price) remains unchanged and a periodic unit price is calculated for the closed period.
    This option is only for materials with price control indicator S,and is only recommended if in addition to multiple currencies and/or valuations, you use single-/multi-level material price determination.
    In single-/multi-level material price determination, a periodic unit price is updated for information, but it can only be used for material valuation in the closed period.
    Dependencies
    The indicator is only of use if the material ledger is active.
    Upon activating a valuation area for the Material Ledger in Customizing, you can enter what type of material price determination will be proposed when creating a material in that valuation area. This proposal will be ignored at production startup: the system automatically sets the indicator to 2 in the material master for all materials present.
    If you want to change the indicator for a particular material later, choose Accounting -> Controlling -> Actual Costing/Material Ledger -> Environment -> Change Material Price Determination.
    best regards,
               Udo

  • Inventory problem for material with valuation category X

    Hi!
    During annual inventory, I found material in a storage location that doesn't exist in SAP as material master.
    I have created the material, managed in batches and valuation category X.
    I have created a batch with MSC1N and now I am trying to create an inventory document to put this material on stock; but when I am trying to create the inventory document with MI01 or MI31, the system is telling me :
    "Batch  0000043183   does not contain a valuation type
    Message no. M7045
    Diagnosis
    The material is subject to split valuation, but the batch entered has not been assigned to a valuation type.
    System Response
    Any transaction/event that has the effect of changing the stock balance will be rejected for this batch.
    Procedure
    Contact your system administrator.
    If you are authorized to do so, do you wish to check the valuation category in the material master record?
    Do you want to display the batch?"
    Now, I don't know exactly what can I do to be able to create the inventory document.
    Any ideas.....
    Thanks

    Since you have created a material master with valuation category that means the system is taking that material either as split valuated or to-be split valuated...the reason of this error you will find out if you go to MSC2N with material-batch & plant you will find in the Basic data 1 tab that Valuation type field is mandatory...so either you have to split valuate the item further and then enter the same valuation type in MSC2N or otherwise if you not still done any transaction with the material master then remove the valuation category from the material master
    Regards,
    Indranil

  • Valuation price with user exit/BADI/Enhancement Spot (In valuation variant)

    Hi all,
    i am facing problem finding enhancement when creation of sales order of Valuation price with user exit/BADI/Enhancement Spot  (In valuation variant)
    For refferenece:
    When going to t.code VA03, select one item and go to extras in the menu bar and select costing then you find some amounts calculation i.e valuation price automatically.
    So when creation of sales order i am giving material and that material price automatically takes from material master and creating sales order.
    My customer requirement is to get the valuation price of the input material from Z-table during the sales order cost estimate.
    This Z-table contains the material code, plant , grade  of the material.
    Ex:
    Material         Plant   Grade Price
    A                1000    XYZ     25000
    A                1000    PQR     35000
    A                1000    BCD     45000
    Suppose it depends on sales document type and which grade price i have to take.
    So first of all i am unable to find enhancement where to change this code to get change the valuation price.
    Does anybody have any idea , is there any user exit/BADI/enhancement for this.
    So please help me in this issue.
    Thanks & Regards,
    lokeshgoud

    pls allow me to post the questions

  • Valuation price with user Exit on activity types

    Hi All,
    Our customer could have different activity cost for different products even if they are processed on the same cost center, same activity type and same activity time. So I wonder whether SAP has valuation price with user Exit on activity types as what on material valuation, when we select "U" in the relevant valuation variant. Could anyone knows advise please?
    Regards
    Walter

    Hi Walter,
    an idea might be to include an ABC template into the costing. ABC tempaltes allow a big degree of freedom in determinin which processes to use and in which quantities. To use the product as a cost driver is certainly not an issue. I doubt that you can directly influence the process 'price' to be applied, but to change the quantity could bring the same result.
    See the docu for more info:
    [http://help.sap.com/saphelp_erp60_sp/helpdata/en/7e/cb7d1443a311d189ee0000e81ddfac/frameset.htm]
    best regards,
                        Udo

  • Raw materials with valuation category are appearing as a missing parts

    Hi All,
    I am converting planned order to production order which is having ten raw materials. Some of them are having valuation category u2018Ru2019. All raw materials are in stock. While procuring raw materials which are having valuation category, we used valuation type u2018RM-OKu2019 so they are having stock with valuation type (RM-OK).
    Raw materials which are having valuation category maintained are always coming as a missing part while converting planned order to production order though they are in stock.
    So, pls do comment where I am doing mistake.

    Hi,
    1. I dont think that the Valuation class and the availability check has any relations ship.
    2. Also in your querry you are mentioning about valuation class and  valuation category .. what is this valuation category and where is it mentioned.
    3. Also check if all the stocks are posted in same storage location
    reg
    dsk

Maybe you are looking for

  • error-page working in netscape but not in explorer

    Hi! I've a problem using I Explorer. I configured in my web.xml an error- page to manager errors of code 403, and it wasn't working, I keep getting an error from the browser and not the error page I specified... I thought it's was something about my

  • Starting f/fox I get AVG asks if it can alter computer, its annoying.

    using F/fx as my search engine on opening it asks me if it can change computer settings

  • Pcmanfm file associations all gone suddenly

    All of a sudden, all my file associations are gone. For video files, documents, everything. I also cannot assign a default association. What do I do......

  • How can I remove silence automatically?

    I've been using Audacity for a while to edit a podcast.  The file length is usually around 30 mins to an hour.  There's a nice tool there that trunticates silence longer than whatever you specify, however my mp3's always sound kind of garbled when I

  • Change Timer LiveFont color?

    Hi guys Is it possible to change the Timer LiveFont color from red to white? The palette doesn't work with it. I tried to change it applying a brightness effect but it doesn't work either. Any suggestion? Thank you!