Splitting batch in process order
HI friends,
How I can split bach in process order ?
Regards,
Chetan
Hi.
Please Refer Below SDN thread.
[Batch split|Batch determination for component in co11n;
Pradeep
Edited by: Pradeep Kumar on May 24, 2008 10:49 AM
Similar Messages
-
Scheduling issue for splitted operations in process order
Hello All,
I am facing problem after scheduling splitted operation in process order. The scenario is as follows.
In process order there are 5 operations. 10, 20, 30, 40 and 50. Out of the above operations 30 is splitted and two different resources are assigned to it. Control key assigned to splitted operation (30) is also scheduling relevant. Now the flow of operations will be as below.
1. Operation 10
2. Operation 20
3. Operation 30 - Operations is splitted (Resource used is A), qty to be produced - 10 kg.
a. Operation 32 - Quantity of operation 32 is changed to 5 kg. Resource used is B.
b. Operation 34 - Quantity of operation 34 is changed to 5 kg. Resource used is C.
4. Operation 40
5. Operation 50
Relationship exists between opearion 10-20, 20-30, 40-50 and between 30,32, 34 with 40. But there is no relationship exists between splitted operations 32 and 34 with any of the previous operations for eg. 10 & 20.
Issue is after scheduling all operations relationship remains maintained between operations 32, 34, 40 & 50. As operation 30 is splitted to two different operations equally total time for scheduling gets reduced but after scheduling of all operations all previous operations before operations 30 does not get resceduled? Scheduling type maintained for order is Backward Scheduling.
Please check this and guide me how all operations before operation 30 can be rescheduled as per changed timing of operations 32 and 34.
Best Regards.
Edited by: Avinash Mohite on Mar 19, 2010 12:43 PM
Edited by: Avinash Mohite on Mar 19, 2010 3:14 PMHi,
I hope u r doing in this way:
In the capacity header screen enter individual capacity as 2. then click on Got( on top of same screen) and go to individual capacites. Enter the names of two individual capacities, for example 1 and 2. These are the names of two work centres where u r splitting ur operation.
Double Click on operation 0030 and go to tab 'splitting' . Tick on ' required splitting' and enter maximum no. of splits as 2.Then go to capacity requirements assignment tab. enter the individual capacity as 1 and 2 and enter the splitted quanitites.Save and reschedule .
Check and revert.
Regards. -
Reservation of component Batch for Process order
Hi PP Guys,
I did the batch determination of a particular component batch in process order, but when I try to create another process order system proposing the available qty without considering the earlier reserved batches.
I want to view only the batches which are free from any reservations during batch determination in process order.
Example: If Batch "A" having qty 1000 kg in unrestricted stock.
I have created a process order and did the batch determination for the quantity of 900 kg, when I create another process order for the same material system should propose only the available component batch qty of 100 kg only, but system still proposing the un-restricted available qty of 1000 kg.
Please advise me the solution to map the scenaio.
Thanks in advance.
regards,
PurnaHi,
Check whether Reservation is included in your checking control(T.Code OPJJ).
If not then correct it by activating check box for Include reservations.
Regards,
Dhaval -
Want to Create batch in process order at a time of Operation release.
HI,
We are going to release operation one by one for process order. There are 4 operations in my process order. I want to create batch in process order header when i release first operation.
Is there way i can set the Production Scheduler Profile to PREL to create batch at header level.
Thanks in advance!Thanks for the Information,
to my understanding, all the Operation controls are in Operation control key.
There is No Batch creation functionlaity assiciated with Operation control key.
Look for a user exit to create the Batch with the PREL of the Header or REL of the 1st operation.
Regards
Ratan -
Batch management & process Order
hi gurus !!!
can we have qty divided in two batch numbers against same process order ??Hi Kaushik,
You need to define Batch Strategy with number of splits "2", so that system will allow 2 splits for a component while Batch determination.
This is a defination basically for a combination of condition type and access sequence.
Hope this helps...
Note during automatic batch determination, if sufficient stocks of a single batch is existing, system default uses only one batch.
Regards,
Prasobh
Reward your points if this was helpful -
Automatic Creation of Batch in Process Order Confirmation
Hi Guru,
What are settings required to set the batch creation automatic during the confirmation of the process order? The header material is semifinished and batch management is ticked in the material master. BOM has been created. In the present scenario, few
Regards,
RajaHi,
You can do that in T Code CORW.
For the required production scheduler select the batch creation for process order.
Also in the Assignment tab of the process order, there is a field for batch, next to it there is a Create button. Click that, you will get the batch number in that field.
Hope that helps.
Regards,
Rohit.
Added: I apologise, its not the Assignment tab in process order. It is Goods Receipt tab.
Edited by: Rohit Chauhan on Aug 3, 2009 9:42 AM -
Stock of Batch in Process order
Hi,
The Requirement is as follows:
Material A is used as a component in Process Order and is managed in Batches. The requirement is the system should show the the available batches with stock when F4 is done for Batch field in Component overview of the Process order.
Regards,
PrasadHi Dhaval,
There is no search filter as Batches in Unrest.
The following search filters are available:
1. Searches for batches via classes
2. batches for plant material
3. batches for Material
4. Batches for valuation type
5. Valuation types for the material
6. Batch work list
7. original batches for plant material
8. Original batches for material
9. Batches for vendor
My requirement is to get those Batches which contains stock with unrestricted status. ie batch list with expiry as mentioned by you.
Regards,
Prasad -
Header batch no copy to component batch in Process order
Hi,
I have following requirement...
we create process orders with COR1 in PP module.. then we assign the batch no to in the goods receipt tab as shown below..
Now when we save the Process order system has to automatically assign the same batch no to one of the component automatically as shown below..
What user exit or enhancement I can use for this..If anybody worked on this can you help me out...
Thanks
KumarHi All,
Can u suggest me any user exits, BAPI or BADI's for this...
Thanks
Kumar -
Update batch for process order in change mode
Hi All ,
I need to update the batch number(which will be external batch number given by me ) in COR2 (process order change) transaction ,under the tab Goods receipt .
Is there any bapi which achieves this ?? pls reply
Thanks .try use BAPI_RESERVATION_CHANGE
-
Create batch for process order
Hi,
I have a requirement to create batch for the process order while releasing/ creating it.
PLease let me know, which BAPi to be used.
Thanks & Regards,
Kalyan Venigalla.Hi All ,
Pls reply
Thanks . -
Header material batch copy to component in Process order
Hi,
I have the following requirement...
We create process order and assign the batch to process order manually..now during saving of the process order system has to copy batch of the process order ( header material ) to the one of the component in the batch automatically, as this is component is by product which comes to stock along with header material...What is the enhancement/ User exit can be used to meet this requirement...
Thanks
KumarKumar.
What should be copied? The header batch or some/all of the characteristics of the header batch to a new batch for the component?
Anoop -
Batch reservation & Allocation in process order
I am allocating batch to process order components(for active ingridient)While I am allocating the batch I am able to select the batch which has all of its quantity reserved,which is not desireble.Any solutions please??/
Eg.In MMBE my batch stock(say for batch AA11) is as follows:Unres stck 100 & reserves 100
If I am determing batch for a different process order where this component is used,I am able to select the same batch,even though it has no open quantities.
Please suggestHi Rele,
Please check in CO09 transaction for the availability of this batch stock whether it is free or confirmed to any other component like.
Regards
R. Senthil Mareeswaran. -
Problem in Process order confirmation ( while doing batch splitting)
Hi All
In our Industry we have sceneraio
we create Internal order and assign internal order to sales order
Once MRP run take place
Planned order created and converted to process order
Process order released
once we try to do confirmation of process order
example suppose process order header matl qty : 8
and in final confirmation while Goods receipt(101) of Fert
we do batch splitting (example 4 batch : each qty : 2)
but some time system not allows to do Goods receipt (movement type101)
system gives "Error confirm order not allowed"
please need urgent help
Thanks in advance
Sunil SinghHi Sunil,
During your first confirmation you must have activated "Final confirmation" Indicator, probably this is blocking from further confirmation.
Please check whether current system status of the order contains "CNF" if so, please cancel the previous confirmation and then redo confirmation with "partial" button active. Final confirmation should be activated only when it is the last confirmation for the order.
Hope this will resolve the problem, reward your points....
Regards,
Prasobh -
Batch Splitting in Process order
Dear all,
I created the process order . Now Executing batch Determination for Qt 265 of Component X .
Now in Batch Determination screen of Process order, out of three available batches , I am selecting one batch by doing copying
Now in Process order screen component overview , I am getting spilt qty. as 52 as first line item and 213 as second line item with selected batch number.
Why this splitting is coming , How to avoid this splitting ???Hi,
May be batch selected by you is not available in stock of 265 qty.
Their fore system has taken 52 qty of another batch.
Just check again MMBe available batches
Or accoriding to your sort rule line item 1 batch say A qty available is 53
Then remaining qty has taken 213 qty from your batch B in 2nd line item.
If you want to select batch A & if full stock available then remove 52 Qty from 1st line item in batch determine screen & put 265 QTY in front of your batch of which you want pick full qty.
Regards
SANIL -
Warning message during batch determination while doing GR for process order
Hi Experts,
During delivery against process order for all SFGs and FGs, we are getting warning message u201CInvalid batch according to selection criteria in batch determinationu201D.
Following settings maintained for batch determination in process order.
Condition table for order/material type maintained
Access sequence maintained for order/material type
In strategy type above access sequence has been maintained. The common class and sort sequence created for all materials in the plant have also been assigned to this strategy type. In batch split changes allowed box has been checked and quantity proposal maintained as 1.
In search procedure control maintained for order/material type. Search procedure has been assigned to all process order types and check activated.
In spite of the above when GR for order is taking place , system is throwing warning message.
GI of components is being done through backflush and without any warning message.
Please advise how to ensure proper batch determination during GR against order.
Regards
Sm.Issue resolved by removing required indicators from characteristics which were not being valuated but were maintained in the class assigned to SFGs/FGs.
Regards
Sm.
Maybe you are looking for
-
What are the steps to send sales order custom field from CRM to ECC
Hi Xperts, We have created a custom field in sales order [ VBAK] and successfully replicate its value from ECC to CRM. But while doing the enhancement to replicate the field value from CRM to ECC [ When the SO is created in CRM ] we are not able to
-
How to determine the percentage of the function
Hi all, CALL FUNCTION 'SAPGUI_PROGRESS_INDICATOR' EXPORTING percentage = 25 text = 'Please wait, data being retrieving..'. Here I want percentage to forward as data is retrieved. For example if I want to put this code segment between a
-
Before header pl/sql process creates blank space at top of page
Hi, I'm finding that w/v 1.6.1 I get a blank space at the top of my page that appears to be somewhat proportional to the amount of code and/or # processes on that page that are before header. moving to after header and before regions also shows this
-
Log & Transfer Error...
Using a Sony HXR camera (AVCHD) and FCE 4.0. When adding clips to the Log & Transfer window, I get a spinning wheel, then a red hexagon with an exclamation mark in it. The continual error is "no data", no matter how many times I try. I have been look
-
Can any version of Photoshop be installed on an iPad?
I have been asked whether one can edit images on an iPad? Could an external drive be attached to an iPad? What's out there? Mary Lou