Splitting of material

Dear All,
I am procuring one SFG (material no:1 (BOM Maintained)) from vendor directly. This SFG is contaning (one spring (material no:2) and cover (material no:3) assembly). For the production of FG (material no:4 (BOM Maintained)) I will consume this as a whole by specifying this SFG as the component (along with CAP(material no: 5)) in the BOM.
But for another FG (material no:6 (BOM Maintained)) I am using (material no:2) as one raw material.
Again for another FG (material no:7 (BOM Maintained)) I am using (material no3) as one raw material.
The production of material (6 & 7) may happen in different days.
My question is, I will make GR for material no :1 once when I am receving from vendor.
When material no :6 is producing I need to split material no:1(GR material) in to material no: 2 and material no:3, so that for producing material no:6 they consume the stock of material no:2.
How can I do this splitting. Pls guide me.
Rgds
Srini

Hi,
Not sure if i have fully understood your need, but based on my understanding find below a possible solution:
1. Create a Production order via co07 & settle the order onto a G/L or cost center.
2. In the operations tab, specify one operation say, dis-assembly
3. In components tab give material no. 1 with +ve qty & mtl - 2 & 3 with -ve qty.
4. Do a PGI for all 3 components, the order will consume mtl - 1 with 261 mvt, while mtl - 2 & 3 are returned to stock via 531 movement.
5. You now have stock of mtl - 2 & 3 which can be issued to the respective orders.
Hope my understanding of your need is correct. Test the above in your sandbox if it meets your need.
Regards,
Vivek

Similar Messages

  • Split Valuation Material Cost Estimate into COPA

    Hi all,
    Is there any way how we can transfer the split valuation material cost estimate into COPA?
    I checked the actual line items, there is no "valuation type / batch" characteristics there.
    Is this the main cause?
    Please kindly suggest on the best way to solve this issue
    Thank you very much
    Regards, Erwin

    Hi, Ajay
    Does this mean that, even though i manage to create the valuation type as characteristic in COPA, i won't be able to get 2 different cost estimate based on valuation type into COPA?
    Hm, then, are there any solutions which can be done to solve this issue?
    The client needs a COPA report which can show the breakdown of the sold materials cost estimates
    As usual, thank you very much for your help
    Regards, Erwin

  • Two step 303, 305 movement stock transfer for split valuatin material

    Hi expert,
    we are using split valuation for material in IS -Retail for both warehouse  as well as store. when i am transfer material from store with movement type 303, message is showing'Use one-step procedure for transfer posting to art. subj. to valuation'.
    we wave to use this method in case of split vauation material.
    how we can do.
    Regards,
    Santosh

    Hi Santosh,
    Try to transfer material using TCode MB1B with Mvt type "301".
    Movement Type "301" is used for stock transfer - One step process.
    So when you post transfer using Mvt. Type 301, the receiving store will not require to do GRN for that material.
    Hope this helps you. Let me know in case you need some more info.
    Regards,
    Nikita

  • Split valuated material price change at header level (without val. Type)

    Hi All,
    Need to change Split valuated Material Price at Header level (without val. type).
    In MR21 valuation type is mandetory for split valuated material.
    Please suggest on changing Material price without val. type.
    Thanks

    You have to advise the users who create accounting views to enter a valid price when they create a material master. Maybe you need to make use of the user exit to prevent saving when no price (or a dummy 0,01)  is entered.
    It is not possible to change the header price with any SAP given transaction, as it could cause inconsistencies if you dont take care about the stocks at valuation type level.
    you may have to deveope an own report on own risk. I personally have the opinion that it is more secure to post stock and reverse it again (which just creates to accounting documents that equalize each other, no remaining value anywhere) than going the risk with an own program to screw up the valuation of a material  in general

  • Movement Type 319 "Split structured material into components "

    Hi SAP Buddies
    Can we use  Movement Type 319 "Split structured material into components " in MM functionality if Yes please tell me how ?.. ..  Since 319 related to Retail. But Somewhere I found it is fulfilling my client requirement..
    Thanks In advanve
    Rgds
    BV

    hi
    Kishore.
    Thanks for ur reply, Is there no way to use it ??.. //or is there any other movement type of this type..
    please suggest..which we can use in ECC 6
    Thanks in Advance
    BV

  • Split the material cost into labor and overhead costs

    Hello Experts,
    We get Finished Goods from another plant and that plant is not on SAP. So we load these materials as Finished Goods and enter the price in the costing tab and we do run cost estimates. In the cost estimate we see this price as material cost. How can we split this material cost into material + labor + over head costs? Is there anywhere we can enter the percentages that would split the total price into material and labor and overhead prices? I appreciate your time and response.
    Thanks In Advance

    HI Venkat,
    You can only split material cost using origin groups and not into material, labour & OH as you may know the cost components are grouping of cost elements (with an option to use origin groups).
    If this is too important for you to maintain that cost component split, then I see the only way is to consider maintaining quantity structure in SAP for the finished product, so that cost roll up happens with cost components.
    Hope this helps.

  • Split Valuation material

    Hi,
    After creating split valuation material (Val. type : external and internal),for doing PO and MIGO,where we change the valuation type..
    Thnks & Regards
    SAP Beginner

    Hello
    Follow the following procedure for the creation of material with split valuation.
    Hope the required configurations are done in SPRO.
    ie valuation types are created and assigned to valuation category and account category reference.
    In the creation of a split valuated material, create the material by giving the valuation category in the accounting view of the material master.
    Then goto MM01 and give the same material number, then system will ask for the valuation type. Create the master record for all the valuation types.
    At the time of PO creation, mention the valuation type in the delivery tab in item details.
    Regards

  • Physical inventory document creation for split valuated material

    Hi
    We are doing stock count in our company. We are using split valuation for some of the materials. When I tried to create a PID for split valuated material which are not in stock, system issued a standard error message. What I understood from that error message, we can create a PID for split valuated materials which are in stock. Is it so? If so, then how can we count split valuated material?
    Let me know if you need any info.
    Thanks in advance..
    Jeny...

    Please refer to SAP note 30254 and it should help.
    Symptom
    If you create a physical inventory document for a material in a storage
    location without existing storage location segment, error message M7006
    is displayed: 'Material & (material number) & (plant) & (storage
    location) does not exist'. Thus, a storage location segment is not
    created automatically for this material.
    The same also applies to the batch segment. The batch segment is also
    not created automatically but, if a batch is specified for a material
    when creating a physical inventory document, that is not yet created for
    this material, error message M7042 is generated: 'Batch & & & & does not
    exist'.
    The same applies to the special stock segments which are also not
    created automatically. Different error messages are generated here
    depending on the special stock (see also Note 64448).
    Additional key words
    MI01, MI09, MI10, M7076, M7183, M7184, M7185, MARD, MCHA, MCHB, MSKA,
    MKOL, MSKU, MSPR, MSLB
    Cause and prerequisites
    If no storage location segment or batch segment or special stock segment
    exists to a material, this then means that a goods movement did never
    occur before in the system to this material (batch) to this storage
    location (special stock), that is that the material (batch) never had a
    stock to this storage location (special stock) in the system before and
    that it was never posted before on this segment. It is therefore not
    possible to carry out a physical inventory for such a material (batch).
    It is different, if a goods movement has already occurred to a material
    (batch) to this segment and if only the present stock is zero. A
    physical inventory is then necessary and also feasible for this material
    (batch) since the different segments are not deleted automatically in
    the moment in which the stock becomes zero.
    Solution
    For a material for that no storage location segment, batch segment or
    special stock segment exists, it is not necessary, to carry out a
    physical inventory on this storage location or for this batch or this
    special stock. If, however, a quantity is physically found to such a
    material, the corresponding segment must be created before the physical
    inventory.
    There are 3 options to create storage location data:
           -  maintain the 'Storage' view in the material master for the
              material and storage location or
                                                                      Page 2
           -  use the 'Enter storage locations' function in the material
              master or
           -  post the first goods receipt (providing, the automatic
              creation of storage location data is permitted in the plant
              and for the movement type).
    There are 2 options to create batch data}:
           -  create the batches in the material master manually via
              function 'Create batch'.
           -  post the first goods receipt for the batches to the respective
              material.
    You can only post the various special stock segments via posting a goods
    receipt. An exception is special stock 'K' (vendor consignment). You
    must define a consignment price in the material master for this special
    stock using the 'Create vendor consignment' function before a goods
    receipt can be posted for this special stock.

  • 319- split Structured material into component

    HI all,
    You are splitting structured material into component by Movement type 319. Basically used in Retail, Now we have a scenario to split structured materrial into component at the time of  good receipt & 319 fullfill our requirement.. But problem is that we dont have SAP Retail.
    Please suggest without SAP Retail how can we use any customization.

    Dear,
    My question is related with Movement type 319 , which is used to Split Structured material into component ie,
    Suppose Structured material - x
    Created Bom X - contains Y&Z material
    When i do Good receipt using 319 only stock of bom materials will increased.
    But You required some Customization for Structured materials to split into components. You can do only if your using SAP Retail.
    We dont have Retail module. So without This feature is there any option in MM.

  • Drop ship line did not split, the material have partial receipts, can the PR and PO be canceled?

    hello,
    I need some help with this issue. We have a drop ship line that have 270 cartons in status awaiting receipt, but in the inventory already received 624 cartons.  The line of that sales order needs to be closed now, to invoice the customer. But the PR and PO looks like OPEN.
    I tried to manually split the line in the sales order. To have two lines; one with the 624 already received, and other one for the 96 cartons left. But an error message shows when i do this.
    The error its :  You are not allowed to split Order Line because:Line is released to purchasing
    I found in the ORDER ORGANIZER when i chek the Sales Order, the ORDER SOURSE LINE REFERENCE the last line (which suppose to be splitted with the reception of the material) have a number lower than the line before it.
    example: line 2.5 have OE_ORDER_LINES_ALL27231981  and line 2.4 OE_ORDER_LINES_ALL27232315
    Can somebody help me with this?
    i also found a bug in meta link but i think something can be done. bug 2281449.
    Thank you,
    Paloma Cadena

    We had similar issues in the past. We solved them by doing a mini customization.
    The customization created an short-text attachment of the type "Note to receiver" at the PR level. The attachment included the Sales order # and line#.
    This attachment flows from the PR to PO and is also available to the receiving clerk during receipt.
    However, once the PO is received, we did not transfer the information to onhand. I don't think one can unless the item was serialized or lot controlled.
    Hope this helps,
    Sandeep Gandhi
    Independent Techno-functional consultant

  • Batch Split for Material which are activated with serial number management

    Hello All,
    We have requirement where we want batch split to be mandatory during goods reciept with inbound delivery  for material which are serial number managed.
    Please let me know the possible solution to achive this requirement.
    Appreciate your quick response.
    BR,
    Tushar

    I have resolved this issue by myself. Check out the link where I have briefed how to resolve the issue using bapi BAPI_OUTB_DELIVERY_CHANGE.
    BAPI_OUTB_DELIVERY_CHANGE - Batch Splits don't work
    Regards,
    Senthil G.

  • How do I update standard cost for split valuation material?

    We are using split valuation on our maintenance material.  Maintenance material is held in an inventory account separate from our production material.  We have materials that are set up with a Parent material as variable, and child materials  which are NEW or REFURBISHED or CORE.
    The Child materials are set as standard cost.  Some of the standards are old.  Unlike our production materials, which have their cost standards on the Costing 2 tab of the material master, split valuation child parts have their costing on the Accounting 1 tab.
    I attempted to update a cost standard by loading a future price manually in the material master.   I was able to load a future price, but could not get it to release in CK24.
    I have been unsuccessful in finding a process or procedure that tells me how to update a child standard once is already exists.  There was one blog that said that the standards could only be released using CK24N if the quantity is zero.  I attemped to update costs on part with zero quantity on hand. This was also unsuccessful.
    I am looking for a process- ie 1) load a future cost using tcode XYZ, 2) Mark and release cost using tcode XYZ, 3) validate changed inventory value using tcode XYZ.
    Thank you in advance for your assistance.

    Hi Govind
    If your valuation variant reads MAP as the strategy sequence - Then average MAP will be taken... i.e. the MAP in the parent accounting view of the material will be taken
    However, if your strategy sequence is intended to look for info records, then follow the link given in the earlier reply
    Regards
    Ajay M

  • Billing Copy control-invoice split by material document

    Splitting the invoice based on the material Document(ekbe-belnr). Suppose i have 3 material documents for one Purchase order. Based on the 3 material documents, it shpould create  3 invoices. So for this i created a routine. Its for  billing document copy control. But my routine is combining all the material document quantities and it creating only one invoice but i required multiple invoices based on no of material document. i wrote code like this. Its urgent..
    FORM daten_kopieren_901.
      TABLES:  kna1.
      DATA : v_kunnr TYPE kunag,
             v_katr2 TYPE katr2,
             v_belnr TYPE ekbe-belnr,
             v_bewtp TYPE ekbe-bewtp.
      DATA: BEGIN OF it_zuk1,
                modul(3) VALUE '904',
                vtweg LIKE vbak-vtweg,
                spart LIKE vbak-spart,
                belnr LIKE ekbe-belnr,
                vgbel LIKE vbrp-vgbel,
            END OF it_zuk1.
      TYPES:BEGIN OF t_ekbe,
               belnr TYPE ekbe-belnr,
               bewtp TYPE ekbe-bewtp,
               flag  TYPE c,  "Rajiv
            END OF t_ekbe.
      TYPES:BEGIN OF t_vbap,
               vbeln TYPE vbap-vbeln,
               posnr TYPE vbap-posnr,
           END OF t_vbap.
      TYPES:BEGIN OF t_vbep,
                 banfn TYPE vbep-banfn,
              END OF t_vbep.
      TYPES:BEGIN OF t_eban,
                ebeln TYPE eban-ebeln,
                ebelp TYPE eban-ebelp,
            END OF t_eban.
      STATICS:i_ekbe TYPE STANDARD TABLE OF t_ekbe.
      DATA: wa_ekbe TYPE t_ekbe.
      DATA: i_vbap TYPE STANDARD TABLE OF t_vbap.
      DATA: i_vbep TYPE STANDARD TABLE OF t_vbep.
      DATA: i_eban TYPE STANDARD TABLE OF t_eban.
      SELECT vbeln posnr FROM vbap INTO TABLE i_vbap
                              WHERE vbeln = vbak-vbeln.
      IF sy-subrc = 0.
        SELECT banfn FROM vbep INTO TABLE i_vbep
                        FOR ALL ENTRIES IN i_vbap
                         WHERE vbeln = i_vbap-vbeln
                         AND   posnr = i_vbap-posnr.
      ENDIF.
      IF sy-subrc = 0.
        SELECT ebeln ebelp FROM eban INTO TABLE i_eban
                        FOR ALL ENTRIES IN i_vbep
                         WHERE banfn = i_vbep-banfn.
      ENDIF.
      IF sy-subrc = 0.
        SELECT belnr bewtp FROM ekbe INTO  TABLE i_ekbe
                  FOR ALL ENTRIES IN i_eban
                       WHERE ebeln = i_eban-ebeln
                       AND   ebelp = i_eban-ebelp.
    endif.
      LOOP AT i_ekbe INTO wa_ekbe WHERE flag NE 'X'.
        IF ( ( wa_ekbe-bewtp = 'E' ) OR  ( wa_ekbe-bewtp = 'R' ) OR
                                            ( wa_ekbe-bewtp = 'Q' ) ).
          it_zuk1-vtweg = vbak-vtweg.
          it_zuk1-spart = vbak-spart.
          it_zuk1-belnr = wa_ekbe-belnr.
          it_zuk1-vgbel = vbrp-vgbel.
          wa_ekbe-flag = 'X'.
          MODIFY i_ekbe FROM wa_ekbe TRANSPORTING flag.
          vbrk-zukri = it_zuk1.
          EXIT.
        ENDIF.
      ENDLOOP.
      REFRESH: i_vbap,i_vbep,i_eban,i_ekbe.
    ENDFORM.

    Hi Ramana,
    I'm afraid this is not possible. Correct me if I'm wrong: You have a TPO scenario in which you create a purchase order for a sales order item. This purchase order may have multiple GR? As billing is based on the sales order position (which is only one) there is no way to split this one position into multiple lines for each GR. This would only work if there is a 1:1 relation between sales order item and GR!
    Regards,
    John.

  • Split valuation / material costing

    Hi all
    I am valuating a raw material twice since in-house production( 50 INR) and external procurement(100 INR). Material code is same as usual. This material is used to make a fert material and is to be included in costing. If then, which valuation type will the system take?
    Yuvi.

    costing depends on the usage of the material with split valuation
    Eg . Material : AAA
    Inhouse material cost -- Rs 50 -valuation type :XXX
    External procurment - Rs 100-Valuation Type :YYY
    you are assembling this material AAA  and FERT is made
    Fert Material : CCC
    BBB  :inhouse machining cost -Rs 25.00
    costing of CCC:if you
    inhouse material then -> 50+25.00-75.00
    External procurement -100+25.00->125.00
    Hope it is clear
    G.Ganesh Kumar

  • Split valuation- material identification

    Hi, letus say we maintained grade1 price and grade 2 price thru split valuation for material x, say shaft. here material number and description is same for both grade materials. How to know which grade should be manufactured when the order comes from sales/ customer? Basically how to identify the material incases of issue to shop floor, receiving from shop floor or from vendor or to customer?

    When you activate spilt valuation for material then for posting inventory movement system will ask you to select the valuation type.
    If material is going to be procured from outside(Vendor) then while creating Purchase order you need to select the valuation type. Same will be considered at GR posting.
    At Issued stage also you need to select the stock from valuation type.
    Regards,
    Ajay Nikte.