SPRUNConversion and historic conversion

Hi All,
e are using the SPRUNCONVERSION stored procedure for the historic conversion.
We assign an historic currency rate to each single entity but when the SPRUNCONVERSION runs it converts only at the currency rate of the default entity.
It works in BO PC 7.0 MS, we have problem in BO BP 7.5 MS with the same business rules.
Environment
Single Server - 64bit
BPC Version: 7.5 SP4
SQL Server: 2008 SP2
Thanks for help
Simone

Hello again,
I've you any idea about the meaning of this message on SPRUNCONSO ?:
SPRunConso Version 2.07
ERROR CSD-150 Problem extracting Data : C_REPART
ERROR CSD-160 Problem extracting Data : C_CONSO
It looks a little bit strange as it concerns only some groups and the top group with all the companies consolidated works fine ?
for ie :
OK :
Global company
|__A method 86 - POWN 100% - PGROUP 1
|__B method 86 - POWN 100% - PGROUP 1
|__C method 86 - POWN 100% - PGROUP 1
NOK with the message above :
Sub_conso
|__A method 86 - POWN 100% - PGROUP 1
|__B method 86 - POWN 100% - PGROUP 1
Thank again
Pascal

Similar Messages

  • UCCX 7.0.1SR5 to 8.0 upgrade while also adding LDAP integration for CUCM - what happens to agents and Historical Reporting data?

    Current State:
    •    I have a customer running CUCM 6.1 and UCCX 7.01SR5.  Currently their CUCM is *NOT* LDAP integrated and using local accounts only.  UCCX is AXL integrated to CUCM as usual and is pulling users from CUCM and using CUCM for login validation for CAD.
    •    The local user accounts in CUCM currently match the naming format in active directory (John Smith in CUCM is jsmith and John Smith is jsmith in AD)
    Goal:
    •    Upgrade software versions and migrate to new hardware for UCCX
    •    LDAP integrate the CUCM users
    Desired Future State and Proposed Upgrade Method
    Using the UCCX Pre Upgrade Tool (PUT), backup the current UCCX 7.01 server. 
    Then during a weekend maintenance window……
    •    Upgrade the CUCM cluster from 6.1 to 8.0 in 2 step process
    •    Integrate the CUCM cluster to corporate active directory (LDAP) - sync the same users that were present before, associate with physical phones, select the same ACD/UCCX line under the users settings as before
    •    Then build UCCX 8.0 server on new hardware and stop at the initial setup stage
    •    Restore the data from the UCCX PUT tool
    •    Continue setup per documentation
    At this point does UCCX see these agents as the same as they were before?
    Is the historical reporting data the same with regards to agent John Smith (local CUCM user) from last week and agent John Smith (LDAP imported CUCM user) from this week ?
    I have the feeling that UCCX will see the agents as different almost as if there is a unique identifier that's used in addition to the simple user name.
    We can simplify this question along these lines
    Starting at the beginning with CUCM 6.1 (local users) and UCCX 7.01.  Let's say the customer decided to LDAP integrate the CUCM users and not upgrade any software. 
    If I follow the same steps with re-associating the users to devices and selecting the ACD/UCCX extension, what happens? 
    I would guess that UCCX would see all the users it knew about get deleted (making them inactive agents) and the see a whole group of new agents get created.
    What would historical reporting show in this case?  A set of old agents and a set of new agents treated differently?
    Has anyone run into this before?
    Is my goal possible while keeping the agent configuration and HR data as it was before?

    I was doing some more research looking at the DB schema for UCCX 8.
    Looking at the Resource table in UCCX, it looks like there is primary key that represents each user.
    My question, is this key replicated from CUCM or created locally when the user is imported into UCCX?
    How does UCCX determine if user account jsmith in CUCM, when it’s a local account, is different than user account jsmith in CUCM that is LDAP imported?
    Would it be possible (with TAC's help most likely) to edit this field back to the previous values so that AQM and historical reporting would think the user accounts are the same?
    Database table name: Resource
    The Unified CCX system creates a new record in the Resource table when the Unified CCX system retrieves agent information from the Unified CM.
    A Resource record contains information about the resource (agent). One such record exists for each active and inactive resource. When a resource is deleted, the old record is flagged as inactive; when a resource is updated, a new record is created and the old one is flagged as inactive.

  • Combined Upgrade and Unicode conversion of Sap 4.6C to ECC6.0

    Hello all,
    my project team intends to carry out a combined upgrade and unicode conversion of an SAP ERP 4.6C system with MDMP to ECC6.0 (no enhancement package). The system is running on Oracle 10.2.
    In preparation for this upgrade, I have gone through the SAP notes 928729, 54801.
    We need to get a rough estimate of the entire downtime so as to alert our end users. From the CU&UC documentation in 928729, I read up note 857081. However the program in this note cannot be used to estimate the downtime as my system is < SAP netweaver 6.20.
    Is there any other SAP note or tool or program that I can use to estimate the downtime for the entire CU&UC? Thanks a lot!

    Hi,
    Combined upgrade depend upon number of factors like database size, resources on the server and optimization. In order to get idea of how much downtime, it will take, I would suggest you to do combined upgrade and unicode conversion on sandbox system which should be the replica of your production system. And try to optimize it. From there you can get approx. downtime required.
    Also, please read combined upgrade and unicode conversion guides on  http://service.sap.com/unicode@sap
    Thanks
    Sunny

  • Subnodes and content conversion in FTP-Adapter

    Hello experts,
    the scenaria is IDOC -> XI -> FTP and content conversion is used.
    The structure of the IDOC is like:
    <head></head>
    <pos>
          <subnode></subnode>
    </pos>
    <pos>
           <subnode></subnode>
    </pos>
    There can be 1 ore more positions.
    We mapped this to a XML-structure according to help.sap.com
    http://help.sap.com/saphelp_nw04/helpdata/en/d2/bab440c97f3716e10000000a155106/frameset.htm
    As we are not allowed to use subnodes all segments have to be on one level.
    How can I map to a structure (with 1 OR MORE positions) like
    <head></head>
    <pos></pos>
    <subnode></subnode>
    <pos></pos>
    <subnode></subnode>
    At the moment we are only able to map to:
    <head></head>
    <pos></pos>
    <pos></pos>
    <subnode></subnode>
    <subnode></subnode>
    In the datatype I can't specify that a position always is followed by a subnode ... i only can use remove context in mapping and put all subnodes beneath the positions. Is there any possibility in graphical mapping to change this?
    Thanks and regards,
    David

    Ok, what can I do, to describe a data typs with variable amount of pos' FOLLOWED by subnodes?
    Or is it possible to create an item line with pos and subnode and remove this line later (move everything to first level).
    <item>
        <pos>
        <subnode>
    </item>
    <item>
        <pos>
        <subnode>
    </item>
    <item>
        <pos>
        <subnode>
    </item>
    MAP TO:
    <pos>
    <subnode>
    <pos>
    <subnode>
    <pos>
    <subnode>
    I can't create a data type like this...
    EDIT:
    Remember, there can be documents with 1 or many positions... and the fieldname always is the same.... the datatype definition doesn't acceppt duplicate fieldnames and fields that are not in a defined sequence.
    Edited by: David Claes on Jul 10, 2008 2:09 PM
    Edited by: David Claes on Jul 10, 2008 2:11 PM

  • 4.7EEx1.10 to ECC6.0 upgrade and Unicode conversion

    Hi Experts,
    We are going to initiate the upgrade from next month onwards. Subsequently i have started preparing the plan and strategy for the same.
    As our current setup is 4.7EEx110/Win 2003 R2-64 bit/Oracle 10.2.0.4.0 (Non unicode). And we have recently migrated on to this setup from WIn2k 32 bit. Also the current hardware is Unicode compatible.
    With respect to strategy for achieving this Upgrade and Unicode conversion, i am planning as follows.
    Step 1) Perform Unicode conversion on the current landscape (Both Export/import on the same servers)
    Step 2) Setup Temporary landscape as part of Dual maintenance strategy and migrate data from the current systems to temporary systems using backup/restore method.
    Step 3) Perform the SAP version upgrade on the current landscape and setup transport routes from temporary to current landscape in order to keep it in sync
    Step 4) after successful upgrade, decommission the temporary landscape
    Please provide your suggestions and valuable advices if there is anything wrong with my strategy and execution plan.
    Regards,
    Dheeraj

    Hi,
    Thanks. As i have already referred these notes as i am seeking advise with respect to my upgrade approach.
    However i have planned to perform in the following manner.
    1) Refresh Sandbox with Prod data and perform Upgrade to ECC6.0 EHP5 & subsequently Unicode conversion on the same server (Since both export & Import has to perform on the same hardware as we have recently migrated on this hardware which is Unicode compatible)
    2) Setup temporary landscape for DEv & QAs and establish transport connection to Production system in order to move urgent changes
    3) Keep a track of the changes which have transported during upgrade phase so that the same can be implemented in the upgraded systems i.e. Dev & QAS
    4) After Sandbox Migration and signoff, we will perform Dev & QAS upgrade & unicode conversion on the same hardware (Note: Since these are running on VMware can we export the data from the upgraded system and import on to a new VM?)
    5) Plan for production cutover and Upgrade the Prod system to ECC6.0 Ehp5 and then Unicode conversion. As i am planning to perform upgrade over the weekend and then Unicode conversion activity in the next weekend (Is it a right way?)
    My Production setup: DB on one Physical host and CI on separate Virtual host
    6) After the stabilization phase, we are planning for OS & DB upgrade as follows:
          a) Windows upgrade from 2003 R2 to Windows 2008 R2
          b) Oracle Upgrade from 10.2 to 11.2
    If anyone thinks that there is anything wrong with my above approach and need changes then please revert.
    I have one more doubt as I am going to upgrade 4.7EEx110 (WAS 620, Basis SP64) to ECC6.0 EHp5.As I presume that I can straight away upgrade from the current version to ECC6.0 Ehp5 without installing EHP. Kindly confirm
    Thanks

  • I recently subscribed to Adobe ExportPDF and tried to convert a PDF file to MS Word.  So far,  after many tries,  I get soe type of error and the conversion fails.  Please advise?

    I recently subscribed to Adobe ExportPDF and tried to convert a PDF file to MS Word.  So far,  after many tries,  I get soe type of error and the conversion fails.  Please advise?

    Hi there,
    It sounds like there may be an issue with the quality of the PDF. Not all PDFs are created equal, and especially those created from scanned documents can be problematic if the scan quality isn't the best. Is there a dark background on the PDF, or stray marks or smudges?
    You can try converting with OCR disabled at outlined in this document: How to disable Optical Character Recognition (O... | Adobe Community. But, while that's a good test to find out where the problem lies, you'll end up with a Word document that isn't editable, so it's not an optimal solution.
    Please let us know how it goes.
    Best,
    Sara

  • Combined Upgrade and Unicode conversion question

    Hello Everyone,
    I will be performing combined Upgrade and Unicode conversion soon. Currently i have run Prepare and do not have any errors.
    I have already run SPUMG consistency check and i do not have any errors there. Since this is Combined Upgrade and unicode conversion according to guide i do not need to do the Nametab conversion right now. But now if i go this place:
    SPUMG -> Status -> Additional Information  , i see a status with red for Unicode nametabs are not consistent or not up-to-date.
    Please let me know if i can ignore this step and do the nametab conversion after upgrade is complete and before unicode conversion.
    Thanks,
    FBK

    Please follow the instructions from the guides.
    The Unicode nametabs will be generated automatically during the upgrade.
    An additional check is integrated into the final preparation steps in the target releases.
    Regards,
    Ronald

  • Cost and/or Conversion Rates are missing for some planning resources

    Hi,
    In Workplan of projects, we are facing a issue "Cost and/or Conversion Rates are missing for some planning resources". even though the schedules for the project WP is defined.
    Any inputs on this is highly apprciated. Thanks !!!
    Regards,
    Pallavi

    Did you check the Cost for all the Planned Workplan Budget Lines. Generally, this type of error comes when the Quantity is defined but the Cost is missing for any Line. Find that Planned Workplan Budget Lines and enter the Cost for them and save it.
    I hope it may help you.
    Regards,
    Khan.

  • LineChart with current and historical data daily report

    Hi all,
    I'm new on BAM and I want to know if it is possible to define a LineChart showing information about today and the 30 last days.
    Is it possible using two dataobjects, one for today data and an external one provided by ODI with the contents for the last 30 days?
    Anyone can provide a sample?
    Thanks in advance.

    Hi,
    Both current and historical data are always stored within the same table. There is no option to create separate tables for each that are managed by OWM.
    However, you do have the option to use dbms_wm.PurgeTable which can be used to purge a set of data, and optionally store it in a archive table. But, after that is done the data is no longer under Workspace manager's control or the versioning environment. From the description that you gave, I am unsure if this would be sufficient to satisfy your requirements. I am guessing not, but wanted to make you aware of the functionality.
    Regards,
    Ben

  • SPRUNCONVERSION and SPRUNCONSO

    I experiment some troubles with the SPRUNCONVERSION and SPRUNCONSO stroreproc.
    SPRUNCONVERSION
    My time dimension is based on this structure :
    YYYY (level : year)
    |__SS (semester and level coded as quarter)
    |____QQ (quarter and level coded as month)
    When I run the process on the 2 last quarter of the year, it works fine (for all the years).
    But when I run it on the 2 first quarters, I get an error message :
    SPRunConversion Version 2.07
    ERROR FX-150 Problem IN Ownership
    Any idea why it doesn't work only for that specific quarters ?
    SPRUNCONSO
    I get the following error message :
    SPRunConso Version 2.07
    ERROR CSD-070 No Time Avalaible
    ERROR CSD-080 No Group Available
    I've checked :
    I've dataentry on datasrc's members coded as "I" in the datarsrc_Type property
    I've correct datasrc's members coded as "A" in in the datarsrc_Type property
    My ownership cube has values since the last period of the previous year
    the logfile dor sprunconso is correct (compared whith apshell)
    Business rules tables for elimation have been filled in.
    For the periods, data in ownership are correct. They're correctly displayed using the dynamic hierachic tool (esbumit)
    Groups members are coded as "G" in Groups (currency) dimension with a group_currency.
    Any idea ?
    Thanks a lot for your help

    Hello again,
    I've you any idea about the meaning of this message on SPRUNCONSO ?:
    SPRunConso Version 2.07
    ERROR CSD-150 Problem extracting Data : C_REPART
    ERROR CSD-160 Problem extracting Data : C_CONSO
    It looks a little bit strange as it concerns only some groups and the top group with all the companies consolidated works fine ?
    for ie :
    OK :
    Global company
    |__A method 86 - POWN 100% - PGROUP 1
    |__B method 86 - POWN 100% - PGROUP 1
    |__C method 86 - POWN 100% - PGROUP 1
    NOK with the message above :
    Sub_conso
    |__A method 86 - POWN 100% - PGROUP 1
    |__B method 86 - POWN 100% - PGROUP 1
    Thank again
    Pascal

  • Combined upgrade and Unicode conversion for ECC5 MDMP system

    Hello,
    We are planning to do Upgrade and Unicode conversion of ECC5 MDMP system to ECC6 EHP4 Unicode. We are adopting Combined upgrade and Unicode conversion strategy to minimise the downtime.
       In source version ECC5 we are in support pack level 6. Should we need to update the support pack to any target version to start with CU&UC or we can start with ECC5 with SP 6 itself.
    Since we cant afford more downtime for support pack update also, is it ok to start with upgrade and unicode conversion with current version.
    please advice.
    Regards
    Vinay

    Hello Vinay,
    please note that as a prerequisite the Basis SP should be accurate for an MDMP conversion.
    There is no MUST to have the latest Basis SP, but without you could have severe issues in SPUMG.
    On the application side, there are in most cases no hard requirements on the SP level.
    Best regards,
    Nils Buerckel
    SAP AG

  • Where is the Combined Upgrade and Unicode Conversion Guide

    Hi All
    Embarassing question time.
    I am after the Combined Upgrade and Unicode Conversion Guide for 4.7 to ERP 6.0, but can only find the Combined Upgrade and Unicode Conversion Guide for 46C to ERP 6.0.
    Can anyone advise where the 4.7 guide is.
    Thanks
    Sam

    Thank God SAP don't include it in the Install guide. The Install Guides are complex already. BTW if you need more info on unicode and its conversion go here
    https://service.sap.com/unicode@sap

  • Does OPC UA Shared Variable Server support Alarm&Event and historical access?

    OPC UA Shared Variable Server is a sample code and resides at https://decibel.ni.com/content/docs/DOC-25602
    It seems to support DSC <-> OPC-UA tag synchronization.
    But does it support alarm&event and historical access?
    I tried to open it with LabVIEW 2012, but lots of VIs were missing in the code, and I am not familiar with DSC and OPC-UA.

    Hi iCat,
    From your post on the example itself, a colleague of mine responded with: "This uses the OPC UA server included in DSC 2011 SP1 which does not include direct support for Alarms and Events. However you could use this idea to synchronize to shared variables on a Windows host which could have those abilities enabled."
    So it looks like it doesn't directly do this.
    Matt S.
    Industrial Communications Product Support Engineer
    National Instruments

  • What is automatic and manual conversion?

    Hi gurus,
    I am pretty new on this and would like to know as a functional consultant what is automatic and manual conversion. How do you do it?
    Thanks a bunch,
    JEss.

    Hi,
    Conversion is converting the legacy data from your old system to SAP system.  This can be done through SAP provided tools like LSMW (Legacy system migration workbench) and through BDC (Batch data conversion).  This would be called as automatic conversion.  In both the tools you first have to record the transaction for which you want to convert the data and then provide the data in excel or txt format.
    The Tcode for LSMW is LSMW and for BDC is SHDB.
    Manual conversion is actually keying in the data in the respective transactions.
    Shrikant

  • Re: SOP and Historic Sales Data

    Dear All
    Is it possible for the system to read it's historic sales data and create a forecast based on the trend?
    Thanks

    Hi Nadia,
    This is possible. But you have to maintain forecasting view in material master with proper values like period, forecast model and historical periods etc.
    The MRP type should be VV in material master MRP1 view.
    The historical "consumption data" of this material is mandatory.For new materisl forecasting also possible.
    You can do the forecasting from MP30 transaction or direct from forecasting view in Material master.
    If helpful rewards your points.
    Regards
    TAJUDDIN

Maybe you are looking for

  • Pages '08 - spelling in British English

    Hi, In Pages '08 when I open a word file I go to Inspector ---> Text ---> More ---> Language I change this to British English as the american one always brings up spelling errors. The problem is that the change sometimes doesn't stick. In any case ev

  • Importing jpg files from hard drive

    I am trying to import all my pictures into iphoto however am getting an error: Unreadable file, The following file cannot be imported. (import failed). The files I am importing are *.jpg files from various camera I have owned over 5 years. I have all

  • Need video in ppt - QT choppy

    I need to insert a 15 min. video in a powerpoint presentation. The iMovie works great but when I exported it "Movie to Quicktime Movie" with default settings, the qt playback is at times choppy. This is before and after inserting into PPT. Using 10.4

  • Oracle BI Publisher ERROR when trying to load XML Data

    Hi all, I use Oracle BI publisher to make layout for reports.When i try to insert xml data in word, error comes as: Microsoft Visual Basic Run time Error '459' Object or class does not support the set of events. can anybody guide me what modification

  • No audio and waveform redrawing issues in CC

    This is simple. Drop an MP3 directly from explorer to the timeline = no audio waveform and no audio at all! The only way to get it is to drag the file to the project panel. And sometimes when i zoom in / zoom out to the timeline waveforms tend to dis