SPUM4 Vocabulary

Dear All,
We are in the process of sap upgrade 4.6 C à ECC6.0 Combine Upgrade and Unicode Conversion (CU and UC).
The active languages in our system UK,CS,DE,EN,FR,HU,IT,DLA,PL,NL,NO,PT,SK, RU,ES,FI,SV. 
As per sap note 756535(SAP Vocabulary for Vocabulary Maintenance for SPUMG & SPUM4), we have auto assigned Vocabulary delivered by SAP.
And then as per sap note:  871541(Frequently used text patterns), we have imported SAP delivered frequently used text patterns extracted from 11 European and Asian languages.
Also after assigning all vocabulary provided by sap, there are still 65000+ words which are not covered by the any of the provided language vocabulary.
Is there any sap standard way/notes/guides to handle this situation and assign language for remaining 65000 words as this information is not provided in the guide.
Thanks & Regards
Rahul

Hi Rahul,
There are various methods to maintain the vocabulary with the correct language keys (which are also listed in the CU&UC guide):
a. Import of existing vocabulary (see SAP note 756535)
b. Language dependent scan (optional - would skip it for PRD)
c. Creation and use of hints (see SAP Note 1034188)
d. Statistical methods based on technical attributes (not available for 4.6c)
e. Statistical methods (see SAP note 756534 / not available for 4.6c)
f. Use of vocabulary patterns (see SAP note 871541)
g. Manual Maintenance (made by native speakers)
For all automatic or semi-automatic methods it is important to check the result with native speakers. This is especially valid for methods b) u2013 f). The manual maintenance should be executed by native speakers.
The sequence of the methods listed above can be used as a hint how to do sequencing during the actual maintenance (of course this is just a proposal - variations are possible). It is pretty clear, that e.g. the manual maintenance should be minimized and therefore should be executed at the end of the list. On the other hand side, existing vocabulary (SAP vocabulary and / or customer vocabulary from earlier scans) should be added at the beginning of the vocabulary maintenance.
For some of the methods described in b. to f. it is possible that the results are not as expected and words are assigned wrongly. Therefore customers need to check the outcome after each step and it is advisable to decide whether to skip the step or make use of it.
In your case it might be useful to have a detailed look into point c: Hint creation
Vocabulary words caused by Company Code dependent tables can be usually assigned to a specific language via company code. Therefore in case of many vocabulary words from this type of tables, it might be useful to create according hints. SAP Note 1034188 lists some more fields (next to company code BUKRS), which are capable to be used for assigning the language via hints. However it needs to be verified with application experts that the selected attributes can be used properly to assign a code page.
Usually it makes sense to create hints only for tables, which contribute a high number of words in the vocabulary. This can be identified via report UMG_VOCABULARY_STATISTIC or UM4_VOCABULARY_STATISTIC
It is recommended to execute UMG_DISTRIBUTE_ASSIGNED_LANGS (see SAP Note 938374) after using the hints.
Best regards,
Nils Buerckel
SAP AG

Similar Messages

  • MDMP SPUM4 Vocabulary Assignment, necessary before upgrade?

    I have a question about SPUM4 when doing an Combined UC&UPG on a 46c system.
    As per the manual you have to run all the scans to complete SPUM4 in Prepare before starting the upgrade.
    But do you have to perform the language assignment of the vocabulary list before the upgrade?
    Is it possible to do this using SPUMG after the upgrade?
    Basically I am being pushed for time and the project team is not ready to do the language assignments during Prepare. So it would be easier for me if I could do the scans and collate all the information required then perform the upgrade. Once the upgrade is complete, then allow the upgrade team to assign the languages post upgrade using the SPUMG transaction.
    I am right in thinking that the vocabulary list has to be completely processed before conversion, this is because the words will use the global fallback which may not be right?
    Thanks
    Chris

    I've done the CU&UC the last year, and if i remember ok the SPUM4 is before the upgrade,......and after the upgrade there is the SPUMG,........
    You can search more info in other posts of the 2008 year with my problems in CU&UC.
    Regards,
    Alfredo.

  • MDMP : Language assignmet Table RFDT Field Position 0

    Hello Team,
    During  the Language assignmet  we have notice that there are few Tables are identified in Field Position 0.
    For example : In SPUM4 Vocabulary Table RFDT have  words.
    For the words in Table RFDT are identified in Filed 0 .
    I would like to know how to proceed with the words having Filed 0 in Hint Management.
    Regards,
    Santosh

    Hi Santosh,
    RFDT is an INDX type table. I assume the words you are referring to are caused by the content of the CLUSTD field.
    Looking at the structure of the table, I am unable to find an appropriate field for a hint (however maybe someone with more application knowledge might have a different opinion).
    If there is no hint possible (and all other automatic assignment do not work), it is necessary to do a manual assignment.
    Best regards,
    Nils Buerckel
    SAP AG

  • SPUM4 Issues before upgrade to ECC6.0

    Hi All,
    I am trying to do vocabulary check in SPUM4 before upgrade for ECC6.0. I have 3 Development clients 010,100,110.
    My issue is that, I am not sure in which client I should do this vocabulary check. Is it in 000 or individual clients.I got this doubt because , I see the same texts in all the clients.
    Can anybody help me in resolving this issue.
    Thanks

    Chandra,
    We did a similar upgrade 2 years ago - 4.7 to ECC 6.0.  We had also implemented cash managment on 4.7.  The configuration for cash management in 6.0 is the same as in 4.7, so we did not have to make any changes to that.  Also, I looked back at our upgrade testing documentation and we did not have any issues related to cash management. 
    Regards,
    Shannon

  • SPUM4 in 4.6C MDMP using CU&UC to upgrade

    Hi Experts,
    upgrading from 4.6C MDMP to ECC 6.0 unicode I have ran SPUM4 in 4.6C from scan1 (CC) through scan7 (INDX Repair).
    Now I would like to know what is the correct sequence and what is the impact if I run "Update Worklist" now.
    I know I will get all tables which have been changed / added since CC check.
    If I reset those tables and run CC again will I lose vocabulary entries which have been added by scan2 through scan4 for these tables?
    If that is the case I guess I have to run all the scans for these tables again and if new words are found they will be added to the vocabulary as usual. Scanning big cluster tables like CDCLS (even if split) will take quite some time which is my concern.
    Another thing: until when am I able to run SPUM4 Update Worklist? Until I start Online Upgrade? Or during online part right before offline part?
    Thanks for your answers!
    Regards,
    Chris

    Hi,
    I think you have to be more specific here, otherwise feedback will be low.
    I am copying the MDMP tasks here from the Guide:
    2.3 MDMP Preconversion     
    2.3.1 Manually Assign the Code Page for an Entire Table     
    2.3.2 Creating the Vocabulary     
    2.3.2.1 Scan 2: Tables without Language Information     
    2.3.2.2 Scan 3: Tables with Ambiguous Language Information     
    2.3.2.3 Edit Invalid Language Keys     
    2.3.2.4 INDX-type Tables     
    2.3.2.5 Scan 4: INDX Analysis     
    2.3.3 Update Database Statistics     
    2.3.4 Maintaining the Vocabulary     
    2.3.4.1 Assignment Options     
    2.3.4.2 Vocabulary Transfer     
    2.3.4.3 Scan 5: Tables with Language Information     
    2.3.4.4 Hint Management     
    2.3.4.5 Manually Assign Language     
    2.3.5 Scan 6: Reprocess     
    2.3.5.1 Reprocess Log     
    2.3.6 Scan 7: INDX Repair     
    2.3.6.1 INDX Log     
    2.3.7 Resolving Collisions     
    These are basically the tasks you have to do for all systems (with reusage of results from former conversions).
    Please specify, which step is confusing.
    Maybe the attachment of SAP note 1037613 helps you to understand the general concept of an MDMP conversion.
    Best regards,
    Nils Buerckel
    SAP AG

  • Vocabulary List in 4.6c

    HI Gurus,
    Please tell how to get the entire vocabulary list in 4.6c system with using the spum4 transaction.
    Thanks in advance
    Regards
    Rahul Jain

    Where u want to export Vocabulary
    Excel or Database
    Two different ways..
    Export UM4% tables and export in Database --> but with some limitations and restrictions.
    Excel import is not possible if vocabulary is large enough.. Use export to ACCESS database.
    Best Regards
    Deepak

  • MDMP 46C Combined UC/UPG, vocabulary assignment required pre-upgrade?

    I have a question about SPUM4 when doing an Combined UC&UPG on a 46c system.
    As per the manual you have to run all the scans to complete SPUM4 in Prepare before starting the upgrade.
    But do you have to perform the language assignment of the vocabulary list before the upgrade?
    Is it possible to do this using SPUMG after the upgrade?
    Basically I am being pushed for time and the project team is not ready to do the language assignments during Prepare. So it would be easier for me if I could do the scans and collate all the information required then perform the upgrade. Once the upgrade is complete, then allow the upgrade team to assign the languages post upgrade using the SPUMG transaction.
    I am right in thinking that the vocabulary list has to be completely processed before conversion, this is because the words will use the global fallback which may not be right?
    Thanks
    Chris

    Hi Chris,
    you have to do the vocabulary assignment in the SPUM4 environment (on 4.6c), if you decide to use CU&UC. In CU&UC it does not make sense to do the assignment after the upgrade.
    In case you go for TU&UC, you have to do the upgrade first and then do the vocabulary assignment.
    Regarding vocabulary maintenance:
    It would be possible to even leave ALL language fields empty in the vocab and go on with the scans. However this will probably produce millions of entries in the reprocess logs (after the reprocess scan), which cannot be handled. The same will be valid for transaction SUMG, which needs to be executed after the conversion (see UCG). This will result in a completely meaningless test for the SPUM4/SUMG.
    If your scope for this test is 100% concentrated on export / import downtime, then this might make sense. However if you are looking for a complete CU&UC test, this does not make sense.
    On the other hand side, there are only a few customers who really manage to maintain the vocab 100% - so a small percentage of unassigned words is usually left over. But the goal should be, to get this as low as possible !
    Normally in the first trial, the number of the unassigned words in the vocab can be relatively high. But the result of the reprocess scan can be used to assign additional words in the vocab (and rerun the reprocess scan after additional maintenance).
    Of course this will take time ! But if you want to avoid problems with many reprocess logs and repair logs, I would recommend to spend some time on maintenance of the vocab.
    What happens, if a word is not assigned in the vocab ?
    1) It will produce at least one (probably multiple) reprocess logs
    2) R3load will use the fallback code page for the conversion of one or multple entries and it will write a message in the according xml-file
    3) In SUMG, the according entries (again one or multiple) will show up in the manual repair
    Best regards,
    Nils Buerckel
    Solution Management
    Globalization Services
    SAP AG

  • MDMP UC/UPG, Vocabulary Assignment completion pre-upgrade?

    I have a question about SPUM4 when doing an Combined UC&UPG on a 46c system.
    As per the manual you have to run all the scans to complete SPUM4 in Prepare before starting the upgrade.
    But do you have to perform the language assignment of the vocabulary list before the upgrade?
    Is it possible to do this using SPUMG after the upgrade?
    Basically I am being pushed for time and the project team is not ready to do the language assignments during Prepare. So it would be easier for me if I could do the scans and collate all the information required then perform the upgrade. Once the upgrade is complete, then allow the upgrade team to assign the languages post upgrade using the SPUMG transaction.
    I am right in thinking that the vocabulary list has to be completely processed before conversion, this is because the words will use the global fallback which may not be right?
    Thanks
    Chris

    Hi Chris,
    I don't recommend to continue with the upgrade unless your data has a minimum amount of characters which are outside of the fallback code page. As a final step of the preconversion and during the export of the database, SAP will write reprocess logs for each record which has no valid language/codepage assignment. You can maintain the reprocess logs after the upgrade in transaction SUMG to convert the data. There is no option to maintain the vocabulary after the upgrade in the unicode system. The vocabulary is only used during the export of the database to convert the data. After the upgrade, you can only convert the table records one by one. This can be a lot of work and should be completed during the downtime for end-users.
    I'm the project leader for a similar project (4.6c MDMP > ECC6.0 Unicode). We plan to go live in ~8 weeks. We use codepages 1100, 8300 and 8400.
    Best regards,
    Michael

  • Stuck with SPUM4 in ERP 6.0 Upgrade

    Dear All,
    We are doing a ERP 6.0 Upgrade:
    System Details: SAP 4.6C Oracle 10G on HP UX with MDMP (9 Languages installed)
    Completed Preapre and started with SAPUp, and we are stuck with SPUM4 stage.
    Consistancy check is all green, then we proceed with remaining scan and for few big tables we were getting job canceled so we deleted the contects of the table and continue with the scanning jobs.
    All scanning completed with some vocablury warnings but still SPUM4 status is not getting green. I checked all the requirments all jobs completed no job in running scheduled or released status.
    I have already gone throuhg the post from SDN regarding but nothing is working for me.
    If I delete the contents of thetable I have to ren this whole consistancy and remaining scans again?
    Do I missing something here?
    Regards
    Shailesh

    hi,
    there're many changes since ERP 5.0
    http://help.sap.com/saphelp_erp2005vp/helpdata/en/e2/f16940c3c7bf49e10000000a1550b0/frameset.htm
    Have you tried trx <b>FS10</b>
    pls reward useful answers
    thank you
    A.
    Message was edited by: Andreas Mann

  • Vocabulary not getting executed for EDI 855 data

    Hello,
    I am trying to pull data from EDI file using vocabulary. But it's not returning any value. 
    xpath selector - 
    /*[local-name()='X12_00401_855' and namespace-uri()='http://schemas.microsoft.com/BizTalk/EDI/X12/2006']/*[local-name()='N1Loop1' and namespace-uri()='http://schemas.microsoft.com/BizTalk/EDI/X12/2006']/*[local-name()='N1' and namespace-uri()='http://schemas.microsoft.com/BizTalk/EDI/X12/2006'][*[local-name()='N101'
    and namespace-uri()='']/text()='ST']
    xpath field -
    *[local-name()='N104' and namespace-uri()='']/text()
    Can anybody help me on this ? 

    No error message. But after I realized that I am not executing instruction loader policy before the rule that uses the vocabulary, then I created instruction loader policy to set the document type for 855 schema.
    But that policy is throwing an exception now. "An exception occurred while executing the policy"

  • Nokia X3 Vocabulary Problem

    hii evry1..
    i bought nokia X3-00 mbl 1month back(nov 3rd)...
    when i went to nearest nokia care ,they updated my mbl s/w.. nw my mbl s/w version z v08.54....
    cmng 2 point.. my prblm z wen im typing text its automatically gng to chinese lang.. wen im selcting dictionary,,its saying "vocabulary files not availble"... wt to do nw??? plz help me...
    b4 updating s/w mbl worked superb..and it supports telugu lang too...
    after updating only the prblm started... plz plz help me ... thanks in advance..

    Menu-->Messaging-->Create Message-->Message-->Options-->Writing Language-->... select the language..
    ...and can you provide more details regarding the Dictionary issue.. I can not see any  such application on my Nokia X3... Did you install that yourself? If so you may have to re-install the same..
    --------------------------------------------------​--------------------------------------------------------​--------------------------------------------------​--If you find this helpful, pl. hit the White Star in Green Box...

  • SPUM4 not doing anything

    Hi,
    I'm doing an upgrade from 46C to ECC6, switching to unicode from a MDMP system. I've finished the prepare and I'm trying to run SPUM4. I've initialized the language list, all the tables are in initial status. When I select a group of tables and schedule a job, the job runs but the records remain in initial status. Did I miss a step?
    Vicki

    leave it plugged in to charge for a couple of hours and see what happens.
    JGG

  • MDMP unicode conversion - Vocabulary maintenace

    Hello,
              W have upgraded 4.5B MDMP system to ECC4 EHP4 and now we are in process of unicode conversion.
    please advice on as specified below.
    In SPUMG Scan process, we have completed the following scans:
    a) Tables without language Info
    b) Tables with Ambiguous language Info
    c) Indx Analysis
    For maintaining vocabulary  we have implemented notes 756534 &  756535, 871541. and Tables with language are also scanned. While handling vocabulary the system has displays 539158 with duplicates and 189314 when duplicates are discarded, which doesnot assigened any languages. We have 9 acive languages.
    As per Unicode conversion document i left out with only 2 more option a) HInt management b) Manual assignment
    How to handle this? is this a normal situation or any correction can be done?
    Thanks and Regards
    Vinay

    Hi Vinay,
    This Thread belongs to the Unicode forum:
    Internationalization and Unicode
    In my opinion one of the best and most efficient possibility to reduce the number of words
    is to make use of hints. Please follow the  Unicode Conversion Guide and SAP note 1034188.
    Application colleagues should be contacted in order to find proper hints.
    Please also note that report umg_vocabulary_statistic or um4_vocabulary_statistic is the best tool to evaluate tables for hint processing.
    And the rest of the vocab, which can not be assigned by the hints method or by the SAP notes you mentioned, need to be assigned by native speakers (manual effort !).
    As you can see, SPUMG is NOT just a tool to be executed by Basis staff.
    It needs in deed collaboration between Basis, Application and native speakers.
    And it should be clear that the duration of the scans can be quite high - therefore a trial & error approach will take time (especially for large systems).
    Best regards,
    Nils Buerckel
    SAP AG

  • Unicode Preconversion - SPUM4 Issue

    SPUM4  - 
    We are performing Preconversion : MDMP -> Unicode . In SPUM4 i have
    completed the consistency check however i am unable to perform any
    other scan . I choose different tab i.e Table without language info and
    choose worker job , the job finishes in 2 sec and the scan has not
    completed .
    Steps for the Reconstruction 
    Upgrade Sandbox - Spum4 - Tables with Language Info - Worker Job -
    Monitor - Nothing . It does not scan anything . Simliar with other tabs
    in there except consistency check .

    Hello Harsh,
    There is an error in in consistentcy check pending.
    To view the table in error, on consistency check scans, Click on Selection ->Status -->>E (error)
    Resolve this error of table(s)
    You able to proceed further to other scans..
    Let me know if any issue further..
    Amit Lal
    SAP Consultant - I18N
    [email protected]

  • UM4 371: SPUM4 preparations did not finish completely.

    In SPUN4, what should i do to ensure the status changes to RED. I'm following the CU&UC_SP15 document to run the SPUM4 for pre conversion before i start the upgrade?
    I've done
    Restart of Scan, Imported the .dat file from the note 996990 and updated in the screen.
    Changed the settings and saved.
    Intialize Worklist
    Checked the jobs. Master job triggred few other jobs. Finally tab:Selection , select for Errors:E and enter. Nothing is displayed.
    When i click the Exception list, huge list of tables are displayed.
    Here i'm stuck. if i check the status, it is in red. Not sure what exactly i need to do here in SPUM4.
    Is there any issues? pls share ur expertise.
    regards
    RGC

    Hi,
    Now two tables are in error in SPUM4 consistency check. M_VMCF & M_VMVA. i check these two tables in SE11 for db objects and runtime check. No inconsistency found.
    If i reset the scan for these two tables and update the worklist still it is failing.
    Also i note that UM4_PMIG_MASTER_JOB is failed with dump error SAPSQL_STMNT_TOO_LARGE in job log.
    Need some help to fix this issue and proceed to SAPup phase...
    Any idea?
    rgds
    RGC

Maybe you are looking for

  • Color Conversion from Spot to CMYK

    How are you able to convert spot colors to the correct color bridge numbers in when rasterizing an eps file? It appears to be driven by color settings, but no matter what is selected, the numbers are never correct.

  • Technical Communication Suite Download

    I have made several attempts (since Jan. 15) to receive the trial copy of TCS.  Has anyone received the trail DVD?  I have made serveral calls to Adobe and no one there seems to understand anything.  I have filled out requests to receive the trial DV

  • Crashing when opening file browser

    When ever i try to send a file or chang my profile picture, it wont open the file browser. Instead sykpe crashes everytime. Help?

  • OWB Error when deploying objects

    Hi we recently upgraded OWB 10.2.0.2 to 10.2.0.3 and now I am getting the following error when I deploy objects. Our platform is on solaris and oracle 10.2 and we are NOT using RAC. Error ORA-29532: Java call terminated by uncaught Java exception: ja

  • HT3775 how to play avi on mac ?

    hi, any idea how to play avi on mac?